HomeMy WebLinkAboutItem 5bRH-1
RH-1
P/OS
RH-1
P/OS
RH-1
O-R
RS-2
P/OS
PUD
P/OS
PUD
C-3
RS-3
RM-1
RS-2
K
E
NWOOD
T
RL
181ST ST W
KENWOODTRLJUREL WAYJ
A
G
U
A
R
PATHJARL CT
JUREL CT
ORCHARDTRL JAVATRLKENRICKAVEKENRIC
K
A
V
E
±
City of Lakeville
Location and Zoning Map
Kenwood Hills
Preliminary Plat
Comp Plan Amend.
Zoning Map Amend.
EXHIBIT A
JurelW ayJurel Ct
Jubilee Way
KenwoodTr
ai
l
(CSAH50)Kach in a C t
JarlCt
J a g u arPathK e n rickAve185th St (CSAH 60)
OrchardTrail
±
Kenwood
Hills
Preliminary
Plat
Kenwood Hills
Prelim ina ry Plat
Comp Plan Amend
Zoning Map Amend
City of Lakeville
Aerial Ma p
EXHIBIT B
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\SURVEYPlotted: 11 /11 / 2014 8:51 AMVicinity Map:
Revisions:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
S13585-MASTER.DWG /CERT
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/12/14 PRELIMINARY PLAT-CITY COMMENTS
N
SCALE IN FEET
0 50
C1-1
RLL SFM
RLL
Richard L. Licht - PLS
26724
License No.Date
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Land Surveyor under the laws
of the State of Minnesota.
Vicinity Map:Sheet Index:
NOTE:
1.Contours shown hereon were obtained from the MnTopo
website http://arcgis.dnr.state.mn.us/maps/mntopo/ on June
19, 2014.
2.The wetlands shown hereon were obtained from a previous
delineation performed by Earth Science Associates, Inc.
3. Benchmark: Top nut of hydrant located at end of
constructed Jurel Way as shown.
Elev. = 1088.93 Feet (City of Lakeville Datum)
DESCRIPTION OF PROPERTY SURVEYED
(Per Schedule A as described in the Commitment for Title Insurance issued by
Custom Home Builders Title, LLC as issuing agent for Stewart Title Guaranty Company,
File No. HB-27199, dated November 12, 2013)
Outlot A in Lakeway Park East Campus, according to the recorded plat thereof, Dakota County, Minnesota.
Torrens Property
Torrens Certificate No. 151844
NOTES
1)The easements of record, shown hereon, were obtained from the above described title commitment.
2)This property is contained in Zone X (areas determined to be outside the 0.2% annual chance
floodplain) per Flood Insurance Rate Map, Community Panel No. 27037C0191E, effective date of
December 2, 2011.
3)The Gross land area is 771,983 +/- square feet or 17.7 +/- acres.
4)We have shown buried structures and utilities on and/or serving the site Per Gopher State One-Call
Ticket No.'s 141152199 and 141152239. The following utilities and municipalities were notified:
ARVIG (218) 298-1025
CHARTER COMMUNICATIONS (800) 778-9140
AT&T TRANSMISSION (903) 753-3145
CENTER POINT ENERGY (763) 559-5185
CITY OF LAKEVILLE (952) 985-2740
GREAT RIVER ENERGY (763) 241-2301
DAKOTA COUNTY HIGHWAY DEPT (952) 891-7900
DAKOTA ELECTRIC (651) 463-6268
DEPARTMENT OF TRANSPORTATION (651) 366-5750
FRONTIER COMMUNICATIONS (763) 682-3514
LEVEL 3 COMMUNICATIONS (877) 366-8344
QWEST COMMUNICATIONS (800) 283-4237
ZAYO BANDWIDTH (888) 267-1063
i)Utility operators do not consistently respond to locate requests through the Gopher State One Call
service for boundary purposes such as this. Those utility operators that do respond often will not
locate services from their main line to the customer's structure or facility - they consider those
segments private installations that are outside their jurisdiction. If a private service to an adjoiner's site
crosses this site or a service to this site crosses an adjoiner, it may not be located since most
operators will not mark such "private" services.
ii)Snow and ice conditions during winter months may obscure otherwise visible evidence of a buried
structure or utility.
iii)Maps provided by operators, either along with a field location or in lieu of such a location, are very
often inaccurate or inconclusive. EXTREME CAUTION MUST BE EXERCISED BEFORE AN
EXCAVATION TAKES PLACE ON OR NEAR THIS SITE. BEFORE DIGGING, YOU ARE REQUIRED
BY LAW TO NOTIFY GOPHER STATE ONE CALL AT LEAST 48 HOURS IN ADVANCE AT
651/454-0002.
