HomeMy WebLinkAbout0928ORDINANCE NO. 928
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
AN ORDINANCE ADOPTING FEES
THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS:
I. LICENSES
A. Dynamic Display Sign:
1. Application fee
2. Annual renewal fee
II. PERMITS
A. Building Permits
TOTAL VALUATION
$1.00 to $ 500.00
$501.00 to 2,000.00
$2,001.00 to $25,000.00
$25,001.00 to $50,000.00
$50,001.00 to $100,000.00
$100,001.00 to $500,000.00
$500,001.00 to $1,000,000.00
$1,000,001.00 and up
$ 100.00
$ 50.00
FEE
$ 30.00
$30.00 for the first $500.00 plus $3.25 for each additional $100.00, or
fraction thereof, to and including $2,000.00
$73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or
fraction thereof, to and including $25,000.00
$413.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00,
or fraction thereof, to and including $50,000.00
$681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or
fraction thereof, to and including $100,000.00
$1,056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00,
or fraction thereof, to and including $500,00.00
$3,456.75 for the first $500,000.00 plus $5.00 for each additional $1,000.00,
or fraction thereof, to and including $1,000,000.00
$5,956.75 for the first $1,000,000.00 plus $4.00 for each additional
$1,000.00, or fraction thereof
B. Plan Check Fees
65% of building permit fee for permits with valuations greater than $10,000.
25% of building permit fee for permits issued for similar buildings as required by State Building
Code.
C. Plumbing Permits
Requirement. Master License Number or pipe layers certificate, $25,000 license bond and current Certificate of
Liability Insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate will
satisfy this requirement.
Residential - Minimum (repairs and alterations, lawn sprinkler systems) $ 39.50
Complete installation.............................................................................. $ 90.00
Commercial -1.5% of contract/valuation price up to $10,000 and 1.0%
of contract/valuation price above $10,000 .......................................
Commercial - Minimum........................................................................... $ 39.50
RPZ Valve (new)....................................................................... $ 39.50
RPZ Valve (replacement or rebuild)........................................................ $ 39.50
Water Softener/Water Heater................................................................. $ 39.50
D. Heatina Permits
Residential - Minimum repairs and alterations .................................. $ 39.50
Complete installation.................................................................. $ 90.00
Commercial -1.5% of contract/valuation price up to $10,000 and 1.0%
Of contract/valuation price above $10,000
Commercial minimum............................................................................ $ 39.50
E. Sewer and Water Permits
Requirement: Master License Number, $25,000 License Bond and current Certificate of Liability Insurance to be
filed with City. Note. State Department of Health Bond and Insurance Certificate will satisfy this requirement.
Residential - Minimum repairs and alterations ....................................... $ 39.50
City water and sewer including conversion ...................................... $ 90.00
Commercial - One percent (I %) of contract/valuation price ................
Commercial - minimum.......................................................................... $ 39.50
Private sewer systems: New installation ............................................. $ 199.50
Private sewer system repair................................................................... $ 199.50
F. Electrical Permits
Requirement. State License from Board of Electricity. Note. An owner who actually occupies or
intends to occupy a single family residence is exempt from the licensing requirement.
Residential - Minimum repairs and alterations ..................................
Residential - Additions, remodels, lower levels (two trips) ...................
Residential - New installation (up to three trips) ................................
Commercial -1.5% of contract/valuation price up to $10,000 and 1.0% of
contract/valuation price above $10,000
Commercial minimum.................................................................
Additional trip charge..................................................................
2
$ 39.50
$ 70.00
$135.00
$ 39.50
$35.00
G. Well Permits
Effective February 1, 1989, all well permits are issued by Dakota County.
