HomeMy WebLinkAboutItem 06.rI I October 31, 2014 Item No. APPROVAL OF SUPPLEMENTAL AGREEMENT WITH ROSTI CONSTRUCTION FOR THE EMBANKMENT REPAIR ALONG THE KENRICK AVENUE TRAIL Proposed Action Staff recommends adoption of the following motion: Move to approve a supplemental agreement for the repair of the trail embankment along the Kenrick Avenue Trail. Overview At the September 15, 2014 City Council Work Session Don Sterna from WSB presented options for the repair of the trail embankment north of Marek's Towing which eroded twice, once following the record rainfalls in the spring after which it was reconstructed and again following the heavy rains Father's Day weekend. It was originally estimated that the preferred option, flattening of the slope to a 2:1 by construction of a Prefabricated Modular Block Wall, seeding, blanketing and other erosion measures would cost $63,951. Based upon negotiations with staff, the cost to perform the described work will be $53,200. Primary Issues to Consider Is the embankment repair necessary? Yes, continued erosion could affect the integrity of the trail and Kenrick Ave. Supporting Information • Supplemental Agreement Brett Altergott i Parks & Recreation Financial Impact: $53,200 Budgeted: Yes Source: Park Dedication Related Documents (CIP, ERP, etc.): Notes: y,weepT� STATE AID FOR LOCAL TRANSPORTATION Rev.Apr.2012 FINAL INSPECTION REPORT Page 1 oft SP 188-118-004 MN Proj. No. TEAX 1912 (279) SA No. 2 Project Location: Kenrick Ave & 195th Street W. Trails Local Agency: Lakeville Local Project No.:NA Contractor: Rosti Construction of Minnesota, Inc. Contract No.: Address/City/State/Zip: PO Box 121 Jordan, MN 55352 Total Supplemental Agreement Amount $ 53,200.00 This contract is between the City of Lakeville and the Contractor as follows: WHEREAS: This Contract provides for, among other things, Grading, Bituminous Trail surfacing, Pedestrian Bridge, Culverts, Traffic Control, and Retaining Walls. WHEREAS: The trail embankment as designed experienced significant erosion over an existing box culvert crossing during large rain events. WHEREAS: The City and the Engineer have developed the design of a retaining wall and flatter trail embankment to eliminate the erosion. WHEREAS: The City and the Contractor have agreed to reestablish the project completion date to November 26, 2014. WHEREAS: The City and the Contractor have reached an agreement to fully and completely settle all claims and liquidated damages that could be brought by the City or the Contractor for construction delays caused by weather, field conditions, and extra work on this project. WHEREAS: The Engineer has determined that the contract will be revised in accordance with MnDOT Standard Specification 1402 NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1. The Contractor will perform the work of this supplemental agreement in accordance with the pertinent portions of the plan, the special provisions, the Mn/DOT Standard Specifications, Mn/DOT Standard Plates, the three (3) 11" x 17" additional plan sheets dated 9/19/14 identified as Plan Sheet Nos. 1, 2, and 3 and as directed by the Engineer. By signing this Agreement, both the Contractor and the Engineer acknowledge receipt of the additional Plan sheets listed above that are incorporated into this Agreement by reference. 2. Payment for all quantity adjustments will be at the Contract Unit Prices for all items except; 2021.501 Mobilization, 2105.523 Common Borrow (CV), and 2411.604 Modular Block Retaining Wall Special, which will be at the Negotiated Unit Prices as shown in the Estimated Cost below. 3. This Supplemental Agreement does change the completion date to November 26, 2014. 4. This Supplemental Agreement covers the known and anticipated costs and contract time adjustment (if any) attributable to the work covered by this Supplemental Agreement. If the Contractor incurs unknown and unanticipated additional work that QJ STATE AID FOR LOCAL TRANSPORTATION Rev.Apr.2012 ` FINAL INSPECTION REPORT Page 2of2 affects costs or impacts the critical path, the Contractor reserves the right to request an additional adjustment to the contract amount or contract time in accordance with MnDOT Specification 1402 ESTIMATED INCRFASEIN COST- SP 188-118-004 Item No. Description Unit Unit Price Quantity Amount 2021.501 MOBILIZATION LUMP SUM $5,000.00 1 $5,000.00 2105.501 COMMON EXCAVATION CU YD $9.00 100 $900.00 2105.523 COMMON BORROW (CV) CU YD $15.00 400 $6,000.00 2411,6041 MODULAR BLOCK RETAINING W ALL SPECIAL SQ YD 1 $184.00 180 $33,120.00 2557.501 WIRE FENCE DESIGN 60V-9322 LIN FT $15.00 200 $3,000.00 2573.54 FILTER LOG TYPE WOOD FIBER BIOROLL LINFT $4.00 6251 $2,500.00 2575.501 SEEDING ACRE $100.00 0.5 $50.00 2575.502 SEED MIXTURE 250 POUND $3.00 50 $150.00 2575.523 EROSION CONTROL BLANKETS CATEGORY 4 SQ YD $3.00 800 $2,400.00 2575.5321 FETIL IZER TYPE 3 POUND $0.40 200 $80.00 TOTAL INCREASE SP 188-118-004 $53,200.00 TOTAL ADJUSTNIF NT SP 188-118-004 $53,200.00 Approved by Parks and Recreation Director: Print Name: Brett Altergott Approved by Project Engineer: Print Name: Nicholas Hentges Approved by Contractor: Date: Phone: 952-985-4601 Date: Phone: 763-287-8523 Date: Print Name: Brandon Hodges Phone: 612-685-4621 Distribution: Project Engineer (Original), Contractor (copy), DSAE (copy for funding review) DSAE Portion: The State of Minnesota is not a participant in this contract. Signature by the District State Aid Engineer is for FUNDING PURPOSES ONLY and for compliance with State and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available. - This work is eligible for: _ Federal Funding _ State Aid Funding _ Local funds District State Aid Engineer: Date: