HomeMy WebLinkAboutINSP0214
BSP Architects 612.6777100
1220 Marshall Street NE 612.677.7499 fax
Minneapolis www.rsparch.com
MN 55413 -1036
Consultants
PROJECT DIRECT
FRANCHISER: STEAMING BEAN COFFEE GO,
2815 North Pascal Street +22
St. Paul, MN. 55113
(612) 493- 0833
FAX: (651) 493 =0844
ARCHITECT: RSP ARCHITECTS, LTD
1220 Marshall Street, NE.
Mhneapolls, Minnesota 55413
(612)67171-1100
FAX: (612) 611 -1499
CONTRACTOR: T.R.D.
CITY: Lakeville, MN
HEALTH DEPT.: STATE OF MINNESOTA
DEPARTMENT OF
ENVIRONMENTAL HEALTH
VICINITY MAP
STEAMING BEAN
1104 160TH STREET
LAKEVILLE, MN 55044
Illy
KEY
CODE REVIEW
for review by Tenant representative or Architect. Refer to finishes plan for
furnished by the owner,
AUTHORITY: CITY OF LAKEVILLE
3
14) All work and materials used to accomplfsh designated work shall be
COPE: 2000 IBC
36
• ISSUED
building owner representative with respect to delivery and storage.
discover In the drawings, or any Inconsistency he may discover in the drawings,
EX16TiNG
Otbr
construction so that the Architect may issue written clarification in a timely
CONSTRUCTION: TYPE 2 -8
manner.
• REVISED AND REISSUED
USE: Restaurant. Group A. Division 2, a
ti
AREA: 1261 sq. Ft.
5) CONTRACTOR Is responsible for all permits and fees.
OCCUPANT LOAD:
p) CONTRACTOR shall not perform any work not contained In the
• ISSUED FOR PERMIT
KITCHEN/PREP 39I/200 2
required locations for all wall mounted shelving, tables, etc. No extra fees will
DINING AREA 928/15 (52
IS) CONTRACTOR Is responsible for coordinating all architectural,
UNOCC. AREA 145/0 0
TOTAL 64
UNOCCUPIED AREA = FREEZER, UTILITY CLOSET, MOP
1) CONTRACTOR Is responsible for recefving and on -site storage of all
• ISSUED FOR BIDS
soft -goods (small wares, etc.) during regular construction hours.
provided.
SINK, RESTROOMS, MILLWORK
19) Dimensions shat( not be changed without architects written approval.
9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c.
AND WALLS.
24ilm
surfaces to their original condition where damaged.
othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which
walls to receive wall covering. Prime these walls with one coat of primer.
EXITING WIDTH: 64 x 02 = 21" REQUIRED
with the contract documents for accuracy and confirming that the work is build
T WO (2) E XITS REQ UI R ED WEN OCC LOAD 15 OVER 50
able as show, before proceeding with construction.
II) CONTRACTOR shall install all artwork and decor, including well hung
PROVIDED 2 EXITS 6 6' -0" EA. = I2' -0" LF.
�
G
PROVIDED I EXITS n) V -0" EA, - 3' - 0" LF,
- t )
-
o
SANITARY RESTROOh15 - EXISTING
FACILITIES:
Vi
lFgtew
SHEET IN
KEY
t r _
for review by Tenant representative or Architect. Refer to finishes plan for
furnished by the owner,
Al'.
3
14) All work and materials used to accomplfsh designated work shall be
�,'+
r3G3�nY�`4r�re
• ISSUED
building owner representative with respect to delivery and storage.
discover In the drawings, or any Inconsistency he may discover in the drawings,
or any inconsistency between the drawings and field conditions, prior to
Otbr
construction so that the Architect may issue written clarification in a timely
representative and architect.
manner.
• REVISED AND REISSUED
4) Do not scale drawings.
ti
coordinate suds with tenant representative.
