HomeMy WebLinkAboutItem 09September 28, 2012 Lakev :Ile Item No. C RESOLUTION APPROVING HERITAGE CENTER CHANGE ORDERS Proposed Action Staff recommends adoption of the following motion: Move to approve Resolution Approving Heritage Center Change Orders Passaae of this motion will result in arnvoval of rhanae orders for the T4eritaae Canter Construction Project. Overview The City Council approved the contracts for the Heritage Center Project on April 2, 2012. As with any remodeling project, there are construction issues which evolve as work progresses. The construction manager, Contegrity Group is recommending approval of change orders for the project. Throughout the entire process, staff and construction manager evaluated each modification to insure that the City was receiving a quality product within the original scope of work at the best possible pricing. Primary Issues to Consider (see attached) • Purpose of the change orders • Project budget and estimated costs as of October 1, 2012 • Project Financing • Interim Financing - Sale of Senior Center Supporting Information • Resolution approving Heritage Center change orders • Supporting documentation is on file in the offices of the Interim Parks and Recreation Hennen, Interim Parks & Recreation Director Financial Impact: $1,136,702 budgeted: N/A Source: Heritage Center Construction Fund Related Documents (CIP, ERP, etc.): Notes: Primary Issues to Consider The revised contracts based on the change orders are as follows: Purpose of the change orders a) Max Steininger, Inc. - Change Order #1 $17,119.40 Unsuitable soils found on drive lane north of building, requiring removal and installation of appropriate material. b) Friedges Drywall - Change Order #1 $1,557.00 Installation of modified doors, skim coat vestibule, relocate specific doors, eliminate second entrance door in front of building (deduct) and add gypsum board to back entry door area (vestibule 162). c) Friedges Drywall - Change Order #2 $12,999.00 Structurally reinforced the existing wood trusses in original portion of building and installed non - combustible insulation /vapor barrier in truss space per fire protection code. d) Friedges Drywall - Change Order #3 $1,250.00 Revise Historical Society and Yellow Ribbon display cases and modify gypsum board soffits in circulation area A117. 2 Original Change Contract Description of Work Contractor Total Orders Revised Earthwork/Utilities Max Steininger 98,892 17,119 116,011 Concrete Thompson Construction 61,750 61,750 Carpentry and Gypsum Friedges Drywall 92,300 16,705 109,005 Roofing Kato Roofing 86,000 86,000 Doors /frames Kendell Doors & Hardware 27,143 5,804 32,947 Tile MCI, Inc 4,000 1,946 5,946 Acoustical Treatments Twin Cities Acoustics Inc 22,795 4,714 27,509 Flooring MCI, Inc 38,840 38,840 Painting Full Specturm 11,890 720 12,610 Fire protection Quality Design and Fire P. 41,003 175 41,178 Mechanical /plumbing Westman Plumbing 29,900 848 30,748 Heating, vent and air SCR, Inc. 111,900 4,730 116,630 Electrical VINCO Inc. 56,600 27,683 84,283 Total contracts 683,023 8 0,444 763,457 Purpose of the change orders a) Max Steininger, Inc. - Change Order #1 $17,119.40 Unsuitable soils found on drive lane north of building, requiring removal and installation of appropriate material. b) Friedges Drywall - Change Order #1 $1,557.00 Installation of modified doors, skim coat vestibule, relocate specific doors, eliminate second entrance door in front of building (deduct) and add gypsum board to back entry door area (vestibule 162). c) Friedges Drywall - Change Order #2 $12,999.00 Structurally reinforced the existing wood trusses in original portion of building and installed non - combustible insulation /vapor barrier in truss space per fire protection code. d) Friedges Drywall - Change Order #3 $1,250.00 Revise Historical Society and Yellow Ribbon display cases and modify gypsum board soffits in circulation area A117. 