HomeMy WebLinkAboutItem 06.gNovember 27, 2013 Item No.
APPROVE CHANGE ORDER NO. 1, FINAL ACCEPTANCE
AND FINAL PAYMENT TO McNAMARA CONTRACTING, INC. FOR 2013
MISCELLANEOUS ROADWAY REPAIRS, CITY PROJECT 13 -01
December 2, 2013 City Council Meeting
Proposed Action
Staff recommends adoption of the following motion: Move to approve Change Order No. 1
final acceptance and final payment to McNamara Contracting, Inc. for 201 Miscellaneous
Roadway Repairs, City Project 1
Passage of this motion will result in the approval of the change order and final payment to the
contractor and acceptance of the project.
Overview
Change Order No. i is for extra work related to additional areas of roadway repairs that
developed during winter /spring conditions and for field conditions encountered during
construction that were different than those shown on the plans. The adjustment in the
original contract is as follows:
Original Contract
$6o1,878.40
Change Order No. 1
$ 34 072.2
Adjusted Contract
$
McNamara Contracting, Inc. is also requesting final acceptance and final payment in the
amount of $113,709.67 for City Project 13 -o1. The final contract amount is $758,io8.07.
Primary Issues to Consider
• Why is the final contract amount considerably higher than the original contract
amount?
• Was all work satisfactorily completed?
Supporting Information
• Staff analysis of primary issues
• Change Order No. 1 and summary
• Request for final payment from McNamara Contracting, Inc., dated November 18, 2013
• Pay Estimate No. 4 and Final
Za
C It
Financial Impact: $113,709.67 Budgeted: Yes Source: Pavement Management Fund
Related Documents (CIP, ERP, etc.):
Notes: Additional funding provided by Park Dedication Fund and Utility Fund - Water Operation
Staff Analysis of Primary Issues
• Why is the final contract amount considerably higher than the original contract
amount?
Winter /Spring weather conditions created new areas and expanded existing areas of
damaged pavement. These additional areas were susceptible to further damaoe from
vehicles and in some instances created safety concerns. To address safety concerns
and protect the roadway from further damage and potential long -term cost
implications, the scope of work was amended to include additional roadway repairs,
including watermain breaks.
Was all work satisfactorily col i pieted!
All work was satisfactorily completed and the contractor has met the administrative
requirements for final payment.
Owner: Cit of Lak Project No.: 13 -01
Project: 2013 Miscellaneous Roadway Repairs
Contractor: McNamara Contracting, Inc.
Contract Hate: April 15, 2013 Original Contract Amount: $601,878.40
To: McNamara Contracting, Inc. (Contractor), you are hereby directed to make the
changes noted below in the subject Contract:
Owner: City of Lakeville By:
Date: By:
Matt Little, Mayor
Charlene Friedges, City Clerk
Nature of the Chanoes:
1. Mobilization
2. Traffic Control
3. Restoration
4. Draintile
5, Common Borrow
6. Subgrade Excavation
7. Aggregate Base
These changes result in the following adjustment of Contract Price:
Original Contract Price $ 601,878.40
Change Order No. 1 $ 34,072.25
Current Contract Price, Including this Change Order $ 635,950.65
The above changes are approved: CITY OF LAKEVILLE
By:
Zach Johnson, City Engineer
Date:
The above changes are accepted: McNAMARA CONTRACTING, INC.
Date: /i -2o- C
["arlAdisl�7�s7�� �s�i!
2013 Miscellaneous Roadway Repairs
City of Lakevilie Improvement Project No. 13 -01
Item
Linn
Quantity
rice
cmensio,^,
MOBILIZATION
LS
1
$
6,700.00
$
6,700.00
TRAFFIC CONTROL
LS
1
$
1,200.00
$
?00.00
RESTORATION
LS
1
$
2,260.00
$
2,250.00
CONNECT TO EXISTING STORM SEWER STRUCTURE
EA
1
$
400.00
$
400.00
5" DRAINTILE
LF
245
$
50.00
$
12,250.00
e^ nRAlni T IL E
LF:
45
$
35.50
$
1,575.nn
DRAINTILE CLEANOUT
EA
5
$
175.00
$
875.00
REMOVE AND RELOCATE MAILBOX
EA
2
$
150.00
$
300.00
COMMON BORROW
CY
55
$
27.00
$
1,485.00
SUBGRADE EXCAVATION
CY
112
$
30.00
$
3,360.00
AGGREGATE BASE CLASS 5
TON
146.69
$
25.00
$
3,667.25
CHANGE ORDER NCB. 1 TOTAL: $ 34,072.25
November 18.YD13
Zachary Johnson
City of Lakeville
7O19S Holyoke Avenue
Lakeville, kXN55Q44
RE: 2O13 Miscellaneous Roadway Repairs
City oil Lakeville Project No. 13-01
Dear Roberta:
Let this letter serve as McNamara Contracting, Inc.'s notice that all work items on the above
referenced project hovabeenconUp|otedandsigh9boff. All project reuonddOuu/neDts,nperatNg'
maintenance and warranty forms have been turned over to the owner.
