Loading...
HomeMy WebLinkAboutItem 06.iFebruary 27, 2014 Item No. SPIRIT OF BRANDTJEN FARM 13 ADDITION March 3, 2014 CITY COUNCIL MEETING Proposed Action Staff recommends adoption of the following motion: Move to approve: a resolution approving the Spirit of Brandtien Farm 13th Addition final plat, and 2) a resolution vacating public drainage and utility easements. Passage of this motion will allow the re- plat /re- configuration of six single family lots within the Spirit of Brandtjen Farm planned unit development (SBF PUD). Overviiew Tradition Development (a /k/a SBF Development Corp.) representatives are requesting approval of the Spirit of Brandtjen Farm (SBF)13th Addition final plat, which is a re -plat of six single family lots and one outlot within the first SBF addition final plat approved in 2005. The re -plat will reconfigure six lots and one trail connection in SBF to allow house construction that is better suited to the setbacks and design criteria of the SBF PUD. In conjunction with the SBF 13th Addition final plat, the developer is requesting the vacation of the boundary drainage and utility easements within these six lots and one outlot. New boundary drainage and utility easements are being dedicated for the re- configured lots. The Planning Commission held a public hearing on the easement vacation at their February 20, 2014 meeting and unanimously recommended approval. There was no public comment. Primary Issues to Consider • Why is there no development contract with this final plat? Utility and street construction is not required with the Spirit of Brandtjen Farm 13 Addition final plat. The streets and utilities for these six lots were constructed in 2013. Supporting Information • Resolutions approving the final plat and easement vacation • February 20, 2014 draft Planning Commission minutes • Aebruary 12th planning report and February 11th engineering report Mor+, Prann!Ag director Financial Impact: $ Budgeted: Y/N Source: Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances and SBF PUD Notes: (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. RESOLUTION APPROVING THE FINAL PLAT OF SPIRIT OF BRANDTJEN FARM 13 ADDITION WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 13 Addition has requested final plat approval; and WHEREAS, the final plat is acceptable to the City. NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council: 1. The final plat of Spirit of Brandtjen Farm 13 Addition is hereby approved subject to the terms and conditions of the Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan Agreement dated October 17, 2005. 2. The Mayor and City Clerk are hereby directed to sign the final plat mylars. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. APPROVED AND ADOPTED this 3 rd day of March, 2014. CITY OF LAKEVILLE BY: Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk STATE OF MINNESOTA) ( CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the P day of March, 2014, as shown by the minutes of said meeting in my possession. Charlene Friedges, City Clerk (SEAL) (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS WHEREAS, the Planning Commission has conducted a public hearing, preceded by two (2) weeks published notice, to consider the following described easement vacation, and WHEREAS, the City Council has determined that it is in the public interest to approve the easement vacation. NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council: 1. All the drainage and utility easements in the following: Lots 1, 2, 3, 4, 5, and 6, Block 13, and Outlot PP, all in SPIRIT OF BRANDTJEN FARM, according to the recorded plat thereof, Dakota County, Minnesota. 2. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. DATED this 3` day of March, 2014. CITY OF LAKEVILLE Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk STATE OF MINNESOTA) ( CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 3` day of March, 2014, as shown by the minutes of said meeting in my possession. Charlene Friedges, City Clerk (SEAL) CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES February 20, 2014 air Lillehei called the meeting to order at 6:00 p.m. in the Council Chambers at City Ha . The pledge of allegiance to the flag was given. Membe Present: Jason Swenson, Vice Chair Bob Boerschel, Chair Brooks Lillehei, Paul Reuveft,, Gerry Grenz, Karl Drotning, Ex- officio Shawn Fi pnry Members Absen - Linda Maguire Others Present: D I Morey, Planning D Engineer; and Penny Bre ' , Recording Secretai "7. 1 rk ' sen, Assistant City items on tonight's agenda are not to d, the March ig will be cancelled. The next PlanningG ommission Ro th . 