SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION
MARCH 16, 2015 CITY COUNCIL MEETING
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving
the Spirit of Brandtjen Farm Commercial 2nd Addition preliminary and final plat and Development
Stage PUD, 2) a resolution vacating public drainage and utility easements and street right-of-way,
and 3) a resolution designating “No Parking” areas on Eagleview Drive.
Passage of this motion will allow the construction of public streets and utilities in the Spirit of
Brandtjen Farm planned unit development (SBF PUD).
Overview
SBF Development Corp. representatives are requesting approval of the Spirit of Brandtjen Farm (SBF)
Commercial 2nd Addition preliminary and final plat and Development Stage PUD plans of 13 outlots,
and public easement and right-of-way vacation. SBF Commercial 2nd Addition proposes the
construction of public streets and utilities to serve the commercial area of the SBF PUD located south
of 160th Street (CSAH 46) and east of Pilot Knob Road (CSAH 31).
The Planning Commission held a public hearing on the SBF Commercial 2nd Addition preliminary and
final plat, Development Stage PUD, and easement and right-of-way vacation requests at their March
5, 2015 meeting and unanimously recommended approval. There was no public comment. The
Parks, Recreation and Natural Resources Committee recommended unanimous approval of the
preliminary and final plat at their March 4, 2015 meeting. Staff also recommends approval.
Primary Issues to Consider
None
Supporting Information
• Resolutions approving the preliminary and final plat and Development Stage PUD, vacating
public easements and right-of-way, and designating “No Parking” areas
• Signed development contract, easement agreements, and deeds
• Planning Commission and Parks, Recreation & Natural Resources Committee minutes
• Planning and Engineering reports
__________________________
Daryl Morey, Planning Director
Financial Impact: $____________Budgeted: Y/N ____ Source: _________________________________
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances and SBF PUD______________
Community Values: Diversified Economic Development and A Sense of Community and Belonging__
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE PRELIMINARY AND FINAL PLAT
AND DEVELOPMENT STAGE PUD PLANS FOR
SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm
Commercial 2nd Addition has requested preliminary and final plat and Development
Stage PUD approval; and
WHEREAS, the preliminary and final plat and Development Stage PUD was
reviewed by the Planning Commission and the preliminary and final plat was reviewed
by the Parks, Recreation and Natural Resources Committee; and
WHEREAS, the preliminary and final plat and Development Stage PUD plans
are acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The preliminary and final plat and Development Stage PUD for Spirit of
Brandtjen Farm Commercial 2nd Addition is hereby approved subject to the
development contract and planned unit development agreement, the security
requirements, and the terms and conditions of the Spirit of Brandtjen Farm
Master Planned Unit Development Stage Plan Agreement dated October 17,
2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
APPROVED AND ADOPTED this 16th day of March, 2015.
CITY OF LAKEVILLE
BY: _____________________
Matt Little, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 16th day of March 2015, as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO._________
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
AND STREET RIGHT-OF-WAY IN SPIRIT OF BRANDTJEN FARM
WHEREAS, the Planning Commission has conducted a public hearing, preceded
by two (2) weeks published notice, to consider the following described easement and
right-of-way vacation, and
WHEREAS, the City Council has determined that it is in the public interest to
approve the easement and right-of-way vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following drainage and utility easements are hereby vacated:
Vacation of the drainage and utility easements over, under and across Outlot F,
SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, according to the
recorded plat thereof, Dakota County, Minnesota, as dedicated per plat of said
SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, and
Vacation of the drainage and utility easements over, under and across Outlots
AA, EE and GG, SPIRIT OF BRANDTJEN FARM, according to the recorded plat
thereof, Dakota County, Minnesota, as dedicated per plat of said SPIRIT OF
BRANDTJEN FARM, and
Vacation of the drainage and utility easements over, under and across Outlot B,
DIAMONTE AT SPIRIT OF BRANDTJEN FARM, according to the recorded plat
thereof, Dakota County, Minnesota, as dedicated per plat of said SPIRIT OF
BRANDTJEN FARM, SPIRIT OF BRANDTJEN FARM 3RD ADDITION, SPIRIT
OF BRANDTJEN FARM 7TH ADDITION, SPIRIT OF BRANDTJEN FARM 10TH
ADDITION, and DIAMONTE AT SPIRIT OF BRANDTJEN FARM, according to
the recorded plats thereof, all in Dakota County, Minnesota.
2. The following public right-of-way hereby vacated:
That part of Eagleview Drive, as dedicated per plat of SPIRIT OF BRANDTJEN
FARM, according to the recorded plat thereof, Dakota County, Minnesota, lying
northeasterly of the following described line and its northwesterly and
southeasterly extensions:
Beginning at the most easterly corner of Lot 1, Block 12, said SPIRIT OF
BRANDTJEN FARM; thence southeasterly to the northerly corner of Lot 1,
Block 4, SPIRIT OF BRANDTJEN FARM 8TH ADDITION, according to the
recorded plat thereof, Dakota County, Minnesota and said line there
terminating.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
DATED this 16th day of March, 2015.
