HomeMy WebLinkAboutItem 06.gtI
Date: 15 August 2014
Item No.
RESOLUTION ACCEPTING BIDS AND AWARDING THE CONTRACT FOR
REPLACEMENT OF THE HERITAGE CENTER SKYLIGHT TO W.L. HALL COMPANY
Proposed Action
Staff recommends adoption of the following motion: Move to accept bids for the Heritage
Center skylight replacement and award the contract to W. L. Hall Company.
Passage of this motion enables the contractor to order skylight panels and begin installation.
Overview
This project will replace the skylight panels over the gift shop and multi-purpose room. The
panels were installed in 1985 and are discolored and highly deteriorated due to sun and
climate exposure. The panels allow water to infiltrate into the multi-purpose room. The
exterior protective coating has worn off exposing the underlying fiberglass. Due to the age
and condition of the panels, they cannot be repaired.
An evaluation of the panels found that they had been framed as windows and integrated into
the support structure of the roof. The original style of panel is no longer available from that
manufacturer. The new panels, from a different manufacturer, are longer and will require a
different support structure for installation.
An advertisement requesting sealed bids was published on 20 June 2014 and sealed bids
were opened on 7 July 2014. One contractor returned a bid for the project. W. L. Hall
Company submitted a total bid of $96,903.00. Staff reviewed the bid and recommends
acceptance of the bid and award of the contract to W. L. Hall Company.
Primary Issues to Consider
• Is replacement of the skylight necessary? Yes, the skylight is 29 years old and has reached
the end of its service life as an effective component of the building envelope. Its age, as
well as other issues, makes it unrepairable.
Supporting Information
• Proposed financing and a copy of the contract are attached.
w_
Christopher J. Petree
Public Works Director
Financial Impact: $108,803.00 Budgeted: Yes Source:
Related Documents (CIP, ERP, etc.):
Notes:
4012.6540
CITY OF LAKEVILLE
RESOLUTION NO:
RESOLUTION ACCEPTING BIDS AND AWARDING THE CONTRACT FOR
REPLACEMENT OF THE HERITAGE CENTER SKYLIGHT TO W.L. HALL COMPANY
WHEREAS, an advertisement to bidders seeking bids for the replacement of the skylight
at the Heritage Center was officially published on 20 June 2014, and
WHEREAS, sealed bids for the skylight replacement were opened at 2:00 p.m. on
7 July 2014, and
WHEREAS, the lowest responsible bidder with a total bid of $96,903.00 was W. L. Hall
Company.
NOW, THEREFORE, BE IT RESOLVED, that the bids are accepted for the Heritage
Center skylight replacement and the contract is awarded to W. L. Hall Company.
APPROVED AND ADOPTED this 18th day of August 2014 by the City Council of the
City of Lakeville.
CITY OF LAKEVILLE
Matt Little, Mayor
ATTEST:
Charlene Friedges, City Clerk
Financing - Heritage Center Skylight Replacement
The total cost of the Heritage Center skylight replacement, including contract and
professional services provided by Inspec, is $108,803.00. The 2014 Building Fund budget
provided $67,000 of appropriations for the project. The actual costs are exceeding budget
due to changes in the panel configuration and support structure, changes to roofing and
flashing around the panels, and interior work to reposition the fire suppression system. The
increased cost is taken into consideration in the 2015 - 2019 Building Fund Capital
Improvement Budget presented to the City Council at the August 11 Council Work
Session. The Heritage Center skylights along with the maintenance projects for other City
facilities will be financed with a combination of one time revenues and an annual $47,600
increase in property taxes over the five year period.
AlT A0
Document A101" - 2007
Standard Form of Agreement Between Owner and Contractor where the basis of
payment is a Stipulated Sum
AGREEMENT made as of the day of in the year
(In words, indicate day, month and year:)
ADDITIONS AND DELETIONS:
BETWEEN the Owner
The author of this document has
added information needed for its
City of Lakeville
completion. The author may also
have revised the text of the original
20195 Holyoke Avenue
AIA standard form. An Additions and
Lakeville, MN 55044
Deletions Report that notes added
information as well as revisions to the
standard form text Is available from
the author and should be reviewed. A
and the Contractor:
vertical line In the left margin of this
document indicates where the author
W. L Hall Company
has added necessary information
530 15th Avenue South
and where the author has added to or
Hopkins, MN 55343
deleted from the original AIA text.
This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
for the following Project:
to Its completion or modification.
2014 Skylight Replacement at Lakeville Heritage Center
AIA Document A2017m 2007,
20110 Holyoke Avenue
General Conditions of the Contract
Lakeville, MN
for construction, Is adopted In this
document by reference. Do not use
with other general conditions unless
The Architect:
this document is modified.
Inspec, Inc.
