Loading...
HomeMy WebLinkAbout08-050 CITY OF LAKEVILLE RESOLUTION NO. os-5o RESOLUTION AUTHORIZING PREPARATION OF FEASIBILITY REPORT AND DESIGN 205TH STREET CHANNEL STABILIZAT/ON CfTY IMPROVEMENT PROJECT 07-16 WHEREAS, a channel located on a city-owned outlot north of 205t" Street, northwest of Jupiter Way, and southeast of Kensington Way is progressively eroding, carrying sediment laden water from a 531 acre watershed downstream into the backwaters of Lake Marion, and WHEREAS, the Vermillion River Watershed Joint Powers Organization has entered into a Joint Powers Agreement with the City to cost share at the rate of 50% of the total cost, not to exceed $12,500, for a Feasibility Study and Design. of the 205t" Street Channel Stabilization; NOW, THEREFORE, LET IT BE RESOLVED, by the City Council of the City of Lakeville: Barr Engineering. Company is hereby authorized to prepare an Engineering Feasibility Study and Design for the 205t" Street Channel Stabilization, City Improvement Project 07-16, as outlined in their February 28, 2008 proposal APPROVED AND ADOPTED this 7t" day of April, 2008. CITY ~ AKEVILLE By: o y Dahl, Mayor ATTEST: Char ene Frie s, City Clerk