The final contract amount isS758 Please refer to pay estimate #4& final application for
payment for detailed information regarding th8 work completed n8 the project. Weemkthat final
payment including release of all retainage in the amount of $113,709,67 be made at this time.
Sincerely,
Contracting, Inc.
Mi6el J. Tubbs
16700 Chippendale, Avenue "Rosemount krnosNz55008
Office (651)32Z'5500^ Fax (K51)322'5550^F|uot(051)S%2-3939
PROJECT: 2013 Miscellaneous Roadway Repairs
City Improvement Project 13 -01
DATE: December 2, 2093
ESTIMATE NO. 4 & Final
OWNER: City of Lakeville, Minnesota
CONTRACTOR: McNamara Contracting, Inc.
96700 Chippendale Ave
Rosemount, N'IN 55068
SUMMARY
ORIGINAL CONTRACT AMOUNT:
CHANGE ORDER NO, 1
TOTAL CONTRACT AMOUNT
$601,878.40
34.072.25
$635,950.65
REQUEST THIS ESTIMATE
WORK COMPLETED TO DATE: $ 758,108.07
MATERIALS ON HAND: $ -
SUBTOTAL: $ 758,108.07
LESS AMOUNT RETAINED: 0 04 -1
LESS PREVIOUS PAYMENTS: $ 644,398.40
AMOUNT DUE THIS PAYMENT: $ 113,709.67
REMARKS:
This is to certify to the best of my knowledge, information and belief, the quantities and values of
work certified herein are fair approximate estimates for the period covered by this voucher.
Name of Contractor: SIGNED:
McNamara Contracting, Inc. TITLE:
DATE. _ 3
This is to certify that the work shown in the Statement of Work certified herein has been actually
furnished for the above - mentioned project in accordance with the plans and specifications
heretofore approved and that the total work is 100% completed as of December 2, 2011 1
hereby recommend payment of this voucher.
SIGNED: g,4 l'i C� ?'7)' ; " -''ti'
Roberta A. McDonald
DATE
RECOMMENDED FOR PAYMENT BY THE CITY OF LAKEVILLE, MINNESOTA,
SIGNED:
City Engineer
SIGNED:
Finance Director
DATE: DATE:
PROJECT:
2013 MISCELLANEOUS ROADWAY REPAIRS (13 -01)
OWNER:
CITY OF LAKEVILLE
CONTRACTOR:
McNAMARA CONTRACTING, INC.
PAY ESTIMATE NO.:
4 & FINAL - DECEMBER 2, 2013
I Current Pay
Est Current Pay ESC I Quantity Da
Ezt t
Contract Price Contract Extension Quantity Extension I Date Date
MOBILIZATION
IS
1
LsmJOi
$ 1,440.00
18,750,00
5
- '. 1
18,750,00
REMOVE CURB AND GUTTER (ALL TYPES)
LM FT
3,545
5
5,25 � S
_ ,....__
18,611.25
62
326.60 aGP 5
21 00425
REMOVE CONCRETE WALK
SO FT
100
I
1.D0 S
160.00
1 200.06
- ley 4
74 2 2.00
REMOVE CONCRETE DRIVEWAY
SO FT
IDO
5
2.00 F
260.00
$
-
126.00
REMOVE. PEDESTRIAN CURB RAMP
EACH -
- - -c
s
- - 50.00 s
- 25000 -
- - -- C
-- e 1
200'.00"
REMOVE CONCRETE VALLEY GUTTER
SO FT
150
$
2.00 <
300.00
$
- $
360.00
REMOVE BITUMINOUS PAVEMENT
SO YD
15,370
275 1 ;
42267.50
$
48 45225
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN F;
9,360
200 A
IS720.00
- 5
j7i0C
21.170.00
SUBG FADE EXCAVATION - (PATCHING)
CU YD
250
26.00 S
S,000AO
9
- 5
5.780.00
AGGREGATE BASE CLASS 5-(PATCHING)
TON
200
15.00 y
3,000,00
159.12 S
2,38`6,80 e.
