HomeMy WebLinkAboutItem 06.mJanuary 31, 2014 Item No.
CONTRACT FOR AERIAL LADDER FIRE TRUCK
Proposed Action
Staff recommends adoption of the following motion: Move to approve Contract with
Rosenbauer Minnesota LLC, Wyoming and Minnesota for an aerial ladder fire truck
Passage of this motion will result in purchase of a 78 foot Ladder Fire Truck for $697,607.
Overview
LFD started the Capital Improvement budget process for replacing fire vehicles. The current
ladder has been in service for 27 years. With the age of the vehicle, there are safety concerns with
its operation. A ladder truck plays a critical role in fire operations at scenes to provide an aerial
device for rescue or roof operations and an elevated master water stream for large fires.
The current ladder has major maintenance issue with the hydraulics on the ladder itself. Repairs
were made in December 2012 which removed the truck from service until February 2013. The
engine continues to have heating /cooling issues with age. Each year we schedule an annual
pump test in early April while the air temperatures are cool to ensure the engine will not
overheat. The current ladder truck is the first one the city purchased and it has served our
community very well for 25 plus years.
Primary Issues to Consider
• What was budgeted for this purchase?
• What are NFPA standards?
• What is the impact if the Ladder is not replaced?
• Disposition of old fire ladder truck.
Supporting Information
• Contract for Purchase of Fire Truck
• Exhibit A - Specifications (147 pages) is available upon request
• Exhibits B and C
Mike Meyer, Fire Chief
Financial Impact: $ 697,607 Budgeted: Y/N _Y_ Source: 2014 Capital outlay
Related Documents (CIP, ERP, etc.):
Notes:
ANALYSIS OF PRIMARY ISSUES
• What was budgeted for this purchase?
Ladder budget is $700,000 for 2014. A ladder committee was formed in January of 2013
made up of members from each station. The committee spent the year going through our
current ladder and determining the baseline for the replacement ladder. The committee
had researched, evaluated and analyzed specifications as well as fire ladder truck
manufacturers. In 2013, the City Council approved a Cooperative Joint Purchasing
Agreement with H -GAC, a consortium of government entities which solicits and awards
bids to government procurement of products and services. The 78 ladder truck provided
by Rosenbauer has the lowest cost which meets City of Lakeville specifications through
the H -GAC joint purchasing program.
• What are NFPA standards?
The NFPA, National Fire Protection Agency, sets standards for design, safety and
operation of fire apparatus'. This is a recognized agency that fire departments use to
guide them with building and designing of fire vehicles. The standard used for the ladder
is NFPA 1901.
• What is the impact if the current ladder is not replaced?
If the existing ladder is not replaced we will continue to operate a vehicle that does not
meet current safety standards. Our current chassis has lap belts for seat belts, 2 forward
facing jump seats and 2 rear facing seats.
Maintenance costs will continue to increase as the vehicle ages beyond its current service
life.
• What is the disposition of old ladder truck?
The City will take sealed bids and the unit will be sold to the highest bidder.
CONTRACT FOR PURCHASE OF FIRE TRUCK
THIS CONTRACT made and entered into this P day of February, 2014, by and between
the CITY LAKEVILLE, a Minnesota municipal corporation ( "City "), and ROSENBAUER
MINNESOTA LLC, WYOMING MN a division subsidiary of Rosenbauer America
( "Contractor ")
WHEREAS, the City in 2013 approved Cooperative Joint Purchasing Agreement with H-
GAC, a consortium of government entities which solicits and awards bids to government
procurement of products and services; and
WHEREAS, The Contractor has been award the contract by H -GAC for 78 foot ladder fire
trucks and the H -GAC contract for a 78 foot ladder fire truck meets City requirements.
NOW THEREFORE, in consideration of the mutual undertakings herein, the parties
hereto agree as follows:
SECTION 1. CONTRACT DOCUMENTS The following documents, attached hereto,
shall be referred to as the "Contract Documents ", all of which shall be taken together as a whole as
the contract between the parties as if they were set out verbatim and in full herein:
This document, entitled "Contract for Purchase of Fire Truck"
• Exhibit A— H -GAC Contract FS12 -13 including specifications and warranties.
• Exhibit B — HGAC Contract Pricing Worksheet
• Exhibit C— Form E Procurement No. FS12 -13
In the event of conflict among the provisions of these documents, the order in which they are listed
above shall control, with the document listed first having the highest priority. The Contract
Documents are fully a part of this Contract as if attached to this Contract or repeated herein.
Doc. #173516v.2 1
RNK: 12/5/2013
SECTION 2. ACCEPTANCE OF BID Contractor shall perform the work as provided
in the Contract Documents. Contractor shall be engaged as an independent contractor and not as a
City employee.
SECTION 3. CONTRACT TIME/DELIVERY The Contractor shall deliver the 78 foot
ladder fire trunk as described in Exhibit A, B and C (herein referred to as "Apparatus ") to the City's
Fire Department in Lakeville Minnesota. The Apparatus shall be ready for delivery from
Contractor within Three Hundred Sixty Five days calendar days from the date of this Contract.
The delivery is based on the Contractor receiving complete and accurate paperwork from the City
and that no major changes take place initiated by the City throughout the process. The time for
delivery shall be extended for the period of any reasonable delay due exclusively to unforeseeable
causes beyond the control, and without the fault of the Contractor, including but not limited to, acts
of God, fires, and floods. Labor strikes are deemed foreseeable. If the Contractor is more than
sixty (60) days late in delivering Apparatus, the City may terminate this Contract and the Contractor
will promptly return all payments made by the City. Contractor is subject to a $100.00 per day
penalty if the Apparatus is not delivered pursuant to the terms in Section of this Contract.
SECTION 4. SPECIFICATIONS Contractor agrees that all material and workmanship
in and about the Apparatus shall comply with the Contract Documents. In the event of any conflict
between the Contract Documents and the Contractor's bid, the City's Contract Documents shall
prevail except where noted in the City's clarifications to specifications, if any.
SECTION 5. PRICE/TERMS OF PAYMENT
A. Price As a contract price for the Apparatus, the City shall pay the sum of Six
Hundred Ninety Seven Thousand Six Hundred Seven Dollars ($697,607.00) and Three Thousand
Four Hundred Eighty Five Dollars ($3,485.00) for Payment and Performance Bond. The bid price
Doc. #173516v.2 2
RNK: 12/5/2013
includes all applicable taxes, if any.
