HomeMy WebLinkAboutItem 06.mJanuary 31, 2014 Item No. CONTRACT FOR AERIAL LADDER FIRE TRUCK Proposed Action Staff recommends adoption of the following motion: Move to approve Contract with Rosenbauer Minnesota LLC, Wyoming and Minnesota for an aerial ladder fire truck Passage of this motion will result in purchase of a 78 foot Ladder Fire Truck for $697,607. Overview LFD started the Capital Improvement budget process for replacing fire vehicles. The current ladder has been in service for 27 years. With the age of the vehicle, there are safety concerns with its operation. A ladder truck plays a critical role in fire operations at scenes to provide an aerial device for rescue or roof operations and an elevated master water stream for large fires. The current ladder has major maintenance issue with the hydraulics on the ladder itself. Repairs were made in December 2012 which removed the truck from service until February 2013. The engine continues to have heating /cooling issues with age. Each year we schedule an annual pump test in early April while the air temperatures are cool to ensure the engine will not overheat. The current ladder truck is the first one the city purchased and it has served our community very well for 25 plus years. Primary Issues to Consider • What was budgeted for this purchase? • What are NFPA standards? • What is the impact if the Ladder is not replaced? • Disposition of old fire ladder truck. Supporting Information • Contract for Purchase of Fire Truck • Exhibit A - Specifications (147 pages) is available upon request • Exhibits B and C Mike Meyer, Fire Chief Financial Impact: $ 697,607 Budgeted: Y/N _Y_ Source: 2014 Capital outlay Related Documents (CIP, ERP, etc.): Notes: ANALYSIS OF PRIMARY ISSUES • What was budgeted for this purchase? Ladder budget is $700,000 for 2014. A ladder committee was formed in January of 2013 made up of members from each station. The committee spent the year going through our current ladder and determining the baseline for the replacement ladder. The committee had researched, evaluated and analyzed specifications as well as fire ladder truck manufacturers. In 2013, the City Council approved a Cooperative Joint Purchasing Agreement with H -GAC, a consortium of government entities which solicits and awards bids to government procurement of products and services. The 78 ladder truck provided by Rosenbauer has the lowest cost which meets City of Lakeville specifications through the H -GAC joint purchasing program. • What are NFPA standards? The NFPA, National Fire Protection Agency, sets standards for design, safety and operation of fire apparatus'. This is a recognized agency that fire departments use to guide them with building and designing of fire vehicles. The standard used for the ladder is NFPA 1901. • What is the impact if the current ladder is not replaced? If the existing ladder is not replaced we will continue to operate a vehicle that does not meet current safety standards. Our current chassis has lap belts for seat belts, 2 forward facing jump seats and 2 rear facing seats. Maintenance costs will continue to increase as the vehicle ages beyond its current service life. • What is the disposition of old ladder truck? The City will take sealed bids and the unit will be sold to the highest bidder. CONTRACT FOR PURCHASE OF FIRE TRUCK THIS CONTRACT made and entered into this P day of February, 2014, by and between the CITY LAKEVILLE, a Minnesota municipal corporation ( "City "), and ROSENBAUER MINNESOTA LLC, WYOMING MN a division subsidiary of Rosenbauer America ( "Contractor ") WHEREAS, the City in 2013 approved Cooperative Joint Purchasing Agreement with H- GAC, a consortium of government entities which solicits and awards bids to government procurement of products and services; and WHEREAS, The Contractor has been award the contract by H -GAC for 78 foot ladder fire trucks and the H -GAC contract for a 78 foot ladder fire truck meets City requirements. NOW THEREFORE, in consideration of the mutual undertakings herein, the parties hereto agree as follows: SECTION 1. CONTRACT DOCUMENTS The following documents, attached hereto, shall be referred to as the "Contract Documents ", all of which shall be taken together as a whole as the contract between the parties as if they were set out verbatim and in full herein: This document, entitled "Contract for Purchase of Fire Truck" • Exhibit A— H -GAC Contract FS12 -13 including specifications and warranties. • Exhibit B — HGAC Contract Pricing Worksheet • Exhibit C— Form E Procurement No. FS12 -13 In the event of conflict among the provisions of these documents, the order in which they are listed above shall control, with the document listed first having the highest priority. The Contract Documents are fully a part of this Contract as if attached to this Contract or repeated herein. Doc. #173516v.2 1 RNK: 12/5/2013 SECTION 2. ACCEPTANCE OF BID Contractor shall perform the work as