Loading...
HomeMy WebLinkAboutItem 06.hDate: 15 July 2014 Item No. APPROVAL OF THE 168TH STREET BRIDGE REPLACEMENT PROJECT CHANGE ORDER NO.3 Proposed Action Staff recommends adoption of the following motion: Move to approve the 168th Street Bridge Replacement Project Change Order No. 3 increasing the contract sum in the amount of $3,086.30. Passage of this motion acknowledges the emergency repair to the roadway resulting from undermining caused by a washout adjacent to the northeast bridge abutment. Overview This change order adds the repair of the undermining of the street adjacent to the bridge and a washout adjacent to the northeast bridge abutment to the project. The undermining and washout were caused by drainage problems during the spring thaw. Two of the existing catch basins adjacent to the bridge had frozen full of water over the winter and, when the heavy snow melt started in early spring, were not able to effectively take and divert the runoff. Staff has reviewed the change order and recommends approval. Primary Issues to Consider • What is the impact to the contract? This change order increased the contract by $3,086.30 to a total of $328,934.14. • How important was this change to the project? Without repair to the undermined area, the roadway would continue to deteriorate and require more extensive repairs. Supporting Information • Copies of Chang_�.Qrder N9.3, Change Order No. 3 detail are attached. Christophetree Public Works Director Financial Impact: $3,086.30 Budgeted Related Documents (CIP, ERP, etc.): Notes: Increases the contract amount to $328,934.14. Yes Source: 6540.6280 CHANGE ORDER NO.3 Owner: City of Lakeville Project No.: Project: 168th Street Bridge Replacement Contractor: Redstone Construction Co., Inc. 12-04 Contract Date: April 15, 2013 Original Contract Amount: $308,586.00 To: Redstone Construction Co., Inc. (Contractor), you are hereby directed to make the changes noted below in the subject Contract: Owner: City of Lakeville By: Date: July 21, 2014 By: Matt Little, Mayor Charlene Friedges, City Clerk Nature of the Changes: See the attached Change Order for a description of the change and supporting information. These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to this Change Order $ ' 325,847.84 Net Increase/Decrease Resulting from this Change Order 3,086.30 Current Contract Price, Including this Change Order $ 328,934.14 The above changes are approved: CITY OF LAKEVILLE The above changes are accepted: 2 Christopher J. Petree Public Works Director Date: 22 July 2014 A Date: CHANGE ORDER NO.3 PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT JULY 2, 2014 CLIENT PROJECT NUMBER: C.P. 12-04 S.A.P. 188-594-001 WSB PROJECT NUMBER: 02109-06 OWNER: CITY OF LAKEVILLE LAKEVILLE, MN 55044 18400 IPAVA AVENUE CONTRACTOR: REDSTONE CONSTRUCTION 2183 HIGHWAY 65 NORTH MORA, MN 55051 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: DESCRIPTION OF CHANGE ORDER. Two of the existing catchbasins adjacent to the 168th Street Bridge had frozen full of water over the winter, which inhibited drainage in.the area of the bridge, and led to undermining of the street adjacent to the bridge and a washout adjacent to the NE bridge abutment. Redstone repaired the undermining and the washout as an emergency repair. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE/DECREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: RECOMMENDED BY: APPROVED BY: MONICA HEIL, PE NAME, PROJECT MANAGER WSB & ASSOCIATES, INC. ENGINEER PUBLIC WORKS DIRECTOR DATE OF COUNCIL ACTION CHANGE IN CONTRACT TIME: $308,586.00 ORIGINAL CONTRACT TIME: 10/31/2013 $17,261.84 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE $325,847.84 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/31/2013 $3,086.30 NET INCREASE OF CHANGE ORDER: 0 DAY $328,934.14 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10/31/2013 APPROVED BY: REDSTONE CONSTRUCTION CONTRACTOR CITY ADMINISTRATOR Page 1 K. 02109-0601Construction Admin= W012109.06 CO 3CO-3 Change Order No. 3 Detail PROJECT NAME: 168th STREET BRIDGE REPLACEMENT PROJECT July 2, 2014 CLIENT PROJECT NUMBER: C.P. 12-04 S.A.P. 188-594-001 WSB PROJECT NUMBER: 02109-06 ADDED ITEMS Item No. Description Qty Unit Price Extended Amount REPAIR OF ROAD UNDERMINING AND EROSION 1 LUMP SUM $3,086.30 $3,086.30 TOTAL INCREASE CHANGE ORDER NO.3 $3,086.30 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $3,086.30 Page 2 KA02109.0601Construction AdminlCO W012109-06 CO 3 A WSB SB R Assodaies, Inc. Engineering ■ Planning ■ Environmental ■ Construction July 2, 2014 Mr. Chris Petree Public Works Director City of Lakeville 18400 Ipava Avenue Lakeville, MN 55044 Re: Change Order No. 3 168th Street Bridge Replacement Project City of Lakeville, MN 55044 S.A.P. 188-594-001 WSB Project No. 1715-831 City Project 12-04 Dear Mr. Petree: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Please find enclosed Change Order No. 3 for the above -referenced project for your review and approval. As you recall, two of the existing catch basins adjacent to the 168th Street Bridge had frozen full of water over the winter, which inhibited drainage in the area of the bridge. This led to undermining of the street adjacent to the bridge and a washout adjacent to the northeast bridge abutment. Redstone repaired the undermining and the washout as an emergency repair. The invoice for this emergency repair work, which took place in April, was received last month. The increase to the contract amount is $3,086.30, resulting in a new contract total of $328,934.14. This change order amount will be shown on the next construction pay voucher processed. We hereby recommend that the City of Lakeville approve Change Order No. 3 for Redstone Construction. If you have any questions regarding the above, please do not hesitate to contact me at 763-287- 7187. Sincerely, WSB & Associates, Inc. Pf k4t* 4�L- Monica Heil, PE Project Manager Enclosures cc: Nate Larson, Redstone Construction Minneapolis ■ St. Cloud Equal Opportunity Employer K:02109-060Constmclion Admiml.TR CO 3 CTY-7 2 1 A.doca