H. Manufactured Home Inspections
Installation permit (foundation, sewer, water, gas) ................................. $ 89.50
Separate permit for electrical hookup ............................................ $ 39.50
I. Swimming Pools
All in -ground pools, regardless of capacity, and above -ground pools hat
exceed 5,000 gallons............................................................ $ 49.50
J. Zoning Permit...................................................................... $ 20.00
K. Signs
Permanent installation....................................................................... $ 75.00
Temporary installation (10 days only) .................................................. $ 50.00
L. Moving Structure
(plus letter of credit or cash escrow) ............................................... $ 125.00
M. Demolition
1. Residential Accessory structures ................................................... No Charge
2. All structures other than residential accessory .............................. $ 49.50
(Also requires a $2,000 site restoration escrow)
N. Fire Systems
Fire Line - One percent of contract/valuation price
O. Sprinkler Fire Protection
Requirement: State Fire Protection Contractor License to be filed with the City.
Commercial. 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above
$10,000 plus surcharge (.0005 times contract/valuation).
Minimum........................................................................................... $ 45.00
Residential - New Construction.................................................................. $90.00
Residential - Remodel.............................................................................. $45.00
P. Miscellaneous Commercial Mechanical
Refrigeration, piping, fuel tanks, etc. - 1.5% of contract/valuation price up to $10,000 and
1% of the contract/valuation price in excess of $10,000
Minimum................................................................................................. $ 39.50
K,
Q. Miscellaneous (re -inspections) Inspections
$55.00/hr., minimum 1 hour
R. Re -Roof, Re -Side, and Retaining Walls over 4 feet high
Residential.............................................................................................. $ 49.50
Commercial............................................................................................ $ 149.50
S. Windows - Comprehensive or Egress
1. Residential........................................................................... $ 49.50
2. Commercial......................................................................................... $ 149.50
T. Inspections after hours (weekends, Holidays) $ 110.00/hr.
Only if an Inspector is available for requested inspection .......................Minimum 1 hour
U. Investigation Fee
Whenever any work for which a permit is required by Code has been commenced without first
obtaining said permit the investigation fee shall be equal to the amount of permit fee.
III. PLANNING AND ZONING
A. Platting (Also refer to Section IV)
Note: Services performed by City personnel will be billed at 2.5 times actual payroll hourly rate.
Services provided by City consultant will be billed at current consultant rates.
Sketch Plan Review - $2,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
Preliminary Plat - $500.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid
for legal notices, planning, engineering and legal services provided by staff and/or consultants.
Final Plat - $200.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for
planning, engineering and legal services provided by staff and/or consultants.
B. Planned Unit Development
- $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
C. PUD Amendment
$500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
D. Variance
1) Single family (includes legal notice publications) ........................... $ 500.00
2) All others, plus $500.00 escrow for legal notices, planning,
engineering and legal services provided by staff and/or consultants...... $ 500.00
E. Conditional Use Permit/CUP Amendment
1) Single family (includes legal notice publications) ........................... $ 500.00
2) All others, plus $1000.00 escrow for legal notices, planning, engineering
and legal services provided by staff and/or consultants..... $ 500.00
F. Conditional Use Permit. Interim Use Permit and Variance Extension
151 extension $ 50.00
Additional extensions $ 250.00
G. Home Occupation Permit ..................................................... $ 100.00
H. Interim Use Permit/IUP Amendment
1) Single family (includes legal notice publications) ........................... $ 300.00
2) All others, plus $1,000.00 escrow for legal notices, $ 500.00
planning, engineering and legal services provided by staff and/or
consultants............................................................................................ .
I. Rezoning
500.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
J. Special Home Occupation Permit -
(includes legal notice publications) ................................................ $ 300.00
K. Administrative Subdivision $ 500.00
plus all applicable dedication requirements and $1,000.00 escrow for planning, engineering and
legal services provided by staff and/or consultants.
L. Street and Easement Vacations
$200.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
M. Zoning Ordinance Text Amendment
$500.00 plus $2,000 escrow for legal notices, planning, engineering and legal services provided
by staff and/or consultants.
N. Lot Release.......................................................................................
$ 50.00
O. Parking Deferment
$100.00 plus $ 1,000.00 escrow for planning, engineering and legal services provided by staff
and/or consultants.
P. Comprehensive Plan Amendment
$500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services
provided by staff and/or consultants.