5801 Duluth Street
Golden Valley, MN 55422
Telephone Number: 763-546-3434
The Owner and Contractor agree as follows.
lNt AIA Document A1011"-211107. Copyright ®1915, 1918, 1925,1937, 1951, 1958,1981, 1983, 1967, 1974,1977, 1987,1991, 1997 and 2007 by The American
Insfik to of Aminliacls. All rights reserved. WARNING: This A10 Documani is protected by U.& Copyright Law and Irdemational Trestles. Unauthorized
reprod action or distribution of this AIA® Document, or any portion of IL may result in severe civil and criminal penalties, and will be prosecuted to the
! maximum extent possible underthe law. This documertwas produced byAlA software at 14:22:15 on 08114/2014 under order N0.8008763245 1 which expires
an 08009/2015, and is not for resale.
User Notes:
(727347512)
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
3 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
B MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
10 INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed
in tins Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are
as finny a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire
and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements,
either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in
the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(Paragraphs deleted)
§ 3.2 The Contract Time shall be measured from the date of commencement.
§ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than { ) days from the date
of commencement, or as follows:
(Paragraph deleted)
(Table deleted)
(Paragraphs deleted)Liquidated Damages; The Contractor and the Contractor's surety, if any, shall be liable for and
shall pay the Owner Two Hundred Fifty Dollars ($250.00) as liquidated damages for each calendar day of delay until
the Work is Substantially Complete.
Init.AIA Document A101 TM — 2007. Copyright ®1915, 1918,1925,1® 37, 1951,1968, 1961,1983,1987,1974.1977,1987,1991,1997 and 2007 by The American
institute of Architects. All rights reserved WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this AIAe Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This document was produced byAIA software at 1422:15 on 0 811412 0 1 4 under Order No.8008783245 1 which expires
on 0810912015, and is not for resale.
User Notes: (727347512)
ARTICLE 4 CONTRACT SHIM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the
Contract. The Contract Sum shall be Ninety -Six Thousand Nine Hundred and Three Dollars ($ 96,903.00 ), subject
to additions and deductions as provided in the Contract Documents.
§ 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents
and are hereby accepted by the Owner:
N/A
§ 4.3 Unit prices, if any:
(Paragraphs deleted)
N/A
(fable deleted)
§ 4.4 Allowances included in the Contract Sums if any:
(Paragraphs deleted)
N/A
(Table deleted)
ARTICLE 5 PAYMENTS
§ 5.1 PROGRESS PAYMENTS
§ 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for
Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the
Contractor as provided below and elsewhere in the Contract Documents.
I § 5.1.2 The period coveted by each Application for Payment shall be one calendar month ending on the last day of the
J month.
§ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the last day of a month, the
Owner shall make payment of the certified amount to the Contractor not later than the last day of the following month.
If an Application for Payment is received by the Architect after the application date fixed above, payment shall be
made by the Owner not later than Thirty ( 30 ) days after the Architect receives the Application for Payment.
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor
in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the
various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to
substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used
as a basis for reviewing the Contractor's Applications for Payment.
§ 5.1.5 Applications for Payment !shall show the percentage of completion of each portion of the Work as of the end of
the period covered by the Application for Payment. '
§ 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be
computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by
multiplying the percentage completion of each portion of the Work by the share of the Contract Sum
allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5.00 %).
Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall
be included as provided in Section 7.3.9 of AIA Document A201TM 2007, General Conditions of the
Contract for Construction;
.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and
mutably stored at the site for subsequent incorporation in the completed construction (or, if approved in
advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of
Zero percent ( 0.00 OA);
.3 Subtract the aggregate of previous payments made by the Owner; and
.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as
provided in Section 9.5 of AIA Document A201-2007.
Irdt AIA Document A18170-2007. Copyright ®1915,1916,1926,1937,1961, 1958,1961,1963, '1957.1974,1977. 19117, 1991,1997 and 2007 by The American
Institute of Archllects. All rights reserved. WARNING: This AIAe Document is protected by U.S. Copyright Law and international Treaties. Unauthorized
reproduction ordistribution of this AIAe Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the
j maximum extent possible under the law. This document was produced by AIA software at 14:22:15 on 0611412014 under Order No.8=783245 1 which expires
on OWS12015, and Is not for resale.
User Notes:
(727347812)
§ 5.1.7 The progress payment amount determined in accordance with Section 5.1.5 shall be further modified under the
following circumstances:
Add, upon Substantial Completion of the Work, a stmt sufficient to increase the total payments to the
fill amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete
Work, retainage applicable to such work and unsettled claims; and
(Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon Substantial
Completion of Work with consent ofsurety, if any.)
Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor,
any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-2007.
§ 5.1.8 Reduction or limitation of retainage, if any, shall be as hallows:
(Paragraphs deleted)
N/A
§ 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for
materials or equipment which have not been delivered and stored at the site,
§ 5.2 FINAL PAYMENT
§ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the
Contractor when
the Contractor has fully performed the Contract except for the Contractor's responsibility to correct
Work as provided in Section 12.2.2 of AIA Document A201-2007, and to satisfy other requirements, if
any, which extend beyond final payment; and
a final Certificate for Payment has been issued by the Architect.
