HomeMy WebLinkAboutItem 06.kMarch 1, 2012 Item No.
SPIRIT OF BRANDTJEN FARM 9 ADDITION
MARCH 5, 2012 CITY COUNCIL MEETING
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution
approving the Spirit of Brandtjen Farm 9 Addition final plat, and 2) a resolution vacating public
drainage and utility easements.
Adoption of this motion will allow the re -plat of single family lots in the Spirit of Brandtjen Farm
planned unit development (SBF PUD).
Overview
Tradition Development (a /k /a SBF Development Corp.) representatives are requesting approval
of the Spirit of Brandtjen Farm 9 Addition final plat of 12 single family lots. SBF 9 Addition is
a re -plat of 13 single family lots in SBF 7 Addition. The re -plat will accommodate a new home
builder in Spirit that is requiring slightly larger house pads. In conjunction with the re -plat, the
boundary drainage and utility easements within the existing lots are being vacated and new
drainage and utility easements are being established along the new platted lot lines.
The Planning Commission held a public hearing on the easement vacation application at their
February 16, 2012 meeting and unanimously recommended approval. Planning and
Engineering staff recommend approval of the SBF 9 Addition final plat and easement vacation.
Primary Issues to Consider
• Why is there no Planning Commission recommendation for the SBF 9 Addition final plat?
The Subdivision Ordinance amendment approved by the City Council on January 3, 2012 no
longer requires final plat review by the Planning Commission. As such, the Planning
Commission recommendation pertains only to the easement vacation, not the final plat
Supporting Information
• Resolution approving the SBF 9 Addition final plat
• Resolution approving the vacation of public drainage and utility easements
• February 16, 2012 draft Planning Commission meeting minutes
• February 9, 2012 planning report on the easement vacation (without exhibits)
Fe • j a 2 , 2012 planning and engineering reports on the final plat
aryl ' rey, PI
ing Director
Financial Impact: $ None Budgeted: Y/N Source:
Related Documents (CIP, ERP, etc.): Zoning and Subdivision ordinances, SBF PUD
Notes:
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO.
RESOLUTION APPROVING THE FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 9 ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 9th
Addition has requested final plat approval; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Spirit of Brandtjen Farm 9 Addition is hereby approved
subject to the terms and conditions of the Spirit of Brandtjen Farm Master
Planned Unit Development Stage Plan Agreement dated October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
APPROVED AND ADOPTED this 5th day of March, 2012.
CITY OF LAKEVILLE
BY:
Mark Bellows, Mayor
ATTEST:
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 5 day of March, 2012, as shown by the
minutes of said meeting in my possession.
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO.
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the Planning Commission has conducted a public hearing, preceded
by two (2) weeks published notice, to consider the following described easement
vacation, and
WHEREAS, the City Council has determined that it is in the public interest to
approve the easement vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. All public drainage and utility easements as dedicated per the plat of SPIRIT
OF BRANDTJEN FARM 7 Tri ADDITION, according to the recorded plat
thereof, Dakota County, Minnesota, lying within Lots 7 through 19, inclusive,
Block 2, said plat of SPIRIT OF BRANDTJEN FARM 7 ADDITION are
hereby vacated subject to the recording of the SPIRIT OF BRANDTJEN
FARM 9 ADDITION final plat.
2. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
DATED this 5 day of March, 2012.
ATTEST:
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
CITY OF LAKEVILLE
Mark Bellows, Mayor
I hereby certify that the foregoing Resolution No. is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 5 day of March, 2012, as shown by the
minutes of said meeting in my possession.
Charlene Friedges, City Clerk
(SEAL)
ITEM 6. SPIRIT OF BRANDTJEN FARM 7TH ADDITION
Chair Davis opened the hearing to the public for comment.
There were no corn nents from the audience.
Planning Commission Meeting
February 16, 2012
Page 2
Chair Davis opened the public hearing to consider the application of SBF
Development Corp. for the vacation of public drainage and utility easements in
conjunction with the re- platting of 13 lots in Spirit of Brandtjen Farm 7th Addition.
The Recording Secretary attested that the legal notice had been duly published in
accordance with State Statutes and City Code.
