HomeMy WebLinkAbout11-19-13 WSCITY OF LAKEVILLE
CITY COUNCIL WORK SESSION MINUTES
November 19, 2013
Mayor Little called the meeting to order at 5:00 p.m. in the Marion Conference Room at City
Hall.
Members Present: Council Members Swecker, LaBeau, Anderson, and Davis, and Mayor Little
Staff Present: Steve Mielke, City Administrator; Dennis Feller, Finance Director; Interim
Police Chief John Kornmann; Chris Petree, Public Works Director; Brenda Visnovec, Liquor
Manager; Brett Altergott, Parks and Recreation Director; Julie Werner, Senior Accountant; Tom
Nesseth, Senior Accountant; Judi Hawkins, Deputy City Clerk
2. Citizen Comments
There were no citizen comments
3. Proprietary
Mr. Feller introduced budget issues which Council wished to discuss further. The Utility Fund
consists of four components: water, sanitary sewer, street lights, and environmental resources.
Proposed changes include increased rates to generate additional revenues for the purpose of
watermain replacement. An additional position which started in June of 2013 is shown in the
2014 budget for the full year.
Mr. Petree stated that 2014 Major Maintenance items includes $2.4M for the watermain
replacement program, rehabilitation of Well #17, wellhead protection plan, and water asset
management software. The water meter replacement program will be accelerated from 500 to
800 meters per year, in order for all meters to be changed on a 20 -year cycle. Installation of
residential radio transmitters to utilize drive -by readings is also being proposed. Other major
items in 2014 are Michaud Park water tower cleaning, construction of Wells 20 and 21, both
along Dodd Blvd., and acquisition of a site for an elevated storage tank. Results of the Water
Treatment Facility Expansion Study show that a second facility is not needed; however, the
current facility can be expanded incrementally to increase capacity.
Mr. Feller discussed remodeling of the City Hall utility billing area to include a window to the
hallway to provide better customer service and security for employees.
Council Member LaBeau asked if current figures are being used for calculations by the Met
Council in their water and sewer projections. Mr. Petree stated that the figures are based on the
City Council Budget Work Session
November 19, 2013
Page -2-
next five years at more conservative growth projections. Council Member Swecker asked if
there is a correlation between the water meter transmitter replacements and the increase in
water rates. Mr. Petree stated that the increased rates will cover the cost of the transmitters.
The increase in the Sanitary Sewer budget is due to the anticipated NCES annual increases of 6%
to 7 %. Capital Outlay is $290,000 which includes lift station improvements and sanitary sewer
improvements in conjunction with the 2014 Street Reconstruction Program. Inflow /Infiltration
mitigation is also included in this category. Anticipated rate increases from Xcel and DEA will
be offset by the sales tax exemption.
City -owned street lights on Kensington Blvd. from 205 to 210t Street will be replaced as part
of the overlay project on that street. The utility provider will take over maintenance when lights
are replaced. The City's policy for many years has been that the utility companies own all lights.
The Environmental Resources Fund includes an update of the stormwater pollution prevention
plan, erosion control standards, recycling and solid waste reduction programs, and South Creek
channel restoration.
Mr. Feller stated that rate increases are being proposed for water and sanitary sewer in 2014, but
not for surface water fees. Mr. Nick Dragisich, Executive Vice President, Springsted Inc., was
present to discuss the results of the water and sewer rate study. Based on historical trends it
was anticipated that the increase from Met Council would be approximately 4 %; however, the
actual increase is now known to be 6 -7 %. Cash reserves will not keep up with operating
expenses and annual capital spending for system maintenance and Metropolitan Council fees.
Compared to other communities, Lakeville's water rates are low and would remain so, even with
a modest rate increase. Based on projections, Springsted is recommending a 4.25% increase for
water and 6.35% increase in sewer rates. Feller stated that the increase will mean approximately
$20 per year for an average household and $50 for a large business.
Council Member Swecker asked about the changing rate structure over the next several years.
Mr. Dragisich responded that a higher rate is required in the beginning to fund the necessary
capital improvements and watermain replacements. Mr. Feller added that the last rate increase
was in 2008, when the tier system was implemented.