2 e) Friedges Drywall - Change Order #4 $899.00 Lower ceiling height from 9' to 8' in order to reuse existing can lights and add soffit on west and east end of Circulation A147. f) Kendell Doors and Hardware - Change Order #1 $5,804.00 Add 1.7 new Best Core locks and provide wireless actuators and receivers at front door locations. g) MCI, Inc - Change Order #1 $787.00 Eliminate VCT (vinyl composition tile) in Art Room and add quarry the base in kitchen. h) MCI, Inc - Change Order #2 $225.00 Installation of VCT -1 in Coffee Room Al 15 and provide credit to patch VCT -4 in Coffee Room A115. i) MCI, Inc - Change Order #3 $934.00 Remove floor box cover plates at 9 locations in multi - purpose room A153, in -fill boxes with concrete flush with top of existing slab and patch with new VCT. j) Twin City Acoustics, Inc. - Change Order #1 $4,273.00 Provide new 2'x2' ceiling grid system throughout 27 rooms in order to install insulation and vapor barrier in wood truss system to meet fire protection code. k) Twin City Acoustics, Inc. - Change Order #2 $440.67 Install break metal soffit in hallways Al26 and A137A to accommodate ceiling height differences. 1) Full Spectrum - Change Order #1 $720.00 Painting of soffit in lobby (Room A100), hollow metal door and frame in Room Al l l and painting in Vestibule A140. m) Westman Plumbing, Inc. - Change Order #1 $848.00 Relocation of existing valving below truss space as result of installation of insulation /vapor barrier in truss space per fire protection code. n) SCR, Inc. - Change Order #1 $5,100.00 Relocation of existing ductwork below wood truss space as result of compromised existing trusses in original portion of building. o) SCR, Inc. - Change Order #2 ($750.00) Deduct for omitting two fire dampers in Storage Room A109 and omitting two fire dampers in Storage Room A107. p) SCR, Inc. - Change Order #3 $380.00 Lock all remaining existing dampers open. q) Vinco, Inc. - Change Order #1 $1,251.00 Add power to door openers in west front door vestibule. r) Vinco, Inc. - Change Order #2 $12,083.00 Relocate electrical boxes in original portion of building as result of installation of insulation /vapor barrier in truss space per fire protection code. s) Vinco, Inc. - Change Order #3 $1,952.57 Disconnect electric feed to four unit heaters, work on circuiting in Rooms Al22, A155 and A163 for safety purposes, disconnect switch and relocate in Room Al29, disconnect and remove conduit and wiring to receptacle on outside wall of Room A162 along with miscellaneous changes in five other rooms. t) Vinco, Inc. - Change Order #4 $2,974.92 Lighting demolition and changes in ten rooms, power and communications changes in seven rooms, addition of light fixture and additional electrical needs for motor and equipment schedule. u) Vinco, Inc. - Change Order #5 $991.17 Miscellaneous additional electrical work throughout building. v) Vinco, Inc. - Change Order #6 $8,430.17 Remove all existing fire alarm smoke detectors throughout building. Connect new flow and tamper devices and connect to fire alarm panel. Provide shunt trap for range and connect annul system panel to fire alarm panel. Provide power and switch to kitchen hood lights and fan. Replace and revise existing exit lights and lighting needs. Install new interior and exterior horn /strobes to replace existing strobes not operating. w) Quality Fire and Design - Change Order #1 $175.00 Relocated sprinkler head to accommodate owner - supplied cabinet unit per fire protection code. Project budget and estimated costs as of October 1, 2012 The project budget and estimated costs as of October 1 compared to the April 2 budget are as follows: The estimated project costs exceed budget by $41,598 which is 3.8% of the April 2 budget 5 As of As of Description of Work Oct. 1, 2012 Apri12, 2012 Variance Earthwork/Utilities 116,011 98,892 (17,119) Concrete 61,750 61,750 Carpentry and Gypsum 109,005 92,300 (16,705) Roofing 86,000 86,000 Doors /frames 32,947 27,143 (5,804) Tile 5,946 4,000 (1,946) Acoustical Treatments 27,509 22� 795 (4,714) Flooring 38,840 38,840 - Painting 12,610 11,890 (720) Fire protection 41,178 41,003 (175) Mechanical /plumbing 30,748 29,900 (848) Heating, vent and air 116,630 111,900 (4,730) Electrical 84,283 56,600 (27,683) Total contracts 763,457 683,013 (80,444) Masonry - materials 6,446 9,184 2,738 Bituminous and trucking 4,389 5,000 611 Aluminum entrances 32,585 21,945 (10,640) Fireplace - materials - 6,921 6,921 General Conditions 57,370 76,318 18,948 Construction Manager 39,900 39,900 - Architect /engineer 66,242 60,750 (5,492) Furniture 29,426 29,785 359 Kitchen