Jacob Fick from SBF Development Corp. presented an overview of his request. Mr.
Fick stated that 13 lots in SBF 7th Addition are being re- platted to accommodate a
new builder, who is requiring larger house pads.
Planning Director Daryl Morey presented the planning report.. Mr. Morey stated
that in conjunction with the SBF 9th Addition final plat, SBF = Development
Corporation has submitted an application to vacate the .existing drainage and utility
easements along the boundaries of the 13 lots being re- platted. He indicated that
new drainage and utility easements will be established along the boundaries of the
12 lots being final platted in SBF 9th Addition, which is one lot less than was
originally final platted with SBF 7* Addition.
Mr. Morey reminded the Planning, Commission that due to the Subdivision
Ordinance amendment approved by the City Council on January 3, 2012, final plats •
no longer require review by the Planning Commission. The only action required at
this time by the Planning Commission is'a recommendation to the City Council on
the easement vacations application.;
Mr. Morey =' stated Planning and Engineering Department staff recommend
approval 'of the drairage and; utility easement vacation as presented in the February
9, 2012 planning report
12.07 Motion was made and seconded to close the public hearing at 6:06 p.m.
Ayes: Boerschel, Maguire, Lillehei, Davis, Blee, Grenz, Drotning.
Nays: 0
Chair Davis asked for comments from the Planning Commission. There were no
comments.
12.08 Motion was made and seconded to recommend to City Council approval of the
vacation of public drainage and utility easements in conjunction with the re- platting
of 13 lots in Spirit of Brandtjen Farm 7th Addition, located east of Draft Horse
Boulevard and north of 170th Street.
Ayes: Maguire, Lillehei, Davis, Blee, Grenz, Drotning, Boerschel.
Nays: 0
ITEM 7. KENORA RIDGE
Chair Davis opened the public hearing to consider. the : application of Ke • on
Holdings, LLC for the preliminary and final plat of three single family lo , to be
known as Kenora Ridge. The Recording Secretary attested that the legal .lice had
been duly published in accordance with State Statutes and City Code.
Chris Remus, with James R. Hill, Inc. and Keith Sperbeck fro enyon Holdings,
LLC were in attendance at tonight's meeting. Mr. Remus pr- • nted an overview of
their request. He indicated that they requesting to pl. ee single family lots
that were platted in 2007 as Outlot B, Kent 46.
Associate Planner Frank . presented th -`' .lanning report. Mr. Dempsey
stated that the Kent 4b development inciixde ghost plat showing three future
single family lots within Outlot. B. He indi ed that the three single family lots in
Kenora Ridge meet the requirements for size and lot width for the RS-3 District.
He indicated that fill will be,required ; • construct homes on these three lots due to
the topography of the subject prop
Regarding the tree, presery - on plan, Mr. Dempsey indicated that the plan
identifies 48 tr- ' and of those 48 trees, two are dead or damaged and
five (three trees on lot d two trees on lot 3) are identified to be saved resulting
in a save'ratio of 10. He stated that a minimum of two trees shall be planted on
each lot without . east two save trees.
Planning Commission Meeting
February 16, 2012
Page 3
Mr. Demps. stated, that Planning and Engineering Department staff recommend
approva the Kenora Ridge preliminary and final plat subject to the 4 stipulations
listed the February 10, 2012 planning report.
air Davis opened the hearing to the public for comment.
Memorandum
City of Lakeville
Planning Department
To: Planning Commission v,,i
From: Daryl Morey, Planning Director r v t
Date: February 9, 2012
Subject: Packet Material for February 16, 2012 Planning Commission Meeting
Agenda Item: Spirit of Brandtjen Farm 7 Addition Easement Vacation
SBF Development Corporation has submitted a final plat application to re -plat 13 single
family Tots in SBF 7 Addition. The lots are being re- platted to accommodate a new builder
in the Spirit of Brandtjen Farm planned unit development, Robert Thomas Homes. The
re -plat, to be known as SBF 9 Addition, will adjust lot lines to meet the house pad needs of
the new builder. The SBF 9 Addition re -plat proposes 12 single family lots, one lot less
than was originally final platted with SBF 7 Addition.