provided in the Contract Documents. Contractor shall be engaged as an independent contractor and not as a City employee. SECTION 3. CONTRACT TIME/DELIVERY The Contractor shall deliver the 78 foot ladder fire trunk as described in Exhibit A, B and C (herein referred to as "Apparatus ") to the City's Fire Department in Lakeville Minnesota. The Apparatus shall be ready for delivery from Contractor within Three Hundred Sixty Five days calendar days from the date of this Contract. The delivery is based on the Contractor receiving complete and accurate paperwork from the City and that no major changes take place initiated by the City throughout the process. The time for delivery shall be extended for the period of any reasonable delay due exclusively to unforeseeable causes beyond the control, and without the fault of the Contractor, including but not limited to, acts of God, fires, and floods. Labor strikes are deemed foreseeable. If the Contractor is more than sixty (60) days late in delivering Apparatus, the City may terminate this Contract and the Contractor will promptly return all payments made by the City. Contractor is subject to a $100.00 per day penalty if the Apparatus is not delivered pursuant to the terms in Section of this Contract. SECTION 4. SPECIFICATIONS Contractor agrees that all material and workmanship in and about the Apparatus shall comply with the Contract Documents. In the event of any conflict between the Contract Documents and the Contractor's bid, the City's Contract Documents shall prevail except where noted in the City's clarifications to specifications, if any. SECTION 5. PRICE/TERMS OF PAYMENT A. Price As a contract price for the Apparatus, the City shall pay the sum of Six Hundred Ninety Seven Thousand Six Hundred Seven Dollars ($697,607.00) and Three Thousand Four Hundred Eighty Five Dollars ($3,485.00) for Payment and Performance Bond. The bid price Doc. #173516v.2 2 RNK: 12/5/2013 includes all applicable taxes, if any. B. Terms of Payment Payment for the Rosenbauer Commander 4000 Cab and Chassis in the amount of Two Hundred Thirty Two Thousand Three Hundred Two Thousand and Three Hundred Eighty Four ($232,384) shall be paid within 30 days after delivery and receipt of invoice from Contractor. Payment for the Rosenbauer 78' Viper Smart Aerial Device (w /o breathing air) in the amount of One Hundred Seventy Six Thousand Thirteen ($176,013) shall be paid within 30 days after delivery and receipt of invoice from Contractor. Full and Final payment shall be made in full within thirty (30) days after the contractor has delivered the Apparatus to the City and receipt of invoice. SECTION 6. RISK OF LOSS The Contractor shall bear the entire risk of loss caused by damage or destruction of equipment or property furnished pursuant to the Contract Documents to the time the Apparatus is delivered to the City. SECTION 7. WARRANTIES In addition to the warranties required in the specifications the Contractor provides the following warranties. The Contractor is responsible for any and all defects in workmanship and materials and upon notification by the City shall immediately replace or repair the defective workmanship and materials without cost to the City. The Contractor warrants that only new unused materials will be used. The Contractor further warrants to the City that all materials and services furnished under the Contract will be in conformance with Contract Documents and that the goods are of merchantable quality and are fit for the use for which they are sold. These warranties are in addition to any manufacturer's standard warranty, and any warranty provided by law. SECTION 8. COPYRIGHT Contractor shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, Doc. #173516v.2 3 RNK: 12/5/2013 drawings or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom. SECTION 9. PATENTED DEVICES, MATERIALS AND PROCESSES If the contract requires, or Contractor desires, the use of any design, devise, material or process covered by letters, patent or copyright, trademark or trade name, Contractor shall provide for such use by suitable legal agreement with the patentee or owner and a copy of said agreement shall be filed with the City. If no such agreement is made or filed as noted, Contractor shall indemnify and hold harmless the City from any and all claims for infringement by reason of the use of any such patented designed, device, material or process, or any trademark or trade name or copyright in connection with the services agreed to be performed under the contract, and shall indemnify and defend the City for any costs, liability, expenses and attorney's fees that result from any such infringement. SECTION 10. INSPECTION AT DELIVERY At the point of delivery, the City will have ten (10) days to inspect the Apparatus for compliance with the Contract Documents. As the result of the inspection, the City will: A. Accept the Apparatus subject to an inspection report requiring correction