Loading...
HomeMy WebLinkAboutItem 06.hDate: 17 January 2012 Item No. RESOLUTION CREATING A PRIORITIZED BRIDGE REPLACEMENT LIST Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution creating a prioritized bridge replacement list. Overview Bridge safety inspections are conducted every two years on bridges (or every four years for bridges classified as culverts) located within City right -of -way as required by Minnesota Statutes and Minnesota Rules, The inspections are used to determine the condition of each bridge and to create a bridge sufficiency rating; this information is used to establish funding eligibility and to prioritize replacement schedules. The City's bridge safety inspections were conducted in October of 2011 by a certified bridge safety inspector from WSB and Associates. The inspection of Bridge L5772, located at the intersection of Gannon Avenue and 168 Street and spanning North Creek, revealed continued deterioration. The new sufficiency rating qualifies this bridge for state bridge bonds and eligibility for the Local Bridge Replacement Program. The 2011 Minnesota Legislature appropriated $33 million of state transportation bond funds for the Local Bridge Replacement Program. Funding is available to cities, counties and townships to assist in paying the costs of reconstructing local bridges. The bond funds cover 100% of the bridge construction cost, with the exception of removal of the existing bridge and engineering costs. The first step in securing funding is to create a prioritized bridge replacement list; this requires a City Council resolution. In an effort to minimize disturbances to surrounding residents, staff recommends that the bridge be replaced in 2012 in conjunction with City Project 12 -02 (2012 Street Reconstruction Project). The City share of project cost ($60,000 — net of anticipated Minnesota Department of Transportation funding) would be included in the 2012 General Obligation Improvement Bond Issuance to be repaid with future property tax levies. Primary Issues to Consider • Is there value in creating a prioritized bridge replacement list now? Projects are funded on a first -come, first -serve basis. If funding is spent down, the project may be delayed. Supporting Information • None. Zacha V. Jb.nson Irterinrt Engiereer Financial Impact: $60,000 Related Documents (CIP, ERP, etc.): Notes: Budgeted: No Source: Old Bridge Number Road Number or Name Total Project Cost Township or State Bridge Funds Federal Funds Local or State Aid Funds Proposed Construction Year L5772 168 Street West $300,000 $24Q000 $0 $60,000 2012 WHEREAS, the City of Lakeville has reviewed the pertinent data on bridges requiring replacement, rehabilitation, or removal, supplied by local citizenry and local units of government; and WHEREAS, the City of Lakeville has identified those bridges that are high priority and that require replacement, rehabilitation, or removal within the next five years. NOW, THEREFORE, BE IT RESOLVED, that the following deficient bridges are high priority and the City of Lakeville intends to replace these bridges as soon as possible when funds are available. CITY OF LAKEVILLE RESOLUTION NO. RESOLUTION CREATING A PRIORITIZED BRIDGE REPLACEMENT LIST FURTHERMORE, the City of Lakeville does hereby request authorization to replace, rehabilitate, or remove such bridges. APPROVED AND ADOPTED this 17 day of January, 2012 ATTEST: Charlene Friedges, City Clerk CITY OF LAKEVILLE Mark Bellows, Mayor 2