In conjunction with the SBF 9 Addition final plat, SBF Development Corporation has
submitted an application to vacate the existing drainage and utility easements along the
boundaries of the 13 lots being re- platted. New drainage and utility easements will be
established along the boundaries of the 12 lots being final platted in SBF 9 Addition.
In response to comments received from developers and in an effort to expidite the
processing of final plats, the City Council approved an amendment to the Subdivision
Ordinance on January 3, 2012 such that final plats no longer require review by the Planning
Commission. The only action required by the Planning Commission at this time is a
recommendation to the City Council on the easement vacation application.
Planning and Engineering Department staff recommend approval of the drainage and utility
easement vacation as presented.
Exhibits:
A. Site Location
B. Easement Vacation Sketch
C. SBF 9 Addition Final Plat (for reference only)
(plancom m- sbf7easem entvacationm emo)
Memorandum
To: Mayor and City Council
From: Daryl Morey, Planning Directo
Copy: Jacob Fick, Tradition Development
Daniel Licht, TPC
Date: February 29, 2012
Subject: Packet Material for the March 5, 2012 City Council Meeting
Agenda Item: Spirit of Brandtjen Farm 9 Addition Final Plat
BACKGROUND
City of Lakeville
Planning Department
Tradition Development representatives have submitted a final plat application for Spirit of
Brandtjen Farm 9 Addition, which re -plats 13 single family Tots from Spirit of Brandtjen
Farm 7 Addition into 12 single family lots. In conjunction with the final plat, Tradition
Development is requesting the vacation of the boundary drainage and utility easements
within the 13 lots being re- platted.
The Spirit of Brandtjen Farm 9 Addition final plat is located in the southeast corner of the
550 acre Spirit of Brandtjen Farm (SBF) Planned Unit Development (PUD) approved in 2005.
The SBF 7th Addition final plat of 34 single family lots was approved by the City Council on
August 1, 2011. The SBF 9 Addition re -plat of a portion of SBF 7 Addition accommodates
a new home builder in Spirit who is requiring slightly larger house pads.
Exhibits:
A. Location Map
B. SBF 9th Addition Final Plat
C. Easement Vacation Sketch
HISTORY
The following is a timeline of plats approved by the City Council for the Spirit of Brandtjen
Farm development:
June 20, 2005 — SBF preliminary plat (130 s.f. lots) and PUD
October 17, 2005 — SBF final plat (133 s.f. lots), and SBF 2 Add. preliminary and final plats
(39 s.f. lots and 52 t.h. lots)
Setbacks
Front
Side
Rear
House
Garage
Door
Garage
Interior
Comer
House
Garage
Door
Garage
House
Garage
20ft.
25ft.
20ft.
7ft.
15ft
25ft
15ft
20ft.
10ft.
SBF 9 Addition Final Plat
March 5, 2012 City Council Meeting
June 5, 2006 — SBF 3 Add. preliminary plat (90 s.f. lots)
March 5, 2007 — SBF Lakepointe Add. final plat (re- plat /reconfiguration of 31 t.h. lots from
SBF 2 Add.)
June 2, 2008 — SBF Lakepointe 2 Add. preliminary and final plats (re- platted 6 t.h. lots
from SBF 2 Add. into 5 t.h. lots)
July 20, 2009 — SBF 3 Add. final plat (4 s.f. lots)
September 8, 2009 — SBF 4 Add. preliminary plat (68 s.f. lots) and final plat (12 s.f. lots);
revised a portion of the SBF 3r Add. preliminary plat which added 9
s.f. lots
April 5, 2010 — SBF 5 Add. preliminary and final plats (7 s.f. lots); revised another portion
of the SBF 3 Add. preliminary plat which added 1 s.f. lot
October 4, 2010 — SBF 6 Add. preliminary plat (29 s.f. lots) and final plat (15 s.f. lots);
re -plat of 30 s.f. lots from the SBF final plat
August 1, 2011— SBF 7 Add. preliminary plat (59 s.f. lots) and final plat (34 s.f. lots);
revised a portion of the SBF 4 Add. preliminary plat which added 4 s.f.
lots
October 17, 2012 — SBF 8 Add. final plat (14 s.f. lots)
APPLICATION ANALYSIS
Consistency with the Preliminary Plat. The 12 single family lots in the SBF 9 Addition
re -plat are consistent with the lot design approved with the SBF 7 Addition preliminary
plat. The street serving the 12 single family lots (Diamonte Way) has already been
constructed and is not being modified by the proposed re -plat.