B. Terms of Payment Payment for the Rosenbauer Commander 4000 Cab and
Chassis in the amount of Two Hundred Thirty Two Thousand Three Hundred Two Thousand and
Three Hundred Eighty Four ($232,384) shall be paid within 30 days after delivery and receipt of
invoice from Contractor. Payment for the Rosenbauer 78' Viper Smart Aerial Device (w /o
breathing air) in the amount of One Hundred Seventy Six Thousand Thirteen ($176,013) shall be
paid within 30 days after delivery and receipt of invoice from Contractor. Full and Final payment
shall be made in full within thirty (30) days after the contractor has delivered the Apparatus to the
City and receipt of invoice.
SECTION 6. RISK OF LOSS The Contractor shall bear the entire risk of loss caused by
damage or destruction of equipment or property furnished pursuant to the Contract Documents to
the time the Apparatus is delivered to the City.
SECTION 7. WARRANTIES In addition to the warranties required in the specifications
the Contractor provides the following warranties. The Contractor is responsible for any and all
defects in workmanship and materials and upon notification by the City shall immediately replace
or repair the defective workmanship and materials without cost to the City. The Contractor warrants
that only new unused materials will be used. The Contractor further warrants to the City that all
materials and services furnished under the Contract will be in conformance with Contract
Documents and that the goods are of merchantable quality and are fit for the use for which they are
sold. These warranties are in addition to any manufacturer's standard warranty, and any warranty
provided by law.
SECTION 8. COPYRIGHT Contractor shall defend actions or claims charging
infringement of any copyright or patent by reason of the use or adoption of any designs,
Doc. #173516v.2 3
RNK: 12/5/2013
drawings or specifications supplied by it, and it shall hold harmless the City from loss or damage
resulting therefrom.
SECTION 9. PATENTED DEVICES, MATERIALS AND PROCESSES If the
contract requires, or Contractor desires, the use of any design, devise, material or process
covered by letters, patent or copyright, trademark or trade name, Contractor shall provide for
such use by suitable legal agreement with the patentee or owner and a copy of said agreement
shall be filed with the City. If no such agreement is made or filed as noted, Contractor shall
indemnify and hold harmless the City from any and all claims for infringement by reason of the
use of any such patented designed, device, material or process, or any trademark or trade name
or copyright in connection with the services agreed to be performed under the contract, and shall
indemnify and defend the City for any costs, liability, expenses and attorney's fees that result
from any such infringement.
SECTION 10. INSPECTION AT DELIVERY At the point of delivery, the City will
have ten (10) days to inspect the Apparatus for compliance with the Contract Documents. As the
result of the inspection, the City will:
A. Accept the Apparatus subject to an inspection report requiring correction and make
payment; or
B. Refuse to make payment until corrections are complete.
Refinements and improvements may be incorporated in the Apparatus quoted above at any time or
times prior to delivery, with the written approval of the City, whenever proven advantageous by
sound engineering development and thorough testing provided, however, that the refinements and
improvements will have no material adverse affect on performance and durability, nor result in an
increase in price.
Doc. #173516v.2 4
RNK: 12/5/2013
SECTION 11. CANCELLATION This Contract may be cancelled by City upon
payment to Contractor of reasonable cancellation charges. Reasonable cancellation charges shall
mean actual costs reasonably incurred up to date of cancellation. Reasonable cancellations charges
shall also take into account Contractor's commitments and profit, if the profit can be calculated and
proven with reasonable certainty. This section, Section 11, does not apply to a termination under
paragraphs 3 and 12 of this Contract.
SECTION 12. PERFORMANCE AND PAYMENT BOND Within fifteen (15)
calendar days after the execution of this Contract and before any work or services are rendered, the
Contractor shall furnish a performance bond and payment bond insuring the faithful performance of
the Contract and payment of all obligations arising thereunder pursuant to Section 574.26 of the
Minnesota Statutes, and in accordance with the Bid Specifications. If the bonds are not submitted
within the time frame, then the Contract shall be considered void and the City may elect to collect
the proposal bonds or security as liquidated damages.
SECTION 13. ASSIGNMENT Neither party may assign, sublet or transfer any interest
or obligation in this Contract without the prior written consent of the other party, and then only upon
such terms and conditions as both parties may agree to and set forth in writing.
SECTION 14. PROMPT PAYMENT TO SUBCONTRACTORS Pursuant to
Minnesota Statute § 471.25, Subdivision 4a, the Contractor must pay any subcontractor within ten
(10) days of the Contractor's receipt of payment from the City for undisputed services provided by
the subcontractor. The Contractor must pay interest of one and one -half percent (1 %2 %) per month
or any part of a month to subcontractor on any undisputed amount not paid on time to the
subcontractor. The minimum monthly interest penalty payment for an unpaid balance of One
Hundred Dollars ($100.00) or more is Ten Dollars ($10.00). For an unpaid balance of less than One
Doc. #173516v.2 5
RNK: 12/5/2013
Hundred Dollars ($100.00), the Contractor shall pay the actual penalty due to the subcontractor. A
subcontractor who prevails in a civil action to collect interest penalties from the Contractor shall be
awarded its costs and disbursements, including attorney's fees, incurred in bringing the action.
SECTION 15. WORKER'S COMPENSATION The Contractor shall obtain and
maintain for the duration of this Contract, statutory Worker's Compensation Insurance and
Employer's Liability Insurance as required under the laws of the State of Minnesota.
SECTION 16. COMPREHENSIVE GENERAL LIABILITY Contractor shall obtain
the following minimum insurance coverage and maintain it at all times throughout the life of the
Contract, with the City included as an additional name insured. The Contractor shall furnish the City
a certificate of insurance satisfactory to the City evidencing the required coverage:
A. Commercial General Liability Insurance
Products /Completed Operations Aggregate - $1,000,000.00
Each Occurrence - $1,000,000.00
B. Umbrella/Excess Liability Insurance
Aggregate - $25,000,000.00
Each Occurrence - $25,000,000.00
C. Blanket contractual (hold harmless) protection and fire, theft and vandalism
insurance for the full value of all materials and equipment furnished by the
Contractor.
SECTION 17. PRODUCT LIABILITY INSURANCE Contractor must submit a
Certificate of Insurance listing the manufacturer's product liability insurance coverage. Liability
insurance shall be a minimum amount of five million dollars with coverage attained with a
minimum of $1,000,000.00 underlying insurance and $4,000,000.00 umbrella coverage.