5) CONTRACTOR Is responsible for all permits and fees.
p) CONTRACTOR shall not perform any work not contained In the
• ISSUED FOR PERMIT
construction documents without the approval of the Architect,
required locations for all wall mounted shelving, tables, etc. No extra fees will
be entertained For lack of coordination.
SHEET IN
KEY
work and shall be responsible for all work and materials including those
for review by Tenant representative or Architect. Refer to finishes plan for
furnished by the owner,
required items.
2) All construction must comply with all local governing codes.
14) All work and materials used to accomplfsh designated work shall be
coordinated with contractor, tenant representative (why applicable) and
• ISSUED
building owner representative with respect to delivery and storage.
discover In the drawings, or any Inconsistency he may discover in the drawings,
or any inconsistency between the drawings and field conditions, prior to
15) CONTRACTOR will appofrt one specific individual for Ilaeon with tenant
construction so that the Architect may issue written clarification in a timely
representative and architect.
manner.
• REVISED AND REISSUED
4) Do not scale drawings.
supervising all safety precautions in connection with the work and shat)
coordinate suds with tenant representative.
5) CONTRACTOR Is responsible for all permits and fees.
p) CONTRACTOR shall not perform any work not contained In the
• ISSUED FOR PERMIT
construction documents without the approval of the Architect,
required locations for all wall mounted shelving, tables, etc. No extra fees will
be entertained For lack of coordination.
IS) CONTRACTOR Is responsible for coordinating all architectural,
mechanical, telephone, electrical (including lighting), and plumbing so to ensure
1) CONTRACTOR Is responsible for recefving and on -site storage of all
• ISSUED FOR BIDS
soft -goods (small wares, etc.) during regular construction hours.
provided.
8) CONTRACTOR shall control nofee producing Items (stereos) at all times.
19) Dimensions shat( not be changed without architects written approval.
9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c.
20) CONTRACTOR to protect existing constructfon and restore all finish
unless noted otherwise. Extenrwalia to be Floor to ceiling, unless noted
surfaces to their original condition where damaged.
othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which
walls to receive wall covering. Prime these walls with one coat of primer.
a
with the contract documents for accuracy and confirming that the work is build
10) Refer to reflected cig plan for light fixture schedule,
able as show, before proceeding with construction.
II) CONTRACTOR shall install all artwork and decor, including well hung
22) Accessible rest rooms are rrovided by landlord and are not part of this
�
G
- t )
-
o
m
e
e
w
La
u
a
a
a
us
w
m
ARCHITECTURAL
--- - -- - - -- - --
•
•
•
-- —
GI�I
C-0- - -- - - - ---
VER SHEET, GENERAL INFORMATION
AEI.I
FLOOR P LAN :
•
•
•
AV]
RE FLECTED CEILING FLAN5 4 DETAILS
•
•.•
AE4.1
INTERIOR ELEVATIONS AND DETAILS
•
•
AL42
INTERIOR ELEV ATIONS A ND DETAIL
•
_•
•_
•
E01.1
EQUIPMENT PLAN
•
•
•
_
ILL
DRAFTING SYMBOLS
INDICATES DETAIL NUMBER NAME
129
INDICATES SHEET UPON
Ai WHICH DETAIL APPEARS ROOM NUMBER
123
I I
AI OI` Al DOOR NUMBER
DETAIL REFERENCE 4
EQUIPMENT NUMBER
l FINISH FLOOR
AEI.1 EL. = 100' -0n
SECTION REFERENCE ELEVATION
I
AEi.I
ELEVATION REFERENCE
1) CONTRACTOR shall field verify all conditions and dimensions prior to any
12) Contractor shall provide samples of all non- building standard materials
work and shall be responsible for all work and materials including those
for review by Tenant representative or Architect. Refer to finishes plan for
furnished by the owner,
required items.
2) All construction must comply with all local governing codes.
