HomeMy WebLinkAboutItem 06.fProposed Action Staff recommends adoption of the following motion: Move to approve Change Order No. 1 to Minnesota Dirt Works Inc. for 20 to Street Kenrick Avenue Roundabout City Project 11 -so. Passage of this motion will result in an adjustment to the contract price. Overview Change Order Rao. 1 is for extra work related to field conditions encountered during construction that were different than those shown on the plans. The primary item is in relation to the box culvert extension. During construction, it was determined that the existing box culvert was poured -in- place. In consideration of the original construction and condition of the box culvert, the box culvert extension design required revisions prior to making a connection. The adjustment in the original contract is as follows: Original Contract 5401,502.75 Change Order No. 1 2g,r, 64, - � g Adjusted Contract $431,o67.14 Primary Issues to Consider How important are these changes to the project? These changes will help to improve public safety and preserve public roadway and utility infrastructure. SuRRorting Information ® Change Order No. 1 and summary Zac �hnso City E ineer Financial Impact: $29,564.39 Budgeted: Related Documents (CIP, ERP, etc.): Notes: Additional fundinq provided by Wal -Mart and G.O. I Yes Source: General Fund and MSA meet Bonds Owner: City of Lakeville Project No.: Project: Kenrick Avenue/205' Street Roundabout Contractor: Minnesota Dirt Works, Inc. 11 -10 Contract Date: May 28, 2013 OriginaIContract Amount: $401,502.75 To: Minnesota Dirt Works, Inc. (Contractor), you are hereby directed to make the changes noted below in the subject Contract: Owner City of Lakeville By: Matt Little, Mayor Date: January 6, 2014 By: Charlene Friedges, City Clerk Nature of the Changes: Extra work incurred related to finding poor soils in the subgrade. During the construction it was determined that the existing box culvert was poured in place. In order to extend the box culvert, it had to be redesigned, and additional costs were incurred. Since the box culvert end section could not be reused, a new end section was required. It was also determined that the existing watermain under the new box culvert location had to be insulated to prevent freezing. These changes result in the following adjustment of Contract Price Contract Price Prior to this Change Order $ 401,502.75 Net Increase Resulting from this Change Order 29,564.39 Current Contract Price, Including this Change Order $ 431,067.14 The above changes are approved: CITY OF LAKEVILLE !-.I The above changes are accepted: (Zach ohnson, Ci Engineer Date: MINNESO� IRT UORKS, INC. By: Date: -I r' M ' 6 z V s.. IL lla E 0 0 LOA m CD 0 0 Ca 0 C] 0 0 m LO 0 v U') C] C> m O 0 0 0 0 m � M r° r O 6 N 6 6 6 6 6 4 lqi Pb qt U)MU�MC)LO to to to It 1l_ C P r LCD N CO It LO to t o o N N N C7) T. C T- 6r�- Gq tA� S4 (IS CA3 61 64 ff} E)- b4 Ef!)- 6o} L0 0 0 0 0 0 0 0 0 � - LBO E- CN C3 (D O C> C) O 0 ,.,E < z cn z 6 d C) r r C) O C] C) O °" r LU 6 N � r LO N CO dt N N N < N LL6 k Eli E4 6C) _ (jS (749 -° z r N r� CO r r r r r O L) _ C'7 LU LU 1 io 0 r - x uj w. w m --I O Li U) `t O LU z W m W 2 0 O C Q U Q ry O m Z E— �` UJ< W Lij W Z a, Q =,Lf-- -mom >0> 0 LL X¢wc~n0 Q0