Council Member Anderson asked about the possibility of issuing debt on the capital outlay
rather than implementing a rate increase. Mr. Feller believes MCES has deferred maintenance
projects in order to keep their rates low through the years when their connection charge
revenue was low. Anderson suggested a steady rate increase in order to minimize spikes in the
rates; however, he does not believe $20 per year is significant. Council members for an analysis
City Council Budget Work Session
November 19, 2013
Page -3-
at the next work session of possibly issuing debt or an interfund transfer rather than a rate
increase.
The 2014 budget includes land acquisition and design of the elevated tank in the amount of
$500,000; land acquisition for two well sites for wells #7 and #8, which will be needed for growth
in the area of the 190 Street corridor; and the two -phase water treatment facility expansion.
Anderson asked how Lakeville's water connection charges compare to other cities. Feller stated
that they are among the highest rates in the metro area, but one of the lowest water rates. A
long -time Council policy is that new construction pays its own way and does not create a
financial burden on existing residents. Mr. Feller stated that in order to have adequate cash
flows the water connection fees would also go up by 2.5% annually based on the construction
price index. Staff is recommending the required public hearing be held on December 16 and
the increase implemented effective February 1, 2014. Builders will be notified that the higher
water connection charge will increase the total building permit application costs. .
Liquor: Ms. Visnovec stated that the Liquor budget reflects the fiscally responsible and growing
enterprise fund, with 2014 operating income projected at $1.69M. A review of accomplishments,
philanthropic endeavors, and 2014 goals and objectives was provided. Council Member LaBeau
complimented the Liquor Dept. on the Taste of Lakeville achievements in 2013. Mayor Little and
other Council Members also commented on the operating efficiencies of the department and
expressed their appreciation. Mr. Feller discussed allocation of liquor funds to equipment fund,
debt, general fund, recycling support, and Police and Parks equipment. Council asked for a
breakdown of liquor cash balance.
4. Budget Discussion - Fees
Mr. Altergott stated that the Parks, Recreation and Natural Resources Committee annually
reviews park dedication fees and is recommending a 2% reduction in fees based on property
valuations and previous Council discussions. Staff recommends this be put on the December 16
agenda for a public hearing to revise park dedication rates.
Mr. Feller compared tax levies in other communities and the factors that caused increases and
decreases. The Metro average is 1.3% tax levy increase, but due to several factors such as state
aid (LGA) and growth, it is difficult and misleading to compare. Lakeville has the lowest
spending per capita in the state and is currently in the early stages of street reconstruction, when
other communities have not yet reached that need. In addition, Lakeville does not receive the
LGA funds which help to keep levies lower in many communities.
City Council Budget Work Session
November 19, 2013
Page -4-
5. Response to questions at November 12 work session
New Personnel Positions: Mayor Little asked how the range of savings for the Fleet Supervisor
position was calculated. Petree stated that significant efficiencies can be achieved in many areas.
Industry standards show that with the use of fuel efficient technologies average fuel usage can be
reduced by 5 -10 %. Mobile management on the plow trucks controls and reduces the amount of
ice control chemicals that are dispensed. Dakota County has seen a savings of over $20,000 with
the use of this technology.
Council Member Swecker would like to see an analysis of the results at the end of the year.
Petree stated that with the position starting later in the year the savings will be more accurately
reflected in the 2015 budget. LaBeau would like to have defined expectations of savings for the
new position, compared to potential overtime. Davis agrees that Council needs to be good
stewards of tax dollars, but does not agree with giving the position a possible end date if cost -
saving goals are not met. Mielke stated that he is not comfortable with a one -year guarantee for
the person who fills the role. Not all results will be seen immediately. Anderson believes this
position provides an opportunity for more efficiency and supports the leadership team and its
goals. Little believes that all positions should go through periodic analysis, similar to the private
sector. Mielke believes there will be immediate savings reflected in the 2014 overtime budget.
Swecker stated that she believes staff will make the best use of all positions. Staff will analyze
overtime and reasonable expectations for commodity savings in the 2014 and 2015 budgets.
Staff suggests reducing the contingency by $198,497 which would reduce the tax levy by the same
amount. Feller is suggesting shifting $300,000 out of the equipment fund into debt for protection
and added flexibility in the event that levy limits are imposed by the Legislature. This does not
change the levy. LaBeau suggested that half of the reserves be used for this purpose.
