Loading...
HomeMy WebLinkAboutItem 07Ladle Date January 7, 2013 Item No. ORDINANCE ADOPTING FEES Proposed Action Staff recommends adoption of the following motion: Move to approve the Ordinance Adopting Fees and Authorizing Summary Publication of Ordinance. Approval of the Ordinance Will reciilt in the apninrOval of changes fnr rertnin fePc Overview The proposed 2013 budget anticipated adjustment of certain fees. The proposed changes are consistent with the discussions conducted at the budget work sessions. Primary Issues to Consider (see attached) ❖ Which fees are proposed to increase and by how much? Supporting Information Ordinance. The attached Ordinance is red -lined to clearly demonstrate the changes from year to (2:eller, ear IWector Financial Impact: $ N/A budgeted: Yes Source: Various Related Documents (CIP, ERP, etc.): Notes: Primary Issues to Consider ❖ Which fees are proposed to increase and by how much? Fees a by Ordinance: State Statutes require certain fees to be approved by ordinance rather than resolution. The following fees will therefore be presented to the City Council at the January 7 meeting. Licenses Bill Board: are proposed to be removed from the fee schedule due to changes in State law or City ordinance. o Billboards ($25 (illuminated) $50 (single faced) $100 (double faced)) • Dynamic Display Sign: The City Council, at its December 3 meeting, approved an Ordinance allowing commercial electronic dynamic display signs. The proposed fee for the initial applications is $100; the annual renewal is $50. Planning and Zoning The single family variance fee is proposed to increase by $50 (from $250 to $300) in order to be consistent with the single family fees for CUPs and IUPs as the processing efforts are similar. CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA SUMMARY OF ORDINANCE NO. AN ORDINANCE ADOPTING A FEE SCHEDULE This ordinance prescribes fees sufficient to defray the costs incurred by the City of Lakeville in reviewing, investigating and administering applications for the amendment to an official control established pursuant to Minnesota Statutes Sections 462.351 to 462.364 and applications for permits or approvals required under an official control established pursuant to those sections. This ordinance also prescribes dynamic display sign license fees and single family variance fees. A printed copy of the ordinance is available for inspection by any person during regular office hours at the office of the City Clerk. APPROVED FOR PUBLICATION this 7th day of January, 2013, by the City Council of the City of Lakeville, Minnesota. CITY OF LAKEVILLE Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk ORDINANCE CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING FEES THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS: I. LICENSES B. Dynamic Display Sign: 1. Application fee 2. Annual renewal fee II. PERMITS A. Building Permits TOTAL VALUATION $1.00 to $500.00 $501.00 to 2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $50,001.00 to $100,000.00 $100,001.00 to $500,000.00 $500,001.00 to $1,000,000.00 $1,000,001.00 and up 100.00 50.00 FEE $30.00 $30.00 for the first $500.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $413.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $1,056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,00.00 $3,456.75 for the first $500,000.00 plus $5.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $5,956.75 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof B. Plan Check Fees 65 of building permit fee for permits with valuations greater than $10,000. 25% of building permit fee for permits issued for similar buildings as required by State Building Code. C. Plumbing Permits Requirement: Master License Number or pipe layers certificate, $25,000 license bond and current Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and insurance Certificate will satisfy this requirement. Residential - Minimum (repairs and alterations, lawn sprinkler systems) $ 39.50 Complete installation ............................................... ............................... $ 90.00 Commercial — 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 ........ ............................... Commercial - Minimum ............................................ ............................... $ 39.50 RPZ Valve (new) ........................................ ............................... $ 39.50 RPZ Valve (replacement or rebuild) ......................... ............................... $ 39.50 Water Softener/Water Heater .................................. ............................... $ 39.50 D. Heatina Permits Residential - Minimum repairs and alterations ... ............................... $ 39.50 Complete installation ................................... ............................... $ 90.00 Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% Of contract/valuation price above $10,000 Commercial minimum ............................................. ............................... $ 39.50 E. Sewer and Water Permits Requirement: Master License Number, $25, 000 License Bond and current Certificate of Liability Insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate will satisfy this requirement. Residential - Minimum repairs and alterations- ........ ............................... $ 39.50 City water and sewer including conversion ....... ............................... $ 90.00 Commercial - One percent (1 %) of contract/valuation price ................ Commercial - minimum ........................................... ............................... $ 39.50 Private sewer systems: New installation .............. ............................... $ 199.50 Private sewer system repair .................................... ............................... $ 199.50 F. Electrical Permits Requirement. State License from Board of Electricity. Note: An owner who actually occupies or intends to occupy a single family residence is exempt from the licensing requirement. Residential - Minimum repairs and alterations ... ............................... $ 39.50 Complete installation- ................................... ............................... $ 90.00 Commercial - 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 Commercial minimum .................................. ............................... $ 39.50 2 G. Well Permits Effective February 1, 1989, all well permits are issued by Dakota County. H. Manufactured Home Inspections Installation permit (foundation, sewer, water, gasy .. ............................... $ 89.50 Separate permit for electrical hookup. ............. ............................... $ 39.50 I. Swimming Pools All in- ground pools, regardless of capacity, and above- ground pools hat exceed 5,000 gallons ............................. ............................... $ 49.50 J. Zoning Permit ....................................... ............................... $ 20.00 K. Signs Permanent installation ........................................ ............................... $ 75.00 Temporary installation (10 days onlyy ................... ............................... $ 50.00 L. Moving Structure (plus letter of credit or cash escrow) ................ ............................... $ 125.00 M. Demolition 1. Residential Accessory structures ...... ............................... No Charge 2. All structures other than residential accessory .............................. $ 49.50 (Also requires a $2,000 site restoration escrow) N. Fire Systems Fire Line - One percent of contract/valuation price O. Sprinkler Fire Protection Requirement. State Fire Protection Contractor License to be filed with the City. 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 plus surcharge (.0005 times contract/valuation). Minimum ............................................................ ............................... $ 39.50 P. Miscellaneous Commercial Mechanical Refrigeration, piping, fuel tanks, etc. - 1.5% of contract/valuation price up to $10,000 and 1% of the contract/valuation price in excess of $10,000 Minimum .................................................................. ............................... $ 39.50 Q. Miscellaneous (re- inspections) Inspections $55.00 /hr., minimum 1 hour R. Re -Roof, Re -Side, and Retaining Walls over 4 feet high Residential............................................................... ............................... $ 49.50 Commercial............................................................. ............................... $ 149.50 3 S. Windows — Comprehensive or Egress 1 . Residential ............................................ ............................... $ 49.50 2 . Commercial .......................................................... ............................... $ 149.50 T. Inspections after hours (weekends, Holidays) $ 110.00 /hr. Only if an Inspector is available for requested inspection .......................Minimum 1 hour U. Investigation Fee Whenever any work for which a permit is required by Code has been commenced without first obtaining said permit the investigation fee shall be equal to the amount of permit fee. PLANNING AND ZONING A. Platting (Also refer to Section IV) Mote: Services performed by City personnel will be billed at 2.5 times actual payroll hourly rate. Services provided by City consultant will be billed at current consultant rates. Sketch Plan Review - $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. Preliminary Plat - $500.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for legal notices, planning, engineering and legal services provided by staff and /or consultants. Final Plat - $200.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for planning, engineering and legal services provided by staff and /or consultants. B. Planned Unit Development - $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants. C. PUD Amendment $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants. D. Variance 1) Single family (includes legal notice publications ) ........................... $ 300.00 250.00 2) All others, plus $500.00 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants...... $ 500.00 E. Conditional Use Permit/CUP Amendment 1) Single family (includes legal notice publications ) ........................... $ 300.00 2) All others, plus $1000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants .... $ 500.00 F. Conditional Use Permit Extension ................... ............................... No Charge 4 G. Home Occupation Permit ...................... ............................... $ 60.00 H. Interim Use Permit/IUP Amendment 1) Single family (includes legal notice publications ) ........................... $ 300.00 2) All others, plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants............................................................. ............................... . I. Rezoning 500.