and make payment; or B. Refuse to make payment until corrections are complete. Refinements and improvements may be incorporated in the Apparatus quoted above at any time or times prior to delivery, with the written approval of the City, whenever proven advantageous by sound engineering development and thorough testing provided, however, that the refinements and improvements will have no material adverse affect on performance and durability, nor result in an increase in price. Doc. #173516v.2 4 RNK: 12/5/2013 SECTION 11. CANCELLATION This Contract may be cancelled by City upon payment to Contractor of reasonable cancellation charges. Reasonable cancellation charges shall mean actual costs reasonably incurred up to date of cancellation. Reasonable cancellations charges shall also take into account Contractor's commitments and profit, if the profit can be calculated and proven with reasonable certainty. This section, Section 11, does not apply to a termination under paragraphs 3 and 12 of this Contract. SECTION 12. PERFORMANCE AND PAYMENT BOND Within fifteen (15) calendar days after the execution of this Contract and before any work or services are rendered, the Contractor shall furnish a performance bond and payment bond insuring the faithful performance of the Contract and payment of all obligations arising thereunder pursuant to Section 574.26 of the Minnesota Statutes, and in accordance with the Bid Specifications. If the bonds are not submitted within the time frame, then the Contract shall be considered void and the City may elect to collect the proposal bonds or security as liquidated damages. SECTION 13. ASSIGNMENT Neither party may assign, sublet or transfer any interest or obligation in this Contract without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. SECTION 14. PROMPT PAYMENT TO SUBCONTRACTORS Pursuant to Minnesota Statute § 471.25, Subdivision 4a, the Contractor must pay any subcontractor within ten (10) days of the Contractor's receipt of payment from the City for undisputed services provided by the subcontractor. The Contractor must pay interest of one and one -half percent (1 %2 %) per month or any part of a month to subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of One Hundred Dollars ($100.00) or more is Ten Dollars ($10.00). For an unpaid balance of less than One Doc. #173516v.2 5 RNK: 12/5/2013 Hundred Dollars ($100.00), the Contractor shall pay the actual penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest penalties from the Contractor shall be awarded its costs and disbursements, including attorney's fees, incurred in bringing the action. SECTION 15. WORKER'S COMPENSATION The Contractor shall obtain and maintain for the duration of this Contract, statutory Worker's Compensation Insurance and Employer's Liability Insurance as required under the laws of the State of Minnesota. SECTION 16. COMPREHENSIVE GENERAL LIABILITY Contractor shall obtain the following minimum insurance coverage and maintain it at all times throughout the life of the Contract, with the City included as an additional name insured. The Contractor shall furnish the City a certificate of insurance satisfactory to the City evidencing the required coverage: A. Commercial General Liability Insurance Products /Completed Operations Aggregate - $1,000,000.00 Each Occurrence - $1,000,000.00 B. Umbrella/Excess Liability Insurance Aggregate - $25,000,000.00 Each Occurrence - $25,000,000.00 C. Blanket contractual (hold harmless) protection and fire, theft and vandalism insurance for the full value of all materials and equipment furnished by the Contractor. SECTION 17. PRODUCT LIABILITY INSURANCE Contractor must submit a Certificate of Insurance listing the manufacturer's product liability insurance coverage. Liability insurance shall be a minimum amount of five million dollars with coverage attained with a minimum of $1,000,000.00 underlying insurance and $4,000,000.00 umbrella coverage. Submitted Certificate shall name the apparatus manufacturer, insurance company, policy number, and effective dates of the insurance policy. SECTION 18. DATA PRACTICES/RECORDS Doc. #173516v.2 6 RNK: 12/5/2013 A. All data created, collected, received, maintained or disseminated for any purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as well as federal regulations on data privacy. B. All books, records, documents and accounting procedures and practices of the Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the City. SECTION 19. U.L.I. CERTIFICATION Contractor shall furnish City with a Certificates of Testing for the Manufacturer's Preliminary Test and the ULI Certification Tests. SECTION 20. DELIVERY MANUALS Upon delivery of the Apparatus, Contractor shall supply the following copies of delivery manuals on each Apparatus: 1. All warranties required by the Contract Documents. 