HomeMy WebLinkAboutItem 06.gSeptember 13, 2012
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution
approving the Spirit of Brandtjen Farm 11t Addition preliminary and final plat, and 2) a
resolution vacating public drainage and utility easements.
Passage of this motion will result in the development of seven single family lots within the
Spirit of Brandtjen Farm planned unit development (SBF PUD).
Overview
Tradition Development (a /k/a SBF Development Corp.) representatives are requesting
approval of the Spirit of Brandtjen Farm (SBF) 11t Addition final plat of seven single family
lots. SBF 11t Addition is a re -plat of eight single family lots from the SBF 8th Addition final
plat, which in turn was a re -plat of lots in the original SBF final plat approved in 2005. In
conjunction with the re -plat, the boundary drainage and utility easements within the existing
final platted lots of SBF 8 Addition are being vacated and boundary drainage and utility
easements are being established along the new platted lot lines.
The Planning Commission held a public hearing on the preliminary plat and easement
vacation applications at their September 6, 2012 meeting and unanimously recommended
approval. There was no public comment. Planning and Engineering staff recommend
approval of the SBF 11t Addition preliminary and final plat and easement vacation.
Primary Issues to Consider
• Why are the lots in SBF 11 Addition being re platted?
Supporting Information
• Staff analysis of issues
• Resolution approving the SBF 11 Addition preliminary and final plat
• Resolution vacating public drainage and utility easements
• September 6 draft Planning Commission meeting minutes
September 5 draft Parks, Recreation and Natural Resources Committee meeting minutes
ug 5t 3t h planning and engineering reports
Daryl Maey, Plann Director
SPIRIT OF BRANDTJEN FARM 11 ADDITION
SEPTEMBER 17, 2012 CITY COUNCIL MEETING
Item No.
Financial Impact: $ Budgeted: Y/N Source:
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances and SBF PUD
Notes:
Staff Analysis of Primary Issues
• Why are the lots in SBF 11 Addition being re- platted?
The proposed re -plat includes design changes that reflect market resistance to the original SBF
PUD design of private carriageways (i.e. alleys) at the rear of homes and to provide greater
separation between lots. The revised design of the SBF 11 Addition re -plat eliminates the
private carriageway at the rear of the lots in this area in favor of two private driveways along
the side lot lines to serve the single family homes to be constructed on Lots 1 and 2, Block 1, and
Lot 1, Block 2 and Lot 1, Block 1, SBF 8 Addition.
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO.
RESOLUTION APPROVING THE PRELIMINARY AND FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 11 ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 11
Addition has requested preliminary and final plat approval; and
WHEREAS, the preliminary plat plans were reviewed by the Planning
Commission and the Parks, Recreation and Natural Resources Committee; and
WHEREAS, the preliminary and final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The preliminary and final plat of Spirit of Brandtjen Farm 1 1 th Addition is
hereby approved subject to the terms and conditions of the Spirit of Brandtjen
Farm Master Planned Unit Development Stage Plan Agreement dated
October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
APPROVED AND ADOPTED this 17 day of September, 2012.
ATTEST:
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
CITY OF LAKEVILLE
BY:
Mark Bellows, Mayor
I hereby certify that the foregoing Resolution No. is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 17 day of September, 2012, as shown by
the minutes of said meeting in my possession.
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO.
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the Planning Commission has conducted a public hearing, preceded
by two (2) weeks published notice, to consider the following described easement
vacation, and
WHEREAS, the City Council has determined that it is in the public interest to
approve the easement vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. All the drainage and utility easements in the following: Lots 1, 2, 3, 4, 5, and
6, Block 2; Lots 1 and 2, Block 3 all in Spirit of Brandtjen Farm 8 th Addition,
according to the recorded plat thereof, Dakota County, Minnesota.
2. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
DATED this 17 day of September, 2012.
CITY OF LAKEVILLE
Mark Bellows, Mayor
ATTEST:
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 17 day of September, 2012, as shown by
the minutes of said meeting in my possession.
Charlene Friedges, City Clerk
(SEAL)
Planning Commission Meeting Minutes, September 6, 2012
Ayes: Maguire, Boerschel, Lillehei, Davis, Grenz, Drotning
9. Spirit of Brandtjen Farm 11 Addition
Chair Lillehei opened the public hearing to consider; the application of SBF
Development Corp. for the following: a. Preliminary plat and PUD development
stage plans of 7 single family lots to be known as Spirit of Brandtjen Farm 11
Addition; and b. The vacation of drainage and utility easements. The Recording
Secretary attested that the legal notice had been duly published, in accordance with
State Statutes and City Code.
