HomeMy WebLinkAboutItem 08/<0N.
' ! !
16 January, 2014 Item No.
KYLA CROSSING PRELIMINARY PLAT
JANUARY 21, 2014 CITY COUNCIL MEETING
Proposed Action
Staff recommends adoption of the following motion: Move to approve the preliminary plat of Kla
Crossina.
Approval of this motion will allow CNC Development to preliminary plat 40 single - family lots.
Overview
Bill Ryan, representing CNC Development, has submitted a preliminary plat application for 40 single family
lots and six outlots on 15.12 acres of land located northeast of Kenwood Trail (CSAH 50) and west of Ipava
Avenue.
At their January 9, 2014 meeting, the Planning Commission held a public hearing to consider the
preliminary plat as well as variances for lot requirements on seven lots in the preliminary plat. Based on
conversations with several planning commissioners prior to the meeting, staff proposed a plan
modification to members of the Dakota County Plat Commission that could eliminate all but one variance.
The Planning Commission unanimously recommended approval of the preliminary plat but the motion to
recommend approval of the variances as presented (on seven lots) failed on a 2 -5 vote. City staff met with
the Dakota County Plat Commission at their January 13, 2014 meeting to discuss the plan revision, for
which the Plat Commission expressed support. The preliminary plat (attached to this memo) has since
been amended and the variances as requested have been eliminated.
The Parks, Recreation and Natural Resources Committee unanimously recommended approval of the
preliminary plat at their January 8th meeting.
Staff recommends approval of the revised Kyla Crossing preliminary plat.
Primary Issue to Consider
• How was the preliminary plat revised and why did that eliminate the variance request?
Supporting Information
• Staff analysis of primary issue
• Revised preliminary plat, ghost plan, and grading plan
• January 9, 2014 Draft Planning Commission meeting minutes
• January 8, 2014 Draft Parks, Recreation and Natural Resources Committee meeting minutes
• January 2, 2014 Planning and Engineering Reports
KTI�3 :�-CWTO
Kris Jenson, Assoc ate Planner
Financial Impact: $ None Budgeted: Y/N Source:
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances
Notes:
STAFF ANALYSIS OF PRIMARY ISSUE
• How was the preliminary plat revised and why did that eliminate the variance request?
A variance was originally requested for seven (7) of the 40 lots within Kyla Crossing due to the additional
land that has been required to be set aside for right -of -way by Dakota County due to the location of the
railroad immediately west of Kenwood Trail (CSAH 50) in the area of the preliminary plat. In response to
concerns about the proposed variances expressed by several planning commissioners, staff reached out to
members of the Dakota County Plat Commission to determine whether Dakota County would accept a trail
easement for the future paved trail along Kenwood Trail (CSAH 50) instead of ROW dedication in the area
of Lots 1 -5, Block 5. This would eliminate the lot depth /setback variance request for those lots that back up
to Kenwood Trail (CSAH 50).
Street A now ends in a cul -de -sac, which allowed property lines on the north side of Street A to be shifted
slightly and eliminated the need for a lot width variance on Lot 1, Block 1. The developer's engineer did
some additional work and was able to make modifications that eliminated the lot width variance for Lot 1,
Block 2.
2
b
_ Y _ H-
Vi w
I z
0
wpwO ��ui
- z,
¢ a
% �rcrc o
<o ��G YJ u1 as »atti
v �n¢�a r
6 zYaz
€ ul oa 0 000`o u�op
aw
Io sss a
L')
C
I
I�
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
I
I
'A3lltlA 'OOl 'HIAOS
/
bbZ9 -069(ZS6) :%V3 bti09- 069(ZS6) 3NOHd
LffSS NN 'nlNSnrw9 'OZl -S 'Zb AN 'u0 'A OOSZ
tMg W 31ddtl SLIM 3NN3 V NYM N—
JN3➢QdOrIaA3a ONO
m
Sa0A3Adns / Sd33NION3 / Sd3NNd3d
W ,
LVgcl IHVNI3i IaHd
z�
a a
wo
o
OJ�
�a
N
03 ul IIiH •H sawed
VIMNNIN '3llIA3AVI
�NissoxO
o
o`
-
5;
��«
N r
"' E
E
c N
O
a
b
_ Y _ H-
Vi w
I z
0
wpwO ��ui
- z,
¢ a
% �rcrc o
<o ��G YJ u1 as »atti
v �n¢�a r
6 zYaz
€ ul oa 0 000`o u�op
aw
Io sss a
L')
C
I
I�
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
I
I
7 c
i
_ m
o
0
Ln� o.
�p1
_-
--
R.
A l
F —�� P
AX
C - j
°srs
/
/
7 c
i
_ m
o
0
Ln� o.
�p1
_-
--
R.
A l
F —�� P
AX
C - j
°srs
ti i.�l i Inrly - ���Ur.,. Uc�IU
n v
365 P =30 4907" R=
3g
n _J I ICJ - �
�_ v A
Ki
V
.30
V)
3
� � m
z
n
1
�. JJJ' jV
rJ�,��/
'A311VA 'OOl 'HIAOS
bbZ9 -069(Z96) :%V3 bti09- O69(ZS6) 3NOHd
LffSS NN 'nlNSnrw9 'OZl -S 'Zb AN 'u0 'A OOSZ
tMg W 31— SLIM 3NN3 V NYM N—
JN3➢QdOrIaA3a ONO
m
W
Sa0A3Adns / Sd33NION3 / Sd3NNdld
W ,
LVgcl IHVNI3i IaHd
Z �
a a
wo
.1
OJ�
�a
M
03 ul IIiH •H sawed
VIMNNIN '3111 3AYI
�NissoxO
o
-
5;
��«
N r
"' E
o
c N
O
a
o3
ti i.�l i Inrly - ���Ur.,. Uc�IU
n v
365 P =30 4907" R=
3g
n _J I ICJ - �
�_ v A
Ki
V
.30
V)
3
� � m
z
n
1
�. JJJ' jV
rJ�,��/
W
o3
ti i.�l i Inrly - ���Ur.,. Uc�IU
n v
365 P =30 4907" R=
3g
n _J I ICJ - �
�_ v A
Ki
V
.30
V)
3
� � m
z
n
1
�. JJJ' jV
rJ�,��/
66Z9 - 069(ZS6) :%V3 6ti09 069(ZS6) 3NOHd
LffSS NN l»H��H9 'OZl 3N'�S 'Zb '�9 'u0 'A OOSZ
Sa0A3AWS / Sd33NION3 / Sd3NNdld
03 ul IN •M SOMP
tMg W 'A3lltlA 3lddtl 'OOl all 'HIAOS 3NN3 V NYM N—
LN3YQdOrIaAaQ ONO
a03
NVId MIS' 'I'IVIlaAO
VIMNNIN '3llIA3AVI
SSOHO T ax
^'
a
/ y 4 =30 °49'07" R= 679.30
o
J /
g $ O ti lo lo
I�r \ rry
U)
c`
T T
I
I.
I
I
I
i
I o
I
I F
I
I
I
I
I
I
I
I
�o
K,
I
\ � b
s / /
m � --
-
C)
J
-
cJ
-
/ / /
w ,
I
O
0986ZZ
z
3113 4VO d
A
a P m
,, 11
WWII
II
ww3� A�3
N SNOISIN3a
CL/01 /01
N K�
o
5L L
2
o
I — �
1
n o�
.. m
n - P
s
m
6
I �
�
°�svoo�
o n �
(i
1
°
J f m' m �
m
0
i
Y
6
6 /
0
� o < o s „ N
°
I
�a z
m n
gggg
°8
mn
K _m
ry
��f o
m
-- --
()0 o � ` o
N.
w
w
— B
3 z
�3r
m
\ z
�a
x P�
w p= /
1. Implementation of the recommendations listed in the January 2, 2014
engineering report.
2. The recommendations of the Parks, Recreation and Natural Resources
Committee.
3. Outlots A, B and C shall be deeded to the City with the final plat.
4. All structures shall meet the following minimum single family residential setback
requirements:
RS -3 District
Front Yard — 30 feet
Rear Yard — 30 feet
Rear Buffer — 50 feet
Side Yards:
Interior — 10 feet
Corner — 20 feet
Buffer — 30 feet
5. The developer shall construct sidewalks on one side of all local streets within the
subdivision except 191 Court.
6. The developer shall construct an eight foot wide bituminous greenway corridor
trail through Outlot E as shown on the preliminary plat plans.
7. Buffer yard landscaping shall be installed according to the approved landscape
plan.
8. The side yard of Lot 1, Block 1 along 190 Street and the rear yards of Lots 1 -6
and 26 and 27, Block 3 along Holyoke Avenue shall be sodded to the rear
property lines. A $1,000 cash escrow must be submitted with the building permit
application for each lot to guarantee installation of the rear yard sod.
9. Any subdivision monument sign is required to be placed in a separate outlot
owned and maintained by a homeowners association.
Ayes: Maguire, Boerschel, Lillehei, Reuvers, Grenz, Drotning, Swenson
Nays: 0
6. Kyla Crossing
Chair Lillehei opened the public hearing to consider the application of CNC
Development for the following, located north of Kenwood Trail (County Road 50) and
west of Ipava Avenue:
A. Preliminary plat of 40 single family residential lots to be known as Kyla
Crossing.
B. Variance for buffer yard lot depth, lot width, and rear yard setback.
Bill Ryan from CNC Development presented an overview of the request. Rick
Osberg from James R. Hill was also present.
Associate Planner Kris Jenson presented the planning report. Ms. Jenson indicated
that there are seven outlots proposed in the Kyla Crossing preliminary plat. Outlots
A, B, C, and D will be deeded to the City. Outlot E will be retained by the developer
Planning Commission Meeting Minutes, January 9, 2014 Page 2
for future development. Outlots F and G will be acquired by Dakota County for
future right -of -way for County Road 50. She indicated that due to the change to
Street A to terminate in a cul -de -sac, the plans will be modified and Outlots F and G
will be combined. Ms. Jenson indicated that the revised preliminary plat with Street
A terminating in a cul -de -sac will prevent cut - through traffic between Ipava Avenue
and Kenwood Trail (CSAH 50) bypassing the traffic signal at that intersection. Ms.
Jenson indicated that the entire set of preliminary plat plans will be updated to show
the cul -de -sac prior to City Council review.