2. Engine manufacturer's certified brake horsepower curve showing the maximum no load governed speed; 3. Manufacturer's record of pumper construction details, per NFPA; 4. Manufacturer's run -in Certification with preliminary test results; 5. Pump Manufacturer's Certification of Hydrostatic Test; 6. Pump Manufacturer's Certification of Pump Test results; 7. The Certification of Inspection/Test of Fire Department Pumper by Underwriters Laboratories, Inc.; 8. Weight documents from a certified scale showing actual loading on the front axle, rear axle, and overall vehicle (with the water tank full but without personnel, equipment, and hose); 9. At least two copies of the complete operation and maintenance manual covering the completed Apparatus as delivered including the pump, emergency lighting and sirens, portable fire pump, portable or built -in generator, or either furnished accessories; Doc. #173516v.2 7 RNK: 12/5/2013 10. Wiring diagrams of electrical systems, installed by Apparatus manufacturer; 11. A Delivery Manual, consisting of a 3 -ring notebook type binder with reference tabs for each section, shall be furnished to include the following item: individual component manufacturer instructions and parts manuals, warranty forms for body, warranty forms for all major components, warranty instructions and format to be used for compliance with warranty objections, routine service forms /publications, and technical publications or training guide for major components. SECTION 21. MISCELLANEOUS A. The Contractor shall hold harmless and indemnify the City from any and all claims, suits, and proceedings, including reasonable attorney fees and expenses, for infringement of any software licenses, copyrights or patent, or patents, covering the property purchased hereunder. B. Each and all of the covenants and agreements herein contained shall extend to and be binding upon the successors and assigns of the parties hereto; provided however, that the Contractor shall not assign this Contract with any person, firm, or corporation for the performance of the Contractor's obligations hereunder, or any part thereof, without the written approval of the City. C. This Contract shall be governed by the laws of the State of Minnesota. In the event of litigation the exclusive venue shall be in the District Court of the State of Minnesota for Dakota County. D. If either party waives any breach of this Contract by the other, such waiver shall not constitute a waiver of any other or any succeeding breach of this Contract by either party, whether of the same or any other covenant, condition or obligation. Doc. #173516v.2 8 RNK: 12 /5/2013 E. This Contract, and the Contract Documents, embody the entire understanding between the parties relating to the subject matter contained herein, and merges all prior discussions and agreements between them. No agent or representative of the Contractor has authority to make any representations, statements, warranties or agreements not herein expressed. THIS CONTRACT ENTERED INTO AS OF THE DAY AND YEAR FIRST ABOVE WRITTEN. CITY OF LAKEVILLE ROSENBAUER MINNESOTA LLC, WYOMING MN ffiv Matt Little, Mayor Charlene Friedges, City Clerk Its Doc. #173516x.2 9 RNK: 12/5/2013 HGA ��� CONTRACT PRICING WORKSHEET For MOTOR VEHICLES Only Contract No.: FS 12 -13 Date Prepared: 1/13/2014 This [Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H -GAC @, 713 - 993 4548, Therefore please type or print legibly. Buying :CITY OF LAKEVILLE, MN Agency: Contractor: :ROSENBAUER MN Contact 'MICHAEL MEYER Person: Prepared 'ED BEENE By: Phone: :952- 985 -4701 Phone: :817- 281 -4172 Fax: :952- 985 -4719 Fax: :817- 281 -6576 Email: :mmeyer @lakevillemn.gov Email: :ed @dacofire.com Product MA01 Code: Description: Mosenbauer 4 -Door Tilt Cab, Extruded Alum Body, Single Axle, 78' Rear Mount Steel Ladder A. Product Itcm'Dase Ultit.Pxice.Pe: Contractor's'H -GAG Contract: 629192 ........................................ ............................... R.. Published' Options . l•t�n . . be Attach >tdditional.sheet(s) ff'nec - 'Include.Opti . d zlescrip . . i . .............. . . . ................. . . . . ....... . . .. . . .... . ... . . . .. (Note; Puhlished.Optimg are ugtions wbich were submitted and priced in.Contractrrr:g bid:). ' . ' . . ........................................ ............................... Description Cost Description Cost Subtotal From Additional Sheet(s): 11 101790 Subtotal B:: 101790 ....................................... ............................... C: i3upiubtished Options = .Itemize lzelm� ( attach,additionai sheet•(sj,if.nexessary:. (Npte" T.Ivpublishe4 opii'�►S are itemS•�eb ure Ztgt' submit(ed and.p4ced ip otltractor's,bid.) Description Cost Description Cost Subtotal From Additional Sheet(s): 7259 Subtotal C:: 7259 Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit: For this transaction the percentage is: 1 Price plus Published Options (A +B). D;•')<'ota( Celt wfore Any- Applieable 'Fraae- ln• /'Otlier:Allowanees %•I5iseounts {ik +B+C): • s Quantity Ordered: 1 X Subtotal of A +B +C: 738241 = Subtotal D:: 738241 Subtotal E:: 200 F: Frade :Iusl'OthrrAiloevanceslSpecial' Discounts ' /.Freight!'ltistallation' Description Cost Description Cost Chassis and Aerial Interest Discount -12934 Delete Delivery - Factory Pickup 3000 Dealer Price Concession -26700 Subtotal F: E -42634 wivel:y:Da: .