Loading...
HomeMy WebLinkAboutItem 06County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 County Road 50 (Kenwood tRail) eConomiC development and pReliminaRy engineeRing study ipava avenue to dodd BoulevaRd Neighborhood meetiNg Lakeville Water Treatment Facility 18400 Ipava Avenue 6:00 pm - 7:00 pm County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 f Introductions - City Staff, County Staff, Consultant Team f Project Overview f History (2013 Corridor Study Re-cap) f 2014 Study Purpose, Goals & Objectives f Study Area f Public/ Stakeholder Involvement f Project Schedule f Preliminary Road Design & Property Impacts f Next Steps f Individual Follow-up Meetings with Property Owners f Questions f Adjourn Meeting Agenda County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 Project Team f City of Lakeville - Engineering & Planning Staff f Dakota County - Transportation Department Staff Consultant Team f Hoisington Koegler Group, inc (HKGi) f Planning, Landscape Architecture, & Urban Design f Redevelopment / Phasing Strategies f Stakeholder Engagement f SRF Consulting f Preliminary Roadway Engineering and Stormwater Management f Stakeholder Engagement f Springsted f Public Finance Strategy f Redevelopment Finance Tool Kit County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design 2013 County Road 50 Corridor Study f Narrow existing right-of-way and railroad right-of-way presents challenges for roadway expansion f Potential for 3/4 Access between Ipava Avenue & Icenic Avenue f Study adopted Fall 2013 2013 corridor study County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Conclusions •Intersection control at 50/60 does affect gaps along the corridor, but does not noticeably affect delays. •Adding a signal at 192nd Street does not noticeably improve delays for 188th Street or Jaguar Avenue in the short term. •The way to noticeably improve delays along the corridor is to improve to 4 lanes. •Expanding to 4 lanes will be necessary to meet future demands. County Highway 50 Corridor Study 2013 corridor study County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design2013 corridor study Conclusions - Access Plan •Short Term: Leave access as-is for KTMS •¾ access between Ipava/Icenic to be considered with corridor improvements •¾ access at Icenic •Long Term: Plan gives guidance if/when safety/operational issues arise at key intersections County Highway 50 Corridor Study County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design2013 corridor study Draft Recommendations (Short Term) •Move forward with 50/60 Roundabout •Widen Jaguar approach now to reduce delays and take full advantage of gaps available •Consider 4 lane expansion of CH 50 -Challenges from Ipava to Icenic County Highway 50 Corridor Study County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design2013 corridor study Draft Recommendations (Long Term) •With improvements, follow access plan •Plan for a connection from Jaguar neighborhood to Ipava Avenue as a 2 nd outlet •Conduct a follow-up gap study after 50/60 roundabout is open to compare actual traffic conditions to model predictions County Highway 50 Corridor Study County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 Goals & Objectives of the 2014 Study f Develop Preliminary Engineering Plans and Cost Estimate for the reconstruction of Kenwood Trail (County Road 50) to a four-lane divided roadway (Ipava Avenue to Dodd Boulevard) f Conduct an Economic Development Study to review current zoning & land use f Develop potential redevelopment opportunities and site configurations integrated with future transportation improvements f Review potential funding sources and mechanisms to aid in financing f Work with key stakeholders to identify a shared vision for the future County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design mcdonald wetschka tharaldson milan ke n w o o d t r a i l ( C S aH 5 0 ) rai l r i g Ht o f w a y ipav a a v e warweg city of lakeville wetschka joh n s o n new h a l l rol l e r emond new market bank eureka construction t & i properties krake kwik trip harrison white funeral home i C eni C wa y lake marion elementary school city of lakeville ice arena ideal way do d d b l v d mcdonalds corp study area Study Parcels County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Public / Stakeholder Involvement f Individual Listening Sessions (x3) f 1. Listen to concerns, understand issues, discuss future opportunities f 2. Review concept alternatives f 3. Review preferred concept plan, engineering design, and implementation steps f Commercial Property Owners (City Staff & Consultant Team) f White Funeral Home f McDonald Eye Care f Lakeville Dental f Lakeville Family Practice f Day Care / Farm Show Magazine Site f Or Others if Necessary f Residential Property Owners (City & County Staff) f School District / Lakeville Hockey Assoc.(City Staff & Consultant Team) f Neighborhood Meetings (x2) public / stakeholder engagement County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Project Schedule f Background Mapping & Analysis (Sept. - Nov. 2014) f Explore Potential Concepts (Nov. 2014 - Feb. 2015) f Prepare the Preferred Plan & Seek Approvals (Feb. - Apr. 2015) project schedule County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Designpreliminary road design approaches Preliminary Road Design Approaches f Full Width - 136ft wide right-of-way f Reduced with trails in right-of-way - 124ft wide right-of-way f Minimized with trails outside right-of-way - 108ft wide right-of-way County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design 136ft Row Full Width 124ft Row Reduced with trails in ROW 108ft Row Minimized with trails outside ROW Preliminary Road Design Approaches preliminary road design approaches County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Designpreliminary road design approaches County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design136 ft right-of-way -- full width potential 3/4 access location County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design136 ft right-of-way -- full width mcdonald wetschka tharaldson city of lakeville wetschka joh n s o n new h a l l rol l e r emond new market bank eureka construction t & i properties krake harrison white funeral home lake marion elementary schoolcity of lakeville ice arena mcdonalds corp kwik trip potential total taking potential partial taking potential 3/4 access location County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design124 ft right-of-way -- reduced with trails in row County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design mcdonald wetschka tharaldson rai l r i g Ht o f w a y ipav a a v e city of lakeville wetschka joh n s o n new h a l l rol l e r emond new market bank eureka construction t & i properties krake harrison white funeral home lake marion elementary schoolcity of lakeville ice arena ideal way mcdonalds corp kwik trip 124 ft right-of-way -- reduced with trails in row potential total taking potential partial taking County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design108 ft right-of-way -- minimized with trails outside row County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design potential total taking potential partial taking mcdonald wetschka tharaldson city of lakeville wetschka joh n s o n new h a l l rol l e r emond new market bank eureka construction t & i properties krake harrison white funeral home lake marion elementary schoolcity of lakeville ice arena mcdonalds corp kwik trip 108 ft right-of-way -- minimized with trails outside row County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 Next Steps f Follow up meetings with individual property owners (Nov/Dec) f Reinvestment/ Redevelopment concepts (Dec/Jan 2015) f 2nd Round of individual property owner meetings (Jan/Feb 2015) f Preferred Alternative (Feb/Mar 2015) f Seek Approvals (Mar/Apr 2015) County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 questions? County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Design Neighborhood Meeting - November 13, 2014 Thank You! County Road 50 Economic Development & Preliminary Engineering Study Hoisington Koegler Group Inc. Planning • Landscape Architecture • Urban Designpreliminary road design approaches