HomeMy WebLinkAboutItem 06County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
County Road 50 (Kenwood tRail)
eConomiC development and
pReliminaRy engineeRing study
ipava avenue to dodd BoulevaRd
Neighborhood meetiNg
Lakeville Water Treatment Facility
18400 Ipava Avenue
6:00 pm - 7:00 pm
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
f Introductions - City Staff, County Staff, Consultant Team
f Project Overview
f History (2013 Corridor Study Re-cap)
f 2014 Study Purpose, Goals & Objectives
f Study Area
f Public/ Stakeholder Involvement
f Project Schedule
f Preliminary Road Design & Property Impacts
f Next Steps
f Individual Follow-up Meetings with Property Owners
f Questions
f Adjourn
Meeting Agenda
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
Project Team
f City of Lakeville - Engineering & Planning Staff
f Dakota County - Transportation Department Staff
Consultant Team
f Hoisington Koegler Group, inc (HKGi)
f Planning, Landscape Architecture, & Urban Design
f Redevelopment / Phasing Strategies
f Stakeholder Engagement
f SRF Consulting
f Preliminary Roadway Engineering and Stormwater Management
f Stakeholder Engagement
f Springsted
f Public Finance Strategy
f Redevelopment Finance Tool Kit
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
2013 County Road
50 Corridor Study
f Narrow existing right-of-way
and railroad right-of-way
presents challenges for roadway
expansion
f Potential for 3/4 Access between
Ipava Avenue & Icenic Avenue
f Study adopted Fall 2013
2013 corridor study
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Conclusions
•Intersection control at 50/60 does affect gaps along
the corridor, but does not noticeably affect delays.
•Adding a signal at 192nd Street does not noticeably
improve delays for 188th Street or Jaguar Avenue in
the short term.
•The way to noticeably improve delays along the
corridor is to improve to 4 lanes.
•Expanding to 4 lanes will be necessary to meet future
demands.
County Highway 50 Corridor Study
2013 corridor study
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design2013 corridor study
Conclusions - Access Plan
•Short Term: Leave access as-is for KTMS
•¾ access between Ipava/Icenic to be
considered with corridor improvements
•¾ access at Icenic
•Long Term: Plan gives guidance if/when
safety/operational issues arise at key
intersections
County Highway 50 Corridor Study
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design2013 corridor study
Draft Recommendations (Short Term)
•Move forward with 50/60 Roundabout
•Widen Jaguar approach now to reduce
delays and take full advantage of gaps
available
•Consider 4 lane expansion of CH 50
-Challenges from Ipava to Icenic
County Highway 50 Corridor Study
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design2013 corridor study
Draft Recommendations (Long Term)
•With improvements, follow access plan
•Plan for a connection from Jaguar
neighborhood to Ipava Avenue as a 2 nd
outlet
•Conduct a follow-up gap study after 50/60
roundabout is open to compare actual
traffic conditions to model
predictions
County Highway 50 Corridor Study
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
Goals & Objectives of the 2014 Study
f Develop Preliminary Engineering Plans and Cost Estimate for the
reconstruction of Kenwood Trail (County Road 50) to a four-lane
divided roadway (Ipava Avenue to Dodd Boulevard)
f Conduct an Economic Development Study to review current zoning &
land use
f Develop potential redevelopment opportunities and site configurations
integrated with future transportation improvements
f Review potential funding sources and mechanisms to aid in financing
f Work with key stakeholders to identify a shared vision for the future
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
mcdonald
wetschka
tharaldson
milan
ke
n
w
o
o
d
t
r
a
i
l
(
C
S
aH 5
0
)
rai
l
r
i
g
Ht o
f
w
a
y
ipav
a
a
v
e
warweg
city of
lakeville
wetschka
joh
n
s
o
n
new
h
a
l
l
rol
l
e
r
emond
new market
bank
eureka
construction t & i properties
krake
kwik
trip
harrison
white
funeral
home
i C eni C wa
y
lake marion elementary
school
city of lakeville
ice arena
ideal way
do
d
d
b
l
v
d
mcdonalds
corp
study area
Study Parcels
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Public / Stakeholder Involvement
f Individual Listening Sessions (x3)
f 1. Listen to concerns, understand issues, discuss future opportunities
f 2. Review concept alternatives
f 3. Review preferred concept plan, engineering design, and implementation steps
f Commercial Property Owners (City Staff & Consultant Team)
f White Funeral Home
f McDonald Eye Care
f Lakeville Dental
f Lakeville Family Practice
f Day Care / Farm Show Magazine Site
f Or Others if Necessary
f Residential Property Owners (City & County Staff)
f School District / Lakeville Hockey Assoc.(City Staff & Consultant Team)
f Neighborhood Meetings (x2)
public / stakeholder engagement
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Project Schedule
f Background Mapping & Analysis (Sept. - Nov. 2014)
f Explore Potential Concepts (Nov. 2014 - Feb. 2015)
f Prepare the Preferred Plan & Seek Approvals (Feb. - Apr. 2015)
project schedule
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Designpreliminary road design approaches
Preliminary Road Design Approaches
f Full Width - 136ft wide right-of-way
f Reduced with trails in right-of-way - 124ft wide right-of-way
f Minimized with trails outside right-of-way - 108ft wide right-of-way
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
136ft Row
Full Width
124ft Row
Reduced with
trails in ROW
108ft Row
Minimized with
trails outside
ROW
Preliminary Road Design Approaches
preliminary road design approaches
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Designpreliminary road design approaches
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design136 ft right-of-way -- full width
potential 3/4
access location
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design136 ft right-of-way -- full width
mcdonald
wetschka
tharaldson
city of
lakeville
wetschka
joh
n
s
o
n
new
h
a
l
l
rol
l
e
r
emond
new market
bank
eureka
construction t & i properties
krake
harrison
white
funeral
home
lake marion elementary
schoolcity of lakeville
ice arena
mcdonalds
corp
kwik
trip
potential total taking
potential partial taking
potential 3/4
access location
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design124 ft right-of-way -- reduced with trails in row
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
mcdonald
wetschka
tharaldson
rai
l
r
i
g
Ht o
f
w
a
y
ipav
a
a
v
e
city of
lakeville
wetschka
joh
n
s
o
n
new
h
a
l
l
rol
l
e
r
emond
new market
bank
eureka
construction t & i properties
krake
harrison
white
funeral
home
lake marion elementary
schoolcity of lakeville
ice arena
ideal way
mcdonalds
corp
kwik
trip
124 ft right-of-way -- reduced with trails in row
potential total taking
potential partial taking
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design108 ft right-of-way -- minimized with trails outside row
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
potential total taking
potential partial taking
mcdonald
wetschka
tharaldson
city of
lakeville
wetschka
joh
n
s
o
n
new
h
a
l
l
rol
l
e
r
emond
new market
bank
eureka
construction t & i properties
krake
harrison
white
funeral
home
lake marion elementary
schoolcity of lakeville
ice arena
mcdonalds
corp
kwik
trip
108 ft right-of-way -- minimized with trails outside row
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
Next Steps
f Follow up meetings with individual property owners (Nov/Dec)
f Reinvestment/ Redevelopment concepts (Dec/Jan 2015)
f 2nd Round of individual property owner meetings (Jan/Feb 2015)
f Preferred Alternative (Feb/Mar 2015)
f Seek Approvals (Mar/Apr 2015)
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
questions?
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.
Planning • Landscape Architecture • Urban Design
Neighborhood Meeting - November 13, 2014
Thank You!
County Road 50 Economic Development &
Preliminary Engineering Study
Hoisington Koegler Group Inc.