- 330 -365 : Cr. :�ota� �iu>rc ►�se:P.rie� �• F ±F}:: 697607 FORM E - PUBLISHED OPTIONS Procurement No.:FS12 -13 Offeror Name: ROSENBAUER MINNESOTA (RMN) Notes: (Important) 1) Bid each Option on a single separate line. Bidder is responsible to identify each item with a specific code or part number. 2) Use a single Form E for ALL items. Add /Insert additional lines as �3) Completely describe each option, including manufacturer's code or part numbers as appropriate. Each item listed MUST have a unique code or part 4) Options which replace standard equipment on a base bid Item on Form D should be priced net of any credit due for the replaced item. 5) Options which are shown as upgrades /downgrades of a base bid item on Form D should be priced at the differential amount between the base bid item 6) You encouraged to offer specific manufacturer's catalogs (eg. Whelan, Fed Signal, etc.) as options, with 'List Less' or 'Cost Plus' percentages for Note: Bidder must identify each option bid with an identifying Code or Part No. that should be referenced on all Contract Pricing Worksheets Code or Part No. Option Description Quan. Offered Price Extended Total ROSENBAUER BODY OPTIONS Part No Description MN PRICE 10 -04 -2720 Bumper Cmpt, Center, Hosewell Compt 1 $306 $ 306 10 -04 -2940 Grating, Bumper Cmpt, Turtle Tile, Ea 1 $75 $ 75 10 -04 -3150 Bumper Cmpt Door, Alum T /P, Flat Style 1 $161 $ 161 10 -04 -3460 Bumper Compt Door Gas Shock 1 $171 $ 171 10 -06 -1110 Whl Trim, S/S Hub/Lug Cvrs, Front/Rr, Sngl Axle 1 $400 $ 400 10 -13 -2600 Cabinet, Center Fwd Facing, Full Ht, Cargo Net 1 $1,547 $ 1,547 10 -13 -3540 Exterior Finish, Cabinet, To Match Cab Interior 2 $298 $ 596 10 -13 -3600 Shelf, Adjust, Crew Cab Cabinet 1 $207 $ 207 10 -13 -4200 Cabinet, Notebook Style, Front Cab, Three 1 $156 $ 156 20 -09 -2130 Pump Flow Rtng, Hale, DSD, 1500 GPM -1 $14,748 $ 14,748 20 -14 -3050 Pump Manufacturer's Pneumatic Pump Shift -1 $944 $ 944 20 -14 -5100 Pump Primer, Hale, ESP, Oil Less -1 $1,299 $ (1,299 20 -23 -3130 Pump Flow Rtng, Waterous, CSUC20, 2000 GPM 1 $22,006 $ 22,006 20 -26 -2200 Pump Seal, Mech, Waterous 1 $439 $ 439 20 -26 -2400 Pump Impeller, Waterous, Flame Plated Hubs 1 $436 $ 436 20 -26 -2500 Pump Counter, Waterous, RPM Counter 1 $223 $ 223 20 -26 -3200 Pump Shift, Waterous, Elee /Pneumatic Operated 1 $402 $ 402 20 -26 -4400 Pump Primer, Waterous, VPO, Oil Less, Elee, Push Button 1 $1,640 $ 1,640 20 -26 -4800 Pump Primer, Waterous, Add'1 Primer Vlv, Front/Rr Intk 1 $592 $ 592 21 -01 -2500 Drain/Bleeder, IC Lift -Up, Mnl 1/4 Turn 3 $120 $ 360 21 -01 -5500 Intk Manifold, Stnls Stl -1 $779 $ (779) 21 -01 -6500 Dschg Manifold, Stnls Stl -1 $779 $ (779) 22 -12 -3100 Intk, Aux, Gtd, 2 -1/2 ", NST, Right Side 1 $787 $ 787 22 -23 -1200 Intk, Gtd, 6" NST, 5" Air Oprtd V1v, 5" Pipe, Front RE Bmpr 1 $849 $ 849 22 -23 -2600 Intk, Fmt, RH Vert, Abv Bumper, Stl Pipe (Cstm) 1 $1,959 $ 1,959 22 -24 -3300 Intk, Gtd, 6" NST, 6" AKR Elec Vlv, RE Side, Bhnd Pnl 1 1 $2,8031 $ 2,803 22 -41 -1100 Plug, 2 -1/2 ", Chrome Rocker Lug, w /Chain 1 1 $81 $ 81 Page 1 of 12 22 -41 -5700 1 Cap, 6 ", Chrome Long Hndl -1 $178 $ 178) 22 -41 -7200 Cap, 5" Storz, LW Alum, Lckng, w /Chain or Cable 2 $89 $ 178 22 -55 -4050 Intk Vlv Cntrl, AKR, Mnl Swing Type- Adjacent 1 $150 $ 150 23 -05 -3200 Dschg, 2" x 1 -1/2" Front Cntr Bumper, Swivel 1 $1,315 $ 1,315 23 -06 -2200 2 Crosslay Dschgs, (2) 1 -1/2 ", Over Pump Panel -1 $2,023 $ (2,023) 23 -08 -1200 Speedlay Dschgs, (2) 1 -1/2 ", Ahead Pump Panel 1 $2,060 $ 2,060 23 -08 -2100 Speedlay Dschg, (1) 2 -1/2 ", Ahead Pump Panel 1 $1,480 $ 1 23 -08 -3300 Crosslay Cvr, Alum T /P, Sngl, W /Vinyl End Flaps -1 $349 $ (349) 23 -08 -3750 Speedlay Cvr, Cargo Web End Flaps 1 $370 $ 370 23 -08 -3800 Speedlay Cvr, Alum T /P, Sngl, Top 1 $224 $ 224 23 -08 -4130 Crosslay Trim, Alum Angles, Both Sides -1 $92 $ (92) 23 -08 -4600 Speedlay Rollers, "U" Shaped, Both Sides 1 $171 $ 171 23 -08 -8100 Speedlay, 1 -3/4 ", Removable Hose Tray, Alum 1 $271 $ 271 23 -09 -4100 5 Dschg, 2 -1/2 ", Left Side, Pump Panel -1 $758 $ (758) 23 -10 -5200 Dschg, 3" x 4 "NST, Right Side, Pump Panel -1 $939 $ (939) 23 -10 -6100 Dschg, 4 ", Right Side, Pump Panel 1 $1,678 $ 1,678 23 -13 -3200 Dschg, 2 -1 /2 ", Right Rr -1 $1,286 $ (1,286 24 -02 -2600 Elbow, LW Alum, 5" Storz x 47 -2 $165 $ 330 24 -53 -0300 Dschg Vlv Cntrl, Pull Rod, 1/4 Turn, SM, AKR Slow Close - IC w /Gauge -1 $201 $ 201 24 -53 -4000 Dschrg Vlv Cntrl, AKR, 2" Elec, #9315, Pres Mtr 1 $2,059 $ 2,059 25 -06 -3100 Foam Sys, F /PRO 2001, Cls A/B, 2.6G, 12V 1 $8,298 $ 8,298 25 -20 -1200 Foam Plmbg, Sngl Class A Tank, 1" Mnl Vlv 1 $156 $ 156 25 -21 -1300 