§ 5.2,2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the
Architect's final Certificate for Payment.
ARTICLE 6 DISPUTE RESOLUTION
§ 63 INITIAL DECISION MAKER
The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the
parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker,
(Paragraphs deleted)
§ 6.2 BINDING DISPUTE RESOLUTION
For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 2007, the
method of binding dispute resolution shall be as follows:
(Paragraph deleted)
[ ] Arbitration pursuant to Section 15.4 of AIA Document A201-2007
IX ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document
A201-2007.
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract
Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract
Documents.
AIA Document A1017m - 2007. Copyright ®1915,1918,1926,1937.1951,1958.1961,1963,1967,1974,197T, 1987,1991.1997 and 2007 by The American
Init. Institute of Architects, M rWts reserved. WARNIN& This AIAe Document is protected by U.& Copyright Law and Intamationall Treaties. Unauthorized
reproduction or distribution of this A10 Document, or any portion of It, may result in covers civil and criminal penalties, and will be prowcuted to the
J maximum extent possible under the law. This document was produced byAIA software at 14:22:15 on 08/1412014 under Order No.8008763245 1 which expires
on 0&0912015, and Is not for resale.
User Notes. (727347512)
§ 8.2 Payments due and unpaid under the Contract shall bear interest fi-om the date payment is due at the rate stated
below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Paragraph deleted)
§ 8.3 The Owner's representative:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
§ 6.4 The Contractor's representative:
W. L. Hall Company
530 15th Avenue South
Hopkins, MN 55343
§ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the
other party.
§ 8.6 Other provisions:
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in
the sections below.
§ 9.1.1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner
and Contractor.
I§ 9.1.27111c General Conditions are AIA Document A201-2007 (as amended), General Conditions of the Contract for
Conshuction.
§ 9.1.3 The Supplementary and other Conditions of the Contract:
02 41 19 Demolition
07 53 00 Elastomeric Roofing Repairs
07 62 00 Sheet Metal Flashing
08 45 23 Pre -Engineered Insulated Translucent Skylight System
(Table deleted)
knit AIA Document A101 TM — 2007. Copyright ®1915,1918, 1925,'937,1951,1968,1961,1963.1967.1974,1977,1987,1991,1997 and 2007 by The American
Institute of Architects. Ail rights reserved. WARNING: Thfa AIDocument is protected by U.S. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this AIAs Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the
1 maximum extent possible under the law. This document was produced byAlA software at 142215 on 08/1412014 under Order NmMM763245 1 which epires
on 08/09/2015, and Is not for resale.
User Nous: (727347512)
Supplement to the General Conditions
(Table deleted)
§ 9.1.4 The Specifications;
01 10 00 Summary
01 20 00
Price and Payment Procedures
01 30 00
Administrative Requirements
014000
Quality Requirements
01 50 00
Temporary Facilities and Controls
01 60 00
Product Requirements
01 70 00
Execution Requirements
02 41 19 Demolition
07 53 00 Elastomeric Roofing Repairs
07 62 00 Sheet Metal Flashing
08 45 23 Pre -Engineered Insulated Translucent Skylight System
(Table deleted)
knit AIA Document A101 TM — 2007. Copyright ®1915,1918, 1925,'937,1951,1968,1961,1963.1967.1974,1977,1987,1991,1997 and 2007 by The American
Institute of Architects. Ail rights reserved. WARNING: Thfa AIDocument is protected by U.S. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this AIAs Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the
1 maximum extent possible under the law. This document was produced byAlA software at 142215 on 08/1412014 under Order NmMM763245 1 which epires
on 08/09/2015, and Is not for resale.
User Nous: (727347512)
§ 9.1.5 The Drawings:
Al Title Sheet, Summary of Work, Notes, Symbols, Site Map
A2 Details
(Table deleted)
§ 9.1.6 The Addenda, if any: N/A
(Table deleted)
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding
requirements are also enumerated in this Article 9.
(Paragraphs deleted)
ARTICLE 10 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document
A201-2007 and the Supplement.
(Table deleted)
This Agreement entered into as of the day and year first written above.
OWNER (Stgnatum)
(Printed name and title)
CONTRACTOR (Signature)
(Printed name and title)
Init. AIA DocumentA101"— 2007. Copyright 91915, 1918,1925, ie937.1961,1958, 1961,1953,1987,1974,1977,1987, 1991,1907 and 2007 by The American
Institute of Architacts. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Trestles. Uneuthorived
reproduction or distribution of this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the
t maAmumextent possible underthelaw.ThisdocumentwasproducedbyAlAsottwareat14:22:15on08/14/2014underOrderNo.80087632451whichexpires
on 08/09=15, and is not for resaie.
user Notes: (727347512)