HomeMy WebLinkAboutItem 06.oDate: 16 August 2012 Item No. Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution rejecting the bid received on August 14, 2012 to replace the 168 Street Bridge and authorizing staff to re- advertise for bids during the 2013 construction season. These bridge improvements constitute City Improvement Project 12 -04. Overview One bid was received and publicly opened for the 168 Street Bridge Replacement Project from Global Specialty Contractors, Inc. in the amount of $435,123.00. The Engineer's Estimate for the bridge replacement project is $231,952.00. The bridge replacement was planned concurrently with the 2012 street reconstruction project. Post -bid phone calls were placed to the three other prime contractors that had purchased bidding documents, but had not submitted bids for the project. All three indicated that they had already committed to enough work for the 2012 construction season and did not have the resources to bid another project. Based on feedback from the bridge contractors regarding their 2012 construction season workloads, staff recommends rejecting the bid received on August 14, 2012 and re- advertising for bids at the start of the 2013 construction season. Primary Issues to Consider • Will the delay in the bridge replacement affect 2012 street reconstruction projects? Interim grading /drainage improvements will need to be constructed at the 168 Street Bridge to allow for the street reconstruction work to be completed in 2012 and for the bridge replacement in 2013. • Can the City still utilize the $240,000 in State Aid Bridge Bonds Funds allocated to this project in 2013? Yes, the Bridge Bond Funds will still be available in 2013. Supporting Information • Attached is a copy of the August 14, 2012 bid tabulation. Notes: RESOLUTION REJECTING THE BID RECEIVEDTO REPLACE THE 168 STREET BRIDGE AND AUTHORIZING STAFF TO RE- ADVERTISE FOR BIDS DURING THE 2013 CONSTRUCTION SEASON nstopher 'etree Public Wor s Director Financial Impact: $240,000 Related Documents (CIP, ERP, etc.): Capital Improvement Plan Budgeted: Yes Source: Bridge Bond Funds ATTEST: Charlene Friedges, City Clerk CITY OF LAKEVILLE RESOLUTION NO: RESOLUTION REJECTING THE BID RECEIVEDTO REPLACE THE 168 STREET BRIDGE AND AUTHORIZING STAFF TO RE- ADVERTISE FOR BIDS DURING THE 2013 CONSTRUCTION SEASON WHEREAS, on August 14, 2012, one bid was received and publicly opened for the 168`'' Street Bridge Replacement Project, City Project 12 -04; and WHEREAS, the bid received was in the amount of $435,123.00; and WHEREAS, the Engineer's Estimate is $231,952.00; and WHEREAS, the contractors that had purchased bidding documents, but did not bid on the project, indicated that they had already committed to enough work for the 2012 construction season, and did not have the resources to bid another project; NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Lakeville, that the City rejects all bids received on August 14, 2012 and authorizes staff to re- advertise for bids to replace the 168 Street Bridge during the 2013 construction season. ADOPTED this 20 day of August 2012, by the City Council of the City of Lakeville. CITY OF LAKEVILLE Mark Bellows, Mayor 2 Global Specialty Contractors, Inc.' Unit Price 'Total Price 1168TH STREET BRIDGE REPLACEMENT 1 $21,500.001 1 00 •000 `1$ 100'009'ZL$ $111,900.001 100'000`8£$ 100'819`6£$ $10,000.001 $13,000.001 100'000`9£$ 100'009`£1.$ $41,600.001 100 00'9L8'L$ 00'009`£$ 100'000`£$ $435,123.001 'Total 168TH STREET BRIDGE REPLACEMENT: L 1 $231.,952.001 1 $435,123.001 1 $435,123.001 %6918 $21,500.001 100'000`1$ $1,250.00 1 00' 001$ 09'1$ $10,000.001 100' 6$ 1 $35,000.001 $85.001 100'002'9$ 1 00'00Z$ $45.001 $14.001 $15.001 Engineers Estimate [Unit Price 'Total Price 1 100 00 00'00L`L£$ 00'999`96$ 00'00L`9$ 00'9£L`6Z$ 00 00'000'93 00'000`0£$ 00'000`8$ 00'00019$ 00'009`9 00'090`6$ $1,000.001 100'009$ $231,952.001 $231,952.001 $10,000.001 1 100'099$ 7 $14.001 100'09$ OZ'6$ 00'000'9$ $ 00'000`0£$ 00'09$ 00'000`8$ 00'99$ 00'9$ 00'1$ 00'£$ Quantity r 185 6666 96 09LiZ r r e- 091. CO 001. 9L1. 09Z 00Z DGE REPLACEMENT: Totals for Project 02109 -06 of Estimate for Project 02109 -06 win INfS dWnl LUMP SUM OA nO Id OS Id Nll �OUND LUMP SUM LUMP SUM LUMP SUM Id Nll HOVB OA nO CIA OS Id Nll CIA OS Project: 02109 -06 - LKVL - 168th Street Bridge wail l MOBILIZATION REMOVE REGULATED WASTE MATERIAL (BRIDGE) STRUCTURAL CONCRETE (3Y43) (P) BRIDGE SLAB CONCRETE (3Y36) (P) TYPE F (TL -4) RAILING CONCRETE (3Y46) (P) REINFORCEMENT BARS (EPDXY COATED) (P) SLOPE PREPARATION STRUCTURE EXCAVATION REMOVE EXISTING BRIDGE STEEL H- PILING DELIVERED 10" ROCK SOCKET RANDOM RIPRAP CLASS III GEOTEXTILE FILTER TYPE IV (MOD) SILT FENCE, TYPE HEAVY DUTY RAPID STABILIZATION METHOD 4 1 Total 168TH STREET BRII 1609'6ZOZI 12104.6011 2401.501 'Z69'1.0131 12401.5131 2401.541 2401.601 1109'60121 12442.5011 111.5'Z51Z1 12452.6021 11.0911.9Z' 193 1 Z05£L9Z 12575.5721 1Item No.1 N CO LC) Cfl N CO 0) 06 1 661 Z6 1 E61 1 161 1 961 CO en CL C tD 3 V DENOTES CORRECTED FIGURE Date: August 14, 2012 License No. 47497