Loading...
HomeMy WebLinkAboutItem 06.dda Date: 11 December 2013 Item No. APPROVAL OF THE 168TH STREET BRIDGE REPLACEMENT PROJECT CHANGE ORDER NO.2 Proposed Action Staff recommends adoption of the following motion: Move to approve the 168th Street Bridge Replacement Project Change Order No. 2 increasing the contract sum in the amount of $ 9,897.24. Passage of this motion will result in the full depth bituminous patching of the excavations resulting from the installation of new gate valves. Overview This change order adds full depth bituminous patching of the areas where the new gate valves were installed on either side of the bridge. This is beyond the patching that was originally specified with the project. The gate valves were installed on either side of the new bridge to reduce the impact of a water shutoff to property owners. Full depth bituminous patching is required to cover the excavations made during the valve installation and return the street to its original condition. Cost of the bituminous patching is $9,897.24. Staff has reviewed the change order and recommends approval. Primary Issues to Consider • What is the impact to the contract? This change order increases the contract by $9,897.24 to a total of $325,847.84. • How important is this change to the project? Without patching, the roadway would quickly deteriorate and require more extensive repairs. Supporting Information Copies of Change Order No. 2, Change Order No. 2 detail, and Letter of Recommendation from WSB and Assgkatrs are�anached. Christoph J etree Public W6fks Director Financial Impact: $9,897.24 Budgeted: Yes Source: 6540.6280 Related Documents (CIP, ERP, etc.): Notes: Increases the contract amount to $325,847.84. CHANGE ORDER NO.2 Owner: City of Lakeville Project No.: Project: 168th Street Bridge Replacement 12 -04 Contractor: Redstone Construction Co., Inc. Contract Date: April 15, 2013 Original Contract Amount: $308,586.00 To: Redstone Construction Co., Inc. (Contractor), you are hereby directed to make the changes noted below in the subject Contract: Owner: City of Lakeville By: Date: December 16, 2013 By: Matt Little, Mayor Charlene Friedges, City Clerk Nature of the Changes: See the attached Change Order for a description of the change and supporting information. These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $ 315,950.60 Net Increase /Decrease Resulting from this Change Order 9,897.24 Current Contract Price, Including this Change Order $ 325,847.84 The above changes are approved: CITY OF LAKEVILLE By: Christopher J. Petree Public Works Director Date: December 17, 2013 The above changes are accepted: By: Date: ,w / WSB & Axsrariule -e_ In. Engineering ■ Planning ■ Environmental ■ Construction December 11, 2013 Mr. Chris Petree Public Works Director City of Lakeville 18400 Ipava Avenue Lakeville, MN 55044 Re: Change Order No. 2 168 Street Bridge Replacement Project City of Lakeville, MN 55044 S.A.P. 188 -594 -001 WSB Project No. 1715 -831 City Project 12 -04 Dear Mr. Petree: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 - 541 -4800 Fax: 763 - 541 -1700 Please find enclosed Change Order No. 2 for the above - referenced project for your review and approval. The City's request to add two new gate valves on either side of the bridge required additional full -depth bituminous patching in order to accommodate the desired placement of the gate valves on either side of the bridge, beyond the patching length that was originally specified with the project. Additionally, it was necessary to mill and overlay a portion of the existing 168th Street leading up to the bridge in order for the street to properly drain with the new bridge and super elevation. The increase to the contract amount is $9,897.24, resulting in a new contract total of $325,847.84. This change order amount will be shown on the next construction pay voucher processed. We hereby recommend that the City of Lakeville approve Change Order No. 2 for Redstone Construction. If you have any questions regarding the above, please do not hesitate to.contact me at 763 -287- 7187. Sincerely, WSB & Associates, Inc. ktav CP 4L Monica Heil, PE Project Manager Enclosures cc: Nate Larson, Redstone Construction Minneapolis ■ St. Cloud Equal Opportunity Employer KM2109 -060\Const=tion Admin\LTR CO 2 CTY- 111813.docx PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT NOVEMBER 15, 2013 CLIENT PROJECT NUMBER: C.P. 12-04 S.A.P. - 188- 594 -001 WAR PROJECT NUMBER: 02109 -06 _ OWNER: CITY OF LAKEVILLE LAKEVILLE, MN 55044 18400 IPAVA AVENUE CONTRACTOR: REDSTONE CONSTRUCTION 2183 HIGHWAY 66 NORTH MORA, MN 55051 . YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: DESCRIPTION OF CHANGE ORDER. The City requested to add 2 new gate valves on either side of the bridge that required full-depth bituminous patching. Additionally, the City needed to mil! and overlay a portion of existing 168th Street. Milling was not previously bid with the project, Payment will be made as shown in the Estimate of Cost which includes the 10% Prime Contractor allowance. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $308,586.00 ORIGINAL CONTRACT TIME: 10/31/2013 PREVIOUS CHANGE ORDERS: $7,364.60 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $315,950.60 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/31/2013 NET INCREASE/DECREASE OF THIS CHANGE ORDER: $9,897.24 NET INCREASE OF CHANGE ORDER: 0 DAY CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $325.847.84 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10131/2013 RECOMMENDED BY: APPROVED BY: MONICA HEIL, PE D in ` - t NAME, PROJECT MANAGER WSB &ASSOCIATES, INC. REDSTONE CONSTRUCTION ENGINEER CONTRACTOR APPROVED BY: _ __` - -_ PUBLIC WORKS DIRECTOR -_--_- _-_-_-__-_�__---- '�-- __`_- - - - -- CITY ADMINISTRATOR DATE OF COUNCIL ACTION Page 1 &102109.0601ConnsWcdon AdmdnlCO W0009 -N CO 2CO-2 r .. November 15, ZO PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT CLIENT PROJECT NUMBER: C.P. 12 -04 S.A.P.188- 594-001 WSB PROJECT NUMBER: 02109-06 ADDED ITEMS N 0 Page 2 Kd02109-0BolConstnu0on AdmfnlCO W012109 -06 CO 2 tv q Unit Price Extended Amount Item No. Description 1068 SF $1.25 $1,335.00 2232.501 MILL BIT 1 -1/2' 1068 SF $1.75 $1,869.00 2360.501 1 -1/2" OVERLAY 2231.601 BITUMINOUS PATCHING 1354.5 SF $4.72 $6,393.24 1 EACH $300.00 $300.00 2506.522 ADJUST CASTING $9,997.24 ' TOTAL INCREASE CHANGE ORDER NO.2 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $9,897.24 N 0 Page 2 Kd02109-0BolConstnu0on AdmfnlCO W012109 -06 CO 2