Submittal:
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\SURVEYPlotted: 11 /13 / 2014 11:7 AMVicinity Map:
Revisions:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
S13585-MASTER.DWG /PRE-PLAT
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
Richard L. Licht - PLS
26724
License No.Date
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Land Surveyor under the laws
of the State of Minnesota.
Vicinity Map:
N
SCALE IN FEET
0 50
PRELIMINARY PLAT GENERAL NOTES
SURVEYOR:OWNER/DEVELOPER:
Loucks Associates, Inc.Homestead Partners
7200 Hemlock Lane, Suite 300 525 - 15th Avenue South
Maple Grove, MN 55330 Hopkins, MN 55343
763-424-5505 952-294-2113
LEGAL DESCRIPTION:
Outlot A, LAKEWAY PARK EAST CAMPUS, according to the recorded
plat thereof, Dakota County, Minnesota
Torren Property (Certificate No. 151844)
DATE OF PREPARATION:
June 2014
BENCHMARK:
Top nut of hydrant located at end of constructed Jurel Way as shown.
Elev. = 1088.93 Feet (City of Lakeville Datum)
EXISTING ZONING:
Zone (RM-1) Medium Density Residential District
PROPOSED ZONING:
Zone (PUD)
AREAS:
45 Lots @ 2,200 Sq. Ft. Each = 99,000 Sq. Ft.
Lot 13, Block 1 = 95,120 Sq. Ft.
Lot 23, Block 2 = 118,467 Sq. Ft.
Lot 12, Block 3 = 48,878 Sq. Ft.
Outlot A = 275,858 Sq. Ft.
Outlot B = 29,554 Sq. Ft.
Right of way Dedication Area = 105,106 Sq. Ft.
Total Area = 771,983 Sq. Ft.
FLOOD ZONE DESIGNATION:
This property is contained in Zone X (areas determined to be outside the
0.2% annual chance floodplain) per Flood Insurance Rate Map,
Community Panel No. 27037C0191E, effective date of December 2, 2011.
C2-1
PAK SFM
RLL
NOTE:
1.The wetlands shown hereon were obtained from a previous
delineation performed by Earth Science Associates, Inc.
Sheet Index:
Submittal:
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\CIVIL\_dwg Sheet FilesPlotted: 11 /13 / 2014 10:41 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
C2-2 SITE PLAN.DWG /C2-2
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
Todd W. McLouth - PE
of the State of Minnesota.
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the laws
20383
License No.Date
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
C2-2
TWM DDL
TWM 11/13/14
N
SITE PLAN GENERAL NOTES
SETBACKS:
FRONT BUILDING SETBACK = 25'
ZONING:
EXISTING ZONING = RST-2 MULTIPLE FAMILEY RESIDENTIAL
PROPOSED ZONING = PLANNED UNIT DEVELOPMENT
SITE AREA:
TOTAL AREA = ~17.7 AC
TOTAL HOUSING UNITS = 45
NET DENSITY = 3.11 UNITS/ACRE
IMPERVIOUS SURFACE AREA = 4.0 AC = 22.6%
PERVIOUS SURFACE AREA = 13.7 AC = 77.4%
ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED
IN ACCORDANCE WITH THE DETAILS SHOWN PER SHEET C8-1 AND THE REQUIREMENTS OF THE
CITY.
CURB AND GUTTER SHALL BE D412 PER CITY DETAIL. ALL INLET LOCATIONS SHALL BE B618 AT
AS PER CITY DETAIL
THE CITY DEPARTMENT OF ENGINEERING AND BUILDING INSPECTIONS DEPT. AND THE
CONSTRUCTION ENGINEER SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY WORK
WITHIN THE STREET RIGHT OF WAY (SIDEWALK, STREET OR DRIVEWAYS)
MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR
TO COMMENCING ANY GRADING, EXCAVATION OR UNDERGROUND WORK.
APPROXIMATE LOCATION OF ON STREET PARKING STALL. (8'X22')
TOTAL ON STREET PARKING STALLS - 87
WETLAND DATA:
AREA OF EXISTING WETLANDS (ON PROPERTY):
WETLAND 'A' = 14,262 SF
WETLAND 'B' = 6,904 SF
WETLAND 'C' = 3,628 SF
WETLAND 'D' = 7,432 SF
WETLAND 'E' = 1,982 SF
WETLAND 'F' = 10,686 SF
WETLAND 'G' = 16,974 SF
WETLAND 'H' = 2,059 SF
TOTAL AREA OF IMPACTED WETLAND = 11,984 SF
WETLAND BUFFERS ARE BEING AVERAGED FOR WIDTH (SEE PLAN).