Ms. Jenson stated that the developer has submitted a ghost plat which shows single
family lots and the future extension of roads to the southeast on the adjacent
Warweg property. She stressed that the adjacent property does not have to be
developed as shown on the ghost plat.
Ms. Jenson reviewed the lot sizes, setbacks, buffer yard requirements, streets, tree
preservation, wetlands, and sidewalks /trails, which are described in detail in the
January 2, 2014 planning report.
Regarding the variance request, Ms. Jenson stated that due to the Dakota County
Plat Commission informing staff and the developer at their November 18, 2013
meeting that an additional 31 feet of right -of -way will be needed to meet the 150 foot
right -of -way needs for Kenwood Trail (CSAH 50), the number of lots proposed on
the original plan design has been reduced from 43 to 40. She indicated that on the
original application, there were no variances requested, but due to the County's
right -of -way needs, a request has been made for variances on seven lots.
Ms. Jenson reviewed the specific criteria, specifically the "practical difficulties"
referred to in the Zoning Ordinance that must be met for a variance request. Staff's
review finds that this request meets the criteria and therefore recommends approval
of the variance as presented.
Ms. Jenson stated that after discussions with some of the Planning Commission
members prior to tonight's meeting, staff contacted Dakota County Transportation
staff, who also are members of the Dakota County Plat Commission, to propose that
the additional 31 feet of requested right -of -way be satisfied by 16 feet of right -of -way
and a 15 foot wide trail easement, which would eliminate the request for a variance
on all but one of the lots within the plat.
Ms. Jenson stated that Planning Department staff recommends approval of the Kyla
Crossing preliminary plat and variance subject to the 14 stipulations listed in the
January 2, 2014 planning report.
There was some discussion among the Planning Commission about the variance
request prior to the public hearing being opened for public comment. Chair Lillehei
asked Mr. Osberg if eliminating the variances entirely would be possible under the
right -of- way /trail easement scenario described by Ms. Jenson. Mr. Osberg stated he
understands that the Planning Commission would like to eliminate the variances and
Planning Commission Meeting Minutes, January 9, 2014 Page 3
that he would explore this possibility prior to City Council action on the preliminary
plat.
Chair Lillehei opened the hearing to the public for comment.
Gary Grassle, 19660 Ireland Way (in the Paradise Hills development)
Concerns of Mr. Grassle:
➢ Would like more time for a financial impact study to be done on the proposed
development. What effect will the homes to be constructed in Kyla Crossing
have on the value of their homes?
➢ He noticed that there would be about twice as many homes to the rear of the
homes currently in Paradise Hills and asked about the types and prices of
homes that will be built in Kyla Crossing.
➢ He stated that Alyssa Ettl was his niece and he thanked the Planning Director
for his earlier comment that the City will review the timing of improvements to
Dodd Boulevard in light of this tragic accident.
Mark Schultz, 19659 Ireland Way
Concerns of Mr. Schultz:
➢ A retaining wall was proposed to be constructed with the previous preliminary
plat application that had been considered several years ago because of the
elevation difference behind the lots on his block. He would like to know how
the elevation difference is proposed to be handled with this preliminary plat.
Reid Hansen, Attorney representing George Warweg
Concerns of Mr. Hansen /Mr. Warweg:
➢ Mr. Warweg owns the property that is shown on the ghost plat. Mr. Warweg
wants to be sure that he can still develop multi - family residential on his
property and that he will have an access from his property onto Ipava
Avenue.
Motion was made by Drotning, seconded by Maguire to close the public
hearing at 6:59 p.m.
Ayes: Boerschel, Lillehei, Reuvers, Grenz, Drotning, Swenson, Maguire
Nays: 0
Chair Lillehei asked for comments from the Planning Commission regarding the
variance request first. Discussion points included:
• The Planning Commission questioned whether they could make a
recommendation on the preliminary plat since it is unknown if the Dakota
County Plat Commission will accept Planning Department staff's proposed
right -of- way /trail easement split for the additional 31 feet required for
Kenwood Trail and the affect this would have on the requested variance. Mr.
Morey stated that due to the discussions that staff had with members of the
Planning Commission Meeting Minutes, January 9, 2014
Page 4
Plat Commission earlier today, staff was confident that the Plat Commission
is open to the option that Ms. Jenson described in her presentation. He
indicated that this option is consistent with what is currently being proposed
by Dakota County staff with a similar situation along Dodd Boulevard (CSAH
9). Mr. Morey stated that this should not prevent the Planning Commission
from making a recommendation tonight on the preliminary plat and variance
applications. There is time between tonight's meeting and the City Council
meeting on January 21 to work with Dakota County and the developer on
this option.
• There was discussion amongst some of the Planning Commission members
who felt that the variance is not needed. They indicated due to the fact that
this is undeveloped land, it would be hard to justify the variance other than for
economic reasons.
• In response to Mr. Hanson's comments, Mr. Morey clarified that the
temporary cul -de -sac proposed with Kyla Crossing would be extended to
Ipava Avenue through Mr. Warweg's property when the Warweg property
develops. He further stated that the Warweg property is not obligated to
follow the land use and subdivision design shown on the ghost plat.
• The time line for action on the preliminary plat and variance was discussed.
Mr. Ryan indicated that he is scheduled to close on the property at the end of
January.
• Mr. Morey explained to the Planning Commission that the variances would
have been for lot depth and buffer yard setbacks that abut Kenwood Trail and
lot width for Lot 1, Block 1 and Lot 1, Block 2 that abut Ipava Avenue. He
indicated that given the discussion with Planning Commission members prior
to tonight's meeting, staff has tried to find a solution to eliminate the
variances. Mr. Morey stated that staff, the developer, and the Planning
Commission are looking for a good outcome and he is confident that the Plat
Commission will accept staff's right -of- way /trail easement option.
• Mr. Morey appreciated that Mr. Ryan and Mr. Osberg have gone above and
beyond to achieve a good outcome for their development given the additional
right -of -way requirement presented to them by Dakota County. He requested
that the Planning Commission make a recommendation on the preliminary
plat and variance applications at tonight's meeting.
• The Planning Commission appreciated all the work that staff, the developer
and his engineer have put forth on this project to try to achieve a good
outcome.
• Regarding the concerns of the neighbors and public, City Attorney Knutson
stated that the financial impact of the proposed development on adjacent
neighborhoods is not a requirement of the Zoning and Subdivision ordinances
that the Planning Commission considers in its review. Chair Lillehei
explained that the Planning Commission reviews the plat to determine if it
meets Zoning and Subdivision ordinance requirements, which do not include
financial impacts on adjacent properties.
• Mr. Osberg provided an overview as to why retaining walls are not needed for
the proposed lots in Kyla Crossing that abut the Paradise Hills neighborhood.
He indicated that the design of the preliminary plat has been revised to
Planning Commission Meeting Minutes, January 9, 2014
Page 5
eliminate the need for retaining walls. All slopes will meet the City's
maximum requirement of 3:1.
• Commissioner Grenz questioned whether a sound wall should be considered
for the homes proposed to be built along County Road 50 due to the
statement in the Dakota County Plat Commission's letter dated November 25,
2013. Mr. Morey indicated that this has been standard wording in Plat
Commission letters for many years. Lakeville's response approximately 15
years ago was to adopt buffer yard requirements in the Subdivision and
Zoning ordinances for lots abutting higher classification roads. Staff does not
feel a noise wall is necessary for this subdivision.
• Commissioner Drotning asked Ms. Jenson to clarify the outline of the
boundaries of the Warweg property in relation to Kyla Crossing and the three
existing single family homes that front County Road 50.
• Mr. Morey stated that Dakota County has determined that the three lane
design of County Road 50 will not be sufficient to accommodate future traffic
volumes and the upgrade to County Road 50 is identified as a 2017 project in
both the County's and City's CIPs. Given the additional right -of -way that is
needed on the northeast side of County Road 50, those three single family
homes would most likely have to be removed to accommodate the street
improvements.
Motion was made by Drotning, seconded by Grenz to recommend to City Council
approval of the Kyla Crossing variance for buffer yard lot depth, lot width, and rear
yard setback.
Ayes: Drotning, Swenson
Nays: Lillehei, Reuvers, Grenz, Maguire, Boerschel
They all felt that the variance was exclusively for economic reasons.
Commissioner Reuvers and Chair Lillehei appreciated the developer and staff
working with the Dakota County Plat Commission to find a solution that works for all
parties.
The Planning Commission agreed that, given their recommendation on the variance,
their motion on the preliminary plat must include a stipulation that all lots meet
Zoning Ordinance requirements without the need for a variance.
Motion was made by Drotning, seconded by Reuvers to recommend to City
Council approval of the Kyla Crossing preliminary plat of 40 single family residential
lots, subject to the following 14 stipulations, as amended:
1. Implementation of the recommendations listed in the January 2, 2014
engineering report.
2. The recommendation of the Parks, Recreation, and Natural Resources
Committee.
3. All lots shall meet the minimum lot requirements of the RST -2 District. All houses
shall meet the minimum setback requirements of the RST -2 District, as indicated
below:
Planning Commission Meeting Minutes, January 9, 2014
Page 6
RST -2 District
Front Yard — 20 feet to the principal building; and 25 feet to the face of the
garage.
Rear yard — 30 feet
Buffer yard — 50 feet
Side Yards
Interior — 10 feet
Corner — 20 feet
Buffer — 30 feet
4. All new local utilities and any existing overhead service utilities shall be placed
underground.
5. Park dedication shall be paid in cash with the final plat.
6. The developer shall construct 5 foot wide concrete sidewalks along one side of
Street A and Street B. The developer shall submit a cash escrow with the final
plat for future trail construction on the northeast side of Kenwood Trail.
7. The accessory building removal shall require a demolition permit from the City
prior to removal.
8. The existing wells within the plat area shall be abandoned in compliance with
state and local requirements.
9. Outlots A, B, C, and D shall be deeded to the City with the final plat.
10. Buffer yard landscaping shall be installed according to the approved landscape
plan. A security for the buffer yard landscaping shall be submitted with the final
plat.
11.The landscape plan must be modified to show the two (2) Austrian Pines
proposed on Lot 18, Block 1 and the four (4) Black Hills Spruce trees proposed
on Lot 1, Block 4 at a minimum of eight (8) feet in height. All evergreen trees in
required buffer areas must be a minimum of eight (8) feet in height and if not
located on a berm the evergreen trees must be a minimum of 10 feet in height.
