Loading...
HomeMy WebLinkAboutItem 06ev�Laklte City of Lakeville Parks & Recreation To: Mayor and City Council Justin Miller, City Administrator Brett Altergott, Parks & Recreation Director From: John Hennen, Park Maintenance & Operations Manager Copy: Dave Olson, Community & Economic Development Director Date: February 18, 2015 Subject: Pioneer Plaza Improvements Background During the review of the proposed 2015 budget, staff informed the Mayor and City Council that the pavers in Pioneer Plaza have been and continue to deteriorate. Over the years, staff has replaced the deteriorating pavers to address safety tripping hazards and liability issues in the plaza. As a result of the deterioration that occurs each year, and associated costs and time to make the repairs, staff recommended removing and replacing the pavers during the budget review process. The Mayor and City Council proceeded to approve $37,000 as part of the 2015 Parks Major Maintenance Fund to complete the following: A. Replace the pavers with stamped colored concrete B. Remove and replace the existing water fountain with a new water feature C. Remove and replace existing Spruce tree on the west end of the plaza Proposed Design Features Staff has been working with Architectural Landscape Design, Inc. (ALD) on the Pioneer Plaza improvements. Attached in your packet are colored drawings of the proposed improvements. As you will note, Staff and ALD are proposing to replace the existing pavers with a combination of a standard broom concrete finish in the middle of the walkway surrounded by a stained/stamped concrete border. The stained/stamped concrete material was also used on the sidewalks installed as part of the newly constructed downtown parking lot which abuts Pioneer Plaza. The proposal also includes removing the existing water fountain feature and replacing it with a granite boulder water feature engraved with the original Pioneer Plaza train graphic and dedication wording that is on the existing plaque that was installed as part of a September 15, 1990 dedication of the plaza. G:\Maintenance\Word-Excel\PARKS-MISC\PIONEER PLAZA\Paver Improvements Memo 02-18-15 JLH.docx As part of the granite boulder water feature, a permeable paver system will be installed which will allow for the reuse and recirculation of the water on site. The estimated costs to complete the improvements are within the approved budget. Staff recently presented the plans to the DLBA which were in favor of the proposed improvements. On a side note, there are currently four Lakeville Pioneers that are recognized with a plaque in the plaza which include Nicholas "Nick" Mahowald, Jerry Erickson, Robert "Bob" Jensen and Bud & Louise White. Recommendation Staff recommends the City Council consider directing staff to take the steps to create a bid package and accept quotes for the Pioneer Plaza improvement project. The project could be completed this spring to early summer. Staff and representatives from ALD will be present at the City Council Work Session to review the project with the Mayor and City Council and answer any questions. JLH:jl Attachments G:\Maintenance\Word-Exce11PARKS-MISC\PIONEER PLAZATaver Improvements Memo 02-18-15 JLH.docx This drawing and the papers that accompany it, are the property of Architectural Landscape Design, Inc. They are not to be used as worlang drawings or reproduced in any way without written per- mission of Architectural Landscape Design, Inc. Page 1 of 3 This drawing and the papers that accompany it, are the property of Architectural Landscape Design, Inc. They are as worldng drawings or reproduced in anyway without written permission of Architectural Landscape Design, Inc. Permeable Paver Concept Paver Pattern Engraved Granite Boulder e Example W- Aico I,/ 'ESI �"f?fllE f)�: SIF 4Fd�"A�'R1F; NSS t.M Paver Color Fountain Concept Stone Details PIC�iVEER PLANA PIONEER PLAZA Dedicated by those who laid the foundation for the City of Laketsiile ' r September 15, 1990