Loading...
HomeMy WebLinkAboutWS Item 04Memorandum City of Lakeville Public Works - Engineering Division To: Mayor and City Council From: Zach Johnson, City Engineer Copy: Allyn Kuennen, Interim City Administrator Chris Petree, Public Works Director Date: September 18, 2014 Subject: Ipava Avenue Traffic Signals - Project Update Overview The City Council approved a proposal from Short Elliot Hendrickson Inc. (SEH) to design traffic signal systems on Ipava Avenue at both 175th Street and 165th Street at its June 2, 2014 meeting. The traffic signals are designed to improve intersection operations by efficiently accommodating traffic diverted from the Kenwood Trail/185th Street project area during the Kenwood Trail/185th Street roundabout construction and road closure conditions, and future traffic volumes. A permanent traffic signal system is proposed at 175th Street. ADA compliant pedestrian curb ramp improvements, including push-button stations, are proposed to improve pedestrian safety. A temporary wood pole and wire -mounted traffic signal system is proposed at 165th Street. Each signal system will include left turn "flashing yellow arrows". Minor striping and signage changes are proposed at each intersection to better direct traffic as it approaches the intersection. There are no roadway geometric changes proposed at either intersection. County, ISD 194 and City staffs are evaluating a potential collaborative fiber network project that would connect the traffic signals to the County's traffic control system. A connection to the County's traffic control system would create a coordinated traffic zone along Ipava Avenue between 162nd Street and 185th Street and maximize the ability to efficiently control traffic through this corridor. Staff will provide a project update outlining the current status and next steps. r O N N N E 0 -P-j CL a) m Background ,+=� • CSAH 50/60 Roundabout and Highway Expansion Traffic Diversion Study • Traffic Mitigation Improvements low Details Project includes: •Permanent traffic signal at 175th St. • Pedestrian curb ramp improvements • Temporary traffic signal at 165t" St. • Striping and signage improvements Is Vi Status �- Field survey complete Construction plans, specifications and -��" reports substantially complete • October: • October: 4 •November. April, 2015: �-. �.�- • May,2015: • June, 2015: Schedule State Aid plan approval Bid opening Begin construction Signals into operation CSAH 50/60 closure Project close-out