Loading...
HomeMy WebLinkAboutItem 06.iakeville Date: 1 December 2014 Item No. RESOLUTION TO AUTHORIZE THE PREPARATION OF A FEASIBILITY REPORT FOR THE HAMBURG AVENUE IMPROVEMENT PROJECT Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution authorizing the preparation of an engineering feasibility report for the Hamburg Avenue Improvement Project that includes that portion of Hamburg Avenue between Lakeville Boulevard and 220th Street. These street improvements constitute City Improvement Project 15-05. Overview This segment of Hamburg Avenue has shown significant surface distresses and failures in the asphalt and the roadway shouldering, as well as drainage issues within the adjacent roadside ditches. The estimated project cost is $1,017,476. On November 17, 2014, City staff hosted a project open house for those property owners that will be specially assessed for the proposed improvements. Four business owners representing 5 properties attended the Open House. A summary of the comments received at the meeting is attached. Proposed project financing is through bonds issued under Minnesota Statutes, Chapter 429, for local improvements. A portion of the total project cost will be assessed to the property owners abutting the identified streets. The feasibility report is required under Chapter 429 prior to adopting a resolution ordering the improvement. The City is also working with Dakota County and the Vermillion River Watershed Joint Powers Organization to procure funding to improve the roadside ditches to alleviate drainage issues and improve the water quality of runoff entering South Creek. Primary Issues to Consider This is an industrial area, how will access to properties be maintained during construction? City staff will need to work with the contractor and property owners to determine delivery/route times in order to define approved periods for paving the new roadway surface. Supporting Information Attached is a copy of the letter mailed to affected property owners dated November 6, 2014 and a summary of the comments received at the November 17, 2014 Open House. llt- Monica Heil, PE Operations and Maintenance Engineer Financial Impact: $1,017,476 Budgeted: Yes Source: 429 Bonds Related Documents (CIP, ERP, etc.): Capital Improvement Plan Notes: A portion of the cost is planned to be assessed to the property owners. CITY OF LAKEVILLE RESOLUTION NO: RESOLUTION TO AUTHORIZE THE PREPARATION OF A FEASIBILITY REPORT FOR THE HAMBURG AVENUE IMPROVEMENT PROJECT WHEREAS, the pavement along Hamburg Avenue between Lakeville Boulevard and 2201h Street has reached the end of its lifespan and is programmed to be reconstructed in the City's 2015-2019 Capital Improvement Plan; and WHEREAS, the City of Lakeville wishes to finance a portion of the project through special assessments; and WHEREAS, a feasibility report is required under MN Stat. Chapter 429 for this local improvement; NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Lakeville, that a feasibility report be prepared for the Hamburg Avenue Improvement Project, City Improvement Project 15-05. ADOPTED this I" day of December 2014, by the City Council of the City of Lakeville. CITY OF LAKEVILLE Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk 3 City of Lakeville Pncitinned to ThrivP November 6, 2014 RE: Open House to Discuss the 2015 Hamburg Avenue Improvement Project Dear Property Owner: The City's Capital Improvement Plan (CIP) identifies that Hamburg Avenue, between Lakeville Boulevard and 2201" Street, is recommended for improvement in 2015 based on the City's recently completed pavement management program. The Hamburg Avenue Improvement Project Location Map is enclosed. Prior to moving forward with a project, the City would like to provide you with information regarding the potential project and gather input from adjacent property owners. With this in mind, the City has scheduled an open house as follows: DATE: MONDAY, NOVEMBER 17, 2014 TIME: 2:00- 3:00 PM LOCATION: LAKEVILLE WATER TREATMENT FACILITY (18400 IPAVA AVENUE) City Staff will be in attendance to present information and answer your questions. Please do not hesitate to contact me directly at 952-985-4545 with any questions or concerns you may have about the project. Sincerely, City of Lakeville 1" 4-kA(�r- Monica Heil. PE Operation and Maintenance Engineer 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400.952-985-4499 fax www.lakevillemn.gov Ham bu rg Avenue Improvement project -1 Project Location Feet 0 250 500 1,000 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400. 952-985-4499 fax www.takevillemn.gov Comment Log hemp P Owner Name Pro a owner Address Phone/Final Date Received comment 1 2 Eric Helm _21795/21725 Hamburg_ 6t 4 -1 5 21365 Hamburg Awrin, 952-985-9993 11/17/2016 11/17/2016 Me "talning truck traffic would be my only concem. Planning a paving schedule would be hel Poi par scheulding incoming antl outgping dellverkz. Business -Hobo: Concernzwould be the pplenl1.1 widening of our driveway (which would Include the maven) for Improved truck accesx Would prefer grass to remain in the d itch. Karen Wenlwprth