Loading...
HomeMy WebLinkAboutItem 06.e March 13, 2015 Item No.________ SUMMERLYN 4th ADDITION FINAL PLAT MARCH 16, 2015 CITY COUNCIL MEETING Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution approving the final plat of Summerlyn 4th Addition. Adoption of this motion will allow the development of 36 single family residential lots. Overview U. S. Home Corporation (DBA Lennar) has submitted an application and plans for the final plat of 36 single family lots to be known as Summerlyn 4th Addition. The property is located north of 194th Street and east of Dodd Boulevard (CSAH 9). Summerlyn 4th Addition represents the fourth phase of the 139 lot Summerlyn preliminary plat approved by the City Council on November 19, 2012. Seven lots will remain to be final platted in a future phase. The Summerlyn 4th Addition final plat is consistent with the approved Summerlyn preliminary plat. Planning Department, Engineering Division and Parks and Recreation Department staff recommend approval of the Summerlyn 4th Addition final plat. Primary Issues to Consider Why are seven lots remaining to be final platted? The remaining seven future single family lots will be final platted and incorporated into Outlot B following future acquisition of the two remaining single family lots on Dodd Boulevard and completion of the Dodd Boulevard improvement project. Supporting Information • Resolution approving the final plat • Signed development contract, warranty deed, and temporary turn-around easements. • Planning and engineering reports dated March 6, 2015 and March 5, 2015 ____________________________________ Frank Dempsey, AICP, Associate Planner Financial Impact: $_None______Budgeted: Y/N ____ Source: __________________________________________ Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances__________________________________ Envision Lakeville Community Values: A Home for All Ages and Stage of Life______________________________ (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. ______ RESOLUTION APPROVING THE FINAL PLAT OF SUMMERLYN 4th ADDITION WHEREAS, the owner of the property described as SUMMERLYN 4th ADDITION has requested final plat approval; and WHEREAS, the preliminary plat was reviewed by the Planning Commission and the Parks, Recreation and Natural Resources Committee and approved by the City Council; and WHEREAS, the final plat is consistent with the preliminary plat; and WHEREAS, the final plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: 1. SUMMERLYN 4th ADDITION final plat is approved subject to the development contract and security requirements. 2. The Mayor and City Clerk are hereby authorized to sign the development contract and the final plat mylars. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. DATED this 16th day of March 2015 CITY OF LAKEVILLE Matt Little, Mayor ATTEST: _______________________ Charlene Friedges, City Clerk STATE OF MINNESOTA ) CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. _________is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 16th day of March 2015 as shown by the minutes of said meeting in my possession. __________________________ Charlene Friedges City Clerk (SEAL) Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 2 City of Lakeville Planning Department Memorandum To: Daryl Morey, Planning Director From: Frank Dempsey, AICP Associate Planner Date: March 6, 2015 Subject: Summerlyn 4th Addition Final Plat INTRODUCTION U.S. Home Corporation (DBA Lennar) has submitted an application and plans for the final plat of Summerlyn 4th Addition, which includes 36 single family lots located east of Dodd Boulevard (CSAH 9) and north of 194th Street. The Summerlyn preliminary plat of 139 single family lots was approved by the City Council on November 19, 2012. Summerlyn 1st Addition with 36 lots was approved by the City Council April 1, 2013. Summerlyn 2nd Addition with 37 lots was approved on April 7, 2014 and Summerlyn 3rd Addition with 23 lots was approved on August 18, 2014. The lot, block and street design of the Summerlyn 4th Addition final plat is consistent with the approved preliminary plat. The final plat plans have been reviewed by Planning Department, Engineering Division and Parks and Recreation Department staff. EXHIBITS A. Location and Zoning Map B. Approved Summerlyn Preliminary Plat C. Final Plat and Area Sketch (2 Pages) D. Greenway Trail Construction Plan E. Summerlyn Development Area Sketch PLANNING ANALYSIS Zoning. The zoning of the property is RM-1, Medium Density Residential District which allows single family homes subject to the RS-4, Single Family Residential District requirements. 