HomeMy WebLinkAboutItem 06.gDate: 27 September 2013 Lakeville APPROVAL OF THE 168TH STREET BRIDGE REPLACEMENT PROJECT CHANGE ORDER NO.1 Proposed Action Staff recommends adoption of the following motion: Move to approve the 168' Street Bridge Replacement Project Change Order No. l increasing the contract sum in the amount of $ 7,364.60. Passage of this motion will result in the installation of two water main gate valves on the existing water main that runs beneath the North Creek drainage channel. Overview This change order adds the installation of two water main gate valves to the existing 6 -inch water main that runs beneath the North Creek drainage channel at the intersection of 168th Street and Gannon Avenue. The water main currently has valves at 168t Street and Gerdine Path and at Gannon Avenue and Garland Way. Should the water main fail at any point between those valves, it would mean shutting off water service for approximately 24 properties. The gate valves will be installed on either side of the new bridge to reduce the impact of a water shutoff to property owners. It also divides this long segment of water main into three distinct parts which will allow the isolation of the segment under the bridge, should it fail, without affecting water service to any property. Cost of the gate valve installation is $7,364.60. Staff has reviewed the change order and recommends approval. Primary Issues to Consider • What is the impact to the contract? This change order increases the contract by $7,364.60 to a total of $315,950.60. • How important is this change to the project? It is important in minimizing the impact of a water shutoff to properties along this segment of water main. SuRporting Information Copies of Change Order No. 1, Change Order No.1 Detail, Letter of Recommendation from WSB and Associates, and a diagram of the water main along 168 Street and Gannon Avenue are attac Christophe tree Public Wor s Director Financial Impact: $7,364.60 Budgeted: Yes Source: Related Documents (CIP, ERP, etc.): 6540.6280 Notes: Increases the contract amount to $315,950.60. CHANGE ORDER NO.1 Owner: City of Lakeville Project No.: 12 -04 Project: 168 Street Bridge Replacement Contractor: Redstone Construction Co.. Inc. Contract Date: April 15, 2013 Original Contract Amount: $3 08,586.00 To: Redstone Construction Co., Inc. (Contractor), you are hereby directed to make the changes noted below in the subject Contract: Owner: City of Lakeville By: Matt Little, Mayor Date: October 7, 2013 By: Charlene Friedges, City Clerk Nature of the Changes: See the attached Change Order for a description of the change and supporting information. These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order Net Increase /Decrease Resulting from this Change Order Current Contract Price, Including this Change Order The above changes are approved: By: $ 308,586.00 7,364.60 $ 315,950.60 CITY OF LAKEVILLE Christopher J. Petree Public Works Director Date: October 8, 2013 The above changes are accepted: Date: C HANCE ORD N0 1 PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT SEPTEMBER 27, 2013 CLIENT PROJECT NUMBER: C.P. 12.04 S.A.P. 188- 594-001 WSB PROJECT NUMBER: 02109.06 OWNER: CITY OF LAKEVILLE LAKEVILLE, MN 66044 18400 IPAVA AVENUE CONTRACTOR: REDSTONE CONSTRUCTION 2183 HIGHWAY 65 NORTH MORA, MN 55051 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: FURNISH AND INSTALL TWO (2) 8-INCH GATE VALVES DESCRIPTION OF CHANGE ORDER. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $308,5886.00 ORIGINAL CONTRACT TIME: 10/7/2013 PREVIOUS CHANGE ORDERS: $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $308,686.00 CONTRACT TIME PRIOR THIS CHANGE ORDER: 10/8/2013 NET INCREASE/DECREASE OF THIS CHANGE ORDER:. $7,364.60 NET INCREASE OF CHANGE ORDER: 1 DAY CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $315,950.60 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10/8/2013 RECOMMENDED BY: APPROVED BY: MONICA HEIL, PE NAME, PROJECT MANAGER WSB & ASSOCIATES, INC. REDSTONE CONSTRUCTION ENGINEER CONTRACTOR APPROVED BY: PUB WORKS DIRECTOR CITY ADMINISTRATOR DATE OF COUNCIL ACTION Page 1 rM2109- NOIConshmdon Admine2loe -H PeyVa d eruo. r Coco-1 Change Order No. 1 Detail PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT September 27, 2013 CLIENT PROJECT NUMBER: C.P. 12 -04 S.A.P. 188 - 594001 WSB PROJECT NUMBER: 02109 -06 ADDED ITEMS Item No. Description Qty Unit Price Extended Amount 1 FURNISH AND INSTALL TWO (2) 6 -INCH GATE 1 LUMP SUM $6,695.09 $6,695.09 VALVES 2 10% MARKUP 1 LUMP SUM $669.51 $669.51 TOTAL INCREASE CHANGE ORDER NO. 1 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $7,364.60 $7,364.60 Page 1 K:102109-0601ConsVuctlon Admin12109 -06 Pay Voucher No. 1 CO W Y S B ' Engineering ■ Planning ■ Environmental ■ Construction fY t }b :N7ClGlt'r. flYC _ September 27, 2013 Mr. Chris Petree Public Works Director City of Lakeville 18400 Ipava Avenue Lakeville, MN 55044 Re: Change Order No. 1 168 Street Bridge Replacement Project City of Lakeville, MN 55044 S.A.P. 188 -594 -001 WSB Project No. 1715 -831 City Project 12 -04 Dear Mr. Petree: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763- 541 -4800 Fax: 763- 541 -1700 Please find enclosed Change Order No. 1 for the above - referenced project for your review and approval. An existing 6 -inch water main exists beneath the North Creek Drainage Channel crossing at the intersection of 168 Street and Gannon Avenue, over which the 168 Street Bridge is currently being replaced. As very few water main valves exist in the area, City Staff desires to install two (2) new 6 -inch water main gate valves on either side of the new bridge, so that service areas within the City's water distribution system can be better isolated in the event there is a water main failure under the bridge. The increase to the contract amount is $7,364.60, resulting in a new contract total of $315,950.60. This change order amount will be shown on the next construction pay voucher processed. We hereby recommend that the City of Lakeville approve Change Order No. 1 for Redstone Construction. If you have any questions regarding the above, please do not hesitate to contact me at 763 -287- 7187. Sincerely, WSB & Associates, Inc. 6 4L ptfiv Gil Monica Heil, PE Project Manager Enclosures cc: Aaron Larson, Redstone Construction Minneapolis ■ St. Cloud Equal Opportunity Employer R. 03109 -M Comtration AdmimLTR CO I C7Y -093713Acx