Foam Tank, Intgrl Poly, 20 Gal, Class A 1 $644 $ 644 25 -23 -1000 Foam Tank Drain, 1" Gate Vlv, Under Tank 1 $234 $ 234 25 -28 -2100 Water Tank, 300 Gal, Aerial, Poly, Rect -1 $4,953 $ (4,953) 25 -28 -2120 Water Tank, 400 Gal, Aerial, Poly, Rect 1 $5,884 $ 5,884 26 -30 -5200 Hosewell, Rning Brd, Pump Panel, RH 1 $231 $ 231 26 -30 -6000 Hosewell, Rning Brd, Cvr, Vinyl, Ea 1 $96 $ 96 26 -35 -1400 Pump Panel, Hngd, RH 1 $213 $ 213 26 -50 -1200 Heater, Pump Enc, 30,000BTU, w /Swtch 1 $556 $ 556 26 -50 -3200 Heat Pan, Pump Enc, Midship, Slide Out Panel, Alum 1 $647 $ 647 26 -56 -2000 Pump Panel Lt, Actuated w/Pump Engagement -1 $113 $ (113 27 -02 -1500 Gauge, Dschg, Noshok, 2 -1 /2" 400 #, WF -1 $103 $ (103) 27 -35 -6100 Water Tank Gauge, Whelen PS TANK LED, Level Lts, Pair, FRC 1 $895 $ 895 27 -36 -1100 Foam Tank Gauge, FRC, Class A, Pump Panel 1 $695 $ 695 30 -01 -3100 Cover, Outrigger, Treadplate -1 $312 $ 312 30 -01 -3120 Cover, Outrigger, Plshd SS 1 $398 $ 398 30 -02 -1780 Finish, Safe Step, Mirror Stainless, Specs, EXT 1 $719 $ 719 30 -02 -1900 Side Body Header, Tread Plate, EXT -1 $795 $ (795) 30 -02 -1920 Side Body Header, Alum, Pntd, EXT 1 $1,190 $ 1,190 33 -62 -1500 Steps, Fldg, Rr Right Hand (2) -1 $140 $ 140 33 -62 -6300 Out & Down Rr Stirrup Step, 12" Wide -1 $578 $ (578) 33 -66 -1120 Steps, Fldg, Frnt, Left Hand (2) 1 $213 $ 213 33 -66 -1140 Steps, Fldg, Frnt, Left Hand (3) -1 $336 $ (336) 33 -66 -2120 Steps, Fldg, Frnt, Right Hand (2) 1 $213 $ 213 33 -66 -2140 Steps, Fldg, Frnt, Right Hand (3) -1 $336 $ (336) 33 -70 -4100 Handrails, Pmpr, Side Pump Panel, Vert, 12 ", Pair 1 $110 $ 110 40 -42 -3122 Roll Up Drs, Otsd Cmpt, SA 75 RMA, Side Bed -1 $4,253 $ 4,253 40 -42 -3152 SafeStep, RU Drs, Otsd Cmpt, SA 75 RMA, Side Bed 1 $7,061 $ 7,061 40 -63 -3830 Abv Rr Whls, Uppr Cmpt, Roll Up Otsd Cmpt, 38" 1 $877 $ 877 40 -72 -5520 Ahd Rr Whls, Low Cmpt, Roll Up Otsd Cmpt, 55" 1 $927 $ 927 41 -39 -1350 Hosebed, Aerial, Right Hand Side Load, EXT -1 $3,340 $ 3,340) 41 -39 -1600 Hosebed, Aerial, Right Hand Side EZ -Load 1 $15,9591 $ 15,959 Page 2of12 41 -39 -5100 Hosebed, Divider, 1/4" Alum -1 $666 $ (666) 44 -06 -5140 Outrigger Panels, Alum UP -1 $491 $ (491) 44 -06 -5440 Outrigger Panels, Polished S/S 1 $1,561 $ 1,561 44 -10 -1600 Whl Well Cmpt, Sngl SCBA, Poly Tube, S/S Dr, (Fire Shopp) -2 $256 $ (513) 44 -10 -2220 Whl Well Cmpt, Dual SCBA, Poly Tube, S/S Dr, (Fire Shopp) 2 $517 $ 1,034 44 -10 -6000 Whl Well Compt, SCBA Compt Straps -3 $30 $ 89 44 -40 -1020 Vents, Compts, Louvers (Ea) 1 $46 $ 46 45 -02 -4100 Shelf, Adjust, Alum 3/16 ", EXT 5 $208 $ 1,040 45 -05 -4100 Slide Tray, 250 #, Alum 3/16" (1/4 Dpth), EXT 2 $417 $ 834 45 -05 -4310 Slide Tray, Mtd on Adj Tracks, (1/4 Dpth) 1 $81 $ 81 45 -06 -2100 Slide Tray, 500 #, Alum 3/16" (1 /4 Dpth), EXT -3 $589 $ 1,766 45 -10 -2100 Pull -Out Drop -Down Tray, 250# (1 /4 Dpth), EXT -1 $534 $ 534 45 -15 -1200 Divider, Vert, Bolt -In, 3/16" Alum 1 $241 $ 241 45 -16 -1100 Tool Board, Roll Out, 500 #, 3/16" Alum 1 $700 $ 700 45 -30 -1125 Turtle Tile, Shelves /Trays, 1/4 Depth, (each) 9 $103 $ 931 45 -30 -1900 Turtle Tile, Floor, Cmpt, Uppr Hgh Sde (up to 1/4 depth) 2 $121 $ 242 50 -08 -1000 Elecal, Base, Multi -Plex, Weldon V -MUX Bdy -1 $5,071 $ (5,071) 50 -08 -1100 Elecal, Base, Multi -Plex, Weldon V -MUX Bdy &Cab w /Aerial 1 $6,719 $ 6,719 50 -16 -1100 Display, Universal, Bar Graph, Sngl Battery Bank -1 $133 $ (133 51 -00 -1700 12V Power /Ground, 30A, Radio Lan 1 $199 $ 199 51 -05 -3200 Dome Lt, Crew Cab Cabinet, 12 Volt, LED 1 $215 $ 215 51 -05 -6300 Lt, Pump Cmpt, 12 Volt Incan 1 $158 $ 158 51 -05 -6400 Lt, Pump Cmpt, 12 Volt LED With Swtch -1 $234 $ (234 51 -15 -4160 Fldlt, Fire Research, Evolution FCA800 -V 15, Contour Brow Mount 2 $1,432 $ 2,864 51 -20 -3100 Fldlt, Mntg Lan, Front Edge Of Cab Roof 1 $113 $ 113 51 -20 -4200 Lt Swtch, Remote Lan, In Chassis Cab 2 $207 $ 414 52 -02 -1110 Back Up Camera, Install Chassis Supl'd, Mn 1 $177 $ 177 52 -15 -1500 Radio Spkr, Fire, Install Cstmer Supl'd, Ea 1 $199 $ 199 52 -15 -1700 Radio, Fire, Install Cstmer Supl'd l $199 $ 199 53 -01 -3000 Marker Lts, Flex Arm (United), Pair 1 $139 $ 139 54 -15 -1280 Scene Lt, Whelen, M6 LED -2 $408 $ 816) 54 -15 -4600 Scene Lt, Fire Research, Spectra, LED Q15 7 $1,575 $ 11,026 54 -15 -5100 Scene Lt Lctn, Left Side Of Cab 1 $78 $ 78 54 -15 -5200 Scene Lt Lctn, Right Side Of Cab 1 $78 $ 78 54 -15 -6400 Scene Lt Swtch , Left Scene Lts, Cab 1 $99 $ 99 54 -15 -6500 Scene Lt Swtch , Right Scene Lts, Cab 1 $99 $ 99 54 -15 -6600 Scene Lt Swtch , Rr Scene Lts, Cab 1 $99 $ 99 54 -15 -6700 Scene Lt Swtch , Rr Scene Lts, Auto w/ Reverse 1 $121 $ 121 55 -01 -3260 Cmpt Lt, Wall, OSS Night Stik, 18" LED Tube Lt, (2) Ea Cmpt -1 $264 $ (264) 55 -01 -3270 Cmpt Lt, Wall, OSS Night Stik, 27" LED Tube Lt, (2) Ea Cmpt -2 $373 $ 746 55 -01 -3280 Cmpt Lt, Wall, OSS Night Stik, 36" LED Tube Lt, (2) Ea Cmpt -2 $414 $ 827 55 -01 -3460 Cmpt Lt, Wall, Whln Fluorent Plus, 18" LED Or Tube