equipment 20,363 19,660 (703) Technology 9,753 12,000 2,247 Automated temperature controls 19,950 20,000 50 Miscellaneous 66,139 41,210 (24,929) Commodities 2,179 - (2,179) Printing and Advertising 10,873 - (10,873 Total other expenditures 365,615 342,673 (22,942) Contingency 7,000 68,788 61,788 Total budget estimate $ 1,136,072 $ 1,094,474 $ (41,598 The estimated project costs exceed budget by $41,598 which is 3.8% of the April 2 budget 5 Three major unforeseen challenges arose during construction which has resulted in project costs exceeding the April 2, 2012 estimates as shown below a) Structural wood trusses. The original police station was constructed with wood trusses in 1984. The structural integrity of the trusses had been compromised with penetrations for HVAC, electrical and other purposes either during the original construction or subsequent remodeling projects. Architects, engineers and building inspectors for the Heritage Center determined that the trusses had to be reinforced to support the roof load. In addition, the current fire and building code requires the installation of a non- combustible insulation and a vapor barrier in and around the trusses. The total cost of change orders to address the structural wood truss issues is $35,303 for Friedges Drywall ($12,999), Westman Plumbing, Inc. (848), SCR, Inc. ($5,1.00), Vinco, Inc. ($12,083) and Twin City Acoustics ($4,273). In addition, the cost of professional services to prepare plans and specifications was $2,250. t,) Parking lot soils corrections. The earth work contractor (Max Steininger) was required to grade the parking lot and drive areas along with installation of Class V material in preparation of the installation of the asphalt. However, the soils on the drive lane north of building and two accesses were comprised primarily of black dirt and substandard soils. To remediate the problem, the soils had to be excavated to an average depth of three feet. The earth work contractor submitted a significant cost to excavate the soils. Staff was able to negotiate with Friedges Excavating to perform the soil removal and disposal for a cost of $5,000. The excavating contractor provided a change order cost of $17,119 to replace the excavated soils. c) Parking lot asphalt. Valley Paving, Commercial Asphalt and Flint Hills Resources had agreed to contribute 700 tons of asphalt material along with the installation of material for the parking lot at no cost to the City. However, the materials required to complete the parking lot exceed the donation by $12,914. The issues noted above represent $72,616 or 70% to the changes in the total project costs and therefore are the primary factors for the project exceeding the April 2, 2012 project cost estimates. Contract 9 Change Other Expenditures Orders Expenses Total a. Structural wood trusses 35,303 2,250 37,553 b. Parking lot soils corrections 17,119 5,000 22,119 c. Parking lot asphalt - 12,914 12,914 Other project costs 28,022 2,778 30,800 Subtotal 80,444 22,942 103,386 Contingency (61,788) Total budget adjustments $ 41,598 9 Project Financing The Heritage Center project is financed with a combination of revenue sources including the Building Fund, Park Dedication fees and the net proceeds of the sale of the Senior Center. All remaining financing requirements are to be provided from fundraising activities. Changes to the Heritage Center Project financing are as follows: a) Sale of Senior Center. At its October 1 meeting, the City Council will consider sale of the Senior Center for $345,000. The Purchase Agreement requires City payment of $13,800 of commissions. The Agreement also includes a $145,000 contract for deed at 4.5% interest which will result in $17,595 of interest earnings over the term of the contract. b) CDBG reimbursement. The CDBG reimbursement requirements are reduced by $17,777 as a result of city investment in the parking lot, facilities and land acquisition since the initial project in 1984. The net proceeds have been adjusted accordingly. The final determination of the reimbursement amount is subject to review and approval by federal agencies and therefore is subject to change. 