12.Any subdivision signs must be located within an outlot owned and maintained by
a homeowner's association.
13.The developer shall install a "Future Street Extension" sign at the temporary
turnaround on Street B.
14. Prior to City Council consideration, the preliminary plat shall be revised such that
Street A terminates in a cul -de -sac at the west end.
Ayes: Reuvers, Grenz, Drotning, Swenson, Maguire, Boerschel, Lillehei
Nays: 0
Mr. Ryan thanked City staff for their efforts on this project and the Planning
Commission for their willingness to move their applications forward this evening.
There being no further business, the meeting was adjourned at 7:43 p.m.
Respectfully submitted,
CITY OF LAKEVILLE
PARKS, RECREATION & NATURAL RESOURCES COMMITTEE
MEETING MINUTES
January 8, 2014
Vice -Chair Peterson called the meeting to order at 6 p.m. in Council Chambers at City
Hall.
Members Present: Lori Bovitz, Tom Goodwin, Judy Hayes, Howard Lovelace,
Jeanne Peterson, Bob Swan
Members Absent: Scott Kelly
Staff Present: Parks & Recreation Director Brett Altergott, Environmental Resources
Manager Mac Cafferty, Recording Secretary Patty Ruedy
2. Approval of December 4, 2013 minutes
Minutes were approved as presented.
3. Citizen comments
There were no citizens present.
4. Staff report
Staff shared that flooding of the rinks has gone extremely well this year and the
rinks opened on December 18. Dan Licht from The Planning Company will be
sharing a draft of the Parks, Trails & Open Space Plan soon. The hope is to have
the plan finalized and submitted to City Council by June.
King Park: Plans for the new playground are progressing; the theme will be Miracle
League and will be created by Landscape Structures. $50,000 is being donated by
the Lakeville Miracle League. Also, the City is working with the Lakeville Baseball
Association on lighting the fields at King Park beginning in phases in 2015. Paving
of the parking lot will be completed in the fall of 2014. Questions were raised about
how they would address the difficulty of exiting the parking lot.
5. Summerlyn North preliminary plat
Staff reviewed the Summerlyn North plat. Staff highlighted that the plat will have a
combination of land dedication for the greenway and cash contribution at the time of
final plat. In addition, the developer is eligible for a credit to the Park Dedication Fee
for the City's portion of the trail on 190 St.
Motion made by Goodwin, seconded by Bovitz to recommend City Council
consider approval of Summerlyn North preliminary plat as presented by City staff.
Ayes: unanimous
6. Kyla Crossing preliminary plat
Staff reviewed Kyla Crossing preliminary plat. No park is proposed. Park dedication
fees will be collected at time of final plat.
Parks, Recreation & Natural Resources Committee Meeting Minutes, January 8, 2014 Page 2
Motion made by Goodwin, seconded by Peterson to recommend City Council
consider approval of Kyla Crossing preliminary plat as presented by City staff.
Ayes: unanimous
7. Other business
Tree Sale will coincide with Community Cleanup Day on April 26. Goodwin
suggested informing the public of recent droughts and perhaps offering a greater
variety of trees available so we don't run into the issue we're facing with the ash
tree.
8. Announcements
Linda Walter will be retiring at the end of January. An open house has been
scheduled for Thursday, January 16. Patty Ruedy will be starting in the position on
January 21. The title has been changed to Recreation Program Coordinator.
Peterson complimented the Arts Center on a phenomenal concert in early
December, Alison Scott.
Tickets are on sale for the Neil Diamond Tribute concert on February 1 at Lakeville
South High School.
Jerry Zell resigned from his position on the Parks Board effective immediately due
to traveling commitments for his job.
Heritage Center fundraising balance is approximately $73,000.
Peterson shared that a Parkview Elementary expansion is in the plans for District
196. She will continue to work with that school.
The next Parks, Recreation & Natural Resources meeting is scheduled for
February.
9. Adjourn
Meeting adjourned at 7:22 p.m.
Respectfully submitted,
Patty Ruedy, Recording Secretary
City of Lakeville
Planning Department
��-�
Lakeville
Memorandum
To: Planning Commission
From: Kris Jenson, Associate Planner
Date: January 2, 2014
Subject: Packet Material for the January 9, 2014 Planning Commission Meeting
Agenda
Item: 1) Preliminary plat of 40 single family lots to be known as Kyla Crossing
2) Variance for buffer yard lot depth, lot width, and rear yard setback.
Action Deadline: Preliminary plat (March 6, 2014); Variance (February 15, 2014)
BACKGROUND
CNC Development has applied for a preliminary plat and variance to allow the
development plat of 40 single family residential lots on approximately 15 acres to be
known as Kyla Crossing. The variance request would permit the reduction of the
required buffer yard lot depth, lot width, and rear yard setback for certain lots within
the plat. The Kyla Crossing preliminary plat is located northeast of Kenwood Trail
(CSAH 50) and west of Ipava Avenue.
The Kyla Crossing preliminary plat plans have been distributed to Engineering Division
and Parks and Recreation Department staff, the Parks, Recreation and Natural
Resources Committee, and the Dakota County Plat Commission.
The subject property has been proposed for development at various times since 1996
with the most recent being a preliminary plat approved by the City Council in 2006.
The developer at that time chose to not move forward prior to City Council
consideration of the final plat. The preliminary plat subsequently expired.
Earlier this week, city staff requested a design change for the preliminary plat, to have
proposed Street A end in a cul -de -sac adjacent to Kenwood Trail (CSAH 50) rather than
connect as originally proposed. The plans attached to this report still reflect the Street
A connection to Kenwood Trail (CSAH 50) as there wasn't enough time to make the
change on the plan sheets. Exhibit H illustrates the new design and both the Planning
and Engineering reports reflect the design change. A revised preliminary plat will be
available for the Planning Commission to view at the January 9t" meeting.
EXHIBITS
Exhibit A - Location and Existing Zoning
Exhibit B - Aerial Photo Map
Exhibit C - Cover Sheet and Site Information (3 pages)
Exhibit D - Existing Conditions Survey
Exhibit E - Boundary Survey
Exhibit F - Preliminary Plat (2 Pages)
Exhibit G - Ghost Plat of Adjoining Properties
Exhibit H - Street A cul -de -sac modification
Exhibit I - Preliminary Grading and Drainage Plan
Exhibit J - Preliminary Grading with Storm Sewer
Exhibit K - Preliminary Erosion and Sediment Control Plan
Exhibit L - Preliminary Utility Plan
Exhibit M - Landscape Plan
Exhibit N -Tree Preservation Plan (2 Pages)
Exhibit O - Letter from Dakota County Plat Commission, dated November 25, 2013
PLANNING ANALYSIS
PRELIMINARY PLAT
Existing Buildings and Conditions. There are four outbuildings located on the Kyla
Crossing property. These will be removed when the site is developed. The existing
wells shall be abandoned according to state and local requirements.
Consistency with the Comprehensive Plan. The Kyla Crossing property is located in
Planning District 5 of the 2008 Comprehensive Plan. Planning District 5 guides the
subject property for low /medium density residential development where city sewer is
available.
Zoning and Adjacent Land Uses. The Kyla Crossing preliminary plat area is currently
zoned RST -2 (Exhibit A). The developer proposes to construct single - family homes
which are a permitted use within the RST -2 district. Those single - family lots will follow
the lot standards of the RS -4 district, as noted in the Zoning Ordinance.
Adjacent land uses and zoning are as follows:
North - Single Family Homes (RS -2 District)
East - Ames Ice Arena (P /OS District)
South - Undeveloped, Single Family Homes (RM -2 District)
West - Single Family Homes (RS -3 District) and Undeveloped (RST -2 District)
Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer
and water improvements for the area of Kyla Crossing will be financed and
constructed by the developer. The development costs associated with the Kyla
Crossing development are not programmed in the 2013 - 2017 CIP.
Premature Subdivision Criteria. A preliminary plat may be deemed premature if any
of the criteria listed in Chapter 10 -2 -4 -1 of the Subdivision Ordinance exist. Eligible
I!
criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and
public service capacity (police and fire protection). The other pertinent criteria pertain
to inconsistencies with the City Comprehensive Land Use and Capital Improvement
Plans (discussed above). Staff review of the Kyla Crossing preliminary plat against
these criteria finds that it is not a premature subdivision.
Density /Average Lot Size. The Kyla Crossing preliminary plat consists of 40 single
family lots on 15.12 acres. This results in a gross density of 2.65 units per acre.
Excluding street right -of -way and outlots, the net density is 4.3 units per acre. Lot sizes
range from 8,400 square feet to 25,103 square feet in area.
Lots /Blocks. The following minimum lot size requirements of the RST -2, Single and
Two Family Residential District will pertain to the Kyla Crossing preliminary plat:
Lot Area -
Interior: 8,400 square feet
Corner: 10,200 square feet
Lot Width -
Interior: 70 feet
Corner: 85 feet
Depth abutting CSAH 50:150 feet
Corner lot width abutting Ipava Avenue: 110 feet.
All of the lots in the Kyla Crossing preliminary plat meet the lot area requirements of
the RST -2 District. A variance for lot depth has been requested for the five (5) lots that
back up to Kenwood Trail (CSAH 50) and a variance for lot width for the two (2) lots
that are adjacent to Ipava Avenue. Further review of the requested variance is
included later in this report.
Setbacks. The subject property is zoned RST -2, Single and Two - Family Residential
District, which permits single family dwellings. The following minimum requirements
for building setbacks will pertain to the Kyla Crossing preliminary plat:
Front Yard - 20 feet to the principal building; 25 feet to the face of the garage.
Rear Yard - 30 feet
Buffer Yard - 50 feet
Side Yards:
Interior -7 feet
Corner - 20 feet
Buffer Yard - 30 feet
The proposed house pads shown on the Kyla Crossing grading, drainage and erosion
control plan indicate that all 40 lots have adequate building pad areas that meet
setback requirements for principal structures. A variance has been requested for the
five (5) lots that back up to Kenwood Trail (CSAH 50) for accessory structure setback.
Further review of the requested variance is included later in this report.