Lots. There is no minimum lot area required by the SBF PUD District. Rather, lots are
regulated based on minimum width requirements, setbacks and design standards
established by the SBF PUD Booklet dated June 20, 2005. The lots in SBF 9 Addition are
proposed with a minimum 60 foot width and are subject to the cottage lot standards as set
forth in Section 7 of the SBF PUD Booklet.
Setbacks. All of the proposed single family lots are subject to the setback requirements
established for cottage lots:
Streets. The 12 single family lots in SBF 9 Addition front Diamonte Way, a 28 foot wide
urban street with on- street parking and a five foot concrete sidewalk on the outside edge of
the loop that encloses a private, homeowners association maintained green space. A 52
foot right -of -way was previously dedicated for Diamonte Way consistent with the design
standards for SC.3 (Streetscape 3) on page 6.2 of the SBF PUD Booklet.
2
SBF 9 Addition Final Plat
March 5, 2012 City Council Meeting
SBF 9 Addition also abuts 170 Street, a major collector. A 55 foot north half right -of -way
exists for 170 Street. No additional right -of -way dedication is required. The buffer yard
berming and landscaping for the lots abutting 170 Street were installed with a previous
SBF development phase.
SBF 9 Addition also abuts future Diamond Path, a major collector. An 80 foot west half
right -of -way was dedicated for future Diamond Path with the SBF 7 Addition final plat. No
additional right -of -way dedication is required. Diamond Path will be constructed at a future
date when the need for the street is warranted.
Grading, Drainage, Erosion Control and Utilities. Engineering Department staff have
reviewed the SBF 9 Addition final plat and easement vacation and recommend approval in
their attached memo dated February 29, 2012.
Easement Vacation. The SBF 9 Addition final plat includes the vacation of the existing
boundary drainage and utility easements within the 13 single family lots being re- platted.
New public drainage and utility easements are shown for each of the 12 single family lots
included with the SBF 9 Addition final plat. The Planning Commission held a public hearing
on the easement vacation request at their February 16, 2012 meeting and unanimously
recommended approval. There was no public comment.
On January 3, 2012 the City Council approved an amendment to the Subdivision Ordinance
such that the Planning Commission will no longer review final plats unless they are
inconsistent with the approved preliminary plat. As such, the Planning Commission
recommendation pertains only to the easement vacation, not the final plat.
RECOMMENDATION
Planning Department staff recommends approval of the Spirit of Brandtjen Farm 9 Addition
final plat and easement vacation subject to the following stipulations:
1. The recommendations listed in the February 29, 2012 engineering report.
2. The lots in SBF 9 Addition must meet the setback and design standards established by
the approved SBF PUD Booklet dated June 20, 2005.
(plancomm- sbf9fi nal plat)
3
;
'—.'
in
i___\_,•\
2.
11
...)-warerwmwma i
aw
_.
II
la
I
\ I
11
County Road 46
I /
0
3
Township
-0
of
Far
widwA
.=
OIL Po,
0 • ' v* 4111k•
o *6 •
i
Spirit Spirit
Brandtjen
9th Addition
d
, 1111111.61
.
1111111111110
II IL
�
th
�
170th
Street
Ilk.