1 Existing Conditions. The Summerlyn 4th Addition final plat area consists of Outlot F, Summerlyn 2nd Addition totaling 13.2 acres. The property includes rolling terrain that was preliminary graded with previous phases of the Summerlyn development. Lot Area. Single family lots within the RS-4 District are required to provide a minimum lot area of 8,400 square feet for interior lots and 10,200 square feet for corner lots. The areas of the lots within Summerlyn 4th Addition meet the minimum square footage required. Lot Width. The minimum lot width for single-family lots within the RS-4 District is 70 feet for interior lots and 85 feet for corner lots. All lots meet the minimum lot width requirement. Setbacks. Setback requirements for single family lots in the RS-4 District are outlined below: Yard Front Side Interior Side Corner Rear Setbacks 20 feet (principal bldg.) 25 feet (garage) 7 feet 20 feet 30 feet The proposed building pads meet the minimum setback requirements for interior and corner lots. Development Density. The Summerlyn 4th Addition final plat consists of 36 single family lots and two outlots on 13.2 acres. This results in a gross density of 2.84 units per acre. The net density, excluding road right-of-way and outlots is 3.49 units per acre. Phasing. Summerlyn 4th Addition is the fourth development phase of the Summerlyn preliminary plat. Seven single family lots remain to be final platted in Outlot B. Lennar soon will begin developing phases of Summerlyn North, located west of Holyoke Avenue and south of 190th Street and Summerlyn Northwest, located south of 190th Street, and east of Dodd Boulevard (CSAH 9). Outlots. There are two outlots proposed with the Summerlyn 4th Addition final plat. • Outlot A is 0.56 acres in area and will be deeded to the City for Greenway Corridor trail and stormwater management purposes. • Outlot B is 1.76 acres in area and will be retained by the developer to be final platted upon future acquisition of the two remaining homes fronting Dodd Boulevard in conjunction with the street improvement project scheduled for 2016. Once those two homes and properties are acquired, Outlot B will be preliminary and final platted into seven single family residential lots. Access. Summerlyn 4th Addition will have access to 194th Street via Indora Trail through Summerlyn 2nd Addition. Streets & Right-of-Way. Summerlyn 4th Addition will include the construction of parts of three residential streets: 2 Indora Trail is a local street that will be 32 feet wide within 60 feet of right-of-way. A five foot wide concrete sidewalk will be constructed on the west side of the street. Impala Way is a local street that will be 32 feet wide within 60 feet of right-of-way. A five foot wide concrete sidewalk will be constructed on the west side of the street. Icicle Avenue is a local street that will be 32 feet wide within 60 feet of right-of-way. A five foot wide concrete sidewalk will be constructed on the southwest side of the street. Temporary Turnarounds. Temporary turnarounds will be required at the north ends of Indora Trail and Impala Way. Temporary turnaround easements will be required from the developer prior to City Council consideration of the final plat. Future street extension signs will be installed at the ends of Indora Trail and Impala Way. These two streets will be extended with the development of the Summerlyn Northwest preliminary plat. Park Dedication and Trails. The City’s Park, Trail and Open Space Plan identifies a Greenway Trail Corridor on the north and east sides of the Summerlyn 4th Addition plat. The developer has met the park dedication requirements with a combination of park land dedication and cash contribution consistent with the approved preliminary plat. The cash fee of $134,830.46 for the Summerlyn 4th Addition final plat is described in the March 5, 2015 engineering report. This cash dedication will complete the land and cash dedication associated with the Summerlyn preliminary plat. An eight foot wide bituminous trail will be constructed in Outlot A as shown on Exhibit D. The trail will be located within north the Greenway Corridor as identified on the approved preliminary plat. Tree Preservation. There are no significant trees in the Summerlyn 4th Addition final plat area. Wetlands. Wetlands were identified within the Summerlyn preliminary plat through a wetland delineation report dated June 18, 2012. There are no wetlands within the Summerlyn 4th Addition final plat. Grading, Drainage and Erosion Control. The final plat includes grading, drainage and erosion control plans. Grading, drainage and erosion control is discussed in more detail in the March 2, 2015 engineering memo. Subdivision Identification Sign. No subdivision sign is proposed with the Summerlyn 4th Addition final plat. 3 RECOMMENDATION The Summerlyn 4th Addition final plat is consistent with the approved preliminary plat and complies with the requirements of the Zoning and Subdivision Ordinances. Planning Department staff recommends approval subject to the following conditions: 1. The recommendations listed in the March 5, 2015 engineering report. 2. Outlot A shall be deeded to the City with the final plat. 3. Five foot wide concrete sidewalks shall be constructed at the developer’s expense as shown on the approved final plat plans. 4. A Greenway Trail Corridor shall be constructed within Outlot A as shown on the approved final plat plans. 5. Temporary turnarounds shall be required at the north ends of Indora Trail and Impala Way. Temporary turnaround cul-de-sacs must be submitted by the developer prior to City Council consideration of the final plat. 6. Future street extension signs shall be installed at the north ends of Indora Trail and Impala Way. cc: Zach Johnson, City Engineer Matt Decur, Civil Engineer Brett Altergott, Parks and Recreation Director Mac Cafferty, Environmental Resources Manager Paul Tabone, U.S Homes Corporation Nick Polta, Pioneer Engineering 4