HomeMy WebLinkAbout08-050 CITY OF LAKEVILLE
RESOLUTION NO. os-5o
RESOLUTION AUTHORIZING PREPARATION OF
FEASIBILITY REPORT AND DESIGN
205TH STREET CHANNEL STABILIZAT/ON
CfTY IMPROVEMENT PROJECT 07-16
WHEREAS, a channel located on a city-owned outlot north of 205t" Street, northwest of
Jupiter Way, and southeast of Kensington Way is progressively eroding, carrying sediment laden
water from a 531 acre watershed downstream into the backwaters of Lake Marion, and
WHEREAS, the Vermillion River Watershed Joint Powers Organization has entered into a
Joint Powers Agreement with the City to cost share at the rate of 50% of the total cost, not to
exceed $12,500, for a Feasibility Study and Design. of the 205t" Street Channel Stabilization;
NOW, THEREFORE, LET IT BE RESOLVED, by the City Council of the City of Lakeville:
Barr Engineering. Company is hereby authorized to prepare an Engineering
Feasibility Study and Design for the 205t" Street Channel Stabilization, City
Improvement Project 07-16, as outlined in their February 28, 2008 proposal
APPROVED AND ADOPTED this 7t" day of April, 2008.
CITY ~ AKEVILLE
By:
o y Dahl, Mayor
ATTEST:
Char ene Frie s, City Clerk