Location Map
N City of Lakeville
of Brandtjen Farm
9th Addition
Exhibit A
IV Spirit
-
z
n
00
0
50
CJ
C-1
( i
C)
C_
l
C7
7:1
c)
_
(X)
cr)
50
55
(i)
T I --4-6.- 50' _150.17 — — — 1 RI
I 0 1
F.1 S I --.4.41,,;.''',,9 1 > /
ZW &°I 1.--1:121-. �W� °s
r0 s�
Sw N / /
,\
2 ° (C) //
4 y� / -
sss� /
1 a� / / ,p 0
55 00 -
s000738"w `- 58.26 -'
N00 ° 07'38 "E
& 8
55 1
r
0
/-' 10218 31 c 7000 1 91.49 p 3086
gam 1 i r - -t - -� r -1- -, ,—
w` \\ \\ 1 1 1 1 i l
1,i \ \, 1 m :,, 1 rJ m 1 I l
/ \ ,\ \NS A H ;-...,/ lm /
�V cv `, .), ` c n \ \\ \ e 1 � . 1 4 I i.
/ �J, \ \3 N 1 1 /I /
o/ �s / DO SrN /
\ � b J w 0/\ \ _.` \ L " ; __ L_ Ir _J L- _., I
J , . 9 _ ' 36 18 70 00 51 82 •
�''� `. „ 0 ° % . 158.00 S00 ° 07'38 "W
\ 4 ° ...
/ S
35
46.5
8 46.5
6
0
c
n
m
0
-' ;D I L) I T rm r . L) / n I n T I r - t\ I r - A L) A A A T I 1 /1 r- 11 I T I/ 1 n I
...1 I1 \11 \_./1 LEI \ / 'IUL_IV 1 r\I \IVI `I v11I■IN
r �
(p
CT)
500'07 "W
I 150.02 - 1 \
I
I I N
I I> - tD
8$ I 0 1 _ oN
1 I o1
1_500.07313"W J 0 0 N
N
. dy
V IrlIVI V I .1 L.)
ATI I
r\ 1 I
K
0
0
z
P
0
9.
F
2
326.10 N00°07'38 "E
r A l 4 r n l T r I I I A \/
UIr)IVIVIV I L_ 644
Z
• 6
110 p1-i AZ
p1xmxm0
mr y0
m z r m z
31 C )
r
m \ o m O 2
°ND D i
m2,Mm .
z 0 z m
m m
- 2 0
A VI 20
OZ0290
• ammz
AD
A> >z
z �<
OZ ; zD
m
zz 2
zz zm
N
132.50
r\I A 4 4, \0IT _)
r- � °07'38 "E
IJIT\IVI\JI'1 I C_
0
W Jr
D� -ID
Z • *
0 ° O m N
tzt
O
Z Z m
f ,`1 m
N O
N - -
f D oz
m
o z 0
0 mx
>Zr_
01>
D�0
'x' 28°
3 9 65 ? � F
/ ,-\:
Ci / / / / / IOl 1
/ /
6 c / • ` .� 1 /
9 UI
/ / / /)0° / I co
/ /
1- . w ° com
I
\ . G'1 I * z
\u
Ol
\m ZLlfl - - -_J I op
M.68 5.0°N— 6
@I ° n
1 \ , )J w1 10 \ �$
a )y9 1\) (r) I� i 1 E.
z 8 '- t z ;V
CD — L N00°07'38 "5 J _+ CD 4
U4Gl - (1 d? x
NO 1 13 i ON g
N I I O N g,
NI — IN
8 1 1
52 \ I_ -J /
0
e
O4
C.S A.H NO. 31 (PILOT KNOB ROAD)
s4_ I 1,*, 1 /
1r R
1
--- I- -- ---
S'
F
9' 1
, 4,
V /
I I I
II i1 s '
__ _
DIAMOND _
PATH
ffr�^
=,
sa
L EEr
kli
' E 1 .
" " S.;
5 o
3
3
Ng
0
a
0
F
D r y
R
0
0
41
a
VJ
0
11
a
z
0
L
m
z
11
2
0
0
H
0
z
5r a05
/0 7F
- a z
• 0
g.
� OZ
� Fy
� 60
a �o
6
E 1
0 `a
0 0
0
s
0'
0
n
3
' SHEET 1 OF 1 I
I FILE NO.
1 -12 -005
I PROJECT NO.