10,570,95
FOUNDATION MATER IAL(3" MINUS
TON
60
S
15.00 4
906.00
$
- 3
774.60
MILL BITUMINOUS STEP JOINT
LIN FT
9,360
5
0,50 s
4,680.00
t
- i 7651 $
3.82E80
TYPE MV3 WEARING COURSE MIXTURE NX - (PATCHING)
TON
1,725
S
72.00 1 S
124,20D.00
25 S
I GOA ON 1 2317.62 S
166,872.86
TYPE LV3 NON WEARING COURSE MIXTURE UR - (PATCHING)
TON
1
72.00 F
136,800.00
49 -01 S
3,528.72 j 2629.422 $
189,318,24
TYPE IV 4 WEARING COURSE MIXTURE (B) - (DRIVEWAYS)
SO YD
200
'
1500 S
3,000.00
S
- 4 ( $
6285.00
PRECASE CONCRETE MANHOLE COVER
EACH
_
A
1,350.0019
4,050 -00
S
I
- 2 1
2700 AO
CAG'I1G ASSEMBLY
EACH
3
680.0,0
: 040,00
S
680.00 5
2.040.00
ADJUST VALVE BOX
EACH
S
350,06
,500.00
2 5.
700.00
".05(100
ADJUST FRAME &RING CASTING
EACH
5
5
5
950.00
2,250.00
£
- 5.F 5
F 5
8.100.06
MANHOLE INSERT RISER RINGS
EACH
LS
L
100.00 R
1,800,00
CONCRETE CURB &GUTTER (ALL TYPES
LIN FT
3,545
14AO 5
51,048.00
62 S
892 80 1 4077 ?
68708.80
4" CONCRETE WALK VA 4" GRANULAR BASE
SQ FT
4,850
5
9.45 S
21,582.50
297 $
1,321.60 1 6669 $
25,227,05
CONCRETE DRIVEWAY PAVEMENT
EQFT
250
-
6.86 5
1,700.00
$
- 63 a
428.40
PEDESTRIAN CURB RAMP
EACH
10
t 5
600.00 1 c.
6,000 00
- 8 $
880000
CROSSWALK MARKINGS- PAINT
SQ ET
468
S
200
93600
S'.
- <
-
IURFESYABLI5HMENT
LS
1
£
14,30000 F
Ii30U OO
P
- c
14300.OD
REPAIR IRRIGATION SYSTEM
EACH
5
5
L'S 00 s
5]500
_. -._
S
i 9
14E -'NG
SUBTOTAL:
S
_
486.660.25
S.
11,635.47 I $
613,41 140
SCHEDULE 9: XZ517H STREET TRAIL RECLAMATION FROM
IPAVA AVENUE
TO
HIGHVIEW AVENUE
!SOUTH SIDE)
MOBILIZATION
LS
i
S
SOOAO I S
500.00
$
- 1 S
500.00
REMOVE CURB AND GUTTER (ALL TYPES
LIN R
210
S
6.25
-,F
S
2500 �- 4' 9
88125
REMOV PEDESTRIAN CURB RAMP
EACH
11
50.00 1 5
SFORG
- 7 5
3350,00
RECLAIM BITUMINOUS TRAIL
SO YD
4,105
4
1.40 $
5,747.00 `
$
- 1 '819 $
5.346.60
2.6" BITUMINOUS TRAIL
SO R
3c,945
11
0777 SS
28,447.6 3
S
- 34766 $
26760.82
CONCRETE CURB & GUTTER (ALL TYPES)
LIN 7
210
F
2700 i s
_
4,910.00 �
4 $
84,00f 141 S
2.561 BE
PEDESTRIAN CURB RAMP
EACH
it
4
600.60 4
6,600.00
L� $
4.200.60
ADJUST VALVE BOX
EACH
1
350.00 5
350.00
$
- 1 $
,x,50.00
TURF ESTABLISHMENT
LS
1
g
21,600,00 ?