5. Spirit of the Advisory Appreciation Dinner will be held on Tues Chair Lillehei opened the public hearing to consider the vacation of permanent drainage and utility easements in Spirit of Brandtjen Farm, located west of Eagleview Drive and north of 170 Street. Jacob Fick from Tradition Development presented an overview of their request. Planning Director Daryl Morey presented the planning report. Mr. Morey stated that in conjunction with the final plat application of Spirit of Brandtjen Farm 13 Addition, Planning Commission Meeting Minutes, February 20, 2014 Page 2 which is a re -plat of six single family lots from Spirit of Brandtjen Farm (SBF), Tradition Development is requesting the vacation of the boundary drainage and utility easements for each of the six lots being re- platted. He indicated that new boundary drainage and utility easements are shown for each of the six single family lots included with the SBF 13 Addition final plat. Mr. Morey stated that Planning Department staff recommends approval of the Spirit of Brandtjen Farm 13 Addition easement vacation, subject to the 2 stipulations listed in the February 12, 2014 planning report. Chair Lillehei opened the hearing to the public for There were no comments from the public. 6. Motion was made by Drotning, sec hearing at 6:07 p.m. Ayes: Swenson, Boerschel, Lillehei, Nays: 0 Chair Lillehei asked for comme is from the comments from the Planning Cftkif Boersche lose the public Grenz, Drotning Commission. There were no Chair Lille en -fie public hearing to consider the application of Shamrock Developmen -� preliminary plat of 49 single family lots to be known as Chokecherry i A ' ' n, located east of Dodd Boulevard (CR 9) and north of 190 Street. Jim Stanton with Shamrock Developme as in attendance at tonight's meeting and presented a short overview of his project. ointed out that Outlot B, which he will be retaining, includes the potential future dev ent of three single family lots if combined with the adjacent exception parcel. Planning Director Daryl Morey presented the planning report. Mr. More ated that Shamrock Development has submitted a preliminary plat applicatio for Am No.. s _� I ra I evie mw-- Memorandum City of Lakeville Planning Department To: Planning Commission From: Daryl Morey, Planning Director Date: February 12, 2014 Subject: Packet Material for the February 20, 2014 Planning Commission Meeting Agenda Item: Spirit of Brandtjen Farm 13th Addition Final Plat and Easement Vacation Application Action Deadline: March 23, 2014 BACKGROUND Tradition Development representatives have submitted a final plat application for Spirit of Brandtjen Farm 13th Addition, which re -plats six single family lots from Spirit of Brandtjen Farm (SBF). This re -plat will adjust lot lines so the lots will be better suited to the setbacks and design criteria of the SBF PUD. In conjunction with the final plat, Tradition Development is requesting the vacation of the boundary drainage and utility easements for each of the six lots being re- platted. The Spirit of Brandtjen Farm 13th Addition final plat is located north and west of Eagleview Drive (see Exhibit A). Exhibits A. Location Map B. SBF 13th Addition Final Plat C. Easement Vacation Sketch D. Grading Plan E. Utility Plan F. Lot Designations HISTORY The following is a timeline of plats approved by the City Council for the Spirit of Brandtjen Farm development: June 20, 2005 - SBF preliminary plat (130 s.f. lots) and PUD October 17, 2005 - SBF final plat (133 s.f. lots), and SBF 2 Add. preliminary and final plats (39 s.f. lots and 52 t.h. lots) June 5, 2006 - SBF 3rd Add. preliminary plat (90 s.f. lots) March 5, 2007 - SBF Lakepointe Add. final plat (re- plat /reconfiguration of 31 t.h. lots from SBF 2 " Add.) June 2, 2008 - SBF Lakepointe 2 Add. preliminary and final plats (re -plat of 6 t.h. lots from SBF 2 Add. into 5 t.h. lots) July 20, 2009 - SBF 3rd Add. final plat (4 s.f. lots) September 8, 2009 - SBF 4th Add. preliminary plat (68 s.f. lots) and final plat (12 s.f. lots); revised a portion of the SBF 3rd Add. preliminary plat which added 9 s.f. lots April 5, 2010 - SBF 5th Add. preliminary and final plats (7 s.f. lots); revised another portion of the SBF 3rd Add. preliminary plat which added 1 s.f. lot October 4, 2010 - SBF 6th Add. preliminary plat (29 s.f. lots) and final plat (15 s.f. lots); re -plat of 30 s.f. lots from the SBF final plat August 1, 2011 - SBF 7th Add. preliminary plat (59 s.f. lots) and final plat (34 s.f. lots); revised a portion of the SBF 4th Add. preliminary plat which added 4 s.f. lots October 17, 2011 - SBF 8th Add. final plat (14 s.f. lots