20662 - 08
I CAD FILE I
20662 - 08stk
' REVISIONS '
I DATE
1/19/12
I DRAWN BY I
PLM
SPIRIT OF BRANDTJEN FARM 8TH ADDITION
LAKEVILLE, MINNESOTA
EASEMENT VACATION SKETCH
FOR
SHF DEVELOPMENT CORPORATION
6800 FRANCE AVENUE SOUTH, EDINA. MINNESOTA 55435
James R. Hill, Inc.
PLANNERS / ENGINEERS / SURVEYORS
2500 W. C1r. R. 42, Soo 120, B1raNSALIE, MN 55337
PHONE: (952)890 -6044 FAX: (952)890 -6244
1/19/2012 02.48PM
50
;rl
0
)\
0
(T)
\ / Y
L T
11 Ill
ss
55
50 50
8
/
35
36 •
46 5
•
°
- 58.26-
NO0 ° 07'38 "E
i
106 33
52
• -P
a4 > / 2
i
V 52
500 "W
1F _! 1
a
iJ
8
8
(ll
4
/Y
r, I^/"rll'r )', 1 Anlr- ro
I
326,10 N00 "E
r - Is sr
8
N1
%' [ao'• .04 •..6000 -
158.00 S00 38 W
c ooV
O ° 4b
Cv
/ p
rl1 Al /r\niTr 46IA\l
IJIrlIVIVI V I L_ YYr \ 1
150 05 1
cn
l.' OD
I IO
o ft 1 1 = O N <.'
_ I J Io ON /j' a
'46 5 1 150.19 500'15'31.W J O j y r\ ) '
.. `� L 1., T
1y 1 m / v
I c . / 52 L�-
Lir A
1t ___il 7) /1v/
5=191 -
=1910 42'_ . \ l
fJ
F
rj
5977
r11 A A/ /-\ n 111
vlruV1 /1 m ill
z
L
w
N O
.30
N
52 ;
r°.
/
1
X39 ` 2a
132.50 -
r y
) 11 -
Ci -- C)
-
— I �'4 )> 1 C) -
-i a)
� C)
,1
0
, CT> C
° 1' -
^ h/
/1 [> A r-T I I c7 , ' r- r\ I 1 1 r- A 1_) n o,
o LJI \rll 1 f1 ''r \...'.L_ LjVVL L_•V/ r,l \U
/
/ o -
o i o �a
/ /m ! \
n 4/ CD ! � / 1 10
. 1 / / _. 1/1
Al / / (Pe" ° ! /44 ( p Y _ 02 ( l l
>n rn
/ 1 4 CO
,° (0 �{
v \: I
1 I 1
0. f
- 1
H
52
(T)
- i
J-
f
rr1
-i
(;)
A)
;n
)'
C7
` i
rJ
10 132.50 10 \ : _
I 1-I,
81 OD 18 z r11 I (,')
) I 00 -
N00.07'38 "E t0 :
13250 .—(' O ff: --i
,1 1. ON
S� v i 8 CT> -, CT>
I II
107 ,.. 0 10 J 52 [ —
N00°07'38 "E
r\I A11rinIrr' F) TI
VIr,IVIV IV I L_ , n, ri
J
0
0
8
Memorandum
To: Daryl Morey, Planning Director
From: Mark DuChene, Development Design Engineer AK)
McKenzie Cafferty, Environmental Resources Manager
Copy: Dennis Feller, Finance Director
Gene Abbott, Building Official
Date: February 29, 2012
Subject: Spirit of Brandtjen Farm 9 Addition
• Easement Vacation
• Final Plat Review
• Grading Plan Review
• Utility Plan Review
BACKGROUND
City of Lakeville
Engineering
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen
Farm 9 Addition. The proposed residential subdivision is a re -plat of Lots 7 -19,
Block 2, Spirit of Brandtjen Farm 7th Addition. The final plat results in one fewer lot
as the Developer revised the site layout to accommodate single family homes with
wider building pad areas. The plat is zoned PUD, Planned Unit Development District.
The residential subdivision is located north of and adjacent to 170 Street, west of
and adjacent to the future extension of Diamond Path (CSAH -33) and east of the
farmstead preservation area.