Submitted Certificate shall name the apparatus manufacturer, insurance company, policy
number, and effective dates of the insurance policy.
SECTION 18. DATA PRACTICES/RECORDS
Doc. #173516v.2 6
RNK: 12/5/2013
A. All data created, collected, received, maintained or disseminated for any purpose in
the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn.
Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as
well as federal regulations on data privacy.
B. All books, records, documents and accounting procedures and practices of the
Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the
City.
SECTION 19. U.L.I. CERTIFICATION Contractor shall furnish City with a
Certificates of Testing for the Manufacturer's Preliminary Test and the ULI Certification Tests.
SECTION 20. DELIVERY MANUALS Upon delivery of the Apparatus, Contractor
shall supply the following copies of delivery manuals on each Apparatus:
1. All warranties required by the Contract Documents.
2. Engine manufacturer's certified brake horsepower curve showing the maximum no
load governed speed;
3. Manufacturer's record of pumper construction details, per NFPA;
4. Manufacturer's run -in Certification with preliminary test results;
5. Pump Manufacturer's Certification of Hydrostatic Test;
6. Pump Manufacturer's Certification of Pump Test results;
7. The Certification of Inspection/Test of Fire Department Pumper by Underwriters
Laboratories, Inc.;
8. Weight documents from a certified scale showing actual loading on the front axle,
rear axle, and overall vehicle (with the water tank full but without personnel,
equipment, and hose);
9. At least two copies of the complete operation and maintenance manual covering the
completed Apparatus as delivered including the pump, emergency lighting and
sirens, portable fire pump, portable or built -in generator, or either furnished
accessories;
Doc. #173516v.2 7
RNK: 12/5/2013
10. Wiring diagrams of electrical systems, installed by Apparatus manufacturer;
11. A Delivery Manual, consisting of a 3 -ring notebook type binder with reference tabs
for each section, shall be furnished to include the following item: individual
component manufacturer instructions and parts manuals, warranty forms for body,
warranty forms for all major components, warranty instructions and format to be
used for compliance with warranty objections, routine service forms /publications,
and technical publications or training guide for major components.
SECTION 21. MISCELLANEOUS
A. The Contractor shall hold harmless and indemnify the City from any and all claims,
suits, and proceedings, including reasonable attorney fees and expenses, for infringement of any
software licenses, copyrights or patent, or patents, covering the property purchased hereunder.
B. Each and all of the covenants and agreements herein contained shall extend to and
be binding upon the successors and assigns of the parties hereto; provided however, that the
Contractor shall not assign this Contract with any person, firm, or corporation for the performance
of the Contractor's obligations hereunder, or any part thereof, without the written approval of the
City.
C. This Contract shall be governed by the laws of the State of Minnesota. In the event
of litigation the exclusive venue shall be in the District Court of the State of Minnesota for Dakota
County.
D. If either party waives any breach of this Contract by the other, such waiver shall not
constitute a waiver of any other or any succeeding breach of this Contract by either party, whether
of the same or any other covenant, condition or obligation.
Doc. #173516v.2 8
RNK: 12 /5/2013
E. This Contract, and the Contract Documents, embody the entire understanding
between the parties relating to the subject matter contained herein, and merges all prior discussions
and agreements between them. No agent or representative of the Contractor has authority to make
any representations, statements, warranties or agreements not herein expressed.
THIS CONTRACT ENTERED INTO AS OF THE DAY AND YEAR FIRST ABOVE
WRITTEN.
CITY OF LAKEVILLE ROSENBAUER MINNESOTA LLC,
WYOMING MN
ffiv
Matt Little, Mayor
Charlene Friedges, City Clerk
Its
Doc. #173516x.2 9
RNK: 12/5/2013
HGA ��� CONTRACT PRICING WORKSHEET
For MOTOR VEHICLES Only
Contract
No.: FS 12 -13
Date
Prepared: 1/13/2014
This [Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents
MUST be faxed to H -GAC @, 713 - 993 4548, Therefore please type or print legibly.
Buying :CITY OF LAKEVILLE, MN
Agency:
Contractor: :ROSENBAUER MN
Contact 'MICHAEL MEYER
Person:
Prepared 'ED BEENE
By:
Phone: :952- 985 -4701
Phone: :817- 281 -4172
Fax: :952- 985 -4719
Fax: :817- 281 -6576
Email: :mmeyer @lakevillemn.gov
Email: :ed @dacofire.com
Product MA01
Code:
Description: Mosenbauer 4 -Door Tilt Cab, Extruded Alum Body, Single Axle, 78' Rear Mount Steel Ladder
A. Product Itcm'Dase Ultit.Pxice.Pe: Contractor's'H -GAG Contract: 629192
........................................ ...............................
R.. Published' Options . l•t�n . . be Attach >tdditional.sheet(s) ff'nec - 'Include.Opti . d zlescrip . . i .
.............. . . . ................. . . . . ....... . . .. . . .... . ... . . . ..
(Note; Puhlished.Optimg are ugtions wbich were submitted and priced in.Contractrrr:g bid:). ' . ' . .
........................................ ...............................
Description Cost
Description Cost
Subtotal From Additional Sheet(s): 11 101790
Subtotal B:: 101790
....................................... ...............................
C: i3upiubtished Options = .Itemize lzelm� ( attach,additionai sheet•(sj,if.nexessary:.
(Npte" T.Ivpublishe4 opii'�►S are itemS•�eb ure Ztgt' submit(ed and.p4ced ip otltractor's,bid.)
Description Cost
Description Cost
Subtotal From Additional Sheet(s): 7259
Subtotal C:: 7259
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit:
For this transaction the percentage is: 1
Price plus Published Options (A +B).
D;•')<'ota( Celt wfore Any- Applieable 'Fraae- ln• /'Otlier:Allowanees %•I5iseounts {ik +B+C): • s
Quantity Ordered: 1 X Subtotal of A +B +C: 738241 = Subtotal D:: 738241
Subtotal E:: 200
F: Frade :Iusl'OthrrAiloevanceslSpecial' Discounts ' /.Freight!'ltistallation'
Description Cost Description Cost
Chassis and Aerial Interest Discount -12934 Delete Delivery - Factory Pickup 3000
Dealer Price Concession -26700
Subtotal F: E -42634
wivel:y:Da: .- 330 -365 : Cr. :�ota� �iu>rc ►�se:P.rie� �• F ±F}::
697607
FORM E - PUBLISHED OPTIONS Procurement No.:FS12 -13
Offeror
Name:
ROSENBAUER MINNESOTA (RMN)
Notes:
(Important)
1) Bid each Option on a single separate line. Bidder is responsible to
identify each item with a specific code or part number.
