Loading...
HomeMy WebLinkAboutItem 06.mProposed action Staff recommends adoption of the following motion: Move to approve final acce Lance of p ublic streets within Chadwick Farm Fifth and Sixth Additions. Passage of this motion will result in the approval and acceptance of the developer- installed public street improvements constructed with the Chadwick Farm Fifth and Sixth Addition subdivisions. Overview James R. Hill, Inc., on behalf of D.R. Horton, Inc. — Minnesota, is requesting final acceptance of the public street improvements that were constructed with the development of Chadwick Farm Fifth and Sixth Additions. The prime contractor responsible for work on these projects was S.R. Weidema Inc. The utilities, curb and gutter, and first lift of bituminous pavement were constructed in 2012. The final bituminous wear course was constructed in 203, The street improvements for the above- referenced projects have been tested and inspected by WSB and Associates and the Public Works Department. Primary Issues to Consider Do the completed improvements meet City standards? All work was satisfactorily completed consistent with the City's construction standard specifications and the developer has met the administrative requirements for final acceptance. Sar ortin! Information W Letters from Kurt Quaintance, James R. Hill, Inc., dated December 3, 203 Zach J hnson City En er Financial impact: $o Related Documents (CIP, ERP, etc.): Notes: Budgeted: N/A Source: 7 0' J, A o U 2500 WEST COUNTY ROAD 42, SUITE 120 BURNSV'LLE, MINNESOTA 55337 I PLANNERS ENGINEERS SURVEYORS Phi. (952) 390 -6044 FAX (952) 890 -6244 Serving our Cients since 7976 December 3, 2013 Mr. Mark Hansen P.E. Assistant City En -ineer City of Lakeville 20195 Holvoke Avenue Lakeville, MN 55044 RE: Chadwick Farm .Fifth Addition — Street and Utility Construction Formal Acceptance Dear Mr. Hansen: On behalf of the developer, D_R_ Horton InQ.- Minnesota, I respectfully request formal acceptance of the street and utility construction for the above referenced project. All documentation. as -built plans lien waivers and the monumentation certification letter have been submitted as requested. If you need additional information or have any questions, feel free to contact one. Thank you. S[nuerely, .TAMES R. HTt� INC. Z ,- urL abntance, P.E_ Vice Presidezu. KDQ cc: Dave Klee -D.R. Horton. Inc. -M=' esota JA ME S UI �a 2500 WEST COUNTY ROAD 42, SUITE 120 BURNSV L! E, MINNESOTA 55337 P LANNERS E NGINEERS SURVEYORS PH. (952', 890 - 6044 FAX (952) 890.6 / Serving our Clients since 1976 December 3, 2013 Mr. Mark Hansen P-E. Assistant City En City of Lakeville 2 0 1 95 Holyoke Avenue Lakeville_ IVi 55044 RE: Chadwick. Farm Sixth Addition— Street and Utility Construction Formal Acceptance Dear Ms. Hansen: On behalf of the developer, D_R. Horton Inc. - Minnesota, I respectfully request formal acceptance of the street and utili - ;y construction for the above referenced project. All documentation, as -built plans, lien waivers, and the monumentation certification letter have been submitted as requested_ If you need additional information or .have any questions feel free to contact .me. '£dank you. Sincereiy, JADES R.�TL,1NtiC. Kurt D. aintance, P,E_ resident KDQ cc: Dave Klee -D.R. Horton, Inc.- Minnesota