Mayor Little is not comfortable using surplus for operating costs but prefers it be used for capital
expenses or paying down debt. He does not wish to burden future councils with difficult funding
decisions. Swecker stated that historically spending has been below budget and staff does a good
job of keeping costs at a minimum. Mielke stated contingency funds are for emergency
purposes. Growth will absorb 2.2% of the 2.5% increase, leaving only a.3% increase.
Council Member Anderson believes this levy amount would demonstrate the City's fiscal
responsibility to the residents. He believes the goal should be to continue to find ways to become
even more efficient. Council Member Davis is supportive of the 2.5% levy and the reduction of
$198,000 in the contingency fund to provide additional flexibility with legislative decisions on
levy limits. He complimented previous councils for the groundwork in efficiency.
City Council Budget Work Session
November 19, 2013
Page -5-
Little has concerns for the long term if surplus reserves are used in this way. Previous councils
reduced the impacts of the difficult years by making prudent decisions and building up fund
balances and reserves. Little would agree to modification of the fund balance policy if there was a
commitment to building up the reserve during times of economic growth. He prefers the use of
capital and debt to use of reserve funds, and believes there needs to be commitment to future
taxpayers and councils to prepare for unexpected occurrences or times of slow growth. Mr.
Feller stated that the 2014 budget is premised on a 40% reserve fund; however, the objective is for
reserves to be a minimum of 40 -45% in order to be prepared for uncertainties.
Little suggested a fund balance policy that would commit to increasing the fund by 1% per year.
Feller reviewed how 2013 general fund balances are being allocated for three purposes: $1.8M
in the equipment fund; $590,000 to building fund; and $45,000 committed to the EAB program.
The $500,000 could be used to reduce taxes by bringing down the tax levy; to establish a policy
to gradually increase the fund balance; or to allocate it to a specific purpose, like what has been
done this year to mitigate future tax increases. The funds can be mitigated to certain funds,
such as the trail fund. The fund balance is kept in the 40 -45% range for several reasons
including the uncertainty of building permits and sustainability of growth. Council should
provide direction on fund balance goals for 2015 as soon as possible. Little believes council's
basic principle and commitment should be to maintain steady levies and spending. A policy
would provide a base to allocate surplus funds.
Anderson agrees and believes it is the Council's duty to be good stewards of the tax dollars that
are entrusted. Mr. Feller stated that the State Auditor recommends 35 -50 %; Lakeville's policy is
40 -50 %. Little is concerned that operating expenses are increased, but not the levy, thereby
reducing the reserves. Swecker agrees that further discussion on this topic is needed in 2014
before the 2015 budget is prepared. Davis agrees with a policy of putting a certain amount of
any surplus into reserve in order to build the fund.
Mr. Feller stated that Council will be provided a five -year projection in the early part of 2014
which will focus on fund balances, general fund policies, growth projections, and long range tax
levy planning. It was Council's consensus to discuss the fund balance policy at that time and to
use this policy as a tool for making financial policy decisions.
Council continued their discussion of the proposed new positions. Anderson believes new
revenue is needed to support the Code Enforcement position. Mr. Mielke stated that this part -
time position is intended to relieve the building inspectors who would then have more time to
perform inspections and provide better customer service. Hiring this position is a less
expensive option than hiring an additional inspector or a contract employee. New revenue
could come from re- inspection fees.
City Council Budget Work Session
November 19, 2013
Page -6-
An additional Police Investigator is needed to focus on increasing fraud and digital crimes.
Interim Chief Kornmann stated that even though crime is going down, year -to -date calls are up
about 1,000 over last year. LPD needs to be able to process cyber- crimes in an efficient manner
and keep up with growth and the ability to be responsive. There are no other positions from
which to draw hours to assist the only detective. This will also help the City to maintain its
reputation as a safe community.
The position of construction observers is recommended in order to utilize City staff rather than
a consultant to monitor street reconstruction projects. The cost is built into the project costs.
Council asked staff to provide an updated overall levy including changes recommended by
Council. There are a few items remaining to be discussed at the November 25 work session.
Council Member LaBeau asked if a joint meeting of the Council and the Finance Committee
could be scheduled after January 1st for the purpose of discussing the Committee's role.
Council expressed their appreciation to staff for their work on the budget and the process that
was used this year.
6. Adjourn
Mayor Little adjourned the meeting at 8:27 p.m.
Respectfully submitted,
Jud awkins, Deputy Clerk
Matt Litt fe, Mayor