2) Use a single Form E for ALL items. Add /Insert additional lines as
�3) Completely describe each option, including manufacturer's code or part
numbers as appropriate. Each item listed MUST have a unique code or part
4) Options which replace standard equipment on a base bid Item on Form D
should be priced net of any credit due for the replaced item.
5) Options which are shown as upgrades /downgrades of a base bid item on
Form D should be priced at the differential amount between the base bid item
6) You encouraged to offer specific manufacturer's catalogs (eg. Whelan,
Fed Signal, etc.) as options, with 'List Less' or 'Cost Plus' percentages for
Note: Bidder must identify each option bid with an identifying Code or Part No. that
should be referenced on all Contract Pricing Worksheets
Code or
Part No.
Option Description
Quan.
Offered
Price
Extended
Total
ROSENBAUER BODY OPTIONS
Part No
Description
MN PRICE
10 -04 -2720
Bumper Cmpt, Center, Hosewell Compt
1
$306
$ 306
10 -04 -2940
Grating, Bumper Cmpt, Turtle Tile, Ea
1
$75
$ 75
10 -04 -3150
Bumper Cmpt Door, Alum T /P, Flat Style
1
$161
$ 161
10 -04 -3460
Bumper Compt Door Gas Shock
1
$171
$ 171
10 -06 -1110
Whl Trim, S/S Hub/Lug Cvrs, Front/Rr, Sngl Axle
1
$400
$ 400
10 -13 -2600
Cabinet, Center Fwd Facing, Full Ht, Cargo Net
1
$1,547
$ 1,547
10 -13 -3540
Exterior Finish, Cabinet, To Match Cab Interior
2
$298
$ 596
10 -13 -3600
Shelf, Adjust, Crew Cab Cabinet
1
$207
$ 207
10 -13 -4200
Cabinet, Notebook Style, Front Cab, Three
1
$156
$ 156
20 -09 -2130
Pump Flow Rtng, Hale, DSD, 1500 GPM
-1
$14,748
$ 14,748
20 -14 -3050
Pump Manufacturer's Pneumatic Pump Shift
-1
$944
$ 944
20 -14 -5100
Pump Primer, Hale, ESP, Oil Less
-1
$1,299
$ (1,299
20 -23 -3130
Pump Flow Rtng, Waterous, CSUC20, 2000 GPM
1
$22,006
$ 22,006
20 -26 -2200
Pump Seal, Mech, Waterous
1
$439
$ 439
20 -26 -2400
Pump Impeller, Waterous, Flame Plated Hubs
1
$436
$ 436
20 -26 -2500
Pump Counter, Waterous, RPM Counter
1
$223
$ 223
20 -26 -3200
Pump Shift, Waterous, Elee /Pneumatic Operated
1
$402
$ 402
20 -26 -4400
Pump Primer, Waterous, VPO, Oil Less, Elee, Push Button
1
$1,640
$ 1,640
20 -26 -4800
Pump Primer, Waterous, Add'1 Primer Vlv, Front/Rr Intk
1
$592
$ 592
21 -01 -2500
Drain/Bleeder, IC Lift -Up, Mnl 1/4 Turn
3
$120
$ 360
21 -01 -5500
Intk Manifold, Stnls Stl
-1
$779
$ (779)
21 -01 -6500
Dschg Manifold, Stnls Stl
-1
$779
$ (779)
22 -12 -3100
Intk, Aux, Gtd, 2 -1/2 ", NST, Right Side
1
$787
$ 787
22 -23 -1200
Intk, Gtd, 6" NST, 5" Air Oprtd V1v, 5" Pipe, Front RE Bmpr
1
$849
$ 849
22 -23 -2600
Intk, Fmt, RH Vert, Abv Bumper, Stl Pipe (Cstm)
1
$1,959
$ 1,959
22 -24 -3300
Intk, Gtd, 6" NST, 6" AKR Elec Vlv, RE Side, Bhnd Pnl
1 1
$2,8031
$ 2,803
22 -41 -1100
Plug, 2 -1/2 ", Chrome Rocker Lug, w /Chain
1 1
$81
$ 81
Page 1 of 12
22 -41 -5700 1
Cap, 6 ", Chrome Long Hndl
-1
$178
$ 178)
22 -41 -7200
Cap, 5" Storz, LW Alum, Lckng, w /Chain or Cable
2
$89
$ 178
22 -55 -4050
Intk Vlv Cntrl, AKR, Mnl Swing Type- Adjacent
1
$150
$ 150
23 -05 -3200
Dschg, 2" x 1 -1/2" Front Cntr Bumper, Swivel
1
$1,315
$ 1,315
23 -06 -2200 2
Crosslay Dschgs, (2) 1 -1/2 ", Over Pump Panel
-1
$2,023
$ (2,023)
23 -08 -1200
Speedlay Dschgs, (2) 1 -1/2 ", Ahead Pump Panel
1
$2,060
$ 2,060
23 -08 -2100
Speedlay Dschg, (1) 2 -1/2 ", Ahead Pump Panel
1
$1,480
$ 1
23 -08 -3300
Crosslay Cvr, Alum T /P, Sngl, W /Vinyl End Flaps
-1
$349
$ (349)
23 -08 -3750
Speedlay Cvr, Cargo Web End Flaps
1
$370
$ 370
23 -08 -3800
Speedlay Cvr, Alum T /P, Sngl, Top
1
$224
$ 224
23 -08 -4130
Crosslay Trim, Alum Angles, Both Sides
-1
$92
$ (92)
23 -08 -4600
Speedlay Rollers, "U" Shaped, Both Sides
1
$171
$ 171
23 -08 -8100
Speedlay, 1 -3/4 ", Removable Hose Tray, Alum
1
$271
$ 271
23 -09 -4100 5
Dschg, 2 -1/2 ", Left Side, Pump Panel
-1
$758
$ (758)
23 -10 -5200
Dschg, 3" x 4 "NST, Right Side, Pump Panel
-1
$939
$ (939)