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. J. Special Home Occupation Permit - (includes legal notice publications) ................. ............................... $ 300.00 K. Administrative Subdivision $ 500.00 plus all applicable dedication requirements and $1,000.00 escrow for planning, engineering and legal services provided by staff and /or consultants. L. Street and Easement Vacations $200.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants M. Zoning Ordinance Text Amendment $500.00 plus $2,000 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants. N . Lot Release ........................................................ ............................... $ 50.00 O. Parking Deferment $100.00 plus $ 1,000.00 escrow for planning, engineering and legal services provided by staff and /or consultants. P. Comprehensive Plan Amendment $500.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and /or consultants. Q. Site Plan $100.00 plus $500.00 escrow for planning, engineering and legal services provided by staff and/or consultants. R. Administrative Permit (per City Ordinance 11 -8-3) ................... $ 100.00 5 IV. ENGINEERING A. Platting Sketch plan review Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate applied to the Planning and Zoning escrows. Preliminary Plat - ....................... ........................$150.00 /acre $ 500.00 minimum $ 3,200.00 maximum Final Plat - .. ............................... .......................$150.00 /acre $ 500.00 maximum B. Construction Plan Review Site, grading, drainage, utility and street plan and specifications review. Services performed by City Personnel will be hourly and billed at 2.5 times actual hourly rate. A cash escrow may be required (if not collected through Planning and Zoning). C. Wetland Conservation Act Administration ( plattinq or non - pl atting action $75.00 Permit to fill a wetland as allowed by the Wetland Conservation Act....... $75.00 Services performed by City Personnel in administering the Wetland Conservation Act will be billed at 2.5 times the actual payroll hourly rate. A minimum escrow of $250.00 will be required (if not collected through Planning and Zoning actions) for: Wetland delineation /delineation review, replacement plan review, mailings and administration, construction inspection and annual monitoring until successful establishment of mitigation area. In addition to the above fees, a deposit will be required to fund special studies such as environmental assessment worksheets, transportation, drainage, noise impacts, indirect source permits, etc. The amount of deposit to be based on the site, complexity, diversity and location of the project. Wetland Determination ................................ ............................... $900.00 Plus staff time Wetland Exemption Application .................... ............................... $200.00 Plus staff time Wetland Replacement ................................ ............................... $300.00 Plus staff time Wetland Application ................................... ............................... $300.00 Plus staff time Wetland Banking Application ....................... ............................... $300.00 Plus staff time Wetland Certificate of Compliance .............. ............................... $200.00 Plus staff time Wetland Appeal of Notice of Decision ........... ............................... $300.00 Plus staff time Wetland Violation ...................................... ............................... $500.00 Plus staff time D. General Engineering 1. Developer Installed Improvements: A. Engineering contract administration - 3.0% of project construction cost* or 3.25% of security in the form of a cash disbursement agreement. * Assumes normal construction conditions and project scheduling. B. Construction observation and final inspection hourly as charged by City's consultant. n Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. C. City record and base map preparation — GIS fee ....................... $ 75.00 parcel /lot 2. City Installed Improvements A. Engineering contract administration - 2.0% of project construction cost B. Preliminary report - as charged by consultants or 20% of design fee if performed by City staff C. Final design - as charged by consultants or as per standard ASCE fee curve if performed by City staff D. Construction observation and final inspection - hourly as charged by City's consultant. Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. Ordinance shall be effective immediately following its passage and adoption. Adopted this 7 day of January 2013 by the City Council of the City of Lakeville, Minnesota. CITY OF LAKEVILLE By: Matthew Little, Mayor ATTEST: Charlene Friedges, City Clerk 7