Jacob Fick from Tradition Development presented an overview of the request. Mr.
Fick stated that their plans keep evolving within SBF and adjustments have been
made due to the economy. He indicated that the lots proposed in SBF 11 Addition
were part of the preliminary plat .of SBF 6 Addition and the final plat of SBF 8
they' He stated that theh;ave; made some'design changes due to market
resistance to the original design:; of private carriageways and they were having
difficulty selling lots that were back to back: Mr. Fick. explained that SBF 11
Addition proposes to elimina to the private carriageway platted as Outlot A, SBF 8
Addition to service the lots in Blocks .1 and 2. He`also indicated that there is one
t h
less lot on the proposed 11.Addition than the approved 8 Addition within Block 2
due to greater lot. widths. Mr stated that there will be an additional outlot that
will provide shared _drivewajr,accessto Eagleview Drive.
Dan Licht:frorn Planning Company` presented the planning report. Mr. Licht
stated that the`los,.included in SBF 11 Addition were part of the preliminary plat of
SB'F 6 Addition and the final= plat of SBF 8 Addition.
Mr. Licht indicated th the lots within SBF 11 Addition are designated on the
preliminary plat and otherwise subject to the cottage or traditional lot standards as
stated in Section 7 of. the SBF PUD Booklet. He stated that the lots within the
preliminary'plat are consistent with the lot requirements for the previously approved
SBF 8 Addition ;.::.':_'.::
Regarding access, Mr. Licht explained that the proposed reconfiguration of the
access for the lots fronting onto Eagleview Drive will reduce encroachment behind
these lots adding visual open space to the privately maintained /publicly accessible
green space approved at the center of the block with SBF 6 Addition that the seven
lots in the 11 Addition will back onto.
ew SBF park dedication credit balance shall be $147,357.22
($255,357. credit balance - $108,000.00 credit for SBF 10
Addition).
Page 11
Planning Commission Meeting Minutes, September 6, 2012 Page 12
Mr. Licht stated that the layout of the streets is unchanged from the approved SBF
8 Addition preliminary plat and are not included as part of the SBF 11 Addition
preliminary or final plat.
Mr. Licht stated that the easements that are shown on the preliminary and final plat
will replace existing drainage and utility easements dedicated with the SBF 8th
Addition final plat that are proposed to be vacated.
Mr. Licht stated that Planning Department and Engineering Department staff
recommend approval of the preliminary plat, PUD development stage plans and the
easement vacation subject to the 2 stipulations listed in the August 30, 2012
planning report.
Chair Lillehei opened the hearing to the public for comment.
There were no comments from the audien
Motion was Davis, seconded .
8:12 p.m.
Ayes: Boerschel, Lillehei, Davis, Grenz, Drotning, Maguire
Nays: 0
Chair Lillehei asked for comments from the .Planning Commission. Discussion
points were:
• The Planning Commissio ri confirmed the PUD garage setback to the shared
private driveways.
Motion was made . .by , , Davis; "seconded by Boerschel to recommend to City
Council - approval of the; preliminary plat ` and PUD development stage plans of 7
single' family lots_= -to be: known as Spirit of Brandtjen Farm 11 Addition and
easement vacation subject to the following stipulations:
SBF 7 Addition shall be developed consistent with the approved SBF
Master Plan, the PUD booklet dated June 20, 2005 and the PUD
- Development Stage Plan /Preliminary Plat.
2. Documents incorporating the SBF 7 Addition final plat as part of the SBF
Master= .Homeowners Association are required to provide for long -term
ownership and maintenance of Outlots A and B and are subject to review
and approval of the City Attorney.
Ayes: Lillehei, Davis, Grenz, Drotning, Maguire, Boerschel
Nays: 0
Chair Lillehei stated that Tradition Development has done an excellent job with this
development including providing a good product for their customers.
DRAFT
CITY OF LAKEVILLE
PARKS, RECREATION & NATURAL RESOURCES COMMITTEE
MEETING MINUTES
September 5, 2012
hair Kelly called the meeting to order at 6 p.m. in the Council Chambers at City Hall.