23 -10 -6100
Dschg, 4 ", Right Side, Pump Panel
1
$1,678
$ 1,678
23 -13 -3200
Dschg, 2 -1 /2 ", Right Rr
-1
$1,286
$ (1,286
24 -02 -2600
Elbow, LW Alum, 5" Storz x 47
-2
$165
$ 330
24 -53 -0300
Dschg Vlv Cntrl, Pull Rod, 1/4 Turn, SM, AKR Slow Close - IC w /Gauge
-1
$201
$ 201
24 -53 -4000
Dschrg Vlv Cntrl, AKR, 2" Elec, #9315, Pres Mtr
1
$2,059
$ 2,059
25 -06 -3100
Foam Sys, F /PRO 2001, Cls A/B, 2.6G, 12V
1
$8,298
$ 8,298
25 -20 -1200
Foam Plmbg, Sngl Class A Tank, 1" Mnl Vlv
1
$156
$ 156
25 -21 -1300
Foam Tank, Intgrl Poly, 20 Gal, Class A
1
$644
$ 644
25 -23 -1000
Foam Tank Drain, 1" Gate Vlv, Under Tank
1
$234
$ 234
25 -28 -2100
Water Tank, 300 Gal, Aerial, Poly, Rect
-1
$4,953
$ (4,953)
25 -28 -2120
Water Tank, 400 Gal, Aerial, Poly, Rect
1
$5,884
$ 5,884
26 -30 -5200
Hosewell, Rning Brd, Pump Panel, RH
1
$231
$ 231
26 -30 -6000
Hosewell, Rning Brd, Cvr, Vinyl, Ea
1
$96
$ 96
26 -35 -1400
Pump Panel, Hngd, RH
1
$213
$ 213
26 -50 -1200
Heater, Pump Enc, 30,000BTU, w /Swtch
1
$556
$ 556
26 -50 -3200
Heat Pan, Pump Enc, Midship, Slide Out Panel, Alum
1
$647
$ 647
26 -56 -2000
Pump Panel Lt, Actuated w/Pump Engagement
-1
$113
$ (113
27 -02 -1500
Gauge, Dschg, Noshok, 2 -1 /2" 400 #, WF
-1
$103
$ (103)
27 -35 -6100
Water Tank Gauge, Whelen PS TANK LED, Level Lts, Pair, FRC
1
$895
$ 895
27 -36 -1100
Foam Tank Gauge, FRC, Class A, Pump Panel
1
$695
$ 695
30 -01 -3100
Cover, Outrigger, Treadplate
-1
$312
$ 312
30 -01 -3120
Cover, Outrigger, Plshd SS
1
$398
$ 398
30 -02 -1780
Finish, Safe Step, Mirror Stainless, Specs, EXT
1
$719
$ 719
30 -02 -1900
Side Body Header, Tread Plate, EXT
-1
$795
$ (795)
30 -02 -1920
Side Body Header, Alum, Pntd, EXT
1
$1,190
$ 1,190
33 -62 -1500
Steps, Fldg, Rr Right Hand (2)
-1
$140
$ 140
33 -62 -6300
Out & Down Rr Stirrup Step, 12" Wide
-1
$578
$ (578)
33 -66 -1120
Steps, Fldg, Frnt, Left Hand (2)
1
$213
$ 213
33 -66 -1140
Steps, Fldg, Frnt, Left Hand (3)
-1
$336
$ (336)
33 -66 -2120
Steps, Fldg, Frnt, Right Hand (2)
1
$213
$ 213
33 -66 -2140
Steps, Fldg, Frnt, Right Hand (3)
-1
$336
$ (336)
33 -70 -4100
Handrails, Pmpr, Side Pump Panel, Vert, 12 ", Pair
1
$110
$ 110
40 -42 -3122
Roll Up Drs, Otsd Cmpt, SA 75 RMA, Side Bed
-1
$4,253
$ 4,253
40 -42 -3152
SafeStep, RU Drs, Otsd Cmpt, SA 75 RMA, Side Bed
1
$7,061
$ 7,061
40 -63 -3830
Abv Rr Whls, Uppr Cmpt, Roll Up Otsd Cmpt, 38"
1
$877
$ 877
40 -72 -5520
Ahd Rr Whls, Low Cmpt, Roll Up Otsd Cmpt, 55"
1
$927
$ 927
41 -39 -1350
Hosebed, Aerial, Right Hand Side Load, EXT
-1
$3,340
$ 3,340)
41 -39 -1600
Hosebed, Aerial, Right Hand Side EZ -Load
1
$15,9591
$ 15,959
Page 2of12
41 -39 -5100
Hosebed, Divider, 1/4" Alum
-1
$666
$ (666)
44 -06 -5140
Outrigger Panels, Alum UP
-1
$491
$ (491)
44 -06 -5440
Outrigger Panels, Polished S/S
1
$1,561
$ 1,561
44 -10 -1600
Whl Well Cmpt, Sngl SCBA, Poly Tube, S/S Dr, (Fire Shopp)
-2
$256
$ (513)
44 -10 -2220
Whl Well Cmpt, Dual SCBA, Poly Tube, S/S Dr, (Fire Shopp)
2
$517
$ 1,034
44 -10 -6000
Whl Well Compt, SCBA Compt Straps
-3
$30
$ 89
44 -40 -1020
Vents, Compts, Louvers (Ea)
1
$46
$ 46
45 -02 -4100
Shelf, Adjust, Alum 3/16 ", EXT
5
$208
$ 1,040
45 -05 -4100
Slide Tray, 250 #, Alum 3/16" (1/4 Dpth), EXT
2
$417
$ 834
45 -05 -4310
Slide Tray, Mtd on Adj Tracks, (1/4 Dpth)
1
$81
$ 81
45 -06 -2100
Slide Tray, 500 #, Alum 3/16" (1 /4 Dpth), EXT
-3
$589
$ 1,766
45 -10 -2100
Pull -Out Drop -Down Tray, 250# (1 /4 Dpth), EXT
-1
$534
$ 534
45 -15 -1200
Divider, Vert, Bolt -In, 3/16" Alum
1
$241
$ 241
45 -16 -1100
Tool Board, Roll Out, 500 #, 3/16" Alum
1
$700
$ 700
45 -30 -1125
Turtle Tile, Shelves /Trays, 1/4 Depth, (each)
9
$103
$ 931
45 -30 -1900
Turtle Tile, Floor, Cmpt, Uppr Hgh Sde (up to 1/4 depth)
2
$121
$ 242
50 -08 -1000
Elecal, Base, Multi -Plex, Weldon V -MUX Bdy
-1
$5,071
$ (5,071)
50 -08 -1100
Elecal, Base, Multi -Plex, Weldon V -MUX Bdy &Cab w /Aerial
1
$6,719
$ 6,719
50 -16 -1100
