Loading...
HomeMy WebLinkAboutItem 06.fQ% May 30, 2014 Item No. AGREEMENT WITH WSB & ASSOCIATES INC. FOR SUMMERLYN PARK FINAL DESIGN & BIDDING Proposed Action Staff recommends adoption of the following motion: Move to approve agreement with WSB & Associates Inc. for Summerlyn Park final design and bidding Overview WSB & Associates, Inc. has submitted a professional services proposal for the purpose of completing final design, engineering, preparation of construction documents, bidding and construction observation services of Summerlyn Park. The 2014-2018 CIP has the park scheduled to be constructed in the summer of 2015. This neighborhood park would serve Summerlyn, Donnelly Farms, Crescent Ridge and Chokecherry Hill Developments. Staff is recommending City Council authorize the Mayor and City Clerk to sign the Professional Services Proposal with WSB & Associates for the final design, engineering, preparation of construction documents, bidding and construction observation services of Summerlyn Park. Primary Issues to Consider • WSB & Associates is qualified to complete project scope of services and has provided professional quality work on previously completed City park master plans. Supporting Information • WSB Proposal for Engineering Services • Summerlyn Park master plan Brett Altergott Parks & RecreatioD rector Financial Impact: $32,000 Budgeted: Y Source: Park Dedication Fund Related Documents (CIP, ERP, etc.): Notes: WSB cPr Assrxiarex, hu•. Engineering ■ Planning ■ Environmental ■ Construction May 5"', 2014 Mr. Brett Altergott Parks & Recreation Director City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 RE: Professional Services Proposal — Summerlyn Park Final Design & Bidding Dear Mr. Altergott: I am pleased to submit this letter proposal on behalf of WSB & Associates, Inc. (WSB) to the City of Lakeville (City) to complete professional design and engineering services for the final design and preparation of construction documents for Summerlyn Park. SCOPE OF SERVICES A. Final Design / Construction Document Preparation 1. WSB shall meet with the City to review the previous approved conceptual design and confirm the elements to carry forward into the final design/construction documents based on a $300,000 project construction budget. 2. WSB shall prepare Construction Documents for the improvements as approved by the City. These documents shall include plans, details and other drawings as necessary, as well as specifications, in sufficient detail for the City to pursue competitive bids for the construction of the improvements along with an estimate of probable costs for construction. 3. WSB shall prepare a playground equipment RFP package to provide to playground equipment vendors/representatives to fit the appropriate features into the playground container. The City will be involved in the selection process to confirm which equipment layout to accept. 4. WSB shall meet with the City to review the Construction Documents plans, specifications and updated cost estimates for construction at the 50% and 95% complete milestones. Task A Proposed Fee: $22,000 Minneapolis ■ St. Cloud Equal Opportunity Employer P:\LRTTRR PROPOS US'Lakmilic -crlyn Park LTR PROPOSAL 7uo Iyn CD 050514.doe Mr. Brett Altergott May 5, 2014 Page 2 B. Bidding Services WSB shall include oversight and administration of the project bidding process, respond to contractor questions that arise, general correspondence, and preparation of all addenda as necessary. 2. WSB shall attend the bid opening, review and tabulate bids received, review contractor references, and recommend qualified contractor. Task B Proposed Fee: $2,000 C. Construction Observation Services: Construction Administration Services: WSB shall undertake project administration and observation of the construction progress and for adherence to design intent as expressed in the plans and specifications to include; a. Administration of pre -construction meeting to review the project elements and clearly define the City's expectations as to the quality of the construction, process for dealing with problems that may arise, timelines, etc. b. Administration of Contract, including preparation of certificate of payment forms, change order forms, substantial completion forms, final payment forms, etc. c. Site observation on a periodic basis for the established duration of the construction project as stated in the specifications to ensure that the design intent of - e plans and specifications are being met. WSB shall prepare field reports as necessary to document construction progress and issues or areas of concern from the site observation meetings. We anticipate this to be approximately once per week with additional meetings during weeks of high activity plus substantial and final site review. 12 site meetings are included in this proposal. d. WSB shall review all shop drawings, procedures and test results. Task C Proposed Fee: $8,000 D. Additional Services 1. Miscellaneous Additional Services: Services other than those listed in the Scope of Services above and requested and authorized in writing by the City. These services shall be billed on an hourly basis according to the 2014 Rate Schedule. P:S. ER PROPOS.1L51akr.Nleiw ncrlyn Pwk1LTR PROPOSAL-Smmnarlyn CD 050514.dm Mr. Brett Altergott May 5, 2014 Page 3 EXCEPTIONS AND EXCLUSIONS This proposal includes the following assumptions and exclusions as related to this project: Picnic Shelter: Our proposal is based on specifying a pre-engineered picnic shelter and not a custom designed shelter requiring architectural or structural engineering services. The City will be involved in the selection process to confirm the shelter size and style that fits within the budget. 2. Surveying: Our proposal does not include any site topographical / boundary survey work of existing conditions or any construction layout surveying/staking. It is our assumption WSB will be able to obtain base mapping and boundary information in autocad format from the City. 3. Electrical: Our proposal does not include any electrical component being included in the construction documents requiring electrical engineering services. 4. Permits: Permit fees are not included in this proposal. The fee for obtaining an NPDES permit will be built into the construction documents as the Contractor's responsibility. No other permits are anticipated at this time. Geotechnical Services: Geotechnical exploration testing and report for the soil conditions are not included in this proposal. FEES FOR PROFESSIONAL SERVICES It is proposed that this project for Tasks A, B and C, as outlined above, be billed for a total fee of $32,000. If you are in agreement with the terms as outlined above, please sign where indicated below and return one copy to our office. Thank you for this opportunity to propose on this project. If you should have any questions regarding this proposal, please contact me at 763-231-4848. Sincerely, WSB & Associates, Inc. City of Lakeville \\ �, .4 Signature: Candace Amberg, RLA Name / Title: Senior Landscape Architect Date: P. IMTER PR0P0SALSUkevi1 Swmnerlyn Park LTR PROPOSAI.Swmnerlyn CD 050514.dm A -Y