Loading...
HomeMy WebLinkAboutItem 06.dDate: 21 February 2012 Item No. O Notice to Bidders • Engineer's Estimate Zaclfary U:�hhspn Interim City ngineer' Financial Impact: $1,064,782 APPROVE PLANS AND SPECIFICATIONS AND SET BID DATE 2012 MISCELLANEOUS ROADWAY REPAIRS AND O VERLA YS CITY PROJECT 12 -01 Proposed Action Staff recommends adoption of the following motion: Move to approve the final Plans and Specifications and the Notice to Bidders with a bid date set for Tuesday, March 13, 2012 at 2:00 p.m. for 2012 Miscellaneous Roadway Repairs and Overlays, City Project 12 -01. Overview In accordance with the City's Pavement Management Program and the 2012 -2016 Capital Improvement Plan, the Engineering Department has completed Plans and Specifications for the above - referenced improvements. City Project 12 -01 consists of miscellaneous roadway repairs (patching) and the mill and overlay of the following collector roadways; 170'" St. (Pilot Knob Rd. to Eagleview Dr.), Flagstaff Ave. (175 St. to south city limits), 175 St. (Highview Ave. to Dodd Blvd.) and Ipava Ave. (Kenwood Tr. to 202 St.). The reconstruction of the North Park trail (Ipava Ave. to Hollyhock Ave.) and 165 St. trail (Ipava Ave. to Hudson Ave. — south side) is also included. The cost of the miscellaneous roadway repairs and overlays is estimated at $1,064,782; the 2012 Pavement Management Fund budget provided $1,071,990.00. The cost of reconstructing the North Park trail and 165 St. trail is estimated at $203,786. The Parks and Recreation Department has budgeted for the trail improvements separately. A copy of the Plans are on file and available for review in the Engineering Department. If bids are above the estimate, areas of roadway repair can be deleted from the contract to keep the project within budget. Attached is a resolution approving the final Plans and Specifications and the Notice to Bidders. Advertisement will occur in the Construction Bulletin on February 27 and March 5, 2012 and in the Dakota County Tribune on February 23, 2012. Primary Issues to Consider • Are the plans and specifications prepared consistent with City Standards? The plans and specifications are consistent with City Standards. Supporting Information Budgeted: Yes Source: Pavement Management Fund Trail Improvement Fund Related Documents (CIP, ERP, etc.): 2012 -2016 Capital Improvement Plan Notes: ATTEST: Charlene Friedges, City Clerk CITY OF LAKEVILLE RESOLUTION NO. RESOLUTION APPROVING PLANS AND SPECIFICAIONS AND SET BID DATE FOR 2012 MISCELLANEOUS ROADWAY REPAIRS AND OVERLAYS CITY PROJECT 12 -01 WHEREAS, the Engineering Department prepared Plans and Specifications for 2012 Miscellaneous Roadway Repairs and Overlays (City Project 12 -01) in accordance with the City's Pavement Management Program and the 2012 -2016 Capital Improvement Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota: That the Plans and Specifications for City Project