7 Estimate Budget October 1 Apri12 V ariance Financial Sources City of Lakeville Building Fund 377,000 377,000 Park Dedication Fund 150,000 150,000 Total City Funds 527,000 527,000 Sale of Senior Center Market value 345,000 345,000 Commisions (13,800) - (13,800) Future interest on CD. 17,595 17,595 CDBG reimbursement (118,905) (136,682) 17,777 Net proceeds from sale 229,890 208,318 21,572 Lakeville Senior Organization 100,000 100,000 - Fundraising activities 279,182 259,156 20,026 Total construction financing $ 1,136,072 $ 1,094,474 $ 41,598 Project Costs Construction contracts 763,457 683,013 80,444 Other 365,615 342,673 22,942 Contingency 7,000 68,788 (61,788) Total project costs $ 1,136,07 $ 1,094,474 $ 41,598 Changes to the Heritage Center Project financing are as follows: a) Sale of Senior Center. At its October 1 meeting, the City Council will consider sale of the Senior Center for $345,000. The Purchase Agreement requires City payment of $13,800 of commissions. The Agreement also includes a $145,000 contract for deed at 4.5% interest which will result in $17,595 of interest earnings over the term of the contract. b) CDBG reimbursement. The CDBG reimbursement requirements are reduced by $17,777 as a result of city investment in the parking lot, facilities and land acquisition since the initial project in 1984. The net proceeds have been adjusted accordingly. The final determination of the reimbursement amount is subject to review and approval by federal agencies and therefore is subject to change. 7 c) Fundraising Activities. With the completion of the Heritage Center, the fundraising requirements are $279,182, which is $20,026 more than the April estimates.. It should also be noted that the contingency was reduced by $14,878 (from $ 83,666 in the January estimates to $ 68,788 in the April 2 Budget) at the April 2 meeting. Currently there is approximately $110,000 cash collected from fundraising initiatives, leaving an estimated $169,000 to complete the fundraising goal. Interim Financing - Sale of Senior Center The Resolution Approving the Construction Contracts Financing for the Heritage Center Project, which was adopted by the City Council on April 2, provided interim financing from the Liquor Store for (a) the future fundraising and (b) the sale of the existing senior center. The terms of the Purchase Agreement for the sale of the Senior Center includes a purchase $345,000 with $200,000 down and a Contract for Deed in the amount of $145,000 at 4.5% interest; the City will accrue $17,595 of interest earnings on the Contract for Deed. The City is responsible for $13,800 of commissions relating to the sale. The Finance Director is recommending selling the Contract for Deed to the Liquor Fund rather than have an interfund loan for an extended period of time. If the City Council concurs, a formal resolution will be provided at a future meeting whereby the $148,795 (representing the contract for deed plus accrued interest less commissions) would be transferred from the Liquor Fund to the Heritage Center Construction Fund in exchange for the Contract for Deed. The future payments from the Contract for Deed would therefore accrue to the Liquor Fund. 8 CITY OF LAKEVILLE RESOLUTION NO. RESOLUTION APPROVING HERITAGE CENTER CHANGE ORDERS WHEREAS, the construction contracts for the Heritage Center were approved on April 2, 2012. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville that the Heritage Center change orders are hereby approved as shown below: Description of Work Contractor Earthwork /Utilities Max Steininger Concrete Thompson Construction Carpentry and Gypsum Friedges Drywall Roofing Kato Roofing Doors /frames Kendell Doors & Hardware Tile MCI, Inc Acoustical Treatments Twin Cities Acoustics Inc Flooring MCI, Inc Painting Full Specturm Fire protection Quality Design and Fire P. Mechanical /plumbing Westman Plumbing Heating, vent and air SCR, Inc. Electrical VINCO Inc. Total contracts Original Change Contract Total Orders Revised 98,892 17,119 116,011 61,750 61,750 92,300 16,705 109,005 86,000 86,000 27,143 5,804 32,947 4,000 1,946 5,946 22,795 4,714 27,509 38,840 38,840 11,890 720 12,610 41,003 175 41,178 29,900 848 30,748 111,900 4,730 116,630 56,600 27,683 84,283 683,013 80,444 763,457 DATED this I" day of October, 2012. ATTEST: Charlene Friedges, City Clerk CITY OF LAKEVILLE Mark Bellows, Mayor 9