Me • ers Present: Matt Dinslage, Tom Goodwin, Judy Hayes, Scott Kelly, Howard Lovelace,
Jeanne • terson, Bob Swan, Jerry Zell
Members • sent: None
Staff Presen . nterim Parks & Recreation Director John Hennen, Environmental Resources
Manager Mac Ca -rty, Recording Secretary Patty Ruedy
2. Approval of July 8, 2012 meeting minutes
Minutes were appro -d as presented.
3. Citizen comments
There were no citizen Comm
ts.
4. Staff report
Staff gave an update on Heritage Ce -r, Kenrick Avenue Trail project and improvements
to King Park infields #1, 2 and 4. Staff .s had some discussions with Steve McComas
regarding water quality issues at Valley Lak Newly- planted park trees are being watered
due to lack of rain. Art Festival is scheduled for eptember 15 -16.
5. Spirit of Brandtjen Farms 10th Addition prelimin . ♦ and final plat
The plat consists of 22 single - family lots located wes .f Draft Horse Blvd. and north of
170th St. SBF Development Corporation has also submitt -, a final plat for approval of 48
single - family lots and 2 outlots. The developer will be requ -d to construct 5' concrete
sidewalks on both sides of all local streets and rough -grade for . ture trail along the west
side of Diamond Path. Park dedication was previously satisfied thr• gh a land dedication
and cash contribution paid in 2005. Staff noted that grading for the ' e was done in the
first phase. Goodwin inquired about trails and green spaces. Staff repli- that trails and
common areas remain intact.
Motion made by Zell, seconded by Goodwin to recommend City Council onsider
approval of Spirit of Brandtjen Farms 10th Addition preliminary plat, PUD develo• ent
stage plan and final plat subject to the TPC Planning Report dated August 30, 2012 d
Engineering Report dated August 30, 2012.
Ayes- Unanimous
6. Spirit of Brandtjen Farms 11th Addition preliminary and final plat
This is a re -plat of the SBF 8th Addition approved by City Council on Oct. 17, 2011. The
private alley platted as Outlot A to service the lots and blocks 1 and 2 has been
eliminated. The developer will be required to construct 5' concrete sidewalks on both
sides of all local streets. The park dedication requirement was paid with the SBF plat in
2005; therefore no park dedication will be collected. Goodwin inquired about trails. Staff
replied that the trails are taken care of by the association in this area.
Parks, Recreation & Natural Resources Committee Meeting Minutes, September 5, 2012 Page 2
Motion made by Dinslage, seconded by Swan to recommend City Council consider
approval of Spirit of Brandtjen Farms 11th Addition preliminary and final plat subject to
the TPC Planning Report dated August 30, 2012 and Engineering Report dated August
30, 2012.
Ayes- Unanimous
7. Motorcycle parking in Antlers Park
Council members recently received an email from a resident requesting a motorcy e
parking area at Antlers Park as a result of receiving a ticket for parking on a stripe.. rea
for handicapped parking. Staff presented options: 1) striping existing stall(s) wi in the
parking lot, 2) renovate existing stub trail located on the south side of the • .rking lot,
remove curb and add concrete pad (high cost). Committee feels that motor cle parking
does not need to be located up front, as it is and always has been first- %me, first - serve.
Committee agreed to direct staff to paint two existing stalls (4 ► otorcycle spots).
Peterson suggested adding renovation of the existing stub trail t the 2014 budget if
funds can't be found in the meantime. Committee is not in fav• of adding designated
motorcycle parking at other parks at this time.
8. Ritter Farm Park South Forty Archery Range
Earlier this year, a resident who lives adjacent Ritte Farm Park contacted the Parks
Department regarding a number of arrows he fou . on his property east of the South
Forty Archery Range while completing significa buckthorn removal on his property.
Prior to Parks & Recreation Director Steve Mi ' aud's retirement, Steve worked with the
South Forty Archery Club, eliminating t targets and relocating six that were in
proximity to the resident's property. Staff ecently met with the resident again along with
the South Forty Archery Club preside ► Shawn Bartlett as a result of resident finding a
new arrow on his property. South orty Archers have since shut down an additional
target located closest to his prop- ty. Dinslage inquired as to whether there is a policy on
setbacks for targets or a buff: zone. Staff replied that there is no policy and that the
archery range has been in e stence since 1984. Staff will continue to work with the South
Forty Archery Club regar• ng preventing errant arrows from leaving the site.