No. 12 -01 are hereby approved by the City Council of the City of Lakeville, Minnesota. BE IT FURTHER RESOLVED, that bids will be advertised as required and opened at 2:00 p.m. on Tuesday, March 13, 2011 at City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota. APPROVED AND ADOPTED this 21 day of February, 2012. CITY OF LAKEVILLE Mark Bellows, Mayor QUANTITY UNIT ITEM 810 CY Subgrade Excavation Bituminous Surface Mill 52,391 SY 10,490 TON Bituminous Base and Wearing Course (Patching & Surfacing 46 EA I Pedestrian Curb Ramp 1,366 LE Concrete Curb and Gutter 74,957 SF Bituminous Walk 8,150 SY Bituminous Trail Reclamation 36 LIN FT 65" Span RC Pipe Arch 2 EA 65" Span RC Pipe Arch — FES w /out Trash Guards NOTICE TO BIDDERS 2 012 MISCELLANEOUS ROADWAY REPAIRS AND OVERLAYS CITY OF LAKEVILLE IMPROVEMENT PROJECT NO. 12 -01 OWNER...The City of Lakeville, Minnesota hereby gives notice that sealed bids will be received for the construction of Improvement Project No. 12 -01. TIME...Sealed bids will be received until 2:00 p,m., Local Time, on Tuesday, March 13, 2012, in the office of the City Clerk, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. PROJECT DESCRIPTION...The work involves roadway repair and trail reconstruction, The work includes the following approximate quantities of principal construction items: BIDDING DOCUMENTS...The bidding Documents are on file for inspection at the office of the City Engineer, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. Copies of the Bidding Documents may be obtained from the office of the City Engineer. A $35.00 payment for each set of Bidding Documents is required. There will be no refund on the deposits. BID SECURITY...Bid security in the amount of not less than 5% of the Bid shall accompany each Bid in accordance with the Information for Bidders. CONTRACT SECURITY...The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to OWNER for 100% of the Contract Price for each of the above Bonds, in accordance with the requirements of the Contract Documents. BID REJECTION /ACCEPTANCE...OWNER reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the OWNER. BID WITHDRAWAL...No bid shall be withdrawn for a period of 60 days after the scheduled opening of the Bids without the consent of the OWNER. Published by the authority of the City of Lakeville, Minnesota. By: Date: Published in the Dakota County Tribune on February 23, 2012 Published in the Construction Bulletin on February 27 and March 5, 2012 Charlene Friedges, City Clerk February 21, 2012 SCHEDULE A: Repairs Citywide ENGINEER'S ESTIMATE CITY OF LAKEVILLE 2012 MISCELLANEOUS ROADWAY REPAIRS AND OVERLAYS CITY OF LAKEVILLE IMPROVEMENT PROJECT NO. 12 -01 item REMOVE CURB AND GUTTER (ALL TYPES) LIN FT 345 REMOVE CONCRETE WALK SQ FT 335 REMOVE BITUMINOUS PAVEMENT SQ YD 17,700 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 10,985 SUBGRADEEXCAVATION - (PATCHING) CU YD 650 AGGREGATE