PROPOSED WETLAND BUFFER TOTAL AREA - 83,381 SF
PROPOSED GRADING AND RESTORATION PLAN FOR THE WETLAND MITIGATION AREAS TO
BE CORDINATED WITH THE CITY OF LAKEVILLE AND THE VERMILLION RIVER WMO.
AREA OF UTILITY EASMENT - APPROX. 60,182 SF
(INCLUDES ALL PAVEMENT, ESTIMATED HOME AREA, AND ESTIMATED DRIVEWAY AREA)
28'
28.0'
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\CIVIL\_dwg Sheet FilesPlotted: 11 /13 / 2014 10:44 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
C3-1 GRADING PLAN.DWG /C3-1
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
Todd W. McLouth - PE
of the State of Minnesota.
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the laws
20383
License No.Date
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
C3-1
TWM DDL
TWM 11/13/14
N
N
GRADING, DRAINAGE & EROSION CONTROL NOTES
1.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 6 INCHES OF TOP
SOIL AND SOD OR SEED. THESE AREAS SHALL BE WATERED BY THE CONTRACTOR
UNTIL THE SOD OR SEED IS GROWING IN A HEALTHY MANNER.
2.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY
DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS
PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO
ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS
PROJECT.
3.THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING
TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL
SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE
NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER
PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE
APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
4.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE
CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS
ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE
PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
5.THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION
REVIEW OF THE CONTRACTORS PERFORMANCE IS NOT INTENDED TO INCLUDE
REVIEW OF THE ADEQUACY OF THE CONTRACTORS SAFETY MEASURES IN, OR NEAR
THE CONSTRUCTION SITE.
6.BEFORE BEGINNING CONSTRUCTION THE CONTRACTOR SHALL INSTALL A
TEMPORARY ROCK ENTRANCE PAD AT ALL POINTS OF VEHICLE EXIT FROM THE
PROJECT SITE. SAID ROCK ENTRANCE PAD SHALL BE MAINTAINED BY THE
CONTRACTOR FOR THE DURATION OF THE PROJECT. SEE DETAILS SHOWN ON SHEET
C8-1 OF THE PROJECT PLANS.
7.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED
AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT
REQUIREMENTS, BEST MANAGEMENT PRACTICES, CITY REQUIREMENTS AND THE
DETAILS SHOWN ON SHEET C8-1 OF THE PROJECT PLANS.
8.ALL ENTRANCES AND CONNECTIONS TO CITY STREETS SHALL BE PERFORMED PER
THE REQUIREMENTS OF THE CITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL PERMITS AND NOTIFICATIONS AS REQUIRED BY THE CITY.
9.SEE UTILITY PLAN (C4-1) FURTHER DETAIL REGARDING THE STORM SEWER AND
OTHER UTILITY STRUCTURE CASTING ELEVATION DETAILS.
10.EACH LOT SHALL HAVE A BACK YARD SLOPE OF 10:1 OR FLATTER FOR A MINIMUM
OF 20 FEET FROM THE BUILDING.
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\CIVIL\_dwg Sheet FilesPlotted: 11 /13 / 2014 10:49 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
C3-2 STORMWATER POLLUTION PREVENTION
PLAN.DWG /C3-2
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
Todd W. McLouth - PE
of the State of Minnesota.
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the laws
20383
License No.Date
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
C3-2
TWM DDL
TWM 11/13/14
N
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
GENERAL NOTES:
1. THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING: A SINGLE FAMILY RESIDENTIAL DEVELOPMENT WITH STREETS,
UTILITIES, STORM WATER MANAGEMENT AND MASS GRADING OF LOTS.
2. THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS:
1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE PAD.
2. INSTALLATION OF STAGE 1 SILT FENCE AROUND SITE.
3. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN
4.INSTALL STAGE 2 SILT FENCE AROUND STRUCTURES, PONDS AND DITCHES.
5. CONSTRUCT TEMPORARY SEDIMENTATION BASIN.
6. CLEAR AND GRUB REMAINDER OF SITE
7. STRIP AND STOCKPILE TOPSOIL.
8. ROUGH GRADING OF SITE
9. STABILIZE DENUDED AREAS AND STOCKPILES
10. INSTALL SANITARY, WATER, STORM SEWER AND SERVICES
11. SUB-CUT STREET, INSTALL STREET SECTION
12.INSTALL CURB AND GUTTER.