9. Other business
Committee inquir
revised docu
determined
will is /wil
10. Ann • ncements
d as to status of Parks, Trails & Open Space Plan. Staff replied that the
nt will be included as part of the City's visioning plan at a yet- to -be-
ate. Goodwin inquired; what is a visioning plan? Hayes inquired as to who
e on the visioning committee. Staff will follow up with committee members.
N :. t Parks, Recreation & Natural Resources Committee meeting, September 19.
Adjourn
Meeting adjourned at 6:55 p.m.
Respectfully submitted,
Patty Ruedy, Recording Secretary
TPC
MEMORANDUM
TO: Daryl Morey
FROM: Daniel Licht, AICP
DATE: 30 August 2012
RE: Lakeville — SBF 11 Addition
TPC FILE: 135.01 — 12.02
ANALYSIS
SBF Development Corporation has submitted plans to replat a portion of the approved
Spirit of Brandtjen Farm (SBF) 8 Addition. The SBF 11 Addition preliminary and final
plat will eliminate the private carriageway platted as Outlot A to service the lots in
Blocks 1 and 2. The applications involved in considering the proposed site design
changes include requests for an amended preliminary plat, amended PUD development
stage plan, final plat and vacation of drainage and utility easements. The subject site is
zoned PUD, Planned Unit Development District as approved by the City Council on 20
June 2005.
Exhibits:
A. Location Map
B. SBF 11 Addition Preliminary Plat
C. SBF 11 Addition Final Plat
D. Easement Vacation Exhibit
ANALYSIS
3601 Thurston Avenue N, Suite 100
Anoka, MN 55303
Phone: 763.231.5840
Facsimile: 763.427.0520
TPC @Plan ni ngCo. corn
Item No. ___
SBF 11 Addition. The lots included in SBF 11 Addition were part of the preliminary
plat of SBF 6 Addition and the final plat of SBF 8 Addition, which re- platted lots in the
initial SBF final plat approved on 17 October 2005. The design changes included in the
6 Addition re -plat were initiated in part to market resistance regarding the original
design of the subdivision's use of private carriageways as well as provide greater
separation at the rear of the homes within this area. The proposed 11 Addition would
Setbacks
Front
Side
Rear
House
Garage
Door
Garage
Interior
Corner
House
Garage
Door
Garage
House
Garage
20ft.
25ft.
20ft.
7ft.
15ft
25ft
15ft
20ft.
10ft.
Lot
Designation
Proposed 11
Addition
Cottage
L1, B1; L2 -5, B2
Traditional
L2, B1; L1, B2
eliminate the private alley platted as Outlot A to service the lots in Blocks 1 and 2.
There is also one less lot shown on the proposed 1 1 th Addition than the approved 8th
Addition within Block 2 due to greater lot widths and an additional outlot that will provide
shared driveway access to Eagleview Drive.
Comprehensive Plan. The 2008 Comprehensive Land Use Plan guides the subject
site for low density residential uses at less than three dwelling units per acre. The net
density of the SBF 1 1 th Addition preliminary plat is 3.43 dwelling units per acre due to
only the lot area of the approved SBF 8 Addition being re- platted. When taken in
context that the proposed SBF 1 1 th Addition removes a lot from the approved SBF 8th
Addition final plat, the use is consistent with the densities allowed in this. Furthermore,
the proposed seven single family lots are within the 2,109 dwelling units planned for
SBF and will not have a negative impact to City service capacities.
MUSA. The subject site is within the current MUSA and sanitary sewer and water
utilities are available to the property to accommodate the proposed SBF1 Addition
plat.
Zoning. The subject site is zoned PUD, Planned Unit Development District subject to
the provisions of Ordinance Number 787 approved by the City Council on 20 June
2005.
Lots. There is no minimum lot area required by the SBF PUD District with the lots
regulated based on minimum width requirements, setbacks and design standards
established by the SBF PUD Booklet dated 20 June 2005. The lots within SBF 1 1 th
Addition are designated on the preliminary plat and otherwise subject to the cottage or
traditional lot standards as set forth in Section 7 of the SBF PUD Booklet. Designation
of the lots as cottage or traditional lots within the preliminary plat is consistent with the
lot requirements for the previously approved SBF 8 Addition.