Residential Buffer Yard Requirements. Seven (7) lots abutting Kenwood Trail (CSAH
50) and two (2) lots adjacent to Ipava Avenue require increased buffer yard lot sizes
3
and setbacks in the Kyla Crossing preliminary plat. Kenwood Trail (CSAH 50) is
classified as a high density minor arterial roadway and Ipava Avenue is classified as a
major collector in the Comprehensive Transportation Plan. The buffer yard screening
along both roadways must provide an effective minimal visual screen of 10 feet in
height. This will be accomplished with landscaping including minimum eight foot tall
evergreen trees and overstory deciduous trees (Exhibit M). The preliminary plat also
provides for a 30 foot side yard buffer setback along Kenwood Trail and Ipava Avenue.
The landscape plan includes the installation of 70 trees (24 deciduous trees and 46
coniferous trees) along the Kenwood Trail and Ipava Avenue buffer yard areas. The
landscape plan must be modified to show the two (2) Austrian Pines proposed on Lot
18, Block 1 and the four (4) Black Hills Spruce trees proposed on Lot 1, Block 4 at a
minimum of eight (8) feet in height. All evergreen trees in required buffer areas must
be a minimum of eight (8) feet in height and if not located on a berm the evergreen
trees must be a minimum of 10 feet in height.
Outlots. There are seven outlots totaling 2.42 acres in the Kyla Crossing preliminary
plat. The use of the proposed outlots will be as follows:
Outlot A - 0.04 acre outlot consisting of wetland and wetland buffer that will be
deeded to the city with the final plat.
Outlot B - 0.39 acre outlot consisting of a stormwater management basin that will
be deeded to the City with the final plat.
OutlotC - 0.42 acre outlot consisting of a stormwater management basin that will
be deeded to the City with the final plat.
Outlot D - 0.82 acre outlot consisting of a stormwater management basin that will
be deeded to the City with the final plat.
Outlot E - 0.11 acre outlot for future residential development to be retained by the
developer.
Outlot F- 0.15 acre outlot consisting of future right of way for County Road 50 that
will be acquired by Dakota County.
Outlot G - 0.49 acre outlot consisting of future right of way for County Road 50 that
will be acquired by Dakota County.
Because of the proposed change of Street A to end in a cul -de -sac rather than
connect to Kenwood Trail (CSAH 50), the plans will be modified and outlots F and
G will be combined into one outlot.
Phasing. Kyla Crossing will be developed in one phase. Following City Council
approval of the preliminary plat, CNC Development plans to submit a final plat for the
entire development as proposed with the preliminary plat.
Signs. No subdivision identification monument signs are proposed with the Kyla
Crossing preliminary plat. If any subdivision identification monument signs are
proposed they must be located within an outlot and be owned and maintained by a
homeowner association.
4
Streets. The following is a summary of streets proposed with the Kyla Crossing
preliminary plat. Additional detailed information is outlined in the Engineering
Division memorandum dated January 2, 2014.
• Kenwood Trail (CSAH 50) - Kenwood Trail is adjacent to the property and is
classified as a minor arterial in the Comprehensive Transportation Plan.
Kenwood Trail requires a total of 150 feet of right -of -way. Because of the
railroad right -of -way located southwest of Kenwood Trail, the additional right -
of -way needed to meet Dakota County's right -of -way needs map must come
from the proposed Kyla Crossing plat. Forty -one (41) feet of right -of -way is
proposed to be dedicated with this plat. The additional 31 feet along Kenwood
Trail shown as outlot has been requested by Dakota County for right -of -way
and the county and city will work with the developer to acquire the right -of-
way with the final plat.
• Street A - Street A will provide access to the Kyla Crossing development from
Ipava Avenue and will end in a cul -de -sac adjacent to Kenwood Trail (CSAH 50).
Street A is a local residential street that will include a 60 foot wide right -of -way
and a 32 foot wide street. The plat originally included an access to Kenwood
Trail (CSAH 50), which met the County's access spacing guidelines. Staff has
concerns that the street would become a shortcut for drivers looking to bypass
the traffic signal at Ipava Avenue and Kenwood Trail (CSAH 50). Earlier this
week, city staff requested that the developer modify the plat to include the cul-
de -sac. Exhibit H reflects the layout with the cul -de -sac, however there wasn't
sufficient time to make the change to all of the plan sheets. The developer's
engineer has stated that a revised plat plan will be available at the Planning
Commission meeting for review.
• Street B - Street B will be a residential street constructed within a 60 foot wide
right -of -way and a 32 foot wide street. Street B will be constructed with a
temporary turnaround until such time the street is extended with the
development of the Warweg property to the east.
All streets meet the minimum width and design requirements of the Subdivision
Ordinance.
The developer shall install a future street extension sign at the end of Street B to notify
the owners of lots on this street that the street will be extended with the future
development of the adjacent property.
Street names will be proposed by the developer and will be reviewed by staff for
compliance with the street naming guidelines prior to final plat.
Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage,
erosion control, and utilities for the Kyla Crossing preliminary plat is shown on the
grading, drainage and erosion control and utility plans. All existing and new local
utilities shall be placed underground.
Grading, drainage, erosion control, and utilities details are outlined in the January 2,
2014 engineering report prepared by Alex Jordan, Civil Engineer and Mac Cafferty,
5
Environmental Resources Manager. The Engineering Division recommends approval of
the preliminary plat.
Right -of Way. There is existing right -of -way that is proposed to be vacated with the
Kyla Crossing final plat as shown on the Boundary Survey (Exhibit E). The platted 4 11
Street and the alley between Lots 1 -4 and 13 -16, Block 4 from the Lenihan's Lots
Antlers Park plat are undeveloped.
Tree Preservation. There are 164 significant trees located within the Kyla Crossing
preliminary plat boundaries. The tree preservation plan proposes to save 72% of the
significant trees on site. A tree preservation plan and a tree inventory were submitted
by the developer (Exhibit N). Mac Cafferty, Environmental Resources Manager has
reviewed the tree preservation plan. His comments are included in the January 2, 2014
engineering report.
Wetlands. A wetland delineation has been completed and the information and data
has been incorporated into the preliminary plat plans. There are two (2) wetlands
within the preliminary plat area. Mac Cafferty has reviewed the wetland delineation
report. His comments are included in the January 2, 2014 engineering report.
Park Dedication. The City's 2006 Comprehensive Parks, Trails, and Open Space Plan
does not identify a need for park land within the Kyla Crossing preliminary plat area.
Staff is recommending a cash contribution to satisfy the park dedication requirements
for the Kyla Crossing plat. The park dedication fee will be based on the rate in effect at
the time of final plat approval. The Parks, Recreation and Natural Resources Committee
will review the preliminary plat at their January 8, 2014 meeting. Their comments will
be forwarded to the Planning Commission at the public hearing.
Sidewalks /Trails. The developer will construct 5 foot wide concrete sidewalks along
the south side of Street A and the east side of Street B. The City Parks, Trail and Open
Space Plan identifies a future bituminous trail along the northeast side of Kenwood
Trail. The developer will submit a cash escrow representing 5 /8t of the cost of the
future trail construction. The trail will be constructed as part of the future upgrade of
Kenwood Trail.
MUSA. The Kyla Crossing preliminary plat area is located within the current MUSA.
Ghost Plat. The developer has submitted a ghost plat (Exhibit G) showing single
family lots and the future extension of roads to the south on the adjacent Warweg
property. This road extension will allow future access from the Kyla Crossing
development to that area when this property develops. It is anticipated that the three
single - family homes along Kenwood Trail (CSAH 50) will be acquired and removed
prior to reconstruction. The ghost plat incorporates the land into future single - family
lots.
Dakota County Plat Commission. The Dakota County Plat Commission reviewed the
preliminary plat at their November 18, 2013 meeting. Because of the location of the
railroad on the west side of Kenwood Trail (CSAH 50), the Plat Commission is requiring
an additional 31 feet to meet the right -of -way needs for Kenwood Trail (CSAH 50). The
County and the City will work with the developer on obtaining the additional right -of-
6
way with the Kyla Crossing final plat. The Plat Commission approved the preliminary
plat.
VARIANCE ANALYSIS
The developer is requesting variances on seven (7) lots within the preliminary plat.
They are as follows:
• Lot 1, Block 1. Variance is requested from the buffer yard lot width requirement,
which is 110 feet. Lot 1, Block 1 is proposed to be 107.6 feet wide, a variance of
2.4 feet. This lot includes the full 30 foot wide buffer yard side setback as
required by ordinance.
• Lot 1, Block 2. Variance is requested from the buffer yard lot width requirement,
which is 110 feet. Lot 1, Block 2 is proposed to be 100 feet wide, a variance of
10 feet. This lot includes the full 30 foot wide buffer side yard setback as
required by ordinance.
• Lots 1 -5, Block 5. Variance is requested from the buffer yard lot depth and
buffer rear yard setback. Section 11 -21 -9E requires double frontage lots to be a
minimum of 150 feet deep with a 50 foot rear buffer yard setback. These lots
are proposed to be 135 feet deep with a 30 foot buffer rear yard setback.
Lot 18, Block 1 was originally included in the lots that would need a variance for the
buffer yard lot width, as it was 106.1 feet wide, 3.9 feet short of the minimum 110 foot
width. With the change that Street A will now end in a cul -de -sac, the lot has changed
slightly and now meets the minimum 110 foot width, thus negating the need for a
variance.
The original preliminary plat design did not include any variance requests. On
November 18, the plat was reviewed by the Dakota County Plat Commission, who
informed staff and the developer that an additional 31 feet of right -of -way, beyond
the 41 feet that was expected to be required, would be needed to meet the 150 foot
right -of -way needs for Kenwood Trail (CSAH 50). This impacted the plat design and the
number of lots proposed was reduced from 43 to 40.
Lots 1 -5, Block 5 are requesting to have a reduced rear yard setback for accessory
structures only. The building pads proposed on these lots are sufficient to
accommodate a single - family home design and will be required to meet to the 50 foot
rear yard buffer setback. Accessory structures such as decks over 30 inches in height
are subject to the same setbacks as primary structures. With the proposed variance,
accessory structures, including decks over 30 inches, would be allowed to be closer to
the rear property line than 50 feet, but in no case would they be allowed to be closer
than 30 feet. The rear 30 feet of the lots includes a public drainage and utility
easement and landscaped buffer yard adjacent to Kenwood Trail (CSAH 50).
Review Criteria. Section 11 -6 -5 of the Zoning Ordinance lists the review criteria for
variances. It states, "The board of adjustment shall not approve any variance request
(major or minor) unless they find failure to grant the variance will result in practical
difficulties. "Practical difficulties" means that the property owner proposes to use the
property in a reasonable manner not permitted by the Zoning Ordinance. Economic
7
conditions alone do not constitute practical difficulties. Practical difficulties include,
but are not limited to, inadequate access to direct sunlight for solar energy systems.