Display, Universal, Bar Graph, Sngl Battery Bank
-1
$133
$ (133
51 -00 -1700
12V Power /Ground, 30A, Radio Lan
1
$199
$ 199
51 -05 -3200
Dome Lt, Crew Cab Cabinet, 12 Volt, LED
1
$215
$ 215
51 -05 -6300
Lt, Pump Cmpt, 12 Volt Incan
1
$158
$ 158
51 -05 -6400
Lt, Pump Cmpt, 12 Volt LED With Swtch
-1
$234
$ (234
51 -15 -4160
Fldlt, Fire Research, Evolution FCA800 -V 15, Contour Brow Mount
2
$1,432
$ 2,864
51 -20 -3100
Fldlt, Mntg Lan, Front Edge Of Cab Roof
1
$113
$ 113
51 -20 -4200
Lt Swtch, Remote Lan, In Chassis Cab
2
$207
$ 414
52 -02 -1110
Back Up Camera, Install Chassis Supl'd, Mn
1
$177
$ 177
52 -15 -1500
Radio Spkr, Fire, Install Cstmer Supl'd, Ea
1
$199
$ 199
52 -15 -1700
Radio, Fire, Install Cstmer Supl'd
l
$199
$ 199
53 -01 -3000
Marker Lts, Flex Arm (United), Pair
1
$139
$ 139
54 -15 -1280
Scene Lt, Whelen, M6 LED
-2
$408
$ 816)
54 -15 -4600
Scene Lt, Fire Research, Spectra, LED Q15
7
$1,575
$ 11,026
54 -15 -5100
Scene Lt Lctn, Left Side Of Cab
1
$78
$ 78
54 -15 -5200
Scene Lt Lctn, Right Side Of Cab
1
$78
$ 78
54 -15 -6400
Scene Lt Swtch , Left Scene Lts, Cab
1
$99
$ 99
54 -15 -6500
Scene Lt Swtch , Right Scene Lts, Cab
1
$99
$ 99
54 -15 -6600
Scene Lt Swtch , Rr Scene Lts, Cab
1
$99
$ 99
54 -15 -6700
Scene Lt Swtch , Rr Scene Lts, Auto w/ Reverse
1
$121
$ 121
55 -01 -3260
Cmpt Lt, Wall, OSS Night Stik, 18" LED Tube Lt, (2) Ea Cmpt
-1
$264
$ (264)
55 -01 -3270
Cmpt Lt, Wall, OSS Night Stik, 27" LED Tube Lt, (2) Ea Cmpt
-2
$373
$ 746
55 -01 -3280
Cmpt Lt, Wall, OSS Night Stik, 36" LED Tube Lt, (2) Ea Cmpt
-2
$414
$ 827
55 -01 -3460
Cmpt Lt, Wall, Whln Fluorent Plus, 18" LED Or Tube Lt, (2) Ea Cmpt
3
$216
$ 647
55 -01 -3470
Cmpt Lt, Wall, Whln Fluorent Plus, 27" LED Or Tube Lt, (2) Ea Cmpt
3
$282
$ 845
55 -05 -1100
Cmpt Lt, Mtd Below Shelves, Incand
7
$56
$ 393
55 -13 -1060
V -MUX Dr Open, Isolation, Body Main Cmpt Doors
1
$906
$ 906
56 -01 -1600
Siren, Elect, Whelen 295SLSAl
-1
$450
$ (450
56 -01 -1700
Siren, Elect, Whelen 295HFS2
1
$623
$ 623
56 -02 -1650
Spkr, Grille, Stnls Stl
-1
$85
$ 85
56 -03 -1100
Spkr Lctn, Bumper, Rcsd, Center
-1
$78
$ 78
57 -02 -1120
Lt Bar, Whelen, Ultra Freedom, #FN72VLED, LED, 72"
1
$2,064
$ 2,064
57 -02 -4600
Lt Bar, Whelen, Freedom, FNMINI, LED, 24"
-1
$2,050
$ (2,050)
57 -03 -7100 ITraffic
Emitter, 3M Opticom, Instld in Lt Bar
1
$1,1831
$ 1,183
58 -01 -1100 1
Bezels, Chrome, Wrn Lts (1 pair)
2
$66
$ 132
Page 3 of 12
58 -01 -1200
Housing, Step, Wrn Lts (1 pair)
-1
$103
$ (103
58 -16 -2100
Wrn Lts, Whelen, Lwr Mid Chassis (2) M6 LED
1
$573
$ 573
58 -36 -2000
Wrn Lts, Whelen, Low Rr Side (2) M6 LED
-1
$573
$ (573
58 -36 -2100
Wrn Lts, Whelen, Low Rr Side (2) L1NZ6 LED
1
$441
$ 441
58 -46 -2000
Wrn Lts, Whelen, Upper Side Front (2) M6 LED
1
$573
$ 573
58 -71 -1820
Wrn Lts, Whelen, Upper Rr (2) S -LED Rotary L31H, 2 -Red
-1
$991
$ 991
60 -05 -9400
Cvr, Gnrtr, Alum UP
1
$505
$ 505
60 -20 -1100
Gnrtr Mtg, Over Pump Enclsr
1
$234
$ 234
60 -20 -1450
Gnrtr Mtg, Front of Hosebed
-1
$448
$ (448)
60 -25 -2000
Rcptcl, 120V, 20 Amp, L5 -20, Twst Lck
-1
$251
$ (251)
60 -30 -2600
Rcptcl Lctn, Left Side, Whl Well, Ea
-1
$14
$ (14)
61 -01 -3100
Cable Reel, Hannay ECR1600, Elec Rwnd, 120V 50A 3 Wire BLK
1
$1,221
$ 1,221
61 -02 -3200
Cable Reel Lctn, Dnng Area, Right Side
1
$255
$ 255
61 -03 -3400
Cable, Elec, 120V, 200' 10/3 Blk
1
$349
$ 349
61 -04 -7200
Cable Rcptcl, 120V L5 -20R, 3- Prong, Twst Lek
1
$105
$ 105
61 -04 -8200
Roller Assy, Cable Reel, 4 -Way, SS Rollers
1
$128
$ 128
61 -04 -9100
Ball Stop, Cable, Orange
1
$53
$ 53
61 -05 -1220
Jct Box, AKR, (4)120V L5 -20R TL, LS -20P Pgtl, Ylw
1
$451
$ 451
61 -05 -4000
Jet Box, Holder, Brushed Alum
1
$96
$ 96
62 -01 -1300
Fldlgt, FRC, Opti, 750W -120V, Brow Contour, Frnt
-2
$798
$ 1,595
63 -15 -3100
Fldlt Cntrl Swtch, Brow Lts, Cab Dash
-1
$135
$ 135
80 -32 -1250
Compt Finish, DA Sanded, Up to 8 Cmpts, EXT
1
$2,913
