Loading...
HomeMy WebLinkAboutINSP0214 BSP Architects 612.6777100 1220 Marshall Street NE 612.677.7499 fax Minneapolis www.rsparch.com MN 55413 -1036 Consultants PROJECT DIRECT FRANCHISER: STEAMING BEAN COFFEE GO, 2815 North Pascal Street +22 St. Paul, MN. 55113 (612) 493- 0833 FAX: (651) 493 =0844 ARCHITECT: RSP ARCHITECTS, LTD 1220 Marshall Street, NE. Mhneapolls, Minnesota 55413 (612)67171-1100 FAX: (612) 611 -1499 CONTRACTOR: T.R.D. CITY: Lakeville, MN HEALTH DEPT.: STATE OF MINNESOTA DEPARTMENT OF ENVIRONMENTAL HEALTH VICINITY MAP STEAMING BEAN 1104 160TH STREET LAKEVILLE, MN 55044 Illy KEY CODE REVIEW for review by Tenant representative or Architect. Refer to finishes plan for furnished by the owner, AUTHORITY: CITY OF LAKEVILLE 3 14) All work and materials used to accomplfsh designated work shall be COPE: 2000 IBC 36 • ISSUED building owner representative with respect to delivery and storage. discover In the drawings, or any Inconsistency he may discover in the drawings, EX16TiNG Otbr construction so that the Architect may issue written clarification in a timely CONSTRUCTION: TYPE 2 -8 manner. • REVISED AND REISSUED USE: Restaurant. Group A. Division 2, a ti AREA: 1261 sq. Ft. 5) CONTRACTOR Is responsible for all permits and fees. OCCUPANT LOAD: p) CONTRACTOR shall not perform any work not contained In the • ISSUED FOR PERMIT KITCHEN/PREP 39I/200 2 required locations for all wall mounted shelving, tables, etc. No extra fees will DINING AREA 928/15 (52 IS) CONTRACTOR Is responsible for coordinating all architectural, UNOCC. AREA 145/0 0 TOTAL 64 UNOCCUPIED AREA = FREEZER, UTILITY CLOSET, MOP 1) CONTRACTOR Is responsible for recefving and on -site storage of all • ISSUED FOR BIDS soft -goods (small wares, etc.) during regular construction hours. provided. SINK, RESTROOMS, MILLWORK 19) Dimensions shat( not be changed without architects written approval. 9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c. AND WALLS. 24ilm surfaces to their original condition where damaged. othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which walls to receive wall covering. Prime these walls with one coat of primer. EXITING WIDTH: 64 x 02 = 21" REQUIRED with the contract documents for accuracy and confirming that the work is build T WO (2) E XITS REQ UI R ED WEN OCC LOAD 15 OVER 50 able as show, before proceeding with construction. II) CONTRACTOR shall install all artwork and decor, including well hung PROVIDED 2 EXITS 6 6' -0" EA. = I2' -0" LF. � G PROVIDED I EXITS n) V -0" EA, - 3' - 0" LF, - t ) - o SANITARY RESTROOh15 - EXISTING FACILITIES: Vi lFgtew SHEET IN KEY t r _ for review by Tenant representative or Architect. Refer to finishes plan for furnished by the owner, Al'. 3 14) All work and materials used to accomplfsh designated work shall be �,'+ r3G3�nY�`4r�re • ISSUED building owner representative with respect to delivery and storage. discover In the drawings, or any Inconsistency he may discover in the drawings, or any inconsistency between the drawings and field conditions, prior to Otbr construction so that the Architect may issue written clarification in a timely representative and architect. manner. • REVISED AND REISSUED 4) Do not scale drawings. ti coordinate suds with tenant representative. 5) CONTRACTOR Is responsible for all permits and fees. p) CONTRACTOR shall not perform any work not contained In the • ISSUED FOR PERMIT construction documents without the approval of the Architect, required locations for all wall mounted shelving, tables, etc. No extra fees will be entertained For lack of coordination. SHEET IN KEY work and shall be responsible for all work and materials including those for review by Tenant representative or Architect. Refer to finishes plan for furnished by the owner, required items. 2) All construction must comply with all local governing codes. 14) All work and materials used to accomplfsh designated work shall be coordinated with contractor, tenant representative (why applicable) and • ISSUED building owner representative with respect to delivery and storage. discover In the drawings, or any Inconsistency he may discover in the drawings, or any inconsistency between the drawings and field conditions, prior to 15) CONTRACTOR will appofrt one specific individual for Ilaeon with tenant construction so that the Architect may issue written clarification in a timely representative and architect. manner. • REVISED AND REISSUED 4) Do not scale drawings. supervising all safety precautions in connection with the work and shat) coordinate suds with tenant representative. 5) CONTRACTOR Is responsible for all permits and fees. p) CONTRACTOR shall not perform any work not contained In the • ISSUED FOR PERMIT construction documents without the approval of the Architect, required locations for all wall mounted shelving, tables, etc. No extra fees will be entertained For lack of coordination. IS) CONTRACTOR Is responsible for coordinating all architectural, mechanical, telephone, electrical (including lighting), and plumbing so to ensure 1) CONTRACTOR Is responsible for recefving and on -site storage of all • ISSUED FOR BIDS soft -goods (small wares, etc.) during regular construction hours. provided. 8) CONTRACTOR shall control nofee producing Items (stereos) at all times. 19) Dimensions shat( not be changed without architects written approval. 9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c. 20) CONTRACTOR to protect existing constructfon and restore all finish unless noted otherwise. Extenrwalia to be Floor to ceiling, unless noted surfaces to their original condition where damaged. othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which walls to receive wall covering. Prime these walls with one coat of primer. a with the contract documents for accuracy and confirming that the work is build 10) Refer to reflected cig plan for light fixture schedule, able as show, before proceeding with construction. II) CONTRACTOR shall install all artwork and decor, including well hung 22) Accessible rest rooms are rrovided by landlord and are not part of this � G - t ) - o m e e w La u a a a us w m ARCHITECTURAL --- - -- - - -- - -- • • • -- — GI�I C-0- - -- - - - --- VER SHEET, GENERAL INFORMATION AEI.I FLOOR P LAN : • • • AV] RE FLECTED CEILING FLAN5 4 DETAILS • •.