5
Q. Site Plan
$100.00 plus $500.00 escrow for planning, engineering and legal services provided by staff
and/or consultants.
R. Administrative Permit (per City Ordinance 11-8-3) ................... $ 100.00
S. Cost Recovery Fee (For code enforcement activities) $70.00 per re-
inspection
IV. ENGINEERING
A. Platting
Sketch plan review
Services performed by City personnel will be hourly and billed at2.5 times actual payroll hourly
rate applied to the Planning and Zoning escrows.
Preliminary Plat - ...............................................$150.00/acre $ 500.00 minimum
$ 3,200.00 maximum
Final Plat -........................................................$150.00/acre $ 500.00 maximum
B. Construction Plan Review
Site, grading, drainage, utility and street plan and specifications review.
Services performed by City Personnel will be hourly and billed at 2.5 times actual hourly rate. A cash
escrow may be required (if not collected through Planning and Zoning).
C. Wetland Conservation Act Administration (platting or non -platting action)
Permit to fill a wetland as allowed by the Wetland Conservation Act.......
$75.00
Services performed by City Personnel in administering the Wetland Conservation Act will be
billed at 2.5 times the actual payroll hourly rate. A minimum escrow of $250.00 will be required
(if not collected through Planning and Zoning actions) for: Wetland delineation/delineation
review, replacement plan review, mailings and administration, construction inspection and
annual monitoring until successful establishment of mitigation area.
In addition to the above fees, a deposit will be required to fund special studies such as
environmental assessment worksheets, transportation, drainage, noise impacts, indirect source
permits, etc. The amount of deposit to be based on the site, complexity, diversity and location of
the project.
Wetland Determination...............................................................
$100.00
Plus staff time
Wetland Exemption Application...................................................
$200.00
Plus staff time
Wetland Replacement...............................................................
$300.00
Plus staff time
Wetland Application..................................................................
$300.00
Plus staff time
Wetland Banking Application......................................................
$300.00
Plus staff time
Wetland Certificate of Compliance .............................................
$200.00
Plus staff time
Wetland Appeal of Notice of Decision ..........................................
$300.00
Plus staff time
Wetland Violation.....................................................................
$500.00
Plus staff time
0
D. General Engineering
1. Developer Installed Improvements:
A. Engineering contract administration - 3.0% of project construction cost* or 3.25% of security
in the form of a cash disbursement agreement.
*Assumes normal construction conditions and project scheduling.
B. Construction observation and final inspection hourly as charged by City's consultant.
Services performed by City personnel will be hourly and billed at 2.5 times actual payroll
hourly rate.
C. City record and base map preparation - GIS fee ....................... $ 75.00 parcel/lot
2. City Installed Improvements
A. Engineering contract administration - 2.0% of project construction cost
B. Preliminary report - as charged by consultants or 20% of design fee if performed by
City staff
C. Final design - as charged by consultants or as per standard ASCE fee curve if
performed by City staff
D. Construction observation and final inspection - hourly as charged by City's consultant.
Services performed by City personnel will be hourly and billed at 2.5 times actual payroll
hourly rate.
V. CONNECTION CHARGES AND OTHER DEVELOPMENT FEES
A. Trunk Storm Sewer Area Charge
1. Single Family Residential
2. Multi Family Residential
3. Commercial and Industrial
$ 0.178/sq. ft.
$ 0.198/sq. ft.
$ 0.250/sq. ft.
B. Crystal Lake Surcharge for Crystal Lake Drainage Areas Only
1. Single Family Residential $ 0.0134/sq. ft.
2. Multi Family Residential $ 0.0153/sq. ft.
3. Commercial and Industrial $ 0.0195/sq. ft.
C. Lateral Watermain Access Charge
(for adjacent wotermain previously unassessed)
1. Residential $ 41.00 per Front Foot plus
$ 408.00 per service
2. Non -Residential
7
$ 48.00 per Front Foot plus
$ 408.00 per service
D. Lateral Sanitary Sewer Access Charge
(for adjacent sanitary sewer previously unassessed)
1. Residential and Non -Residential
E. Sanitary Sewer Availability Charge
F. Sanitary Sewer Unit
G. Watermain Unit Charge
1. Residential
2. Non -Residential
H. Cash Escrow For Future Upgrading of Adjacent Street
(State and Street Assessment Rates)
1. Residential Urban Section
2. Residential Rural Section
3. Commercial Urban Section
4. Commercial Rural Section
I. Park Dedication Fees
1. High Density Residential
2. Medium Density Residential
3. Low Density Residential
4. Commercial
5. Industrial
Ordinance shall be effective January 1, 2015.
