Loading...
HomeMy WebLinkAboutItem 09.bG:\Bu M e To: From: Date: Subject: BACKGR The pave photo. O hazards a and asso replacing PAVER R Options Option A Option B Option C Option D All quote Staff reco the colo the down FOUNTA The exist pavers, c udget\2015 Budge e mor Mayo Allyn Denn Brett A John H Dave Novem Pione ROUND ers in Pione Over the yea and liability ociated cost g the pavers REPLACEME for replacin A: Installatio B: Installatio C: Installatio D: Replace p es include th ommends O red stampe ntown parki AIN ting fountai consideratio et\Council work se r and r and City Co Kuennen, Int is Feller, Fina Altergott, Pa Hennen, Par Olson, Comm mber 21, 201 er Plaza Pave er Plaza hav ars, staff ha y issues in th t and time s. ENT OPTION g the pavers on of standa on of colore on of colore pavers with he applicatio Option C as d concrete ing lot proje in on site is on should be ession\2014-11-24 d u m ouncil terim City Ad ance Directo arks and Recr k Maintenan munity and E 14 er Replacem ve been and s replaced t he plaza. As to make th NS s and associ ard grey con d concrete d/stamped new pavers on of a seale the long te is consisten ect. (See att cracking an e given to re 4 Council work se m dministrator or reation Direc nce and Ope Economic De ment and Am d continue t the deterior s a result of he repairs, iated cost w ncrete concrete s er. erm mainten nt with the n ached phot nd chipping emove, repa ession\Paver Repla r ctor erations Man evelopment menity Improv to deteriora rating paver the deterio staff is reco with each op $ $ $ $ nance costs newly const to) g. As part o air, or replac acement Memo 1 Cit Parks ager t Director vements ate as noted rs to addres ration that o ommending tion are as f $ 9,379 $12,359 $18,500 $20,650 are less tha tructed side of the projec ce the fount 1-20-14 JLH.docx ty of Lakev & Recrea d in the atta ss safety trip occurs each g removing follows: an Option D ewalks as pa ct to replace tain. There ville tion ached pping h year g and D and art of e the are a G:\Budget\2015 Budget\Council work session\2014-11-24 Council work session\Paver Replacement Memo 11-20-14 JLH.docx number of water feature options that could be selected to replace the existing fountain which can range in cost from $5,000 to $17,500 according to a local landscape designer/installer. If the City Council chooses to replace the fountain, direction should be given to work with a landscape designer and installer to replace the existing fountain at a cost not to exceed $17,500. Staff would then provide a number of water feature options for Council’s review at a future work session. SPRUCE TREE REPLACEMENT Considering the large Spruce tree on the west end of the plaza, that is lit for the DLBA holiday lighting ceremony, has a number of tree branch voids, consideration should also could be given to replace the tree. The cost to replace the tree is $50/foot (i.e. 20’X$50=$1000) for either a Colorado or Black Hills Spruce. RECOMMENDATION Staff recommends the City Council consider directing staff to take the steps to: A. Replace the pavers with Option C – Installation of colored/stamped concrete at a cost of $18,500 B. Remove and replace the water fountain with a new water feature at a cost not to exceed $17,500 C. Remove and replace existing spruce tree with a 20 foot tree at a cost of $1,000 In summary, the cost of the recommended improvements is as follows: Stamped/Colored Concrete $18,500 Water Feature (Not to exceed) $17,500 Spruce Tree $ 1,000 T o t a l $ 3 7 , 0 0 0 G:\Bu udget\2015 Budgeet\Council work seession\2014-11-24 Pio 4 Council work se oneer Plaza ession\Paver Replaacement Memo 11-20-14 JLH.docx G:\Buudget\2015 Budgeet\Council work se Downtown ession\2014-11-24 n parking lot 4 Council work se t – stamped ession\Paver Repla concrete ex acement Memo 1 xample: 1-20-14 JLH.docx