The following criteria must also be met:
A. That the variance would be consistent with the comprehensive plan.
B. That the variance would be in harmony with the general purpose and intent of
the Zoning Ordinance.
C. That the plight of the landowner is due to circumstances unique to the
property not created by the landowner.
D. That the purpose of the variance is not exclusively economic considerations.
E. That the granting of the variance will not alter the essential character of the
neighborhood in which the parcel of land is located.
F. That the requested variance is the minimum action required to eliminate the
practical difficulty.
G. Variances may not be approved for any use that is not allowed under this
section for property in the zone where the affected person's land is located.
Staff's review of the requested variance for the Kyla Crossing preliminary plat finds
that it meets the above criteria. Findings of fact for the variance request are attached
for your consideration.
RECOMMENDATION
Planning Department staff recommends approval of the Kyla Crossing preliminary plat
and variance subject to the following stipulations:
1. Implementation of the recommendations listed in the January 2, 2014
engineering report.
2. The recommendation of the Parks, Recreation, and Natural Resources
Committee.
3. All houses shall meet the following minimum setback requirements of the RST-
2 District, except for those lots subject to the variance, as indicated below:
Front Yard - 20 feet to the principal building; and 25 feet to the face of the
garage.
Rear Yard - 30 feet
Buffer Yard - 50 feet
Lots 1 -5, Block 5 - Rear buffer yard - 30 feet for accessory structures only.
Side Yards:
Interior -10 feet
Corner - 20 feet
Buffer - 30 feet
4. All new local utilities and any existing overhead service utilities shall be
placed underground.
I
5. Park dedication shall be paid in cash with the final plat.
6. The developer shall construct 5 foot wide concrete sidewalks along one side
of Street A and Street B. The developer shall submit a cash escrow with the
final plat for future trail construction on the northeast side of Kenwood Trail.
7. The accessory building removal shall require a demolition permit from the
City prior to removal.
8. The existing wells within the plat area shall be abandoned in compliance with
state and local requirements.
9. Outlots A, B, C, and D shall be deeded to the City with the final plat.
10. Buffer yard landscaping shall be installed according to the approved
landscape plan. A security for the buffer yard landscaping shall be submitted
with the final plat.
11. The landscape plan must be modified to show the two (2) Austrian Pines
proposed on Lot 18, Block 1 and the four (4) Black Hills Spruce trees proposed
on Lot 1, Block 4 at a minimum of eight (8) feet in height. All evergreen trees
in required buffer areas must be a minimum of eight (8) feet in height and if
not located on a berm the evergreen trees must be a minimum of 10 feet in
height.
12. Any subdivision signs must be located within an outlot owned and
maintained by a homeowner's association.
13. The developer shall install a "Future Street Extension" sign at the temporary
turnaround on Street B.
14. Prior to City Council consideration, the preliminary plat shall be revised such
that Street A terminates in a cul -de -sac at the west end.
Attachments
word /plats /Stone Ridge preliminary plat
9
a
N ----
V 1 L
Lo - ----------
- - - - --
7 a;
11 w J
LLJ
11 a
O O
-
---------- _
---- - - - - --
� V
r ^
V � Un
W
^ z� �. �1 N
F 4 C ]
J (n w
> > Z
r , O
z r�rl� O
~ V W
z
w a
W
- - -- W - --
a_ m a
z
A x w
a
-
-
- --
Lo
a
-
o
. . ¢
0. w
Q W a q �
' ' F ' •¢a y �i
/ ;
I
I
o
PIT
zo
wo
zzzz�zz
�
EM� -2
z��
U z
x�
—
0
c.7
N ----
V 1 L
Lo - ----------
- - - - --
7 a;
11 w J
LLJ
11 a
O O
-
---------- _
---- - - - - --
� V
r ^
V � Un
W
^ z� �. �1 N
F 4 C ]
J (n w
> > Z
r , O
z r�rl� O
~ V W
z
w a
W
- - -- W - --
m
-
-
- --
Lo
z C ca
L' L
986ZZ
'ON 103M` Jd
51986ZZ
3113 OVo
SNOISIA3a
L/o VoL
31VO
a
z Fw
v�aw w°
L)
� aE- a°
x UQ
= o
W
Z
- d r
- p
/
L_
L' L
986ZZ
'ON 103M` Jd
51986ZZ
3113 OVo
SNOISIA3a
L/o VoL
31VO
a
z Fw
v�aw w°
L)
� aE- a°
x UQ
= o
W
Z
- d r
a
z�
0
1 -
11 lo l o ,
oo
V
H
o]
2
X
w
71 1
L_
/ ;
o
PIT
zo
EM� -2
U z
x�
0
c.7
a
z�
0
1 -
11 lo l o ,
oo
V
H
o]
2
X
w
71 1
1
i
1
I i �
I 1
O I—
ri
I
I I
r G
/I I
t
,1. r
I 1
_ I I
I�� I
_ 1ON3WV - � 3XDA10H _ •r 8. 4 �.,{
�A
_
_ -
J Mv, 7 rr,nrr
r w
RA
;t
j I � / ��• 1 \off' .- ",yvp
1r
' 1 • �' ' i .- I J a !I/ � �. NC=B`\ 'r
6 .. I f n
o p
� � I
2'L
986ZZ
'ON 103M` Jd
15986ZZ
3113 OV0
$NOISIA3a
£L /OL /OL
31V0
W1f
V]od W°
o=x ao
g W W o
ci
_
.w m
�z
w
>✓
ES 2
Z
z
¢ o
20- o a
aa- -
U z
Z
r
986ZZ
'ON 103r �jd
15986ZZ
_ 3113 OVA
:
t�teoi�o
3wryo� x,
SNOISIA3a
_ 31VO
W1f
�,�: A9 NMVaO
p o- co B �O
-- — -- — - — — < - -- -- E- zo
U
- s -
a o 0
a
V
o
_ r
m
N �
(�
Ez
M
0 of '
p� 0
�
5�
Orw 4 o LL
- ♦
o
U
�
a°
o 0
W
— — — — — — — — — — — — — — — — — — — — — — — — — — — — n
U
W° e
o
n
a
m
�Fm
Eo
yas
in
W�
0. v
C7
r..
. u
r.
— i nn V v _�.
l �� � � , vt i� 'ON 103f`Obd
3113 4VO
i
SN3Ib
3
Hir
A9 NMVN(l
a C _{
/ O
, z
I _
= I
6
Li
0
0 1'
� 61
I
/ y w
o F)
w
c
a i ,
�j dew`
Iw
I
H
O]
2
X
W
66Z9 - 099(ZS6) :%V3 6609 069(M) 3NOHd
LffSS NN l»H�.H9 'OZl 3N'�S 'Zb AN 'u0 'A OOSZ
Sa0A3�?Jf S/ S?J33NI�N3 / Sd3NNdld
tMg NN 'A3lltlA 31ddtl 'OOl all 'HIAOS 3NN3 V NYM N—
II INHMOIaA3a ONO
W,
A �A2II1S A2IVQNIlOH
m
Z
3 a<
M
^ o
Z
o
=
v
p
Z.
N
'�ul IN sawed
VIMNNIN '3llIA3AVI
�NiSSOHO c rux
Q
O m
K �o
r
N E
o
O N
O
a
1
_ �'$ a
�
a s z
lE
E
\� p
65
� � 0 5.39
A
o
s
Fa
as
0.
I
w
H
O]
w
L < )
C
I
I
I
i
i
i
i
I
I
I
i
I
°sr
'A3lltlA 'OOl 'HIAOS
/
/
JJ
bbZ9- 069(ZS6) :XVJ bti09- 069(ZS6) 3NOHd
LffSS NN 'nlxsnrw9 'OZl -S 'Zb AN 'uO 'M OOSZ
tMg W 31ddtl SLIM 3NN3 V NYM N—
JN3➢QdOrIaA3a ONO
Sa0A3�?Jf S/ S?J33NI�N3 / Sd3NNdld
LVgcl IHVNI3fna d
Z3
a a
wo
o
O
b
�
N
Ul IN •M sawed
3NNIN '311
tl105IA3Ntll
m
N r
E
o
_
c m
O
a
-
L < )
C
I
I
I
i
i
i
i
I
I
I
i
I
°sr
/
/
/
JJ
L5
b
m
_
-
>.p¢�:
aoo iip I
rcrc
F
tl
a,m
a
zz Yw
uI0a0Q� oo '^ 30000 UOO(p�rc
Faop z 2P 2P z
v O'�
F
33333
L < )
C
I
I
I
i
i
i
i
I
I
I
i
I
°sr
4Q�
\ f
m
e � a
L0
eI
IS
LL
x
w
/
/
/
JJ
4Q�
\ f
m
e � a
L0
eI
IS
LL
x
w
(i
3
� � m
z
n
!t 1
'A311VA 'OOl 'HIAOS
bbZ9- 069(Z96) :XVJ bti09- O69(ZS6) 3NOHd
LffSS NN 'nlxsnrw9 'OZl 3<OS 'Zb na 'u3 'A OOSZ
tMg W 31— SLIM 3NN3 V NYM N—
Jx3➢QdOrIaA3a OHO
=
W
Sa0A3AWS / Sd33NION3 / S?J3NNdld
a03
Ld'Id A2iVNIYIPI32id
Z �wo
O
�
M
•�ul IN 'M sawed
VIMNNIN '311 1 3N 1
ssoxO
N r
m E
o
c m
O
a
o3
(i
3
� � m
z
n
!t 1
J=
=
W
c
o3
€
i
_Y
moNw �a
3H H
�inl Inrly
-
�nnLJ ^"
LJ ��I LJ
�
IV�/iLl��v
ivVi i, /J
✓ii
-� II, �_ IV
h,
✓�4/�
°49'07" R= 679.30
_
77,
39
p_30
_
(i
3
� � m
z
n
!t 1
66Z9 - 069(ZS6) :%V3 6ti09 069(ZS6) 3NOHd
LMG NM 311MWG 'OZL -S 'Zb n9 'u0 'M OOSZ
Sa0A3A?Jf S / S?J33NION3 / Sd3NNdld
03 ul IN •H sawed
tMg W 'A3lltlA 31ddtl 'OOl 3LIf1S 'HIAOS 3NN3 V NYM N—
I'I'I ,LN33gdOIan3Q ONO
NV MIS' TIVIlaAO
VIMNNIN '3llIA3AVI
�rciSSOHO T ax
°� N
a
C; )
C`
T
I
I
I
I
I o
I
I F
I
I
I
I
I
I
I
I
I _o
•6
K,
I
\ � b
d "
°� N
e Lo
O
�\ " v�•J
� k y Q- v v„
/
No �\ ✓ 9
4 =30 °49'07" R= 679.30 _
✓.
y
O
v
712j4
V
O r r ' ,'
rye
o
\
/ �� �.