13.BITUMINOUS ON STREETS.
14. FINAL GRADE BOULEVARD INSTALL SEED AND MULCH.
15. INSTALL STAGE 3 SILT FENCE BEHIND ALL CURB.
16. REMOVE ACCUMULATED SEDIMENT FROM BASIN.
17. REPEAT STEPS 1-16 AS NECESSARY THROUGH PHASES UNTIL CONSTRUCTION IS COMPLETE.
18. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE AND RESEED ANY AREAS
DISTURBED BY THE REMOVAL.
3. SITE DATA:
AREA TO BE DISTURBED = 17.7 ac.
PRIOR TO CONSTRUCTION POST CONSTRUCTION
IMPERVIOUS AREA: 0 ac. 4.0 ac.
SOIL TYPES: SEE SOILS REPORT
POST CONSTRUCTION RUNOFF COEFFICIENT: CN=70
4. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE
CONSTRUCTION BEGINS.
5. CONSTRUCTION ACTIVITY - EROSION PREVENTION PRACTICES
TIME AN AREA CAN REMAIN
OPEN WHEN NOT ACTIVELY
BEING WORKED TYPE OF SLOPE
7 DAYS STEEPER THAN 3:1
7 DAYS 10:1 TO 3:1
7 DAYS FLATTER THAN 10:1
AREAS TO BE COVERED WITH EROSION CONTROL BLANKET.
6. ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER
THAN 75 FEET.
7. ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE STABILIZED.
8. TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN SURFACE WATERS OR
STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC
COMPOUNDS ARE EXEMPT EX: CLEAN AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES.
9. SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE
TREATED WITH THE APPROPRIATE BMP'S.
10. SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
11. EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE.
12. NO ENGINE DEGREASING IS ALLOWED ON SITE.
13. THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE FOR COMPLIANCE WITH ALL
TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO SIGNS THE NPDES PERMIT APPLICATION IS A
PERMITTEE FOR PARTS II.B., PART II.C AND PART IV. OF THE NPDES PERMIT AND IS JOINTLY RESPONSIBLE WITH THE OWNER FOR
COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT.
14. ALL CONSTRUCTION DOCUMENTS AND SPECIFICATIONS ARE CONSIDERED PART OF THE SWPPP.
15. DOCUMENTATION OF INFEASABILITY-THE PERMITEE MUST DOCUMENT THE DETERMINATION AND SUBSTITUTE BMP'S IN THE
SWPPP IF THEY DETERMINE THAT COMPLIANCE WITH THE REQUIREMENTS FOR TEMPORARY SEDIMENT BASINS(III.C) OR OBTAINING
ROW (III.D) IS INFEASIBLE.
16. CHANGE OF COVERAGE-UPON COMPLETION OF GRADING, UTILITIES, AND STREET CONSTRUCTION THE NEW OWNER (HOME
BUILDER) MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS OF ASSUMING OPERATIONAL CONTROL OF THE SITE,
COMMENCING WORK ON THEIR PORTION OF THE SITE, OR OF THE LEGAL TRANSFER, SALE OR CLOSING ON THE PROPERTY. NOTE:
THE NEW CAN IMPLEMENT THE ORIGINAL SWPPP CREATED FOR THE PROJECT OR DEVELOP AND IMPLEMENT THEIR OWN SWPPP.
17. TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT)
TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS
HAVE BEEN MET:
A. FINAL STABILIZATION, PER NPDES PERMIT PART IV.G. AND DEFINITION IN APPENDIX B HAS BEEN ACHIEVED ON ALL PORTIONS
OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE.
B. ANOTHER OWNER HAS ASSUMED CONTROL OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED.
18. INSPECTIONS
A. INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED.
B. EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24 HOURS RAIN EVENT.
C. STABILIZED AREAS: ONCE EVERY 30 DAYS
D. FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION.
19. OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, ALL INSPECTIONS AND MAINTENANCE, PERMANENT
OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM
WATER MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS. RECORDS TO INCLUDE: DATE & TIME OF
INSPECTION, NAME OF INSPECTOR, FINDINGS & RECOMMENDATIONS OF CORRECTIVE ACTIONS, DATE & AMOUNT OF RAINFALL
EVENTS GREATER THAN 0.5" IN 24 HOURS.
20. SWPPP MUST BE AMENDED WHEN:
A. THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT
EFFECT ON DISCHARGE
B. INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS.
C. THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT CONSISTENT WITH THE TERMS
AND CONDITIONS OF THE PERMIT.