BASE CLASS 5 - (PATCHING) TON 410 FOUNDATION MATERIAL (3" MINUS) TON 600 MILL BITUMINOUS STEP JOINT LIN ET 10,955 TYPE MV3 WEARING COURSE MIXTURE (B) - (PATCHING) TON 1,650 TYPE LV3 NON WEARING COURSE MIXTURE (B) - (PATCHING) TON 2,135 2.5" BITUMINOUS WALK W /8" CL 5 AGGREGATE BASE SQ FT 2,560 ADJUST VALVE BOX EACH 6 ADJUST FRAME & RING CASTING EACH 10 4" CONCRETE WALK W/ 4" GRANULAR BASE SQ FT 335 CONCRETE CURB & GUTTER (ALL TYPES) LIN FT 345 REPAIR IRRIGATION SYSTEM EACH 4 SUBTOTAL: SCHEDULE B:170TH STREET Surface Mill and Overlay - PILOT KNOB ROAD TO EAGLEVIEW OR REMOVE BITUMINOUS PAVEMENT SQ YD 300 REMOVE PEDESTRIAN CURB RAMP EACH 8 REMOVE STORM SEWER (ALL TYPES) LIN FT 42 27" CB W /NEENAH R4342 CASTING EACH 1 12" RCP CL V LIN FT 48 12" FES EACH 1 RIP RAP CL III TON 11 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 200 SUBGRADE EXCAVATION - (PATCHING) CU YD 10 AGGREGATE BASE CLASS 5- (PATCHING) TON 25 FOUNDATION MATERIAL (3" MINUS) TON 25 AGGREGATE SHOULDERING CLASS 2 TON 30 MILL BITUMINOUS SURFACE (2.0 ") SQ YD 11960 TYPE MV3 WEARING COURSE MIXTURE (B) - (PATCHING) TON 1,490 TYPE LV3 NON WEARING COURSE MIXTURE (B) - (PATCHING) TON 35 2.5" BITUMINOUS WALK W/8" CL 5 AGGREGATE BASE SQ FT 215 PEDESTRIAN CURB RAMP EACH 10 MINOR DITCH GRADING LF 550 TURF ESTABLISHMENT LF 1 PAVEMENT MESSAGE (RIGHT ARROW) - PAINT EACH 10 4" SOLID LINE WHITE - PAINT LIN FT 6,060 24" SOLID LINE WHITE - PAINT LIN FT 30 4" SOLID LINE YELLOW - PAINT LIN FT 1,085 4" BROKEN LINE YELLOW - PAINT LIN FT 450 4" DOUBLE SOLID LINE YELLOW - PAINT LIN FT 230 CROSSWALK MARKINGS - PAINT SQ FT 90 Contract Contract Unit Quantity Price Extension SUBTOTAL: 9.00 $ 2.80 $ 3.50 $ 2.15 $ 18.00 $ 20.00 $ 25.00 $ 2.35 3 89.00 $ 87.00 $ 5.00 $ 185.00 $ 390.00 $ 6.30 $ 20.50 $ 460.00 $ $ 4.30 $ $ 115.00 $ $ 8.00 $ $ 1,270.00 $ $ 25.00 $ $ 630.00 $ $ 125.00 $ $ 2.15 $ $ 21.50 $ 19.75 $ $ 21.15 $ $ 21.50 $ $ 0.85 $ $ 57.50 $ $ 95.00 $ $ 5.00 $ $ 525.00 $ $ 10.00 $ $ 4,100.00 $ $ 41.00 $ 0.15 $ $ 2.10 $ $ 0.15 $ $ 0.15 $ $ 0.30 $ $ 2.75 $ 3,105.00 938.00 61,950.00 23,617.75 11,700.00 8,200.00 15,000.00 25, 744.25 146,850.00 185,745.00 12,800.00 1,110.00 3,900.00 2,110.50 7,072.50 1,840.00 is 511,683.00 1,290.00 920.00 336.00 1,270.00 1,200.00 630.00 1,375.00 430.00 215.00 493.75 528.75 645.00 10,166.00 85,675.00 3,325.00 1,075.00 5,250.00 5,500.00 4,100.00 410.00 909.00 63.00 162.75 67.50 69.00 247.50 $ 126,353.25 item REMOVE CURB AND GUTTER (ALL TYPES) LIN FT 351 REMOVE BITUMINOUS PAVEMENT SQ YD 300 REMOVE PEDESTRIAN CURB RAMP EACH 10 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 800 SUBGRADE EXCAVATION - (PATCHING) CU YD 65 AGGREGATE BASE CLASS 5 - (PATCHING) TON 100 FOUNDATION MATERIAL (3" MINUS) TON 100 MILL BITUMINOUS SURFACE (2.0 ") SQ YD 12,782 TYPE MV3 WEARING COURSE MIXTURE (8) - (PATCHING) TON 1,590 TYPE LV3 NON WEARING COURSE MIXTURE (5) - (PATCHING) TON 40 2.5" BITUMINOUS WALK W /8" CL 5 AGGREGATE