�✓ ai A CJ
ro ,.
C; )
C`
T
I
I
I
I
I o
I
I F
I
I
I
I
I
I
I
I
I _o
•6
K,
I
\ � b
O]
x
x
w
d "
°� N
e Lo
O
�\ " v�•J
� k y Q- v v„
No �\ ✓ 9
O
v
j�`
rye
B yyo
\
/ �� �.
�✓ ai A CJ
O]
x
x
w
2
m_
2
x
w
LCFZI m
a
r
b vi ° o� F
b6'6Zl o O
a I ^ m o
v
4 � M I J
F
�^
0a m
°O a 00 "OZL Q
o J M
N
J �
CD
V zaLZi b N
W
rn 1
g
a0 l
o b
Z �� i
o o
m " F—
F Z62ZL
LL
1� N
rn �m i � pAO
r rn
86
°£ o p
Ld
00
Q / P
r
o / °P Apo
G� 82.04 V
S
- < Z
°6 °
s
9 ° I "
31VO
Wif
Me- A9 NMV80
I — �
m
n - P
�` I KPO o o � m - �WZ
m w 6
rno
oL_ f �
'`-
� ; E.0
�O o m F oi �yb G r m
o�l 00P
n
zoo a 1 h
0 n e
-7 �a Li
EA
/
F 4
cr
0
s
s o /
0
'.
o � M
� o z
c zom
R
) � ? v V 0 9
e M � mo `�8� 000QyO Aq � �� ✓�\ /
n 0
$ o
n
C
-
o� mo o E -
Sj
i
/ I
P m
S
\ z
�Il m
ssi a
0
- -- ---
/i
WtlC—n —717011 -
m
2
w
�J 986ZZ X
_ 'ON 1�3f`O?Jd w
i5986zZ
3113 OVA
y` sNO Isln3a
31VG
Nir
i
N AB NMV?JO
NIN
a
I�a
PP
I � a
°
v
mm A 'F
z
z �
5
z
e <
II
J
C
J
r
_ T
CN
r � ,
�h
I I _
I
/
L Q
I O
J
/ C
/ w
�i J
P
I -
z m _
I
e P
i J
m
o
z
a
z
ow
o � - M PIE
� O
O
h '
Nf WRO bIOZ /LO /I — bMP "—
1
1 I,,
I
` I
I
0.
g
9 _
V
� O
r
J _ D
m
0
J
LU
� W
/
J
J � o
i
z i o
i
oz
qy ) 1 ac
� o a
a / o ow o o
�mm rJ
. P
C
K
cn
Ell
xU
I a
9 <aO e�oz zo � — P�a39asz <a0 e�oz zo � — P�a39aszz
986ZZ
'ON 1031011,1
311A 6ZZ
a 3113 OVO
c� /syz�
SNOISIh3N
31VO
_ WLf
A8 NMtl110
0.
�ay Wn- o
Y
H
O]
2
W
i
/ b
— . Q -- \� 986ZZ
'ON 1031`0?Jd
II A PO Q _ n996ZZ
3113 OV0
-
�i .
_ a, 11 10 lo
w _ sNOlsln3a
i x 1 31VO
Mir
A9 NMVaO
L J
J
z �
E w
-�° c c o ) ] �S
-
❑ Lgy L) � a
r w za
U
- 7
Lf)
ILI
o
o �
-J sxP II �
e
\ � X
\ U
LP i
o
Co
LF
m
/
�\
m
— _
L C p -
- -
= w
> e
LLo 0
ttr tt �
I` o
\ $m Jyl 000 i3oo
L,
7 S E a d
0 o U
0 0
0
a � a W
w a a
z
00 o_
/ o
I
/
F —
E z
LD
7 7-77
�Ad
1 7
m
, 7
o
Eh ` 2
1. LLj
ILL
ILL
Ir rn
o
7 ,
ILL
4S
21
E
z
LLI
CL
C)
Cf)
Ir
z
LL
L,
'ON 1�3fOad
3113 OVO
L SNOISII
9 L/Z L/O L
31VO
HO
A 9 NMVa
Z
0 zz aW
L)
L )
L)
Z
L>
Le
m 2
o 2
�2
L�l—
---- ---------------
-------
-------
o
I L
�o
-
- - -
2
-
- -
- - -
N
Lu
OM
.
03
ol
�Ad
1 7
m
, 7
o
Eh ` 2
1. LLj
ILL
ILL
Ir rn
o
7 ,
ILL
4S
21
E
z
LLI
CL
C)
Cf)
Ir
z
LL
L,
'ON 1�3fOad
3113 OVO
L SNOISII
9 L/Z L/O L
31VO
HO
A 9 NMVa
Z
0 zz aW
L)
L )
L)
Z
L>
Le
m 2
o 2
�2
L�l—
986ZZ
/ •K -, r J � \ � � I � i �I I� � � �O 1 � 'ON 103f`O?Jd
d1986zb
311J avo
\
I \
1O ,o
\ � I I 51N SNOISIA3b
1
/
31V4
Mir
J \ I 1 I II II I r L J k' - A9 NMVaO
>
z Ea
r
o
�aPA
,I
x w t'
W
Z
U
. ` x
\
I
I-
/ p
/
k l�
c7
r \ \
I '
I g y
I
/
I /
I I /
I
I
I 1
El
Co
cu
1 1
lil ll�'�l� I
r
I C� I
J _
e ./ I� a 1 v l e � •: / �" '�
s .
__- ------ d
f - Z }
§ K�g v I ? 03 3o Qi ez�
7
Z
m
2
w
Iloilo
C 40r-47�
C O U N T Y
Dakota County Surveyor's Office
Western Service Center • 14955 Galaxie Avenue suite # 335 • Apple Valley, MN 55124
952- 891 -7087 • Fax 952- 891 -7127 • www.dakotacounty.us
November 25, 2013
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
Re: KYLA CROSSING
The Dakota County Plat Commission met on November 18, 2013, to consider the preliminary plan of the
above referenced plat. The plat is adjacent to CSAH 50, and is therefore subject to the Dakota County
Contiguous Plat Ordinance.
The preliminary plat proposes a residential development located north of CSAH 50 and west of Ipava
Avenue. The proposed plan indicates one access to CSAH 50 (Street A). The right -of -way needs are 150
feet of full width or 75 feet of half right of way for a four -lane divided roadway. There is railroad along
the existing southwesterly right of way line of CSAH 50 and future expansion of CSAH 50 is limited on
the south. With approximately 78 feet of existing right of way for CSAH 50, 72 feet of new right of way
is needed on the north side of CSAH 50 to meet the full width of 150 feet. About 41 feet of new right -of-
way dedication would meet the 75 feet of half right of way with an additional 31 feet right of way
needed (72 feet total) to meet the four -lane divided roadway needs of 150 -feet. With no room to
expand the future road southerly, the County and City will be working with the developer on the options
to obtain the additional 31 feet. The Plat Commission discussed the 2.5 acre parcel to the north along
CSAH 50 and the possibility of an internal connection within this plat to eliminate a driveway access to
CSAH 50. Restricted access should be shown along all of CSAH 50 except for the one opening (Street A).
A study of CSAH 50 from the CSAH 50/60 roundabout to CSAH 9 was recently completed and
reconstruction of this stretch of road is planned to begin in 2017.
The Plat Commission has approved the preliminary plat provided that the described conditions are met.
The Ordinance requires submittal of a final plat for review by the Plat Commission before a
recommendation is made to the County Board of Commissioners.
Traffic volumes on CSAH 50 are 13,100 and are anticipated to be 18,200 ADT by the year 2030. These
traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded
for the proposed plat. Residential developments along County highways commonly result in noise
complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential
units, substantial building setbacks, buffer areas, and other noise mitigation elements should be
incorporated into this development.
EXHIBIT 0
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder's Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. The Plat Commission highly
recommends early contact with the Transportation Department to discuss the permitting process that
reviews the design and may require construction of highway improvements, including, but not limited
to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact
Gordon McConnell regarding permitting questions at (952) 891 -7115 or Todd Tollefson regarding Plat
Commission or Plat Ordinance questions at (952) 891 -7070.
Sincerely,
A'
I�k
Todd B. Tollefson
Secretary, Plat Commission
cc: Joel Cooper, JRH
Rick Osberg, JRH
Dave Anderson, Brandl /Anderson
Bill Ryan, Ryan Real Estate
M ot
Memorandum
To: Kris Jenson, Associate Planner
From: Alex Jordan, Civil Engineer
McKenzie L. Cafferty, Environmental Resources Manager
Copy: Dennis Feller, Finance Director
Gene Abbott, Building Official
Mark Hansen, Assistant City Engineer
Date: January 2, 2014
Subject: Kyla Crossing
• Preliminary Plat Review
• Grading Plan Review
• Utility Plan Review
• Tree Preservation Plan Review
City of Lakeville
Engineering
BACKGROUND
CNC Development LLC has submitted a preliminary plat named Kyla Crossing. The
proposed subdivision is located north of and adjacent to Kenwood Trail (CSAH 50)
and west of and adjacent to Ipava Avenue. The parent parcels are zoned RST -2,
Single and Two Family Residential District and consist of multiple lots and outlots
created with the Antlers Park plat (1909) and the Lenihan's Lots, Antlers Park plat
(1941) which is a re -plat of the Antlers Park plat. The individual parcels that
comprise Kyla Crossing are summarized below:
PID No.