Lt, (2) Ea Cmpt 3 $216 $ 647 55 -01 -3470 Cmpt Lt, Wall, Whln Fluorent Plus, 27" LED Or Tube Lt, (2) Ea Cmpt 3 $282 $ 845 55 -05 -1100 Cmpt Lt, Mtd Below Shelves, Incand 7 $56 $ 393 55 -13 -1060 V -MUX Dr Open, Isolation, Body Main Cmpt Doors 1 $906 $ 906 56 -01 -1600 Siren, Elect, Whelen 295SLSAl -1 $450 $ (450 56 -01 -1700 Siren, Elect, Whelen 295HFS2 1 $623 $ 623 56 -02 -1650 Spkr, Grille, Stnls Stl -1 $85 $ 85 56 -03 -1100 Spkr Lctn, Bumper, Rcsd, Center -1 $78 $ 78 57 -02 -1120 Lt Bar, Whelen, Ultra Freedom, #FN72VLED, LED, 72" 1 $2,064 $ 2,064 57 -02 -4600 Lt Bar, Whelen, Freedom, FNMINI, LED, 24" -1 $2,050 $ (2,050) 57 -03 -7100 ITraffic Emitter, 3M Opticom, Instld in Lt Bar 1 $1,1831 $ 1,183 58 -01 -1100 1 Bezels, Chrome, Wrn Lts (1 pair) 2 $66 $ 132 Page 3 of 12 58 -01 -1200 Housing, Step, Wrn Lts (1 pair) -1 $103 $ (103 58 -16 -2100 Wrn Lts, Whelen, Lwr Mid Chassis (2) M6 LED 1 $573 $ 573 58 -36 -2000 Wrn Lts, Whelen, Low Rr Side (2) M6 LED -1 $573 $ (573 58 -36 -2100 Wrn Lts, Whelen, Low Rr Side (2) L1NZ6 LED 1 $441 $ 441 58 -46 -2000 Wrn Lts, Whelen, Upper Side Front (2) M6 LED 1 $573 $ 573 58 -71 -1820 Wrn Lts, Whelen, Upper Rr (2) S -LED Rotary L31H, 2 -Red -1 $991 $ 991 60 -05 -9400 Cvr, Gnrtr, Alum UP 1 $505 $ 505 60 -20 -1100 Gnrtr Mtg, Over Pump Enclsr 1 $234 $ 234 60 -20 -1450 Gnrtr Mtg, Front of Hosebed -1 $448 $ (448) 60 -25 -2000 Rcptcl, 120V, 20 Amp, L5 -20, Twst Lck -1 $251 $ (251) 60 -30 -2600 Rcptcl Lctn, Left Side, Whl Well, Ea -1 $14 $ (14) 61 -01 -3100 Cable Reel, Hannay ECR1600, Elec Rwnd, 120V 50A 3 Wire BLK 1 $1,221 $ 1,221 61 -02 -3200 Cable Reel Lctn, Dnng Area, Right Side 1 $255 $ 255 61 -03 -3400 Cable, Elec, 120V, 200' 10/3 Blk 1 $349 $ 349 61 -04 -7200 Cable Rcptcl, 120V L5 -20R, 3- Prong, Twst Lek 1 $105 $ 105 61 -04 -8200 Roller Assy, Cable Reel, 4 -Way, SS Rollers 1 $128 $ 128 61 -04 -9100 Ball Stop, Cable, Orange 1 $53 $ 53 61 -05 -1220 Jct Box, AKR, (4)120V L5 -20R TL, LS -20P Pgtl, Ylw 1 $451 $ 451 61 -05 -4000 Jet Box, Holder, Brushed Alum 1 $96 $ 96 62 -01 -1300 Fldlgt, FRC, Opti, 750W -120V, Brow Contour, Frnt -2 $798 $ 1,595 63 -15 -3100 Fldlt Cntrl Swtch, Brow Lts, Cab Dash -1 $135 $ 135 80 -32 -1250 Compt Finish, DA Sanded, Up to 8 Cmpts, EXT 1 $2,913 $ 2,913 80 -43 -1800 Painting, Suction Elbow, To Match Truck 1 $61 $ 61 80 -50 -1800 Lettering, 4" Mylar Gold Leaf, 75 Letters 1 $630 $ 630 80 -50 -2000 Lettering, 4" Scotchlite Reflect, 75 Letters -1 $754 $ 754 80 -65 -1300 Dr Seals, Install Cstmer Frnshd 1 $64 $ 64 80 -70 -1700 Stripe, Sngl Reflective, 6 ", Straight Design 1 $451 $ 451 80 -71 -1600 Stripe, Triple Reflective, 1" x 6" x 1" Large "Z" Design -1 $903 $ 903 90 -03 -3300 Ladder, Roof, Duo - Safety, 14' Alum 775 -A -1 $414 $ (414) 90 -03 -3400 Ladder, Roof, Duo - Safety, 16' Alum 875 -A 2 $465 $ 931 90 -09 -2200 Ladder, Combo, Duo - Safety, 8/13' Alum 300 -A -1 $666 $ (666 90 -16 -3000 Pike Pole, 12' Fbgls, Round Hndl -1 $222 $ (222) Page 4 of 12 ROSENBAUER MOTORS CHASSIS OPTIONS 03 -00 -0000 ROSENBAUER COMMANDER CHASSIS - RAC2 - 10 JUNE 2013 $ - 03 -00 -0711 60" Cab Length 11" Roof -1 $29,822 $ (29,822) 03 -00 -0761 70" Cab Length 11" Roof 1 $34,409 $ 34,409 03 -05 -0015 Cab Roof Channel 53" W x 11" D -1 $4,744 $ (4,744) 03 -06 -0021 Step Trim Kickplate, Tread late 1 $110 $ 110 03 -06 -1201 Door Panel Finish ARMA Gray -1 $248 $ 248 03 -06 -1202 Door Panel Finish ARMA Black 1 $248 $ 248 03 -06 -1221 Cab Door Trim Reflective Vertical w/ RA Logo -1 $266 $ 266 03 -09 -0185 Seat Driver Bostrom Sierra 4 -Way Air ABTS -1 $1,302 $ 1,302 03 -09 -0352 Seat Crew Rear Facing Outer Bostrom Tanker Fixed ABTS -2 $686 $ 1,373 03 -09 -0510 Seat Mounting Forward Facing Outer Outboard 2 $152 $ 304 03 -09 -0552 Seat Crew Forward Facing Center Bostrom Tanker Fixed -2 $686 $ 1,373) 03 -09 -0575 Seat Mounting Forward Facing Center -2 $67 $ 134) 03 -09 -0584 Bostrom Seat Package - ITS Roll Tek 1 $3,207 $ 3,207 03 -09 -0605 Seat Driver Bostrom Sierra 4-Way Air ABTS ITS RollTek 1 $1,583 $ 1,583 03 -09 -0625 Seat Officer Bostrom Tanker Fixed ABTS ITS RollTek 1 $810 $ 810 03 -09 -0652 Seat Crew Rear Facing Outer Bostrom Tanker Fixed ABTS IBP RollTek 2 $1,389 $ 2,779 03 -09 -0784 Seat Crew Forward Facing Outer Bostrom Tanker Flip-Up ITS RollTek 2 $1,396 $ 2,792 03 -09 -3100 Seat Box (60/54) Forward Facing (FFC Seats) -1 $517 $ (517) 03 -09 -3120 Seat Box (70) Outer Driver Forward Facing 1 $238 $ 238 03 -09 -3121 Seat Box (70) Outer Officer Forward Facin 1 $238 $ 238 03 -09 -3215 Seat Box (60) Forward Facing Storage Access Door (2) Driver /Officer Sides -1 $152 $ (152) 03 -09 -4105 Seat Box Doors Finish Gray -1 $108 $ (108) 03 -09 -8017 Cab Insulation Underbody -1 $344 $ (344) 04 -01 -1075 Interior Trim Color Gray, 60 "- 11" Roof -1 $2,518 $ (2,518) 04 -01 -1101 Interior Trim Color Black, 70 " -11" Roof 1 $3,056 $ 3 04 -01 -1120 Interior Trim Color Gray Rear Wall 11" Roof -1 $441 $ (441 04 -01 -1121 Interior Trim Color Black Rear Wall 11" Roof 1 $441 $ 441 