21,600.00
i
21.600,00 S
21.600,00
REPAIR IRRIGATION SYSTEM
EACH
S
135.00 <
J -7,O -00
-
6 ?5.00 � $
6?5,00
SUBTOTAL
S 69787 1
S 22.384.00 j= .3 ,633.67
SCHEDULE C: 205th STREET TRAIL OVERiAY FNvM ficNSINGON
BLVD TO JACQUARD AVENUE USQUTH
BIDET
MOBILIZATION
IS
1
§
500.00 S
500.00
S
1 $
500.00
REMOVE CURBAND GTYOTER(ALL TYPES)
LIN FT
60
i
5.50 e
330.00
2 $
11.00 TS $
412.50
REMOVE PEDESTRIAN CURB RAMP
EACH
2
£
50.00 5
10
$
2 $
100.00
REMOVE BITUMINOUS TRAIL
SO FT
1,267
R
1,00. 5
1,267.00
$
- 2160 $
2.160.00
AGGREGATE BASE CLASS 5
TON
15
IT
25.00 s
375.00
18,07 8
451.75 35.21 $
880.26
L5" BITUMINOUS TRAIL (OVERLAY)
SOFT
45,150
F S
6.50 S
22,57100
248 S
121.50 42176 $
21.08800
2.5" BITUMINOUS TRAIL
50 FT
815
Is
1.60 5
1,304.00
$'
- 1 300 $
2 MEN On
CONCRETE CURB & GUTTER (ALL TYPES)
PEDESTRIAN CURB RAMP
ADJUST FRAME & RING CASTING
MANHOLE INSERT RISER RINGS
TURF ESTABLISHMENT
REPAIR IRRIGATION SYSTEM
LIN FT
EACH
EACH
EACH
LS
EACH
SUBTOTAL:
60
10
1
3
_
2
5 24.00
$ 1,440.00
2 S 48.00
S -
1 $ 450.00
P 1 $ 100.00
1 S 10,520.G0
$ -
75 $ 1,860.00
iG $ 6. Goo .OD
1,350.00
� . $ 100.00
1 S 10.520.00
( $ -
F 6OCA0
T 5 6,000.,00
% 950.00
S 450.00
100.00
1 £ 300.00
£ 10.520.001
S 10,520.00
_ It 135.00
T s
6,700.06
�270.OU)
III 45431.NO
ItS 11.702 5
R'
4�,
CHANGE ORDER i
MOBILIZATION
LS
1
S
6.700.00 $
EGGING ( 1 $
EYES 00
1 $
6,700.06
TRAFFIC CONTROL
LS
1
$
1 200 -00 $
1,20100 1 $
1 200.06
$
1,206.00
RESTORATION
LS
1
$
2260.00 $
2.260.00 1 It
2260,00
1 S
2.260.60
CONNECT TO EX STORM STRUCTURE
EA
1
$
400.00 1
400.00 1 $
40000
�� S
400..00
6" DRAIN TILE
LF
245
$
50.00 $
12,250,00 245 $
12250C.
245 $
12,256.00
Current Pay
Est Current Pay Est,
Quantity to Extension to
Item
Unit
Quantity
Contract Price
Contract Extension
Quantity Extension
Data
Dew
4 DRAINTILE
LP
S
4E .4
36.00 F 1,5]5.00
4E ° 1,5]5.001
45 $
1..`,75.0
DRAIN TILE CLEANOUTS
EA
5 5
175.00 3 875.00
; &7500
$
876.60
REMOVE AND RELOCATE MAILBOXES
EA
2 S
S
15600 S 30000
.
t $ 30000
.
8 $
300.00
COMMON BORROW
CY
55 S
27.00 S 148500
05 a 1,4E5.00
5E $
1,48500
SURCEASE EXCAVATION 175TH ST TRAIL A PARK)
CY
112 $
30.00 $ 3.360.00
112 $ 3,360,00
1' ^ $
2.360.00
CLASS 5
TON
146.69 S
25.00 8 3.6E7,25
146.69 a 3.66]25 7
146.69 $
3,667,2E
5 3d092.25
I: 34,012.25
3S.W2.25
SCHEDULEA - REPAIRS CITY WIDE-
5 486,660.25
1 11,635.47
5
613.411.40
SCHEDULE S -=F STREET TRAIL RECLAIMATION FROM IPAVA
AVE TO HIGHVTEW
AVE
5 69,787.15
5 22,384.06
T
63,633.61
SCHEDULE C - 285TH STREET TRAIL OVERIAY FROM KENSINGTON
BLVD TO
JACQUARD AVE
5 951931..06
11702.25
S
46,990]5
CHANGE ORDER
S 34.072.2E
9 3407225
5
84.0722E
.. TOTAL:
]— 9