$ 41.50 per Front Foot plus
$ 418.00 per service
$ 327.00 per Unit
$ 825.00 per Unit
$ 4,100.00 per Unit
$ 2,050.00 per Unit
$ 107.00 per Front Foot
$ 62.00 per Front Foot
$ 160.00 per Front Foot
$ 94.00 per Front Foot
$ 1,972.00 per dwelling unit
$ 2,572.00 per dwelling unit
$ 3,781.00 per dwelling unit
$ 7,693 per acre
$ 4,558 per acre
Adopted this 17th day of November 2014 by the City Council of the City of Lakeville, Minnesota
CITY OF LAKEVILLE
By: Matt Little, Mayor
ATTEST:
L11 A
J
Charlene Friedges, City; erk
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
SUMMARY OF ORDINANCE NO. 928
AN ORDINANCE ADOPTING A FEE SCHEDULE
This ordinance prescribes fees sufficient to defray the costs incurred by the City of Lakeville in
reviewing, investigating and administering applications for the amendment to an official
control established pursuant to Minnesota Statutes Sections 462.351 to 462.364 and
applications for permits or approvals required under an official control established pursuant
to those sections.
A printed copy of the ordinance is available for inspection by any person during regular office
hours at the office of the City Clerk.
APPROVED FOR PUBLICATION this 17th day of November, 2014, by the City Council of the City
of Lakeville, Minnesota
CITY OF LAKEVILLE
BY: ,
Matt 6ttle, Mayor
ATTEST:
Charlene Friedges, City Jerk
AFFIDAVIT OF PUBLICATION
STATE OF MINNESOTA
COUNTY OF DAKOTA
) ss
Charlene Vold being duly sworn on an oath,
states or affirms that they are the Authorized
Agent of the newspaper(s) known as:
STW Lakeville
and has full knowledge of the facts stated
below:
(A) The newspaper has complied with all of
the requirements constituting qualifica-
tion as a qualified newspaper as provided
by Minn. Stat. §331A.02, §331A.07, and
other applicable laws as amended.
(B) This Public Notice was printed and pub-
lished in said newspaper(s) for I succes-
sive issues; the first insertion being on
11/21/2014 and the last insertion being on
11/21/2014.
By: DWASLAAAW�
Authorized Agent
Subscribed and sworn to or affirmed before
me on 11/21/2014.
caiLvt_ itA ci,(1)44tf„
Notary Public
Rate Information:
(I) Lowest classified rate paid by commercial users
for comparable space:
$27.40 per column inch
Ad ID 313734
CITY OF LAKEVILLE
DAKOTA COUNTY
MINNESOTA
SUMMARY OF
ORDINANCE NO. 928
AN ORDINANCE ADOPTING
A FEE SCHEDULE
This ordinance prescribes fees
sufficient to defray the costs in-
curred by the City of Lakeville in
reviewing, investigating and ad-
ministering applications for the
amendment to an official control
established pursuant to Minne-
sota Statutes Sections 462.351 to
462.364 and applications for per-
mits or approvals required under an
official control established pursuant
to those sections.
A printed copy of the ordinance
is available for inspection by any
person during regular office hours
at the office of the City Clerk.
APPROVED FOR PUBLICATION
this 17th day of November, 2014,
by the City Council of the City of
Lakeville, Minnesota
CITY OF LAKEVILLE
BY: Matt Little, Mayor
ATTEST: Charlene Friedges
City Clerk
Published in
Lakeville
November 21, 2014
313734