General Description
22- 11500 -05 -181
Lots 4, 11 -13, 15 -18, Block 5, Antlers Park
22- 44900 -04 -040
Lots 1 -4, Block 4, Lenihan's Lots, Antlers Park
22- 44900 -04 -160
Lots 13 -16, Block 4, Lenihan's Lots, Antlers Park
22- 44900 -02 -020
Part of Outlot G, Lenihan's Lots, Antlers Park
22- 44900 -05 -282
Parts of Outlots F and G and Lots 3, 5 -10, 14, 19 -28, Block 5,
Lenihan's Lots, Antlers Park
The preliminary plat consists of forty single family lots within five blocks and seven
outlots on 15.12 acres. The Developer is dedicating 0.90 acres as Kenwood Trail
right -of -way.
KYLA CROSSING
JANUARY 3, 2014
PAGE 2 OF 10
The outlots created with the preliminary plat shall have the following uses:
Outlot A: Existing wetland and drainage way; to be conveyed to
Development of the site includes the following public improvements: sanitary sewer,
watermain, storm sewer, stormwater management basins, and local streets and
sidewalks.
The proposed subdivision will be completed by:
Developer: CNC Development LLC
Engineer /Surveyor: James R. Hill, Inc.
SITE CONDITIONS
Kyla Crossing consists primarily of agricultural land that previously was the site of
Cross Nurseries. The land was utilized for growing garden nursery plants and trees
and storing landscaping materials through the spring of 2006. The majority of the
site drains to the east, while a small portion of the site drains to the northwest
corner of the site. The significant trees are primarily located along the north plat
boundary, although several small clusters are scattered throughout the site.
The existing homestead, accessory buildings, driveways, curb -cuts, septic systems,
irrigation systems, fuel tank, landscaping materials and fences shall be removed and
the wells shall be abandoned with the Kyla Crossing development.
The Developer shall provide a security at the time of final plat to ensure that this
work is completed and certified per all applicable codes and regulations. The
Developer shall obtain a demolition permit from the Building Inspections Department
prior to their removal. A permit from Dakota County is required prior to any work
within Kenwood Trail right -of -way.
the City by deed (0.04 acres)
Outlot B:
Stormwater management basin, to be
conveyed to the
City by deed (0.39 acres)
Outlot C:
Stormwater management basin, to be
conveyed to the
City by deed (0.42 acres)
Outlot D:
Stormwater management basin, to be
conveyed to the
City by deed (0.82 acres)
Outlot E:
Future residential development, retained by the
developer (0.11 acres)
Outlot F:
Future Kenwood Trail right -of -way,
retained by the
developer (0.15 acres)
Outlot G:
Future Kenwood Trail right -of -way,
retained by the
developer (0.49 acres)
Development of the site includes the following public improvements: sanitary sewer,
watermain, storm sewer, stormwater management basins, and local streets and
sidewalks.
The proposed subdivision will be completed by:
Developer: CNC Development LLC
Engineer /Surveyor: James R. Hill, Inc.
SITE CONDITIONS
Kyla Crossing consists primarily of agricultural land that previously was the site of
Cross Nurseries. The land was utilized for growing garden nursery plants and trees
and storing landscaping materials through the spring of 2006. The majority of the
site drains to the east, while a small portion of the site drains to the northwest
corner of the site. The significant trees are primarily located along the north plat
boundary, although several small clusters are scattered throughout the site.
The existing homestead, accessory buildings, driveways, curb -cuts, septic systems,
irrigation systems, fuel tank, landscaping materials and fences shall be removed and
the wells shall be abandoned with the Kyla Crossing development.
The Developer shall provide a security at the time of final plat to ensure that this
work is completed and certified per all applicable codes and regulations. The
Developer shall obtain a demolition permit from the Building Inspections Department
prior to their removal. A permit from Dakota County is required prior to any work
within Kenwood Trail right -of -way.
KYLA CROSSING
JANUARY 3, 2014
PAGE 3 OF 10
RIGHT -OF -WAY VACATION
The parent parcels contain the following existing public rights -of -way that were
dedicated with the Antlers Park plat (1909):
• 4 th Street: 60 -foot wide right -of -way
• The alley in Block 4, Antlers Park: 16 -foot wide right -of -way
The rights -of -way are undeveloped and the Developer is requesting that they be
vacated with the final plat. The City previously vacated the section of Taft Avenue
located north and west of 4 th Street, and the alley in Block 5, Antlers Park. The
proposed right -of -way vacation will be processed along with the Kenwood Trail
right -of -way dedication (Outlots F and G) at the time of final plat.
EASEMENTS
The parent parcels contain one public drainage easement and one private
transmission line easement. An existing 1,200 square -foot permanent drainage
easement located near the northwest corner of the proposed plat is in favor of the
Minnesota Department of Transportation and was established to collect and convey
runoff generated within Kenwood Trail right -of -way when it was a state roadway. An
existing blanket easement for transmission lines is in favor of Northwestern Bell
Telephone Company and was established across existing utility lines. Both
easements will remain and do not impact the design of the plat.
STREET AND SUBDIVISION LAYOUT
Kyla Crossing is located adjacent to transportation facilities under the control of
Dakota County and the City of Lakeville.
Kenwood Trail (CSAH 50)
Kyla Crossing is located north of and adjacent to Kenwood Trail (CSAH 50), an
arterial roadway as identified in the City's Transportation Plan. Dakota County
controls the right -of -way requirement and access locations for Kenwood Trail. The
Dakota County Road Plat Review Needs Map (dated April 16, 2013) indicates the
ultimate design for the section of Kenwood Trail adjacent to the site is a four -lane
divided urban roadway. The 1 /2 right -of -way requirement for a four -lane divided
urban roadway is 75 feet. The Developer is proposing to dedicate 41 feet of right -of-
way such that the combined north 1 /2 right -of -way, measured from the center of
existing Kenwood Trail, is 75 feet. Dakota County is requesting an additional 31 feet
of right -of -way width along Kenwood Trail to meet the right -of -way needs for a four
lane divided roadway. This is necessary as the existing railroad right -of -way south of
Kenwood Trail limits the roadway expansion to the south. The Developer will outlot
the 31 feet and continue discussions with Dakota County on options to acquire the
additional right -of -way. The Dakota County Plat Commission approved the Kyla
Crossing preliminary plat at its November 18, 2013 meeting.
KYLA CROSSING
JANUARY 3, 2014
PAGE 4 OF 10
The section of Kenwood Trail adjacent to the site is constructed as a 52 -foot wide
undivided urban roadway and striped as a three -lane section, with one through lane
in each direction and center left -turn lanes between the intersections. The City's and
Dakota County's current Capital Improvement Program is scheduled to improve
Kenwood Trail from CSAH 60 to CSAH 9 to a four lane divided roadway in 2017.
A cash fee for the future upgrade of Kenwood Trail has not been collected on the
parent parcels and shall be paid at the time of final plat.
Ipava Avenue
Kyla Crossing is located west of and adjacent to Ipava Avenue, a major collector as
identified in the City's Transportation Plan. Ipava Avenue is constructed as a four -
lane divided parkway within a 120 -foot wide right -of -way. Because Ipava Avenue is
built to its ultimate section at this location, and the right -of -way requirement for a
parkway is 120 feet, additional right -of -way will not be required.
Street A
Development of Kyla Crossing includes the construction of Street A. Street A is
designed as a public 32 -foot wide two -lane undivided urban roadway within a 60-
foot wide right -of -way that will terminate in a permanent cul -de -sac west of Street
B. The cul -de -sac is designed as a 45 -foot radius within a 60 -foot right -of -way
radius. The cul -de -sac street length of approximately 350 feet meets Subdivision
Ordinance requirements. Street A will provide a connection and access to Ipava
Avenue that aligns with the northerly driveway entrance to the Lakeville North High
School stadium /Ames Ice Arena parking lot. The existing Ipava Avenue parkway
section is constructed to provide a full access intersection at Street A. Prior to City
Council consideration, the preliminary plat plans must be revised to show the west
end of Street A terminating in a permanent cul -de -sac.
Street B
Street B is designed as a public 32 -foot wide two -lane undivided urban roadway with
a 60 foot wide right -of -way that terminates in a temporary cul -de -sac. The cul -de-
sac is designed as a 45 -foot radius within a temporary easement. Street B will be
extended when the adjacent property to the southeast develops.
Ghost Plat
The preliminary plat includes a ghost plat for the exception parcels. The ghost plat
consists of 23 single - family homes. The ghost plat incorporates a conceptual layout
of the possible redevelopment of the parcels that provides a future additional access
to Ipava Avenue.
CONSTRUCTION ACCESS
Construction traffic access and egress for grading, utility and street construction
shall be at Street A via Ipava Avenue, by way of Kenwood Trail.
KYLA CROSSING
JANUARY 3, 2014
PAGE 5 OF 10
PARKS, TRAILS AND SIDEWALKS
Development of Kyla Crossing includes the construction of public sidewalks. 5 -foot
wide concrete sidewalks, with pedestrian curb ramps, will be installed along the east
side of Street B and the south side of Street A. The developer shall also replace the
pedestrian curb ramps along Ipava Avenue at Street A.
The City's Comprehensive Trail System Plan identifies a 10 -foot wide bituminous trail
along the north side of Kenwood Trail. The Developer shall submit a cash escrow for
5/8's of the future trail construction cost. The cash escrow, based on an estimate
provided by the Developer's engineer, shall be submitted at the time of final plat.
The trail will be constructed at the time Kenwood Trail is reconstructed to a four -
lane divided roadway. The Developer shall extend the sidewalk along Street A to the
plat boundary to provide for a connection to the future trail along Kenwood Trail.
The Park Dedication Fee has not been collected on the parent parcels and shall be
paid at the time of final plat.
UTILITIES
SANITARY SEWER
Kyla Crossing is located within subdistricts ML -70000 and ML -70215 of the Marion
Lake sanitary sewer district as identified in the City's Comprehensive Sewer Plan.
Wastewater will be conveyed via existing trunk sanitary sewer to the MCES
Farmington Interceptor and continue to the Empire Wastewater Treatment Facility.
The downstream facilities have sufficient capacity to serve the proposed subdivision.
Development of Kyla Crossing includes the extension of sanitary sewer. 8 -inch
sanitary sewer will be extended within the subdivision from an existing 8 -inch
sanitary sewer stub to provide sanitary sewer service. The sanitary sewer stub is
located within Ipava Avenue right -of -way, at the intersection of Street A. The City's
Comprehensive Sewer Plan does not identify any trunk sanitary sewer improvements
within the proposed plat.