$ 2,913
80 -43 -1800
Painting, Suction Elbow, To Match Truck
1
$61
$ 61
80 -50 -1800
Lettering, 4" Mylar Gold Leaf, 75 Letters
1
$630
$ 630
80 -50 -2000
Lettering, 4" Scotchlite Reflect, 75 Letters
-1
$754
$ 754
80 -65 -1300
Dr Seals, Install Cstmer Frnshd
1
$64
$ 64
80 -70 -1700
Stripe, Sngl Reflective, 6 ", Straight Design
1
$451
$ 451
80 -71 -1600
Stripe, Triple Reflective, 1" x 6" x 1" Large "Z" Design
-1
$903
$ 903
90 -03 -3300
Ladder, Roof, Duo - Safety, 14' Alum 775 -A
-1
$414
$ (414)
90 -03 -3400
Ladder, Roof, Duo - Safety, 16' Alum 875 -A
2
$465
$ 931
90 -09 -2200
Ladder, Combo, Duo - Safety, 8/13' Alum 300 -A
-1
$666
$ (666
90 -16 -3000
Pike Pole, 12' Fbgls, Round Hndl
-1
$222
$ (222)
Page 4 of 12
ROSENBAUER MOTORS CHASSIS OPTIONS
03 -00 -0000
ROSENBAUER COMMANDER CHASSIS - RAC2 - 10 JUNE 2013
$ -
03 -00 -0711
60" Cab Length 11" Roof
-1
$29,822
$ (29,822)
03 -00 -0761
70" Cab Length 11" Roof
1
$34,409
$ 34,409
03 -05 -0015
Cab Roof Channel 53" W x 11" D
-1
$4,744
$ (4,744)
03 -06 -0021
Step Trim Kickplate, Tread late
1
$110
$ 110
03 -06 -1201
Door Panel Finish ARMA Gray
-1
$248
$ 248
03 -06 -1202
Door Panel Finish ARMA Black
1
$248
$ 248
03 -06 -1221
Cab Door Trim Reflective Vertical w/ RA Logo
-1
$266
$ 266
03 -09 -0185
Seat Driver Bostrom Sierra 4 -Way Air ABTS
-1
$1,302
$ 1,302
03 -09 -0352
Seat Crew Rear Facing Outer Bostrom Tanker Fixed ABTS
-2
$686
$ 1,373
03 -09 -0510
Seat Mounting Forward Facing Outer Outboard
2
$152
$ 304
03 -09 -0552
Seat Crew Forward Facing Center Bostrom Tanker Fixed
-2
$686
$ 1,373)
03 -09 -0575
Seat Mounting Forward Facing Center
-2
$67
$ 134)
03 -09 -0584
Bostrom Seat Package - ITS Roll Tek
1
$3,207
$ 3,207
03 -09 -0605
Seat Driver Bostrom Sierra 4-Way Air ABTS ITS RollTek
1
$1,583
$ 1,583
03 -09 -0625
Seat Officer Bostrom Tanker Fixed ABTS ITS RollTek
1
$810
$ 810
03 -09 -0652
Seat Crew Rear Facing Outer Bostrom Tanker Fixed ABTS IBP RollTek
2
$1,389
$ 2,779
03 -09 -0784
Seat Crew Forward Facing Outer Bostrom Tanker Flip-Up ITS RollTek
2
$1,396
$ 2,792
03 -09 -3100
Seat Box (60/54) Forward Facing (FFC Seats)
-1
$517
$ (517)
03 -09 -3120
Seat Box (70) Outer Driver Forward Facing
1
$238
$ 238
03 -09 -3121
Seat Box (70) Outer Officer Forward Facin
1
$238
$ 238
03 -09 -3215
Seat Box (60) Forward Facing Storage Access Door (2) Driver /Officer Sides
-1
$152
$ (152)
03 -09 -4105
Seat Box Doors Finish Gray
-1
$108
$ (108)
03 -09 -8017
Cab Insulation Underbody
-1
$344
$ (344)
04 -01 -1075
Interior Trim Color Gray, 60 "- 11" Roof
-1
$2,518
$ (2,518)
04 -01 -1101
Interior Trim Color Black, 70 " -11" Roof
1
$3,056
$ 3
04 -01 -1120
Interior Trim Color Gray Rear Wall 11" Roof
-1
$441
$ (441
04 -01 -1121
Interior Trim Color Black Rear Wall 11" Roof
1
$441
$ 441
04 -02 -1100
Interior Floor Covering Color Gray, 60"
-1
$1,220
$ 1,220
04 -02 -1125
Interior Floor Covering Color Black, 70"
1
$1,562
$ 1,562
04 -03 -2000
Officer MDT Mount
-1
$447
$ (447)
04 -03 -2100
Officer Glove Com t
-1
$305
$ (305)
04 -04 -1131
Black Plates with (2) Power Points
-1
$78
$ (78)
04 -04 -1141
Map Light
1
$70
$ 70
04 -04 -1146
Locking Accy Box
-1
$105
$ 105
04 -04 -1161
Cup Holder, Dual
-1
$55
$ (5 L5
05 -00 -0062
Aerial Interlock Cab Tilt
-1
$241
$ (241)
05 -01 -5015
Cab Paint Exterior Two Tone
1
$1,122
$ 1,122
05 -02 -0560
Air Conditioning Compressor for Diesel Greenstar
1
$824
$ 824
05 -02 -0700
Auxiliary Heating System (For Greenstar)
1
$1,925
$ 1,925
06 -00 -1014
400HP Cummins ISL 91,
-1
$34,959
$ (34,959)
06 -00 -1016
450HP Cummins ISL 91,
1
$36,057
$ 36,057
07 -02 -0012
Transmission 1 o'clock PTO
1
$1,146
$ 1,146
07 -04 -0300
Fuel Tank 50 Gal/ 189 Liter, Driver Side Fill
1
$1,253
$ 1,253
07 -04 -0301
Fuel Tank 68 Gallon/257 Liter
-1
$1,439
$ (1,439)
07 -07 -0711
(2) Front Wheels Accuride 22.5 x 12.25 Aluminum
1
$1,240
$ 1,240
07 -07 -0720
(2) Front Wheels Alcoa Polished 22.5 x 12.25 Aluminum