BASE SQ FT 210 ADJUST FRAME & RING CASTING EACH 1 MANHOLE INSERT RISER RINGS EACH 5 CONCRETE CURB & GUTTER (ALL TYPES) LIN FT 351 PEDESTRIAN CURB RAMP EACH 12 PAVEMENT MESSAGE (LEFT ARROW) - PAINT EACH 2 PAVEMENT MESSAGE (RIGHT ARROW) - PAINT EACH 3 PAVEMENT MESSAGE (THRU ARROW) - PAINT EACH 1 24" SOLID LINE YELLOW - PAINT LIN FT 565 4" DOUBLE SOLID LINE YELLOW - PAINT LIN FT 3,390 CROSSWALK MARKINGS - PAINT SQ FT 126 SUBTOTAL: SCHEDULE C:FLAGSTAFF AVENUE Surface Mill and Overlay - 175TH STREET TO SOUTH CITY LIMITS REMOVE CURB AND GUTTER (ALL TYPES) LIN FT 380 REMOVE CONCRETE WALK $Q FT 187 REMOVE BITUMINOUS PAVEMENT SQ YD 300 REMOVE PEDESTRIAN CURB RAMP EACH 14 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 700 SUBGRADE EXCAVATION - (PATCHING) CU YD 65 AGGREGATE BASE CLASS 5 - (PATCHING) TON 125 FOUNDATION MATERIAL (3" MINUS) TON 125 MILL BITUMINOUS SURFACE (2.0 ") SQ YD 20,714 TYPE MV3 WEARING COURSE MIXTURE (B) - (PATCHING) TON 2,550 TYPE LV3 NON WEARING COURSE MIXTURE (B) - (PATCHING) TON 45 ADJUST VALVE BOX EACH 3 ADJUST FRAME & RING CASTING EACH 1 4" CONCRETE WALK W/ 4" GRANULAR BASE SQ FT 660 CONCRETE CURB & GUTTER (ALL TYPES) LIN FT 405 PEDESTRIAN CURB RAMP EACH 18 PAVEMENT MESSAGE (LEFT ARROW) - PAINT EACH 6 PAVEMENT MESSAGE (RIGHT ARROW) - PAINT EACH 5 PAVEMENT MESSAGE (LEFT -THRU ARROW) - PAINT EACH 2 PAVEMENT MESSAGE (RIGHT -THRU ARROW) - PAINT EACH 1 4" SOLID LINE WHITE - PAINT LIN FT 660 24" SOLID LINE WHITE - PAINT LIN FT 50 4" BROKEN LINE WHITE - PAINT LIN FT 240 4" SOLID LINE YELLOW - PAINT LIN FT 3,155 4" BROKEN LINE YELLOW - PAINT LIN FT 1,290 4" DOUBLE SOLID LINE YELLOW - PAINT LIN FT 1,800 24" SOLID LINE YELLOW - PAINT LIN FT 175 CROSSWALK MARKINGS - PAINT SQ FT 252 Contract Contract Unit Quantity Price Extension SUBTOTAL: SCHEDULE D:175TH STREET Surface Mill and Overlay - HIGHVIEW AVENUE TO DODD BLVD 9.00 4.30 115.00 2.15 21.50 19.75 21.15 0.85 57.50 95.00 5.00 390.00 100.00 20.50 525.00 41.00 41.00 41.00 2.10 0.30 2.75 $ 9,00 $ $ 1.50 $ $ 4.30 $ $ 115.00 $ $ 2.15 $ $ 21.50 $ $ 19.75 $ $ 21.15 $ $ 0.85 $ $ 57.50 $ 95.00 $ $ 241.00 $ $ 390.00 $ $ 4,00 $ $ 20.50 $ $ 525.00 $ $ 41.00 $ $ 41.00 $ $ 84.40 $ $ 84.40 $ $ 0.15 $ $ 2.10 $ $ 0.15 $ $ 0.15 $ $ 0,15 $ 0.30 $ 2.10 $ $ 2.75 $ 3,159.00 1,290.00 1,150.00 1,720.40 1,397.50 1,975.00 2,115.00 10,864.70 91,425.00 3,800.00 1,050.00 390.00 500.00 7,195.50 6,300,00 82.00 123.00 41.00 1,186.50 1,017.00 346.50 $ 137,127.70 3,420.00 280,50 1,290.00 1,610.00 1,505.00 1,397.50 2,468.75 2,643.75 17,606.90 146,625.00 4,275,00 723.00 390.00 2,640.00 8,302.50 9,450.00 246.00 205.00 168.80 84.40 99.00 105.00 36.00 473.25 193.50 540.00 367.50 693.00 $ 207,839.35 Item REMOVE CURB AND GUTTER (ALL TYPES) LIN FT 265 REMOVE BITUMINOUS PAVEMENT SQ YD 200 REMOVE PEDESTRIAN CURB RAMP EACH 2 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 415 SUBGRADEEXCAVATION - (PATCHING) CU YD 20 AGGREGATE BASE CLASS 5 - (PATCHING) TON 