21. OWNER: HOMESTEAD PARTNERS
MATT HANISH
525 15TH AVENUE S.
HOPKINS, MN 55343
(952) 949-3630
CONTRACTOR: PENDING
THE CONTRACTOR SHALL OVERSEE THE IMPLEMENTATION OF THE SWPPP AND SHALL BE THE RESPONSIBLE PARTY FOR ALL
OPERATIONS ON SITE. IF THE CONTRACTOR FAILS TO IMPLEMENT THE SWPPP THE OWNER SHALL ASSUME RESPONSIBILITY FOR THE
SWPPP. THE OWNER SHALL BE RESPONSIBLE FOR THE LONG TERM OPERATION & MAINTAINABLE OF THE
SEDIMENTATION/DETENTION BASIN AND STORM SEWER ON SITE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION
COMPLYING WITH THE REQUIREMENTS AS STATED IN PART III OF THE NPDES PERMIT.
22. BMP TABULATION: APPROXIMATE QUANTITIES
SILT FENCE - 5,800 LF
ROCK ENTRANCE PAD - 1 EA
SEED/MULCH - 13.7 AC
EROSION CONTROL BLANKET - 3,600 SY
SWPP MAINTENANCE - 1 EA
23. THE FOLLOWING INDIVIDUALS MUST BE TRAINED IN ACCORDANCE WITH THE NPDES PERMIT REQUIREMENTS: THE INDIVIDUAL
WHO PREPARES THE SWPPP; THE INDIVIDUAL OVERSEEING THE IMPLEMENTATION, REVISING, & AMENDING THE SWPPP; THE
INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE, & REPAIR OF THE BMP'S.
24.HAZARDOUS MATERIALS SUCH AS OIL, GASOLINE, PAINT, AND ANY OTHER HAZARDOUS SUBSTANCES MUST BE PROPERLY
STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS, OR OTHER DISCHARGES. RESTRICTED ACCESS
TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. CONCRETE WASH MUST BE LIMITED TO A DEFINED AREA OF
THE SITE AND RUNOFF MUST BE CONTAINED WITHIN THE DEFINED AREA.
25. ALL WASTE AND UNUSED BUILDING MATERIALS SHALL BE PROPERLY DISPOSED OF OFF SITE AND NOT ALLOWED TO BE CARRIED
BY RUNOFF INTO A RECEIVING CHANNEL OR STORAGE SEWER SYSTEM.
26.CONTRACTOR TO SEE SHEET C8-1 FOR STANDARD DETAILS FOR EROSION CONTROL DEVICES.
SILT FENCE REQUIRED MAINTENANCE:
1. WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF SILT FENCE IT MUST
BE REMOVED WITHIN 24 HOURS.
2. REPAIR OR REPLACE DYSFUNCTIONAL SILT FENCE WITHIN 24 HOURS.
3. SEDIMENT REMOVED FROM SURFACE WATERS WITHIN 7 DAYS.
4. SITE EXITS INSPECTED AND TRACKED SEDIMENT REMOVED
WITHIN 24 HOURS.
INLET PROTECTION REQU'D MAINTENANCE:
BASKET DEPTH IT MUST BE CLEANED WITHIN 24 HOURS.
2. REPAIR OR REPLACE DYSFUNCTIONAL INLET PROTECTION
WITHIN 24 HOURS.
1. WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\CIVIL\_dwg Sheet FilesPlotted: 11 /13 / 2014 10:52 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
C4-1 UTILITY PLAN.DWG /C4-1
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
Todd W. McLouth - PE
of the State of Minnesota.
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the laws
20383
License No.Date
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
C4-1
TWM DDL
TWM 11/13/14
N
UTILITY PLAN GENERAL NOTES
1. ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE
FURNISHED AND INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS, THE
CITY AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY ENGINEERS
ASSOCIATION OF MINNESOTA (CEAM), 2013 EDITION. ALL HDPE CONNECTIONS TO
CONCRETE MANHOLES SHALL BE CONNECTED WITH AN INTERNAL RUBBER GASKET
OR BY USING ADS WATERSTOP GASKET. ALL SANITARY SEWER MAIN LINE SHALL BE
SDR 35. ALL SANITARY SEWER SERVICES SHALL BE SDR 26.
2. SEE SHEET C8-1 AND THE CONTRACT SPECIFICATIONS FOR SPECIFIC UTILITY DETAILS
AND UTILITY SERVICE DETAILS.
3. ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR
MATERIAL PER THE REQUIREMENTS OF THE CITY. ALL COMPACTION SHALL BE
PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION.
4. ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE
REQUIREMENTS OF THE CITY. THE CITY DEPARTMENT OF ENGINEERING AND
BUILDING INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE
NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF
WAY, OR WORK IMPACTING PUBLIC UTILITIES.
5. ALL SANITARY SEWER AND WATER SERVICES SHALL TERMINATE AT THE PROPERTY
LINE UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION OR UNDERGROUND
WORK.
7. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS WITH
SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF
WATER AND SANITARY SEWER LINES SHALL BE PROVIDED WHERE 7.5 FEET MINIMUM
DEPTH CAN NOT BE ATTAINED.
8. ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS
OF THE CITY. ALL TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AND
SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE CITY. THIS SHALL INCLUDE
ALL SIGNAGE, BARRICADES, FLASHERS AND FLAGGERS AS NEEDED. ALL PUBLIC
STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE
PERMITTED WITHOUT THE EXPRESSED AUTHORITY OF OF THE CITY.
9. ALL NEW WATERMAIN MUST HAVE A MINIMUM OF 7.5 FEET OF COVER.
10. ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED
GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY
OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS
REQUIREMENTS FOR TRAFFIC LOADING.
11. HORIZONTAL SEPARATION BETWEEN WATERMAIN AND SANITARY SEWER TO BE 10
FEET.
12. PROPOSED PIPE MATERIALS:
WATERMAIN C900 PVC NO LESS THAN 8' DEEP.
WATER SERVICE COPPER TYPE K,1" SERVICE TO PROPERTY LINE.
SANITARY SEWER PVC SDR 35 NO MORE THAN 20' DEEP.
SANITARY SEWER PVC SDR 26 20' - 25' DEEP.
SANITARY SEWER PVC 4" SCH. 40 SERVICE TO PROPERTY LINE.
STORM SEWER RCP CLASS 5 12" TO 30" DIAMETER.
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\LANDSCAPE\_dwg Sheet FilesPlotted: 11 /13 / 2014 11:12 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
L1-1 LANDSCAPE PLAN.DWG /L1-1
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
L1-1
TWM DDL
TWM 11/13/14
N
Date
of the State of Minnesota.
Douglas D. Loken, LA
I am a duly Licensed Landscape Architect under the laws
prepared by me or under my direct supervision and that
I hereby certify that this plan, specification or report was
45591
License No.
PLANT SCHEDULE:
THE CITY REQUIRES LANDSCAPE AT SITE PERIMETER. A CONIFEROUS
TREE ROW HAS BEEN PLACED ON THE NORTHERN PERIMETER TO
PROVIDE SCREEN FROM ADJACENT RESIDENTIAL NEIGHBORHOOD.
CITY REQUIRES LANDSCAPING QUANTITIES BASED ON A PERCENTAGE
OF SITE IMPROVEMENTS TO COST. THIS FIGURE IS UNKNOWN AT
THIS TIME. THE PLAN SHOWS 1 TREE PER LOT, AT STREET
INTERSECTIONS, AS WELL AS THE PERIMETER.
GENERAL NOTES
CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL
INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS
RELATING TO THE NATURE AND SCOPE OF WORK.
VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE
ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH
MAY COMPROMISE THE DESIGN AND/OR INTENT OF THE PROJECT'S
LAYOUT.
ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS
GOVERNING THE WORK OR MATERIALS SUPPLIED.
CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS/GUTTERS,
TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING
OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST
TO THE OWNER.
CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL
UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE
NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION / MATERIAL
INSTALLATION BEGINS (MINIMUM 10' - 0" CLEARANCE).
ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO
NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO REMAIN.
EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER
EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO
LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY
AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY
LANDSCAPE ARCHITECT OF SAME.
THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS
AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED TO
CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO
MINIMIZE TREE REMOVAL AND GRADING. ANY CHANGE IN ALIGNMENT
MUST BE APPROVED BY LANDSCAPE ARCHITECT.
LANDSCAPE INSTALLATION:
COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING
INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND
CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA.
WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF
SOD/SEED SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL,
SLAB, CURB, ETC.
SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE
AREAS NOTED TO RECEIVE SOD. SEED SHALL BE INSTALLED AND
MULCHED AS PER MNDOT SPECS. SOD SHALL BE LAID PARALLEL TO THE
CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER
THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE
GROUND.
ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE
AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION
OF NURSERYMEN. UNLESS NOTED OTHERWISE, DECIDUOUS SHRUBS
SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED SHRUB HEIGHT.
ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN
BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND
BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 6'
ABOVE FINISHED GRADE.
ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE
SALES SHALL NOT BE USED. ALL CONIFEROUS TREES SHALL BE FULL
FORM, NATURAL TO THE SPECIES, WITHOUT PRUNING.
PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN
QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES.
NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS
APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE
LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BID
AND/OR QUOTATION.
ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE
NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE
LANDSCAPE ARCHITECT MUST BE NOTIFIED.
ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH
DRIED BONE MEAL, OTHER APPROVED FERTILIZER MIXED IN WITH THE
PLANTING SOIL PER THE MANUFACTURER'S INSTRUCTIONS OR MAY BE
TREATED FOR SUMMER AND FALL INSTALLATION WITH AN APPLICATION
OF GRANULAR 0-20-20 OF 12 OZ PER 2.5" CALIPER PER TREE AND 6 OZ
PER SHRUB WITH AN ADDITIONAL APPLICATION OF 10-10-10 THE
FOLLOWING SPRING IN THE TREE SAUCER.
ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS.
WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER
IN CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY,
WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE.
WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND
REMOVE ALL WRAPPING AFTER 5-1.
ALL TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD MULCH WITH
NO MULCH IN DIRECT CONTACT WITH TREE TRUNK.
SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER
MANUFACTURES RECOMMENDATIONS UNDER ALL MULCHED AREAS.
THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A
WATERING SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS
AND TO PLANT MATERIAL GROWTH REQUIREMENTS.
IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY
DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY
OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT
ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE
DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR
TO PROCUREMENT AND/OR INSTALLATION.
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER
ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE
IMPROVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL
NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE.
ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO
OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A
MAINTENANCE PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED
TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL.
CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH
ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE.
WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS
SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE
ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE
MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED.
REPRODUCIBLE AS-BUILT DRAWING(S) OF ALL LANDSCAPE
INSTALLATION AND SITE IMPROVEMENTS UPON COMPLETION OF
CONSTRUCTION INSTALLATION AND PRIOR TO PROJECT ACCEPTANCE.
UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING
PLANT MATERIAL INSTALLATION AND SEED/SOD PLACEMENT IS FROM
THE TIME GROUND HAS THAWED TO JUNE 15.
FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 -
NOVEMBER 1. FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15;
DORMANT SEEDING IN THE FALL SHALL NOT OCCUR PRIOR TO
NOVEMBER 1. PLANTING OUTSIDE THESE DATES IS NOT
RECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED IN WRITING
BY THE LANDSCAPE ARCHITECT.
CONIFEROUS PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1
AND FALL DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL
NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT
RECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED IN WRITING BY
THE LANDSCAPE ARCHITECT.
PROTECT ALL EXISTING OAKS ON SITE SCHEDULED TO REMAIN. IF
EXISTING OAKS ARE DAMAGED IN ANY MANNER, ABOVE OR BELOW
GROUND IN THE ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT
SHOULD BE APPLIED IMMEDIATELY AFTER WOUNDING. OAKS ARE NOT
TO BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN APRIL 15 AND
JULY 1. NOTIFY LANDSCAPE ARCHITECT IF THESE DATES ARE
UNAVOIDABLE.
LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION
THAT SOIL AND COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW
FOR PROPER DRAINAGE AT AND AROUND THE BUILDING SITE.
LANDSCAPE PLAN:
NOTES:
TURF SEED MIX - MNDOT SEED MIX # 25-131.
APPLY AT 220 LBS/AC.
MID TERM STABILIZATION SEED MIX - MNDOT SEED
MIX # 22-112. APPLY AT 40 LBS/AC.
DRY PRAIRIE SEED MIX - MNDOT SEED MIX # 35-221.
APPLY AT 36.5 LBS/AC.
STORMWATER POND SEED MIX - MNDOT SEED MIX #
33-261. APPLY AT 35 LBS/AC.
DRY POND SEED MIX - MNDOT SEED MIX # 33-262.
APPLY AT 44 LBS/AC.
SEEDING LEGEND:
SITE IMPROVEMENTS CONSTRUCTION COST IS ESTIMATED TO BE LESS
THAN $1M. TWO PERCENT OF THIS COST IS TO BE USED FOR
LANDSCAPING. EXACT COST IS CURRENTLY UNKNOWN. THIS
INFORMATION IS TO BE PROVIDED AFTER CONSTRUCTION
DOCUMENTS ARE GENERATED.