SITE CONDITIONS
Spirit of Brandtjen Farm 9th Addition was mass graded with the Spirit of Brandtjen
Farm 7 Addition improvements. Public utilities and streets were constructed with
Spirit of Brandtjen Farm 7 improvements.
EASEMENTS AND EASEMENT VACATIONS
Drainage and utility easements in favor of the City of Lakeville were previously
established around the perimeter of the individual lots, as depicted on the Spirit of
SPIRIT OF BRANDTJEN FARM 9 7 " ADDITION
FEBRUARY 29, 2012
PAGE 2 OF 5
Brandtjen Farm 7 Addition plat. The easements will be vacated and re- platted
along the new lot lines with the Spirit of Brandtjen Farm 9 Addition plat.
STREET AND SITE LAYOUT
170 Street
Spirit of Brandtjen Farm 9 Addition is north of and adjacent to 170 Street, a major
collector roadway as identified in the City's Transportation Plan. The Developer
previously dedicated 55 feet of right -of -way, consistent with the 1 /2 right -of -way
requirement for a major collector, with the Spirit of Brandtjen Farm plat.
170 Street is constructed as a two -lane undivided roadway. The north half of the
road is an urban section with concrete curb and gutter while the south half is a rural
section. Designated left and right -turn lanes exist at the Draft Horse Boulevard
intersection. The ultimate roadway section for 170 Street will likely consist of a 52-
foot wide undivided urban roadway with shoulders and striped as a three -lane
section, with one through -lane in each direction and a center continuous left -turn
lane with exclusive turn lanes at the intersections.
Diamond Path
Spirit of Brandtjen Farm 9 Addition is west of and adjacent to Diamond Path, a future
major collector roadway as identified in the City's Transportation Plan. The current
Dakota County Road Plat Review Needs Map identifies Diamond Path as a future
four -lane undivided County State Aid Highway with a 1 /2 right -of -way requirement of
60 feet. The Developer has dedicated 80 feet of right -of -way, as shown on the
Spirit of Brandtjen Farm 7th Addition plat, to satisfy the 1 /2 right -of -way requirement
for Diamond Path.
The County's current Capital Improvement Program does not include the
construction of Diamond Path. Diamond Path will be constructed in the future when
the need for the street is warranted.
Diamonte Way
Diamonte Way was constructed with Spirit of Brandtjen Farm 7th Addition and is
designed as a 28 -foot wide urban street with a 5 -foot wide concrete sidewalk along
the outside edge of the loop. The southern end of Diamonte Way transitions into a
loop with a 5 -foot wide concrete sidewalk along one side. The Developer previously
dedicated 52 feet of right -of -way, as shown on the Spirit of Brandtjen Farm 7th
Addition plat, to satisfy the right -of -way requirement for Diamonte Way. The street
and landscape boulevard design is consistent with the approved Spirit of Brandtjen
Farm Planned Unit Development Plan.
SPIRIT OF BRANDT]EN FARM 9 T " ADDITION
FEBRUARY 29, 2012
PAGE 3 OF 5
PARKS AND TRAILS
There is no new trail or sidewalk requirement with Spirit of Brandtjen Farm 9th
Addition. A 5 -foot wide concrete sidewalk along the outside edge of the loop of
Diamonte Way was constructed with Spirit of Brandtjen Farm 7 Addition
improvements.
The Park Dedication Fee was paid with Spirit of Brandtjen Farm 7 Addition;
therefore no Park Dedication shall be collected with Spirit of Brandtjen Farm 9th
Addition.
UTILITIES
SANITARY SEWER & WATERMAIN
Development of Spirit of Brandtjen Farm 9 Addition will not require new sanitary
sewer or watermain construction. Sanitary sewer, watermain, and sanitary sewer
and water services installed with Spirit of Brandtjen Farm 7 Addition improvements
will serve the lots within Spirit of Brandtjen Farm 9 Addition.
As a result of the revised site layout, one sanitary sewer and water service pair must
be abandoned. The abandoned service pair must be removed entirely to the utility
main and plugged per the manufacturer's recommendations. No certificates of
occupancy will be issued for the following lots until the abandonment has been
completed:
• Lots 5 & 6, Block 1
The Sanitary Sewer Availability Charge was paid with Spirit of Brandtjen Farm 7th
Addition; therefore no Sanitary Sewer Availability Charge shall be collected with
Spirit of Brandtjen Farm 9 Addition.