from the SBF 6th Add. preliminary plat) March 5, 2012 - SBF 9th Add. final plat (re -plat of 13 s.f. lots from SBF 7th Add. into 12 s.f. lots) September 17, 2012 - SBF 10th Add. preliminary and final plat (48 s.f. lots; 26 from the SBF 7th Add. preliminary plat) September 17, 2012 - SBF 11 th Add. (re -plat of 8 s.f. lots from SBF 8th Add. into 7 s.f. lots) August 19, 2013 - SBF 12th Add. preliminary plat (52 s.f. lots) September 16, 2013 - SBF 12th Add. final plat (29 s.f. lots) APPLICATION ANALYSIS Consistency with the Preliminary Plat. The six single family lots in the SBF 13th Addition re -plat are consistent with the lot design approved with the SBF preliminary plat. The street serving the six single family lots (East Lake Drive) has already been constructed and is not being modified by the proposed re -plat. Lots. There is no minimum lot area required by the SBF PUD District. Rather, lots are regulated based on minimum width requirements, setbacks and design standards established by the SBF PUD Booklet dated June 20, 2005. As shown on Exhibit F, Lot 1, Block 1 and Lots 1 -3, Block 2 are designated as cottage lots and Lots 2 and 3, Block 1 are designated as traditional lots. Setbacks. The proposed single family lots in SBF 13t Addition are subject to the setback requirements for cottage lots (Lot 1, Block 1 and Lots 1 -3, Block 2) and traditional lots (Lots 2 and 3, Block 1) and as set forth in Section 7 of the SBF PUD Booklet. Streets. The six single family lots in SBF 13th Addition front a looped segment of East Lake Drive that is a 24 foot wide, one -way street with on- street parking on one side and five foot concrete sidewalks on both sides. A 48 foot right -of -way was dedicated for East Lake Drive with the SBF final plat consistent with the design standards set forth is Section 6 of the SBF PUD Booklet. Grading, Drainage, Erosion Control and Utilities. Engineering Department staff has reviewed the SBF 13th Addition final plat and easement vacation and recommend approval in their attached memo dated February 11, 2014. Easement Vacation. The SBF 13th Addition final plat includes the vacation of the existing boundary drainage and utility easements within the six single family lots being re- platted. New boundary drainage and utility easements are shown for each of the six single family lots included with the SBF 13t Addition final plat. RECOMMENDATION Planning Department staff recommends approval of the Spirit of Brandtjen Farm 13th Addition final plat and easement vacation subject to the following stipulations: 1. The recommendations listed in the February 11, 2014 engineering report. 2. The lots in SBF 13 Addition must meet the setback and design standards established by the approved SBF PUD Booklet dated June 20, 2005. (plancomm- sbfl3finalplat) N --1. y ^'+Sy ipl 'ice `d I ..Spirit of Brandtjen Farm ' 13th Addition Final Plat Last Lake 1?rive , q L�= 'X City of Lakeville Aerial Map Spirit of Brandtjen Farm 13th Addition Final Plat EXHIBIT A 6 a FF s` a� s afi a Cie F BE I y Qu S $ 30 e E fi e i_'� .Y 0 S @ i i t z if fss €€ f a €€ @@ a C g S F a w� �R - M,91.80SON Z9 tOZ S� iew _ I Q d= na„ ____ _ ^ enI ;° --- - ------------------- r f' aa N N uj U. i is mR �J' Iala ,s , 3.9ti n- 3oo. l __________________________ f 8 r lowo 8 tp mac, si °.00s ' - ____________ ♦ v , ---- - - - --_ - - --- - _— H« ° ------------ pz \ ``� � � \ \ a- •, 8��• FEES V EXHIBIT B 0 0 � � � � � � \ w \ � { /!{ |� /| \ \ \ \\ ail |� � � . \ � '!! .� �)] � \{ ) IT C • � . O! §\ �I §§ �§|/ °@ o� ■ §z! §t cm; §4| ]§( �� § is , §�! ` � � ■ | |§` � � « j | || || • ; 1Z{ 0 0 � � � � � � \ w \ � { /!{ |� /| \ \ \ \\ ail |� � � . \ � '!! .� �)] � \{ ) IT C m 99 ++ - - - - - -- F ____ � � e b C p ° s 1 - 5 i i - F s Ye C�� >p 2� 0 1 �� � W N 55 0 W ZZM ai�i O s W o Z m rc g 3� ts I I I I - Ill�llll�l�lli �� y F -J Y y AD ION / ' '\ ` \ ,\ i a.ZZ6'!Y ' it °'Z26 =l tytfi - Olfi \ � ■ � � l � � � � ! € i sH nas g q I it 46 ° a �I 1 € OC R I � V � � ) c�//) } \ ' • x O EXHIBIT D O z LLJ K W \.