Setbacks. All of the proposed single family lots are subject to and are consistent with
the setback requirements established for both "cottage" and "traditional" lots:
Access. The approved SBF 8 Addition final plat established Outlot A as a private
drive accessing Lot 1, Block 1 and Lots 1 -6, Block 2. The proposed SBF 11 Addition
maintains no direct driveway access to Eagleview Drive by providing lot frontage and
driveway access to Dynamic Drive and by proposing shared private driveways within
2
Purpose
Outlots
Private carriageway and trail
A
Private carriageway
B
Outlots A and B to the sides of Block 1 for access to Lots 1 -2, Block 1 and Lot 1, Block
2, as well as Lot 1, Block 1, SBF 8 Addition. Outlots A and B intersect Eagleview Drive
at East Lake Trail and Early Dawn Trail creating four -way intersections. The proposed
reconfiguration of the access for the lots fronting onto Eagleview Drive will reduce
encroachment behind these lots adding visual open space to the privately maintained /
publicly accessible green space approved at the center of the block with SBF 6th
Addition that the seven lots in the 11 Addition will back onto.
Streets. The layout of the streets is unchanged from the approved SBF 8 Addition
preliminary plat and are not included as part of the SBF 11 Addition preliminary or final
plat.
Sidewalks/Trails. Concrete sidewalks are required to be provided along the front of all
lots within SBF 11 Addition. In addition, there will be a trail along the south side of
Outlot A accessing the publicly accessible / privately maintained green space platted as
Outlot A, SBF 6 Addition. Construction plans for the proposed sidewalks and trail must
be submitted and are subject to review and approval of the City Engineer.
Outlots. The SBF 11 Addition preliminary and final plat includes two outlots:
Landscape Plan. A landscape plan for the internal boulevard streets must be
submitted prior to City Council consideration of the applications and is required to be
consistent with the landscape concept plan included in the SBF PUD Booklet dated 20
June 2005.
Park Dedication. No public park land will be dedicated to the City as part of SBF 11
Addition. Park dedication requirements are calculated and paid at the time of final plat
approval based on the formula established by the SBF Master PUD Development
Agreement, minus any outstanding credits due from previously final platted additions.
The park dedication requirement for the SBF 11 Addition final plat was paid with the
SBF plat in 2005; therefore no park dedication will be collected with the 11 Addition.
Easements. The preliminary plat and final plat illustrate drainage and utility easements
at the perimeter of the single family lots as required by Section 10 -4 -4 of the Subdivision
Ordinance. These easements replace existing drainage and utility easements
dedicated with the SBF 8 Addition final plat that are being vacated.
Grading Plan. All grading and drainage issues are subject to review and approval of
the City Engineer.
Utility Plan. All utility issues are subject to review and approval of the City Engineer.
3
Homeowners Association. Documents including SBF 1 1 th Addition as part of the SBF
Master Homeowners Association are required to provide for long -term ownership and
maintenance of Outlots A and B. These documents are subject to review and approval
by the City Attorney.
CONCLUSION
The Spirit of Brandtjen Farm 1 1 th Addition PUD Development Stage Plan, Preliminary
and Final Plat, and easement vacation are consistent with the requirements of the
Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance and the approved SBF
PUD. Our office recommends approval subject to the conditions outlined below:
1. SBF 7 Addition shall be developed consistent with the approved SBF Master
Plan, the PUD booklet dated 20 June 2005 and the PUD Development Stage
Plan /Preliminary Plat.
2. Documents incorporating the SBF 11 Addition final plat as part of the SBF
Master Homeowners Association are required to provide for long -term ownership
and maintenance of Outlots A and B and are subject to review and approval of
the City Attorney.
c. Jacob Fick, Tradition Development
4
Spirit of
Brandtjen Farm
11th Addition
Location Map
City of Lakeville
Spirit of Brandtjen Farm
11th Addition
Exhibit A
GI—
=
O_
f
0
®
i
EXHIB
IT B
EXHIBIT C
CI—
t=14 g
9 ,!