MINIMUM LANDSCAPE VALUE:
TYPICAL HOUSE FOUNDATION PLANTINGS:
FOUNDATION PLANTINGS MUST CONSIST OF A COMBINATION OF
DECIDUOUS AND CONIFEROUS SHRUBS AS WELL AS PERENNIALS.
EACH TOWNHOME UNIT SHALL INCLUDE A MINIMUM 10 SHRUBS
AND 10 PERENNIALS. PLANTINGS TO BE INSTALLED BY BUILDER AT
TIME OF HOME CONSTRUCTION.
Professional Services:
CADD Qualification:
by the Consultant. With the Consultant's approval, others
may be permitted to obtain copies of the CADD drawing
or for completion of this project by others without written approval
shall not be used on other projects, for additions to this project,
for use solely with respect to this project. These CADD files
are instruments of the Consultant professional services
CADD files prepared by the Consultant for this project
Consultant from any & all responsibilities, claims, and liabilities.
deletions and that party shall hold harmless and indemnify the
at the full risk of that party making such revisions, additions or
revisions, additions, or deletions to these CADD files shall be made
files for information and reference only. All intentional or unintentional
Professional Signature:
Quality Control:
Sheet Title:
Sheet No.:
Project No.:
Checked By:
Project Lead:
Review Date:
Drawn By:
Project Name:
Owner/Developer Name:W:\2013\13585\CADD DATA\LANDSCAPE\_dwg Sheet FilesPlotted: 11 /13 / 2014 11:17 AMSheet Index:
Submittal:
Landscape Architecture Environmental
Planning Civil Engineering Land Surveying
2014
7200 Hemlock Lane - Suite 300
Maple Grove, MN 55369
Telephone: (763) 424-5505
www.LoucksAssociates.com
525 15th Avenue South
Hopkins, MN 55343
C0-1
C1-1
C2-1
C2-2
C3-1
C3-2
C4-1
C8-1
L1-1
L1-2
COVER SHEET
CERTIFICATE OF SURVEY
PRELIMINARY PLAT
SITE PLAN
GRADING PLAN
SWPP PLAN
UTILITY PLAN
CIVIL DETAILS
LANDSCAPE PLAN
TREE INVENTORY PLAN
L1-2 TREE INVENTORY.DWG /L1-2
06/27/14 CITY SUBMITTAL
07/11/14 PRELIMINARY PLAT SUBMITTAL
PRELIM
I
N
A
R
Y
09/04/14 PRELIMINARY PLAT RE-SUBMITTAL
10/06/14 PRELIMINARY PLAT-CITY COMMENTS
11/03/14 PRELIMINARY PLAT-CITY COMMENTS
11/13/14 PRELIMINARY PLAT-CITY COMMENTS
L1-2
PAK DDL
DDL 11/13/14
N
OVERALL TREE DATA:
TOTAL NUMBER OF TREES SURVEYED: 358 TREES
Date
of the State of Minnesota.
Douglas D. Loken, LA
I am a duly Licensed Landscape Architect under the laws
prepared by me or under my direct supervision and that
I hereby certify that this plan, specification or report was
45591
License No.
TREE INFORMATION:
TREE INVENTORY NOTES:
THE EXISTING TREES SHOWN ON THIS PLAN WERE
SURVEYED BY LOUCKS ASSOCIATES FROM 10/29/14 TO
11/05/14. SEE CHART BELOW FOR TREE INFORMATION. NOT
ALL TREES LISTED ARE ON THE PROJECT'S PROPERTY. SOME
TREES LISTED ARE ON ADJACENT PROPERTIES.
ALL TREES WITHIN THE CONSTRUCTION LIMITS WERE
SURVEYED. TREES 50' BEYOND CONSTRUCTION LIMITS ON
PROJECT PROPERTY WERE SURVEYED.
ALL TREES WITHIN THE
CONSTRUCTION LIMITS WERE
SURVEYED. TREES 50' BEYOND
CONSTRUCTION LIMITS ON
PROJECT PROPERTY WERE
SURVEYED.
ALL TREES WITHIN THE
CONSTRUCTION LIMITS WERE
SURVEYED. TREES 50' BEYOND
CONSTRUCTION LIMITS ON
PROJECT PROPERTY WERE
SURVEYED.
ALL TREES WITHIN THE
CONSTRUCTION LIMITS WERE
SURVEYED. TREES 50' BEYOND
CONSTRUCTION LIMITS ON
PROJECT PROPERTY WERE
SURVEYED.
3800
TREE LEGEND:
TREE TO REMAIN
TREE TO BE REMOVED