\ /r a W m /-mom gi o ` a K LL 40 q I a` a > . EXHIBIT D = m N gg O o s W z 3 - s Wog ti t yj °3 en °m �- '13TH AD_DlTION i - ' i Q law , _ 911 < I RB R5� ak , --------------------------- - - - - -- , I � _ 1p j I O i S83 _ g It ! III � I z 1 �Illlllll�llli n I I I I I I I I I I I ^ e I I I I I I r I Illllllllllllil maw 7 Rj 1 W w 2 N g 3W�N S N rr st " gil 11ifi 1 'i 1 I� T 1 I O O i I I CC I ! o 2 0 z Z z W I.L a D EXHIBIT E w w a: 0 LL F— a J Q E i d. 4 a _ $ ■ 6�• S � �t;B � a B € 4 e � i �� : �e • fi� 2 � fi� �� g$a:� fi ��F �� � � giQ F-1 lOZ N.9160SON r w - - - - -- - - ° a • � U I i � 'o M � � I s W s _- -- - - - - -- � \ p p I BegE EXHIBIT F L «kcvrllc Memorandum To: Daryl Morey, Planning Director From: Mark C. Hansen, Assistant City Engineer McKenzie Cafferty, Environmental Resources Manager Copy: Zach Johnson, City Engineer Brett Altergott, Parks and Recreation Director Dennis Feller, Finance Director Gene Abbott, Building Official Date: February 11, 2014 Subject: Spirit of Brandtjen Farm 13th Addition • Final Plat Report • Final Grading Plan Review City of Lakeville Engineering 1:: : ; Z0 I SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm 13th Addition. The proposed subdivision is a re -plat of Lots 1 to 6 of Block 13 and Outlot PP of the original Spirit of Brandtjen Farm plat. No additional lots are proposed with this final plat. The plat is requested to adjust lot sizes in order to make them more compatible with current house styles being offered within the Spirit of Brandtjen Farm development. The plat is located directly north and east of East Lake Drive. The proposed plat consists of six (6) single family residential lots within two (2) blocks. Utilities and streets were previously constructed in 2013, which included minor re- grading of side yard swales necessary for the reconfigured lots. Developer: SBF Development Corporation Engineer: I & S Group SPIRIT OF BRANDUEN FARM 13 ADDITION - FINAL PLAT REPORT FEBRUARY 11, 2014 PAGE 2 SITE CONDITIONS The area included within the Spirit of Brandtjen Farm 13 Addition was previously graded in 2013 with final street and utility construction. The utility and street layout followed the original Spirit of Brandtjen Farm plat. PARKS. TRAILS AND SIDEWALKS No new park dedication, trails, or sidewalk are required with Spirit of Brandtjen Farm 13 Addition. The developer is required to meet all the park, sidewalk, and trail requirements listed in the Spirit of Brandtjen Farm Development Agreement. U TILITIE S SANITARY SEWER: No new sanitary sewer is required for Spirit of Brandtjen Farm 13th Addition. The sanitary sewer through the development and sanitary sewer services were installed in 2013 with the Spirit of Brandtjen Farm plat. WATERMAIN: No new watermain is required for Spirit of Brandtjen Farm 13' Addition. The watermain and water services were installed with the Spirit of Brandtjen Farm 13th Addition plat. Some of the water service curb stops may be located within proposed driveway surfaces. The developer must ensure that a meter cover is installed over all the curb stops that fall within driveway areas. DRAINAGE AND GRADING The rough site grading was completed with the Spirit of Brandtjen Farm plat. The stormwater basins and infiltration areas have been constructed. The developer must submit a soils report for the revised building locations to verify that the building pads are prepared for building construction. STORM SEWER The storm sewer was installed with the Spirit of Brandtjen Farm plat, and the storm sewer area charge has been paid. FEMA FLOODPLAIN ANALYSIS The Spirit of Brandtjen Farm 13th Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, SPIRIT OF BRANDTJEN FARM 13 ADDITION - FINAL PLAT REPORT FEBRUARY 11, 2014 PAGE 3 there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WETLANDS There are no wetlands within Spirit of Brandtjen Farm 13th Addition. TREE PRESERVATION There are no significant trees within the Spirit of Brandtjen Farm 13th Addition. EROSION CONTROL As stated previously, the site has been graded. The developer must maintain the erosion control per the Spirit of Brandtjen Farm Development Agreement and approved plans, and the builder must install and maintain erosion control as required by the individual building permits. EASEMENT VACATION The shifting of the lots requires that the original drainage and utility easements placed along the property lines must be vacated. With this re -plat, public drainage and utility easements will be placed around the perimeter of the revised lots. SECURITIES A security is being held by the City for the improvements installed by the developer with the Spirit of Brandtjen Farm plat. A security is also being held by the City for the installation of the lot corner monuments. As the total number of lots has not changed, no additional security is required with this development. CASH FEES There are no cash fees due with this development; the proposed plat is moving lot lines only. RECOMMENDATION Engineering recommends approval of the Spirit of Brandtjen Farm 13th Addition final plat and easement vacation subject to the comments contained in this report. Approval is also subject to the comments of the City Administrator, Planning Director and City Attorney.