g3
r
d
EXHIBIT D
Memorandum
BACKGROUND
Outlot A: H.O.A. alley; to be retained by the Developer
(0.11 acres)
Outlot B: H.O.A. alley; to be retained by the Developer
(0.07 acres)
City of Lakeville
Public Works— Engineering Division
To: Daryl Morey, Planning Director
From: Mark DuChene, Development Design Engineer PAV
Mac Cafferty, Environmental Resources Manager
Copy: Zachary V. Johnson, City Engineer
John Hennen, Interim Parks and Recreation Director
Gene Abbott, Building Official
Dennis Feller, Finance Director
Date: August 30, 2012
Subject: Spirit of Brandtjen Farm 11 Addition
• Easement Vacation
• Preliminary Plat Review
• Final Plat Review
• Grading Plan Review
• Utility Plan Review
SBF Development Corporation has submitted a preliminary and final plat named Spirit
of Brandtjen Farm 11 Addition. The residential subdivision is a replat of the Spirit of
Brandtjen Farm 8 Addition that was approved by the City Council on October 17, 2011.
The subdivision is located north of 170 Street, east of Pilot Knob Road (CSAH -31),
south of 160 Street (CSAH -46) and west of the future extension of Diamond Path
(CSAH -33). The parent parcels consists of Outlot A, Lots 1 -6, Block 2 and Lots 1 -2,
Block 3 Spirit of Brandtjen Farm 8 Addition and is zoned PUD, Planned Unit
Development. Development of Spirit of Brandtjen Farm 11 Addition is subject to the
requirements listed in the Spirit of Brandtjen Farm Planned Unit Development Plan
booklet dated June 20, 2005.
The preliminary and final plats consist of seven (7) single - family lots and two (2) outlots
on 2.22 acres. The outlots created with the final plat will have the following uses:
Spirit of Brandtjen Farm 11 Addition
August 30, 2012
Page 2 of 5
SITE CONDITIONS
The Spirit of Brandtjen Farm 11 Addition site consists of vacant, undeveloped land that
was previously mass graded with Spirit of Brandtjen Farm and Spirit of Brandtjen Farm
8 Addition improvements.
EASEMENTS AND EASEMENT VACATIONS
Drainage and utility easements in favor of the City of Lakeville were previously
established around the perimeter of the individual lots, as depicted on the Spirit of
Brandtjen Farm 8 Addition plat. The easements will be vacated and re- platted along
the new lot lines with the Spirit of Brandtjen Farm 11 Addition plat.
STREET AND SITE LAYOUT
Eaqleview Drive
Spirit of Brandtjen Farm 1 1 th Addition is east of and adjacent to Eagleview Drive, a
minor collector roadway as identified in the City's Transportation Plan. The Developer
previously dedicated 100 feet of right -of -way, as shown on the Spirit of Brandtjen Farm
plat, to satisfy the right -of -way requirement.
Eagle View Drive was extended with the Spirit of Brandtjen Farm 8 Addition
improvements. Eagleview Drive is designed as a two -lane divided urban parkway with
on- street parking and 5 -foot wide concrete sidewalks along both sides. The streetscape
design is consistent with the Spirit of Brandtjen Farm Planned Unit Development Plan
booklet dated June 20, 2005.
Dynamic Drive
Spirit of Brandtjen Farm 11 Addition is west of and adjacent to Dynamic Drive.
Dynamic Drive was extended with the Spirit of Brandtjen Farm 8 Addition
improvements. Dynamic Drive is designed as a two -lane undivided urban street with
on- street parking along one side and 5 -foot wide concrete sidewalks along both sides.
The Developer dedicated 52 feet of right -of -way, as shown Spirit of Brandtjen Farm 8th
Addition plat, to satisfy the right -of -way requirement. The streetscape design is
consistent with the Spirit of Brandtjen Farm Planned Unit Development Plan booklet
dated June 20, 2005.
Alley
Development of Spirit of Brandtjen Farm 1 1 th Addition includes the construction of two
private alleys. The alleys are designed to provide owner driveway access to lots with
frontage along Eagleview Drive consistent with the approved PUD. The 14 -foot wide
alleys will be located within Outlots A and B and be privately owned and will be
maintained by the homeowners association. The streetscape design is consistent with
Spirit of Brandtjen Farm 11 Addition
August 30, 2012
Page 3 of 5
the Spirit of Brandtjen Farm Planned Unit Development Plan booklet dated June 20,
2005.
Building permits, except one model home permit, will not be issued until the concrete
curb and gutter and bituminous base pavement have been installed.