DRAINAGE AND GRADING
Spirit of Brandtjen Farm 9 Addition was mass graded with Spirit of Brandtjen Farm
7 Addition.
The final grading plan shall identify all fill lots in which the building footings will be
placed on fill material. The grading specifications shall also indicate that all
embankments meet FHA /HUD 79G specifications. The Developer shall certify to the
City that all Tots with footings placed on fill material are appropriately constructed.
Building permits for Spirit of Brandtjen Farm 9 Addition shall not be issued until a
certified grading plan has been submitted and approved.
SPIRIT OF BRANDT3EN FARM 9"' ADDITION
FEBRUARY 29, 2012
PAGE 4 OF 5
RESIDENTIAL BUFFER YARD REQUIREMENTS
A buffer yard berm and landscaping screen was provided adjacent to 170 Street
with previous Spirit of Brandtjen Farm improvements. A certified as -built grading
plan of the buffer yard berm must be submitted and approved by City staff.
A buffer yard berm and landscaping screen with a combined height of 10 feet will be
provided adjacent to Diamond Path, as shown on the landscape plan. A certified as-
built grading plan of the buffer yard berm must be submitted and approved by City
staff prior to the installation of any buffer yard plantings.
STORM SEWER
Development of Spirit of Brandtjen Farm 9 Addition will not require new storm
sewer construction. Storm sewer was installed with Spirit of Brandtjen Farm 7th
Addition. Any draintile construction, including perimeter draintile required for
building footings, which is deemed necessary during construction, shall be the
Developer's responsibility to install and finance.
The Trunk Storm Sewer Area Charge was paid with Spirit of Brandtjen Farm 7th
Addition; therefore no Trunk Storm Sewer Area Charge shall be collected with Spirit
of Brandtjen Farm 9 Addition.
WETLANDS
There are no existing wetlands within the Spirit of Brandtjen Farm 9 Addition site.
TREE PRESERVATION
There are no significant trees within the Spirit of Brandtjen Farm 9 Addition site.
EROSION CONTROL
As stated previously, Spirit of Brandtjen Farm 9th Addition was mass graded with
Spirit of Brandtjen Farm 7 Addition improvements. The Developer shall maintain
erosion control measures in accordance with the Spirit of Brandtjen Farm 7th
Addition Development Contract and comply with the approved grading and erosion
control plan. Homebuilders shall install and maintain erosion control measures as
required with the individual building permits.
SPIRIT OF BRANDT3EN FARM 9T" ADDITION
FEBRUARY 29, 2012
PAGE 5 OF 5
SECURITIES
The Developer provided a Letter of Credit as security for the Developer - installed
improvements relating to Spirit of Brandtjen Farm 7th Addition. The Developer also
posted a security to ensure that all property corners are installed. No additional
security is required with Spirit of Brandtjen Farm 9th Addition as the Developer is not
increasing the number of lots and the public improvements were previously
constructed with Spirit of Brandtjen Farm 7 Addition. The Developer must submit a
letter from the lending institution providing the letter of credit for Spirit of Brandtjen
Farm 7 Addition stating that the letter of credit shall cover work done with the
Spirit of Brandtjen Farm 9 Addition including the service pair abandonment.
CASH FEES
There are no additional cash requirements with the development of Spirit of
Brandtjen Farm 9 Addition. The proposed plat is a re -plat to accommodate wider
single family lots that were previously approved with Spirit of Brandtjen Farm 7th
Addition.
RECOMMENDATION
Engineering recommends approval of the easement vacation, final plat, grading plan
and utility plan for Spirit of Brandtjen Farm 9 Addition, subject to the comments
within this report and the following:
• Prior to release of the final plat mylars, the Developer must submit a letter
from the lending institution providing the letter of credit for Spirit of
Brandtjen Farm 7 Addition stating that the letter of credit shall cover work
done with the Spirit of Brandtjen Farm 9 Addition.