-1
$1,123
$ (1,123)
07 -07 -0775
(4) Rear Wheels Accuride 22.5 x 9.00 Aluminum
1
$1,697
$ 1,697
07 -07 -0786
(4) Rear Wheels Alcoa Polished 22.5 x 9.00 Aluminum
-1
$2,265
$ 2,265
07 -08 -0203
Front Brakes Meritor EX225 Disc 17"
1
$1,166
$ 1,166
Page 5 of 12
07 -08 -0725
Air Horn Reservoir (1) 1200 Cu In
1
$403
$ 403
07 -09 -0012
Frame Double Channel 35" Frame Width
-1
$9,621
$ (9,621)
07 -09 -0016
Frame Double "DIET" Channel 35" Frame Width
1
$9,621
$ 9,621
07 -09 -0137
Frame /Front Extension Hot Dip Galvanized
1
$2,475
$ 2,475
07 -09 -0501
Front Bumper Stainless Steel 2 Rib Std 12 "H
-1
$1,032
$ (1,032)
07 -09 -0545
Front Bumper Extension Length 18"
-1
$432
$ 432
07 -13 -0105
Front Bumper Suction 5" Officer Vertical Outboard
1
$1,188
$ 1,188
07 -13 -0302
Tow Hooks Painted Rearward Mount
-1
$110
$ (110)
07 -13 -0305
Tow Hooks Chrome Rearward Mount
1
$264
$ 264
08 -00 -0752
Interior Door Warning Lights Red 3" LED
1
$251
$ 251
08 -00 -0815
Add'1 LED Dome Lt Blue /Clear - Individual Swtchd
1
$171
$ 171
08 -00 -4010
Dr Open/Hazard Wrn Lt, Flashing Red Lens (Do Not Move Apparatus Light)
-1
$144
$ 144
08 -00 -4020
Dr Open/Hazard Wrn Lt, Flashing LED Red Lens o Not Move Apparatus Li
1
$187
$ 187
08 -01 -0050
Driver VISTA Display Weldon Vista IV
-1
$1,399
$ (1,399)
08 -01 -0051
Driver & Officer VISTA Display Weldon Vista IV
1
$2,672
$ 2,672
08 -02 -0104
Rear Crew Controls Manual - Rear Facing Driver's Side - Remote Mt
1
$264
$ 264
08 -02 -0176
Assc Power Distribution Panel Bhnd Off Seat 10 Position 40A Batt Dir
-1
$344
$ (344
08 -02 -0516
Aux Pwr & Gnd Stud Behind Console 40A Batt Direct
1
$138
$ 138
08 -03 -0110
Communication Antenna Base Officer Cab Roof
1
$109
$ 109
08 -06 -0160
Driver & Officer Side Cameras, Rear Camera; Driver Vista
1
$809
$ 809
08 -09 -0504
Engine & Transmission Operation Manuals (2 ) Sets
-1
$165
$ 165
08 -09 -0510
Engine Service Manual Cummins ISL /ISX (1) Set
-1
$413
$ (413)
08 -09 -0511
Engine Service Manual Cummins ISL /ISX (2) Sets
-1
$825
$ (825)
Page 6 of 12
Page 7 of 12
ROSENBAUER AERIAL OPTIONS
00 -07 -1220
Aerial Operation Instructions, By Aerial Mfg, At FD 3 Days, STANDARD
-1
$4,166
$ (4,166)
00 -09 -5060
Hydraulic Warranty, 2 Years
-1
$1,650
$ (1,650)
01 -00 -1520
Galvanized Aerial Ladder Sections
1
$5,609
$ 5,609
10 -07 -6120
Rescue Basket, Outside Base, w /Mntgs, Junkin: JSA -200
1
$1,478
$ 1,478
45 -02 -1010
Roof Ladder, Bolt On, Mnt Bracket, Inside Fly Section
1
$550
$ 550
50 -02 -1010
Command Pedestal Lid
1
$275
$ 275
50 -17 -1200
1 Air Horn Button, Turntable Panel
-1
$364
$ 364
65 -02 -1110
Stabilizer, 2 Front Up-Down, (Additional)
1
$5,242
$ 5,242
65 -04 -1310
Outrigger Control Valves, Electric, (2 ) Out -Down
-1
$652
$ (652)
65 -04 -1320
Outrigger Control Valves, Electric, (2 ) Out -Down, (2)Up-Down
1
$981
$ 981
70 -16 -1100
Monitor, TFT, Monsoon RD, Y4- E21A -L -01
1
$186
$ 186
70 -20 -1020
Pre - Connect Discharge, 2.5" x 1.5 ", Butterfly Hand Valve,Tip
1
$2,893
$ 2,893
80 -11 -2000
ITracking Lights, (2), 500W, 120V, FRC O ti: OPA570- S50 -ON
-1
$1,618
$ 1,618
85-45 -2000
Receptacle, Ladder Tip, 120V, 15A, (1)Circuit, (1)Outlet
1
$1,195
$ 1,195
88 -01 -4200
Cab Lift Interlock, Limit Switch
-1
$220
$ 220
90 -01 -1510
Extension Shaft
-1
$1,444
$ (1,444)
90 -10 -1200
Special Tools
-1
$316
$ (316)
TOTAL PUBLISHED OPTIONS
$ 101,790
Page 7 of 12
THE FOLLOWING UNPUBLISHED OPTIONS ARE INCLUDED IN THE PROPSAL
Part No
Description
QUAN
MN PRICE
52 -10 -1000
Install Customer Supplied FireCom Intercom System
1
1974
$ 1,974
58- 71 -1800S
Wm Lts, Whelen, Upper Rr (2) MCSLED2R Micro Edge LED
1
1259
$ 1,259
10- 05 -4224S
Frnt Bumper, 4000, 2 -Rib S/S 12" H T/P Apron, S/S Wings, 24" Extension
1
1981
$ 1,981
40- 78 -4520S
Behind Rr Outrigger, Low Cm t, Hinged Double Door Cm t, 50"
1
2045
$ 2,045
TOTAL AMOUNT OF UNPUBLISHED OPTIONS
S 7 254
Page 8 of 12