25 FOUNDATION MATERIAL (3" MINUS) TON 25 MILL BITUMINOUS SURFACE (2.0 ") SQ YD 6,935 TYPE MV3 WEARING COURSE MIXTURE (B) - (PATCHING) TON 865 TYPE LV3 NON WEARING COURSE MIXTURE (0) - (PATCHING) TON 90 ADJUST VALVE BOX EACH 4 ADJUST FRAME & RING CASTING EACH 7 MANHOLE INSERT RISER RINGS EACH 5 CONCRETE CURB & GUTTER (ALL TYPES) LIN FT 265 PEDESTRIAN CURB RAMP EACH 2 PAVEMENT MESSAGE (LEFT ARROW) PAINT EACH 1 PAVEMENT MESSAGE (RIGHT -THRU ARROW) PAINT EACH 1 4" SOLID LINE WHITE - PAINT LIN FT 2,880 24" SOLID LINE WHITE - PAINT LIN FT 50 4" DOUBLE SOLID LINE YELLOW - PAINT LIN FT 1,460 SCHEDULE F :- NORTH PARK TRAIL RECLAMATION REMOVE PEDESTRIAN CURB RAMP EACH 3 REMOVE STORM SEWER (ALL TYPES) LIN FT 80 RECLAIM BITUMINOUS TRAIL SQ YD 5,565 2.5" BITUMINOUS WALK SQ FT 50,517 2.5' BITUMINOUS WALK W /8" CL 5 AGGREGATE BASE SQ FT 745 PEDESTRIAN CURB RAMP EACH 4 TURF ESTABLISHMENT LS 1 4" PVC SDR 35 LIN FT 70 6" PVC DRAIN TILE CLEANOUT -SDR 35 EACH 1 12" RCP CL V LIN FT 90 12" RCP FES EACH 6 65" SPAN RC PIPE-ARCH CULVERT CL III LIN FT 36 65" SPAN RC PIPE -ARCH APRON WITH TRASH GUARD EACH 2 RIP RAP CL IV Ton 40 REPAIR IRRIGATION SYSTEM EACH 2 SCHEDULE G:- 165th STREET TRAIL RECLAMATION FROM IPAVA AVENUE TO HUDSON AVENUE RECLAIM BITUMINOUS TRAIL SQ YD 2,585 $ 25" BITUMINOUS WALK SO FT 24,440 $ CONNECT TO EXISTING STORM SEWER EACH 1 $ 4" PVC SDR 35 LIN FT 150 $ 6" PVC DRAIN TILE CLEANOUT -SDR 35 EACH 2 $ TURF ESTABLISHMENT LS 1 $ REPAIR IRRIGATION SYSTEM EACH 2 $ SCHEDULE A - CITY WIDE REPAIR - SUBTOTAL: SCHEDULE B - 170TH STREET SURFACE MILL AND OVERLAY - SUBTOTAL: SCHEDULE C- FLAGSTAFF AVE SURFACE MILL AND OVERLAY - SUBTOTAL: SCHEDULE D 175TH STREET SURFACE MILL AND OVERLAY - SUBTOTAL: SCHEDULE E - IPAVA AVENUE SURFACE MILL AND OVERLAY - SUBTOTAL: SCHEDULE F - NORTH PARK TRAIL RECLAIMATION - SUBTOTAL: SCHEDULE G 165TH STREET TRAIL RECLAIMINATION FROM IPAVA AVE TO HUDSON AVE SUBTOTAL: Contract Contract Unit Quantity Price Extension SCHEDULE E: IPAVA AVENUE Surface Mill and Overlay - KENWOOD TRAIL (CSAH 50) TO 202ND STREET SUBTOTAL: SUBTOTAL: SUBTOTAL: TOTAL: $ 9.00 $ $ 4.30 $ $ 115.00 $ $ 2.15 $ $ 21.50 $ 19.75 $ $ 21.15 $ $ 0.85 $ $ 57.50 $ 95.00 $ 241.00 $ $ 390.00 $ $ 100.00 $ 20.50 $ $ 525.00 $ $ 41.00 $ $ 84.40 $ $ 0.15 $ 2.10 $ $ 0.30 $ 115.00 $ 6.55 $ 1.00 $ 2.00 $ 5.00 $ 676.00 $ 6,500.00 $ 10.00 $ 125.00 $ 25.00 $ 630.00 $ 175.00 $ 3,600.00 $ 150.00 $ 386.00 $ 2,385.00 860.00 230.00 892.25 430.00 493.75 528.75 5,89 4.75 49,737.50 8,550.00 964.00 2,730.00 500.00 5,432.50 1,050.00 41.00 84.40 432.00 105.00 438.00 $ 81,778.90 345.00 524.00 5,565.00 101,034.00 3,725.00 2,704.00 6,500.00 700.00 125.00 2,250.00 3,780.00 6,300.00 7,200.00 6,000.00 772.00 L$ 147,524.00 1.00 $ 2,585.00 2.00 $ 48,880.00 100.00 $ 100.00 10.00 $ 1,500.00 125.00 $ 250.00 2,175.00 $ 2,175.00 386.00 $ 772.00 56,262.00 11 ($ 511,683.00 126,353.25 137,127.70 207,839.35 81,778.90 147, 524.00 56,262.00 $ 1,268,568.20