14) All work and materials used to accomplfsh designated work shall be
coordinated with contractor, tenant representative (why applicable) and
3) CONTRACTOR shall report to the Architect any error or omission he may
building owner representative with respect to delivery and storage.
discover In the drawings, or any Inconsistency he may discover in the drawings,
or any inconsistency between the drawings and field conditions, prior to
15) CONTRACTOR will appofrt one specific individual for Ilaeon with tenant
construction so that the Architect may issue written clarification in a timely
representative and architect.
manner.
16) CONTRACTOR shall be responsible for initiating, maintaining, and
4) Do not scale drawings.
supervising all safety precautions in connection with the work and shat)
coordinate suds with tenant representative.
5) CONTRACTOR Is responsible for all permits and fees.
p) CONTRACTOR shall not perform any work not contained In the
6) CONTRACTOR is responsible for providing adequate blocking at the
construction documents without the approval of the Architect,
required locations for all wall mounted shelving, tables, etc. No extra fees will
be entertained For lack of coordination.
IS) CONTRACTOR Is responsible for coordinating all architectural,
mechanical, telephone, electrical (including lighting), and plumbing so to ensure
1) CONTRACTOR Is responsible for recefving and on -site storage of all
that required clearances for installation and maintenance or all equipment are
soft -goods (small wares, etc.) during regular construction hours.
provided.
8) CONTRACTOR shall control nofee producing Items (stereos) at all times.
19) Dimensions shat( not be changed without architects written approval.
9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c.
20) CONTRACTOR to protect existing constructfon and restore all finish
unless noted otherwise. Extenrwalia to be Floor to ceiling, unless noted
surfaces to their original condition where damaged.
othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which
walls to receive wall covering. Prime these walls with one coat of primer.
21) CONTRACTOR shall carefully deck field conditions coordinating them
with the contract documents for accuracy and confirming that the work is build
10) Refer to reflected cig plan for light fixture schedule,
able as show, before proceeding with construction.
II) CONTRACTOR shall install all artwork and decor, including well hung
22) Accessible rest rooms are rrovided by landlord and are not part of this
pictures Furnished by Owner.
contract.
- t )
A. _ <�
i }
I
_ 0 Job Site Copy C10
MECHANICAL. NOTES EaUIPMENT NOTES '
1) The CONTRACTOR Is responsible For the mechanical systems on a i) Rarer to equipment schedule for Owner supplied, Owner installed,
, design build" bsisls. Systems are required to meet current city /state codes, etc. equipment. if any place or equipment Is not specifically listed, then It
el-all be provided and Installed by the General Contractor.
ELECTRICAL. NOTES= 2) All non - portable (ie. - non- rolling) equipment shall be
completely caulked in place with clear sealant. Fill all gaps, etc.
U CONTRACTOR is responsible for the electrical systems on a adeeign completely around all equipment.
build" basis. Systems are required to meet current citylstate codes.
2) Electrician is notified (f the owner requires the space to be wired for
wireless Internet connections (3), located by owner's representative on HVAC NOTES:
site.
1) The HVAC system shall be installed new, or modiffed, as required to meet
� the tenant's requirements based upon equipment loads, function and type of
2 \ space.
Certification
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that Iam aduly licensed
Architect under the laws of the State of Minnesota.
Signature
Registration No. 14066
Date 6 JUNE 2003
Project For
Lakeville, MN
Project No. 1 372, 002.02
Drawn By MGSIAM0
Chocked By: GAS
Date: 3 JULY 2003
NM CE: The designs shown and described herein mciuilirg all technical drawings,
graphics, and models thereof, are pmlimimmy and cannot be copied, duplicated or
commemisily egrloitad. in whola or in part without expresswdt@n permission of
11SPAchitads. These aeavagabie forfnifted reviewand eraluationlivdiants,
consultants, contractors, gwemmentagcocies, vendors and office personnel only
in aanrdancewith this Notice-
® Copyright RSP Architects 2002. All rights reserved.
1/3(03 151PPERS COMMENTS
1 I ii16103 I REVISED
2 1125/03 IMISCELLANEOUIS REVISIONS
Mark Da te
08 -18 -03 A10:0° IN
COVER SHEET