04 -02 -1100 Interior Floor Covering Color Gray, 60" -1 $1,220 $ 1,220 04 -02 -1125 Interior Floor Covering Color Black, 70" 1 $1,562 $ 1,562 04 -03 -2000 Officer MDT Mount -1 $447 $ (447) 04 -03 -2100 Officer Glove Com t -1 $305 $ (305) 04 -04 -1131 Black Plates with (2) Power Points -1 $78 $ (78) 04 -04 -1141 Map Light 1 $70 $ 70 04 -04 -1146 Locking Accy Box -1 $105 $ 105 04 -04 -1161 Cup Holder, Dual -1 $55 $ (5 L5 05 -00 -0062 Aerial Interlock Cab Tilt -1 $241 $ (241) 05 -01 -5015 Cab Paint Exterior Two Tone 1 $1,122 $ 1,122 05 -02 -0560 Air Conditioning Compressor for Diesel Greenstar 1 $824 $ 824 05 -02 -0700 Auxiliary Heating System (For Greenstar) 1 $1,925 $ 1,925 06 -00 -1014 400HP Cummins ISL 91, -1 $34,959 $ (34,959) 06 -00 -1016 450HP Cummins ISL 91, 1 $36,057 $ 36,057 07 -02 -0012 Transmission 1 o'clock PTO 1 $1,146 $ 1,146 07 -04 -0300 Fuel Tank 50 Gal/ 189 Liter, Driver Side Fill 1 $1,253 $ 1,253 07 -04 -0301 Fuel Tank 68 Gallon/257 Liter -1 $1,439 $ (1,439) 07 -07 -0711 (2) Front Wheels Accuride 22.5 x 12.25 Aluminum 1 $1,240 $ 1,240 07 -07 -0720 (2) Front Wheels Alcoa Polished 22.5 x 12.25 Aluminum -1 $1,123 $ (1,123) 07 -07 -0775 (4) Rear Wheels Accuride 22.5 x 9.00 Aluminum 1 $1,697 $ 1,697 07 -07 -0786 (4) Rear Wheels Alcoa Polished 22.5 x 9.00 Aluminum -1 $2,265 $ 2,265 07 -08 -0203 Front Brakes Meritor EX225 Disc 17" 1 $1,166 $ 1,166 Page 5 of 12 07 -08 -0725 Air Horn Reservoir (1) 1200 Cu In 1 $403 $ 403 07 -09 -0012 Frame Double Channel 35" Frame Width -1 $9,621 $ (9,621) 07 -09 -0016 Frame Double "DIET" Channel 35" Frame Width 1 $9,621 $ 9,621 07 -09 -0137 Frame /Front Extension Hot Dip Galvanized 1 $2,475 $ 2,475 07 -09 -0501 Front Bumper Stainless Steel 2 Rib Std 12 "H -1 $1,032 $ (1,032) 07 -09 -0545 Front Bumper Extension Length 18" -1 $432 $ 432 07 -13 -0105 Front Bumper Suction 5" Officer Vertical Outboard 1 $1,188 $ 1,188 07 -13 -0302 Tow Hooks Painted Rearward Mount -1 $110 $ (110) 07 -13 -0305 Tow Hooks Chrome Rearward Mount 1 $264 $ 264 08 -00 -0752 Interior Door Warning Lights Red 3" LED 1 $251 $ 251 08 -00 -0815 Add'1 LED Dome Lt Blue /Clear - Individual Swtchd 1 $171 $ 171 08 -00 -4010 Dr Open/Hazard Wrn Lt, Flashing Red Lens (Do Not Move Apparatus Light) -1 $144 $ 144 08 -00 -4020 Dr Open/Hazard Wrn Lt, Flashing LED Red Lens o Not Move Apparatus Li 1 $187 $ 187 08 -01 -0050 Driver VISTA Display Weldon Vista IV -1 $1,399 $ (1,399) 08 -01 -0051 Driver & Officer VISTA Display Weldon Vista IV 1 $2,672 $ 2,672 08 -02 -0104 Rear Crew Controls Manual - Rear Facing Driver's Side - Remote Mt 1 $264 $ 264 08 -02 -0176 Assc Power Distribution Panel Bhnd Off Seat 10 Position 40A Batt Dir -1 $344 $ (344 08 -02 -0516 Aux Pwr & Gnd Stud Behind Console 40A Batt Direct 1 $138 $ 138 08 -03 -0110 Communication Antenna Base Officer Cab Roof 1 $109 $ 109 08 -06 -0160 Driver & Officer Side Cameras, Rear Camera; Driver Vista 1 $809 $ 809 08 -09 -0504 Engine & Transmission Operation Manuals (2 ) Sets -1 $165 $ 165 08 -09 -0510 Engine Service Manual Cummins ISL /ISX (1) Set -1 $413 $ (413) 08 -09 -0511 Engine Service Manual Cummins ISL /ISX (2) Sets -1 $825 $ (825) Page 6 of 12 Page 7 of 12 ROSENBAUER AERIAL OPTIONS 00 -07 -1220 Aerial Operation Instructions, By Aerial Mfg, At FD 3 Days, STANDARD -1 $4,166 $ (4,166) 00 -09 -5060 Hydraulic Warranty, 2 Years -1 $1,650 $ (1,650) 01 -00 -1520 Galvanized Aerial Ladder Sections 1 $5,609 $ 5,609 10 -07 -6120 Rescue Basket, Outside Base, w /Mntgs, Junkin: JSA -200 1 $1,478 $ 1,478 45 -02 -1010 Roof Ladder, Bolt On, Mnt Bracket, Inside Fly Section 1 $550 $ 550 50 -02 -1010 Command Pedestal Lid 1 $275 $ 275 50 -17 -1200 1 Air Horn Button, Turntable Panel -1 $364 $ 364 65 -02 -1110 Stabilizer, 2 Front Up-Down, (Additional) 1 $5,242 $ 5,242 65 -04 -1310 Outrigger Control Valves, Electric, (2 ) Out -Down -1 $652 $ (652) 65 -04 -1320 Outrigger Control Valves, Electric, (2 ) Out -Down, (2)Up-Down 1 $981 $ 981 70 -16 -1100 Monitor, TFT, Monsoon RD, Y4- E21A -L -01 1 $186 $ 186 70 -20 -1020 Pre - Connect Discharge, 2.5" x 1.5 ", Butterfly Hand Valve,Tip 1 $2,893 $ 2,893 80 -11 -2000 ITracking Lights, (2), 500W, 120V, FRC O ti: OPA570- S50 -ON -1 $1,618 $ 1,618 85-45 -2000 Receptacle, Ladder Tip, 120V, 15A, (1)Circuit, (1)Outlet 1 $1,195 $ 1,195 88 -01 -4200 Cab Lift Interlock, Limit Switch -1 $220 $ 220 90 -01 -1510 Extension Shaft -1 $1,444 $ (1,444) 90 -10 -1200 Special Tools -1 $316 $ (316) TOTAL PUBLISHED OPTIONS $ 101,790 Page 7 of 12 THE FOLLOWING UNPUBLISHED OPTIONS ARE INCLUDED IN THE PROPSAL Part No Description QUAN MN PRICE 52 -10 -1000 Install Customer Supplied FireCom Intercom System 1 1974 $ 1,974 58- 71 -1800S Wm Lts, Whelen, Upper Rr (2) MCSLED2R Micro Edge LED 1 1259 $ 1,259 10- 05 -4224S Frnt Bumper, 4000, 2 -Rib S/S 12" H T/P Apron, S/S Wings, 24" Extension 1 1981 $ 1,981 40- 78 -4520S Behind Rr Outrigger, Low Cm t, Hinged Double Door Cm t, 50" 1 2045 $ 2,045 TOTAL AMOUNT OF UNPUBLISHED OPTIONS S 7 254 Page 8 of 12