PARKS AND TRAILS
There is no new trail or sidewalk requirement with Spirit of Brandtjen Farm 11 Addition.
A 5 -foot wide concrete sidewalk along both sides of Eagleview Drive and Dynamic Drive
were constructed with Spirit of Brandtjen Farm 8 Addition improvements.
The Park Dedication Fee was satisfied with Spirit of Brandtjen Farm 8 Addition;
therefore no Park Dedication shall be collected with Spirit of Brandtjen Farm 11
Addition.
UTILITIES
Sanitary Sewer & Watermain
Development of Spirit of Brandtjen Farm 11 Addition will not require new sanitary
sewer or watermain construction. Sanitary sewer, watermain, and individual lot sanitary
sewer and water services installed with Spirit of Brandtjen Farm 8 Addition
improvements will serve the lots within Spirit of Brandtjen Farm 11 Addition.
The Sanitary Sewer Availability Charge was paid with Spirit of Brandtjen Farm;
therefore no Sanitary Sewer Availability Charge shall be collected with Spirit of
Brandtjen Farm 11 Addition.
DRAINAGE AND GRADING
Spirit of Brandtjen Farm 11 Addition was mass graded with Spirit of Brandtjen Farm 8th
Addition.
The final grading plan shall identify all fill lots in which the building footings will be
placed on fill material. The grading specifications shall also indicate that all
embankments meet FHA/HUD 79G specifications. The Developer shall certify to the
City that all lots with footings placed on fill material are appropriately constructed.
Building permits for Spirit of Brandtjen Farm 11 Addition shall not be issued until a
certified grading plan has been submitted and approved.
STORM SEWER
Development of Spirit of Brandtjen Farm 11 Addition will not require new storm sewer
construction. Storm sewer was installed with Spirit of Brandtjen Farm 8 Addition. Any
draintile construction, including perimeter draintile required for building footings, which is
Spirit of Brandtjen Farm 11 Addition
August 30, 2012
Page 4 of 5
deemed necessary during construction, shall be the Developer's responsibility to install
and finance.
The Trunk Storm Sewer Area Charge was paid with Spirit of Brandtjen Farm; therefore
no Trunk Storm Sewer Area Charge shall be collected with Spirit of Brandtjen Farm 11
Addition.
WETLANDS
There are no existing wetlands within the Spirit of Brandtjen Farm 11 Addition site.
TREE PRESERVATION
There are no significant trees within the Spirit of Brandtjen Farm 11 Addition site.
EROSION CONTROL
As stated previously, Spirit of Brandtjen Farm 11 Addition was mass graded with Spirit
of Brandtjen Farm 8 Addition improvements. The Developer shall maintain erosion
control measures in accordance with the Spirit of Brandtjen Farm 8 Addition
Development Contract and comply with the approved grading and erosion control plan.
Homebuilders shall install and maintain erosion control measures as required with the
individual building permits.
SECURITIES
The Developer provided a Letter of Credit as security for the Developer - installed
improvements relating to Spirit of Brandtjen Farm 8 Addition. The Developer also
posted a security to ensure that all property corners are installed. No additional security
is required with Spirit of Brandtjen Farm 11 Addition as the Developer is not increasing
the number of lots and the public improvements were previously constructed with Spirit
of Brandtjen Farm 8 Addition. The Developer must submit a letter from the lending
institution providing the letter of credit for Spirit of Brandtjen Farm 8 Addition stating
that the letter of credit shall cover work done with the Spirit of Brandtjen Farm 11
Addition.
CASH FEES
There are no additional cash requirements with the development of Spirit of Brandtjen
Farm 11 Addition. The proposed plat is a re -plat to eliminate the private alleyway that
would have served the six lots in Spirit of Brandtjen Farm 8 Addition that fronted
Eagleview Drive.
RECOMMENDATION
Spirit of Brandtjen Farm 11 Addition
August 30, 2012
Page 5 of 5
Engineering recommends approval of the easement vacation, preliminary and final plat,
grading plan and utility plan for Spirit of Brandtjen Farm 1 1 th Addition, subject to the
comments within this report and the following:
• Prior to release of the final plat mylars, the Developer must submit a letter
from the lending institution providing the letter of credit for Spirit of Brandtjen
Farm 8 Addition stating that the letter of credit shall cover work done with the
Spirit of Brandtjen Farm 11 Addition.