Loading...
HomeMy WebLinkAboutItem 06.eLakeville November 3, 2014 Item No. Resolution Amending 2014 Building Fund Budget Proposed Action Staff recommends adoption of the following motion: Move to approve the Resolution Amending the 2014 Building Fund Budget. Approval of the Resolution will result in amendment of the 2014 Building Fund Budget. Overview Recently there have been several unanticipated events which are adversely affecting the Building Fund. The facility major maintenance projects and project financing were discussed with the City Council at the October 14 work session. These events include the following: • Fire Station #4 - Roof top unit (heating system) malfunction and replacement • Heritage Center - Skylight replacement • City Hall - Backup generator malfunction and replacement • Central Maintenance Facility - Gate access controller • Central Maintenance Facility - Hoist repair • Central Maintenance Facility -trench drains Primary Issues to Consider ➢ Description of purpose of proposed budget adjustments. See attached. ➢ Financing of proposed budget adjustments. See attached. Supporting Information Financial Impact: $ See attached budgeted: N/A Source: Various Related Documents (CIP, ERP, etc.): Notes: Primary Issues to Consider ➢ Description of purpose of proposed budget adjustments. Fire Station #4 - Roof Ton Unit (heating system) malfunction and replacement The heating component of RTU #4, which serves the Fire Administration area of Fire Station #4, failed in April. The RTU #4 was not programmed to be replaced within the next 10 years. The heating component on the RTU is a unique on demand tank -less water heater design. Repair is not an option and there are no replacement components available. The station also has two other identical RTUs with the same hot water heating component that serve other areas of the station. Neither of these units will be repairable if they should fail. While RTU #4 must be replaced immediately, the benefits to replacing all three at the same time are minimization of mobilization costs, equipment standardization, equipment lead times and avoidance of potential failure during winter months. Award of contract was approved by the City Council at the August 18'h meeting. Heritage Center - Skylight Replacement. The main skylights in the Heritage Center are showing signs of delamination and deterioration thereby resulting in water leaks into the multi-purpose room. Replacement of the skylight system was originally budgeted at $67,500. Originally it was presumed that the skylight panels could be replaced on a one for one basis. An engineering evaluation of the skylights showed that the original panels were framed as windows and were part of the support structure. These panels are no longer available and replacing them in the same manner is not an option. The replacement panels will be longer thereby requiring a different support structure as well as drywall work, modifications to the fire sprinkler system, and roof work and flashing to the area around the skylights and the gutters. Award of contract was approved by the City Council at the September meeting. City Hall - Generator Replacement. The generator at City Hall provides backup power to the computer servers in the event of a power failure. The IT department also has an uninterrupted power supply as a backup system to provide power to the servers while the generator picks up the full load. The UPS can provide approximately 1 hour of power in the event both the electricity and the generator fail. The generator sustained significant mechanical failure in August. Cost of replacement was more cost effective than extensive repair costs. Because of the critical nature of the backup systems for the servers, staff has obtained bids to replace the generator immediately. Three quotes were obtained with the lowest being $16, 907. Replacement of the generator was originally scheduled and budgeted in 2015 for $34,000. The generator was replaced in late August and was operational in early September. Central Maintenance Facility- Hoist repair The Central Maintenance Facility has two heavy duty hoists which are used for repair of heavy equipment such as snow plow vehicles and fire trucks. The concreate around the rails supporting one of the front hoists is deteriorating thus causing the hoist to lean slightly when the vehicle weight is not evenly distributed such as a plow truck with a wing. Being limited to one heavy duty hoist does impact the completion of repairs to dump trucks and other heavy equipment. Major repairs to the hoist were not anticipated within the five year Capital Improvement Plan. Central Maintenance Facility- Gate access controller. The memory chips in the CMF gate controller cannot be replaced. The system has reached the end of its life cycle. If the unit experiences any catastrophic event, electrical surge, lighting strike, or struck by a vehicle that would damage the board and/or chip, the system will not be repairable. If the system fails, security and access will be a major operational issue. Replacement of the gate controller was included in the 2015 original estimate within the five year Capital Improvement Plan. Central Maintenance Facility - Trench Drains In the truck parking area of the Central Maintenance Facility there are three trench drains that run down the center of the driving lanes. The purpose of these trench drains is to collect snow melt and water runoff from the trucks and carry it to the storm sewer system. The concrete holding up the rails that, in turn, hold up the grates was beginning to fail in several areas. The failing concrete causes the rails to separate from the concrete and bend, causing the grates to fall into the trench drain. This creates a safety hazard for staff as well as a driving hazard. In one instance, the grates are being held up with blocks of wood, in other instances staff has covered the failing areas with sheets of metal. Repairs require that the concrete around the trench drain be removed, new concrete poured and tied into the existing floor reinforcement, new rails installed, and the existing grates reinstalled. There will be approximately 2,800 square feet of concrete removed and replaced. Cost of the repairs is approximately $36,000. The Building Fund 2014 budget provided $33,000 to seal the floor. Staff is requesting the $33,000 for floor sealing be re -appropriated to the trench drain repairs with the remaining $3,000 to be appropriated from the Building Fund balance. Sealing of the floor would be deferred to a future budget. ➢ Financing of proposed budget adjustments. There are currently adequate balances available in the Building Fund in 2014 and 2015 for financing the projects discussed above and scheduled facility improvements as described in the proposed 2015 - 2019 Capital Improvement Plan. A Summary of the Building Fund financial projections is shown below. Building Fund 2014 2015 Adopted Amended Original Revised Budget Adjust Budget Estimates Adjust Estimates Revenues Expenditures Fire Station 44 - RTU Heritage Center - skylights City Hall -generator CMF - hoists CMF - gate controller CMF -floor sealing CMF - trench drains Other Total expenditures Netchange Fund Balance -Jan. 1 Fund Balance- Dec 31 67,000 33,000 277,825 377,825 (377,825) 112,000 112,000 41,000 108,000 16,907 16,907 20,850 20,850- 13,350 13,350 (33,000) - 12,717 (12,717) - 277,825 802,375 171,107 548,932 815,092 (171,107) (548,932) (815,092) 36,000 23,283 (23,283) 36,000 802,375 838,375 (838,375) 1,516,976 - 1,516,976 968,044 - 968,044 1,139,151 (171,107) 968,044 181,369 (23,283) 129,669 CITY OF LAKEVILLE RESOLUTION No. RESOLUTION AMENDING THE 2014 BUILDING FUND BUDGET BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota that the 2014 Building Fund budget is hereby approved and amended for the fiscal year ending December 31, 2014 as per Exhibit A attached hereto. APPROVED AND ADOPTED this 3rd day of November 2014 by the City Council of the City of Lakeville, Minnesota. CITY OF LAKEVILLE, MINNESOTA Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk 2014 BUILDING FUND BUDGET 2014 Adopted Budget Revenues Charges for services $ Investment income - Miscellaneous Total revenues Expenditures General government Public safety Public works Parks and recreation Total expenditures Exhibit A 2014 2014 Amended Adjustment Budget S - $ 150,712 16,907 167,619 65,600 112,000 177,600 55,000 1,200 56,200 106,513 41,000 147,513 377,825 171,107 548,932 Excess (deficiency) of revenues over expenditures (377,825) (171,107) (548,932) Otherfinancing sources (uses) Transferfrom otherfunds Total otherfinancing sources (uses) Net change in fund balance Fund balance, January 1 Fund balance, December 31 960 960 (376,865) (171,107) (548,932) 1,400, 812 116,164 1,516,976 $ 1,023,947 $ (54,943) $ 968,044