Loading...
HomeMy WebLinkAboutItem 06.k 16 Marc Proposed Staff rec specifica Overlays Passage Miscellan Overview City Proj Fire Stati of Jazz C projects Ave.); Ipa Park to 1 The estim project is Dedicatio credit or Building on file an Primary  W  W Supporti  St  R M _______ Monica H Operatio Financia Related D Commun h, 2015 APPRO d Action commends ations and s project, Cit of this mo neous Roadw w ject 15-01 c ion #1, Fire S Court within are also inc ava Avenue 65th Street). mated cons s $1,265,583 on Fund an riginally sub Fund provi nd available Issues to Co What project What is the p ing Informa taff analysis esolution a Miscellaneou _________ Heil, PE ons and Main l Impact: $__ Documents nity Values _ OVE PLANS adoption o setting a b y Project 15 otion will r way Repairs consists of m Station #2 a n the Kenri cluded: 165 e trail reclam . struction co 3. The 2015 d Trail Impr bmitted wit des $536,00 for review i onsider (see ts are includ project finan ation s of primary pproving p us Roadway ________ ntenance En _$1,265,583 (CIP, ERP, et _Good Value AND SPEC of the follo bid date fo 5-01. result in th s and Overla miscellaneou and the rear ick Pond de th St. trail re mation (east st of the 20 Pavement M rovement F th the Kenr 00 for City p n the Opera e attached) ed and why ncing? issues plans and sp Repairs and ngineer 3_______Bu tc.): _______ e for Public CIFICATION owing motio r the 2015 he solicitatio ays project. us roadway Heritage Ce evelopment eclamation t side from 015 Miscella Managemen und will pro rick Pond d parking lot i ations and M y? pecifications d Overlays p dgeted: Y/N __________ Services___ NS AND SE on: Resolu Miscellane on and rec y repairs, reh enter parkin t. The follo (north side the south aneous Roa nt Fund will ovide $167,0 developmen mprovemen Maintenance s and settin roject, City P N __Y__ Sou ___________ ___________ Item ET A BID DA ution appro eous Roadw ceipt of bid habilitation ng lots, and owing parks from Ipava entrance of adway Repa l provide $4 087; a draw nt will provi nts. A copy e Division. ng a bid da Project 15-0 urce: ______ __________ __________ No._______ ATE oving plans way Repairs ds for the of the City the constru s and recre a Ave. to Ke f Steve Mic irs and Ove 478,496; the w on the lett ide $84,000 y of the plan ate for the 01. ___________ ______ ___ __ and s and 2015 Hall, ction ation enrick haud erlays e Park ter of 0; the ns are 2015 ___ Staff Analysis of Primary Issues  What roadway and parking lot projects are included and why? Kenrick Pond Street Extension The Kenrick Pond development, which is located along the south/east side of Kenrick Avenue south of 165th Street, was originally platted in 2004. Soon after platting the property, the proposed user for the lot opted not to move forward with construction, and so there was no driver for completing the public improvements, which include the construction of a cul-de-sac and storm sewer facilities. However, as the property is a lot of record, the request for a building permit to construct the Ballet Royal facilities in 2014 triggered the need to complete the public improvements. Staff will utilize the Letter of Credit that originally required with the development to complete the improvements. City Facility Parking Lots The City Hall, Fire Station #1, Fire Station #2 and the rear Heritage Center parking lots are among the lowest rated in the City. Reclamation of the pavement surface and drainage improvements at the City Hall parking lot will serve to extend the useful life of the existing parking lot sections. Other Repairs such as patching, curb and sidewalk replacement and minor storm sewer repairs are designed to maintain the overall condition and maximize the service life of the road at the best overall cost.  What are the project costs and funding? Total Costs Construction $1,008,939 Contingency & Engineering $256,644 Total Cost $1,265,583 Funding Pavement Management $478,496 Building Fund (Parking Lot Improvements) $536,000 Park Dedication/Trail Improvement Funds $167,087 Kenrick Pond LOC $84,000 Total Funds $1,265,583 Kenrick Pond Improvements associated with the Kenrick Pond development will be financed using the letter of credit originally provided with the development. Pavement Repairs The miscellaneous roadway repairs, as well as the parking lot rehabilitation work at City Hall, Fire Station #1, Fire Station #2 and the rear Heritage Center parking lots, are financed with property taxes accounted for in the pavement management fund and the facilities capital improvement plan, respectively. Parks The park projects are financed from the Park Dedication Fund CITY OF LAKEVILLE RESOLUTION NO._________ RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND SETTING A BID DATE 2015 MISCELLANEOUS ROADWAY REPAIRS AND OVERLAYS CITY PROJECT 15-01 WHEREAS, the Operations and Maintenance Division prepared Plans and Specifications for 2015 Miscellaneous Roadway Repairs and Overlays (City Project 15-01) in accordance with the City’s Pavement Management Program and the 2015 - 2019 Capital Improvement Plan. NOW, THEREFORE, LET IT BE RESOLVED by the City Council of the City of Lakeville, Minnesota: That the Plans and Specifications for City Project 15-01 are hereby approved by the City Council of the City of Lakeville, Minnesota. BE IT FURTHER RESOLVED, that bids will be advertised as required and opened at 10:00 a.m. on Friday, April 17, 2015 at City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota. APPROVED AND ADOPTED this 16th day of March, 2015. CITY OF LAKEVILLE By: Matt Little, Mayor ATTEST: Charlene Friedges, City Clerk