Any existing sanitary sewer service that is to be permanently abandoned must first
be televised for evidence of inflow and infiltration. If the City's review of the
televising suggests no inflow and infiltration, the sanitary sewer service may be
abandoned in place. If the City's review of the televising suggests any inflow and
infiltration, the sanitary sewer service must be plugged at the main by inserting a
plug at the wye per the manufacturer's recommendations. In addition, any existing
sanitary sewer service disturbed during water service abandoning must also be
plugged. GPS coordinates must be provided per Lakeville Standard Plate LV- ST -12.
All sanitary sewer service abandonment /removal work must be inspected by the
City's Utility Department.
KYLA CROSSING
JANUARY 3, 2014
PAGE 6 OF 10
The Lateral Sanitary Sewer Access Charge is due for the lateral portion of the 27-
inch sanitary sewer within Kenwood Trail right -of -way and shall be paid at the time
of final plat. Two of the parent parcels (PID No. 22- 11500 - 181 -05 and 22- 44900 -05-
282) were previously assessed for 600 feet when the property connected to City
sewer. These assessments have been paid. The Lateral Sanitary Sewer Access
Charge is based on the total frontage of the plat adjacent to Kenwood Trail and is
estimated as follows:
• Front Footage along Kenwood Trail 960.00 f.f.
• Less Front Footage previously assessed -(600.00 f.f.)
• Total Front Footage to be collected 360.00 f.f.
at the time of final plat
The Lateral Sanitary Sewer Access Charge is due for the lateral portion of the 8 -inch
sanitary sewer within Ipava Avenue right -of -way and shall be paid at the time of
final plat. The Lateral Sanitary Sewer Access Charge is calculated based on the total
frontage of the plat adjacent to Ipava Avenue and is estimated as follows:
• Front Footage along Ipava Avenue 588.13 f.f.
• Total Front Footage to be collected 588.13 f.f.
at the time of final plat
WATERMAIN
Development of Kyla Crossing includes the extension of watermain. 8 -inch
watermain will be extended within the subdivision from an existing 8 -inch watermain
stub to provide water service to the subdivision. The watermain stub is located
within Ipava Avenue right -of -way, at the intersection of Street A. The City's
Comprehensive Water Plan does not identify any trunk watermain improvements
within the proposed plat.
Any existing water service that is to be permanently abandoned shall be capped at
the property line. In addition, the curb box & stop and stationary rod must be
removed to the curb stop valve. The remaining portion of the water service will be
removed in conjunction with the planned reconstruction of Kenwood Trail. GPS
coordinates must be provided per Lakeville Standard Plate LV- ST -12. For all existing
water services that are to be permanently abandoned, a fee of $1000 /abandoned
service shall be paid at the time of final plat to the City for future maintenance
related to the abandoned service repairs. All water service abandonment /removal
work must be inspected by the City's Utility Department.
The proposed watermain layout is in accordance with the City's Comprehensive
Water Plan.
The Lateral Watermain Access Charge is due for the lateral portion of the 16 -inch
watermain within Kenwood Trail right -of -way and shall be paid at the time of final
KYLA CROSSING
JANUARY 3, 2014
PAGE 7 OF 10
plat. Two of the parent parcels (PID No. 22- 11500 -05 -181 and 22- 44900 -05 -282)
were previously assessed for 600 feet when the property connected to City water.
These assessments have been paid. The Lateral Watermain Access Charge is based
on the total frontage of the plat adjacent to Kenwood Trail and is estimated as
follows:
• Front Footage along Kenwood Trail 960.00 f.f.
• Less Front Footage previously assessed - (600.00 f.f.)
• Total Front Footage to be collected 360.00 f.f.
at the time of final plat
The Lateral Watermain Access Charge is due for the lateral portion of the 12 -inch
watermain within Ipava Avenue right -of -way and shall be paid at the time of final
plat. The Lateral Watermain Access Charge is calculated based on the total frontage
of the plat adjacent to Ipava Avenue and is estimated as follows:
• Front Footage along Ipava Avenue 588.13 f.f.
• Total Front Footage to be collected 588.13 f.f.
at the time of final plat
OVERHEAD LINES
Consistent with the City's Right -of -Way Management Ordinance, the Developer shall
remove the existing overhead utility lines and utility poles that serve the existing
homestead. A security shall be submitted at the time of final plat to ensure that the
overhead lines and poles are removed.
DRAINAGE AND GRADING
Kyla Crossing is located primarily within subdistrict SC -56 of the South Creek
drainage district as identified in the City's Water Resources Management Plan. A
small section of the site, the northwest corner, is located within subdistrict ML -51B
of the Marion Lake drainage district. The City's Plan does not identify any trunk
storm sewer improvements within the proposed plat.
Development of Kyla Crossing includes the construction of three stormwater
management basins. The stormwater basins will be located within Outlots B, C, and
D and an infiltration basin will be located within Outlot D. Outlots A. B, C, and D will
be conveyed to the City by deed with the final plat.
The stormwater basin design includes an aquatic safety bench and a skimming
device designed for the 10 -year event, consistent with City requirements. The
infiltration basin is designed to infiltrate 1 1 /2 -inch of runoff from all newly created
impervious surface area within 72 hours, reducing the thermal impacts of the new
impervious surface. The infiltration basin is consistent with the requirements of the
KYLA CROSSING
JANUARY 3, 2014
PAGE 8 OF 10
City's South Creek Management Plan. Following the final grading and stabilization of
the development, the developer shall excavate the infiltration basin down to a
consistent layer of sand to improve the functionality of the basin. The Developer
shall backfill the infiltration basin with at least three feet of a sand /compost mixture
that is consistent with the City of Lakeville standard plate LV- STM -28.
The majority of runoff generated from within the site will be collected via storm
sewer and conveyed to the infiltration basin located within Outlot D. Pre - treatment
will be obtained via a wet sedimentation pond before outletting to the infiltration
basin. Runoff from the stormwater basins will be treated and ultimately released into
an existing public storm sewer system, eventually discharging to regional
stormwater basin SC -56 -1.
The Developer proposes to obtain a temporary grading easement from the owner of
9805 Iteri Ct E. This easement will allow for the grading of a 3:1 rear yard slope
behind Lots 14 -18, Block 1 in lieu of a retaining wall.
The final grading plan shall identify all fill lots in which the building footings will be
placed on fill material. The grading specifications shall also indicate that all
embankments meet FHA /HUD 79G specifications. The Developer shall certify to the
City that all lots with footings placed on fill material are appropriately constructed.
The Kyla Crossing site contains approximately 15 acres. A National Pollution
Discharge Elimination System General Stormwater Permit for construction activity is
required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage
must be submitted to the City upon receipt from the MPCA.
STORM SEWER
Development of Kyla Crossing includes the construction of public storm sewer
systems. The City's Water Resources Management Plan does not identify any trunk
storm sewer improvements within the proposed plat.
The public storm sewer consists primarily of five storm sewer systems and outlet
piping for the stormwater management basins. The storm sewer systems will collect
runoff generated within the rights -of -way of Streets A and B, and convey it to the
stormwater basins located within Outlots B, C, and D. Existing storm sewer located
at the low point near the northwest corner of the proposed plat collects off -site
runoff from north of the proposed plat and conveys it to an existing storm sewer
system within Kenwood Trail.
Final storm sewer locations and sizes shall be reviewed by City staff with the final
construction plans. Draintile construction is required within Kyla Crossing for the
street sub -cuts and for all lots with rear yard elevations higher than the front yard
elevations. Any additional draintile construction, including perimeter draintile
KYLA CROSSING
JANUARY 3, 2014
PAGE 9 OF 10
required for building footings, which is deemed necessary during construction, shall
be the Developer's responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels
and shall be paid at the time of final plat.
RESIDENTIAL BUFFER YARD REQUIREMENTS
Kenwood Trail is an arterial roadway and Ipava Avenue is a major collector as
identified in the City's Transportation Plan. A buffer yard screen containing a
combination of earth berms, plantings, or privacy fencing of a sufficient density to
provide a minimum visual screen and a reasonable buffer a minimum of ten feet in
height shall be provided adjacent to Kenwood Trail and Ipava Avenue.
WETLANDS
The wetland delineation for the site was conducted on 9/24/2013 by Arrowhead
Environmental Consulting and two wetlands were identified within the project
boundaries. The Notice of Application was sent out November 1, 2013. No
comments were received during the comment period.
Based on the information provided in the report dated October 11, 2013 and site
visit, the wetland delineation for the area outlined in the report has been determined
to be acceptable for use in implementing the Wetland Conservation Act. The
wetland delineation was approved December 4, 2013.
The replacement plan for the site identifies impacts to Wetland 1, totaling 0.08
acres. The developer will be purchasing 0.16 acres of wetland credits from a
wetland bank in service area #8 as there are no credits available in Dakota County.
No wetland impacts can take place until the wetland replacement plan is approved
and confirmation from BWSR that the wetland bank credits have been purchased
and withdrawn.
It is the applicant's responsibility to obtain proper wetland approvals from the U.S.
Army Corps of Engineers.
TREE PRESERVATION
A tree preservation plan was completed for Kyla Crossing. The plan identifies a total
of 164 significant trees within the site. The plan proposes to save 118 (72 %) trees
on the site.
KYLA CROSSING
JANUARY 3, 2014
PAGE 10 OF 10
EROSION CONTROL
An erosion control plan has been submitted and includes the following:
• A single gravel construction entrance is indicated on the erosion control
notes.
• A seed /mulch specification that meets City requirements.
• All 3:1 slopes seeded and stabilized with fiber blanket.
• Phased construction to minimized soil loss.
• Inlet protection is included in the plans. Wimco Road Drain or equivalent will
be used on all street catch basins and Royal Infra -safe or equivalent will be
used for all rear lot catch basins.
• The NPDES requirements are included in the plan set.
Additional erosion control measures may be required during construction as deemed
necessary by City staff. Additional measures shall be installed and maintained by the
developer. The streets must be cleared of debris at the end of each day. Street
sweeping must be done weekly or more often as needed. All streets must be
maintained to provide safe driving conditions. Heavy -duty silt fence must be
installed and maintained along all wetland boundaries.
RECOMMENDATION
Engineering recommends approval of the preliminary plat, grading plan, utility plan
and tree preservation plan for Kyla Crossing, subject to the requirements and
stipulations within this report and the following:
• Prior to City Council consideration of the preliminary plat, revised plans
detailing the plan changes along Street A shall be submitted to the City.
Approval shall also be subject to the comments of the City Administrator, Planning
Director and City Attorney.