• AE4.1 INTERIOR ELEVATIONS AND DETAILS • • AL42 INTERIOR ELEV ATIONS A ND DETAIL • _• •_ • E01.1 EQUIPMENT PLAN • • • _ ILL DRAFTING SYMBOLS INDICATES DETAIL NUMBER NAME 129 INDICATES SHEET UPON Ai WHICH DETAIL APPEARS ROOM NUMBER 123 I I AI OI` Al DOOR NUMBER DETAIL REFERENCE 4 EQUIPMENT NUMBER l FINISH FLOOR AEI.1 EL. = 100' -0n SECTION REFERENCE ELEVATION I AEi.I ELEVATION REFERENCE 1) CONTRACTOR shall field verify all conditions and dimensions prior to any 12) Contractor shall provide samples of all non- building standard materials work and shall be responsible for all work and materials including those for review by Tenant representative or Architect. Refer to finishes plan for furnished by the owner, required items. 2) All construction must comply with all local governing codes. 14) All work and materials used to accomplfsh designated work shall be coordinated with contractor, tenant representative (why applicable) and 3) CONTRACTOR shall report to the Architect any error or omission he may building owner representative with respect to delivery and storage. discover In the drawings, or any Inconsistency he may discover in the drawings, or any inconsistency between the drawings and field conditions, prior to 15) CONTRACTOR will appofrt one specific individual for Ilaeon with tenant construction so that the Architect may issue written clarification in a timely representative and architect. manner. 16) CONTRACTOR shall be responsible for initiating, maintaining, and 4) Do not scale drawings. supervising all safety precautions in connection with the work and shat) coordinate suds with tenant representative. 5) CONTRACTOR Is responsible for all permits and fees. p) CONTRACTOR shall not perform any work not contained In the 6) CONTRACTOR is responsible for providing adequate blocking at the construction documents without the approval of the Architect, required locations for all wall mounted shelving, tables, etc. No extra fees will be entertained For lack of coordination. IS) CONTRACTOR Is responsible for coordinating all architectural, mechanical, telephone, electrical (including lighting), and plumbing so to ensure 1) CONTRACTOR Is responsible for recefving and on -site storage of all that required clearances for installation and maintenance or all equipment are soft -goods (small wares, etc.) during regular construction hours. provided. 8) CONTRACTOR shall control nofee producing Items (stereos) at all times. 19) Dimensions shat( not be changed without architects written approval. 9) interior walls to be Na" g . bd. on each side of metal studs 9 16 "o.c. 20) CONTRACTOR to protect existing constructfon and restore all finish unless noted otherwise. Extenrwalia to be Floor to ceiling, unless noted surfaces to their original condition where damaged. othh✓rwise. All walls to be taped, sanded and painted. Verify with Owner which walls to receive wall covering. Prime these walls with one coat of primer. 21) CONTRACTOR shall carefully deck field conditions coordinating them with the contract documents for accuracy and confirming that the work is build 10) Refer to reflected cig plan for light fixture schedule, able as show, before proceeding with construction. II) CONTRACTOR shall install all artwork and decor, including well hung 22) Accessible rest rooms are rrovided by landlord and are not part of this pictures Furnished by Owner. contract. - t ) A. _ <� i } I _ 0 Job Site Copy C10 MECHANICAL. NOTES EaUIPMENT NOTES ' 1) The CONTRACTOR Is responsible For the mechanical systems on a i) Rarer to equipment schedule for Owner supplied, Owner installed, , design build" bsisls. Systems are required to meet current city /state codes, etc. equipment. if any place or equipment Is not specifically listed, then It el-all be provided and Installed by the General Contractor. ELECTRICAL. NOTES= 2) All non - portable (ie. - non- rolling) equipment shall be completely caulked in place with clear sealant. Fill all gaps, etc. U CONTRACTOR is responsible for the electrical systems on a adeeign completely around all equipment. build" basis. Systems are required to meet current citylstate codes. 2) Electrician is notified (f the owner requires the space to be wired for wireless Internet connections (3), located by owner's representative on HVAC NOTES: site. 1) The HVAC system shall be installed new, or modiffed, as required to meet � the tenant's requirements based upon equipment loads, function and type of 2 \ space. Certification I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that Iam aduly licensed Architect under the laws of the State of Minnesota. Signature Registration No. 14066 Date 6 JUNE 2003 Project For Lakeville, MN Project No. 1 372, 002.02 Drawn By MGSIAM0 Chocked By: GAS Date: 3 JULY 2003 NM CE: The designs shown and described herein mciuilirg all technical drawings, graphics, and models thereof, are pmlimimmy and cannot be copied, duplicated or commemisily egrloitad. in whola or in part without expresswdt@n permission of 11SPAchitads. These aeavagabie forfnifted reviewand eraluationlivdiants, consultants, contractors, gwemmentagcocies, vendors and office personnel only in aanrdancewith this Notice- ® Copyright RSP Architects 2002. All rights reserved. 1/3(03 151PPERS COMMENTS 1 I ii16103 I REVISED 2 1125/03 IMISCELLANEOUIS REVISIONS Mark Da te 08 -18 -03 A10:0° IN COVER SHEET