CITY OF LAKEVILLE
_____________________
Matt Little, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 16th day of March, 2015, as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS
ON EAGLEVIEW DRIVE
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the section of Eagleview Drive in Spirit of Brandtjen Farm
Commercial 2nd Addition will be constructed to allow a single traffic lane in each
direction with no parking consistent with the approved street sections in the Spirit of
Brandtjen Farm planned unit development, and
WHEREAS, establishing “No Parking” areas on Eagleview Drive will discourage
potential on-street parking, maintain sufficient access to the traffic lanes, provide
increased sight lines for drivers, and reduce the interaction between vehicles and
pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that, except for the east side of
Eagleview Drive adjacent to Outlot B, both sides of Eagleview Drive in Spirit of
Brandtjen Farm Commercial 2nd Addition shall be designated “No Parking” anytime.
DATED this 16th day of March, 2015.
CITY OF LAKEVILLE
By: ________________________________
Matt Little, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
MEMORANDUM
TO: Daryl Morey
FROM: Daniel Licht, AICP
DATE: 26 February 2015 (Revised 12 March 2015)
RE: Lakeville – SBF Commercial 2nd Addition
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted plans for SBF Commercial 2nd Addition to
provide for construction of public streets and utilities within the north half of the SBF
development connecting Eagle View Drive to 160th Street (CSAH 46) and 162nd Street
to Eagle View Drive. The subject site is zoned PUD, Planned Unit Development
District as approved by the City Council on 20 June 2005. The submitted plans involve
consideration of a preliminary and final plat and PUD Development Stage Plan, as well
as vacation of existing right-of-way and drainage and utility easements. A public
hearing has been noticed for the Planning Commission meeting on 5 March 2015 to
consider the applications.
Exhibits:
A. Aerial Location Map
B. SBF PUD Master Land Use Plan
C. SBF PUD Master Site Plan
D. SBF Commercial 2nd Addition Title Sheet
E. SBF Commercial 2nd Addition Preliminary Plat (4 pages)
F. Preliminary Erosion & Sediment Control Plan (4 pages)
G. Preliminary Grading & Drainage Plan (4 pages)
H. Preliminary Utility Plan (4 pages)
I. Preliminary Street Plan and Details (6 pages)
J. ROW and Easement Vacation Sketch (2 pages)
K. SBF Commercial 2nd Addition Final Plat (3 pages)
ANALYSIS
SBF Land Use Plan. Land uses within SBF are regulated based upon the SBF Master
Land Use Plan included within the SBF PUD Booklet dated 20 June 2005. No land
uses are shown on the submitted plans. Unless approved by amendment of the
Comprehensive Plan and SBF PUD District, the following land use designations will
apply to the outlots within SBF Commercial 2nd Addition and corresponding land uses
allowed by the PUD District:
Outlot Comprehensive Plan SBF Land Use
A Open Space Storm water basin
B Open Space HOA Irrigation Building
C L/M Density Residential Single Family
D Open Space Storm water basin
E Open Space City Greenway Trail Corridor
F L/M Density Residential
Med. Density Residential
High Density Residential
Multi-Family/ Future City
Greenway Trail Corridor
G Med. Density Residential
High Density Residential
Multi-Family/
Residential Village
H Open Space Wetland/City Trails/City
Greenway Trail Corridor
I High Density Residential Multi-Family
J Street HOA maintained center island
K Office/Residential Transition Residential Village
L Office/Residential Transition Residential Village
M High Density Residential Multi-Family
Site Plan Modifications. The site design for the area included in SBF Commercial 2nd
Addition is different than shown on the SBF Master Land Use Plan. The northerly
traffic circle was to be a three legged intersection with a significant water feature
extending south as a visual focal point. The proposed site plan has the traffic circle
functioning as a four-way intersection and the alignment of Eagleview Drive to the south
is shifted west absorbing planned open space, but takes advantage of changes in
topography and the alignment of the roadway to create vistas of open space adjacent to
the roadway and the man-made lake and Brandtjen Farmstead Preservation Area to the
south. The revised layout of Eagleview Drive eliminates a traffic circle that was to be
constructed at the current terminus of the street, which is beneficial from a maintenance
standpoint.
Streets. The Transportation Plan designates Eagleview Drive as a minor collector
street between 160th Street and 170th Street and is designed with a divided section that
complies with MSA standards. A landscape plan for the median must be submitted.
The divided roadway narrows to an undivided street with a 31 foot width inside a 70 foot
right of-way between storm water basins on either side of the roadway just north of the
2
regional greenway corridor. Prior to City Council consideration of the preliminary and
final plat, the plans must be revised to increase the width of this segment of Eagleview
Drive to 36 feet. In addition, Eagleview Drive must be posted as “No Parking”. As
noted above, the proposed layout of Eagleview Drive eliminates the planned south
traffic circle and the right-of-way that was previously dedicated must be vacated as part
of the preliminary and final plat applications to allow for the proposed design. The
section of 162nd Street between Elmhurst Lane and Eagleview Drive will be a 44 foot
wide street within an 80 foot right-of-way consistent with the design for 162nd Street
approved with SBF Commercial 1st Addition. The roadway divides with a center
median approaching the traffic circle intersection with Eagleview Drive. All streets are
subject to review and approval of the City Engineer.
Sidewalks. Sidewalks are provided on both sides of public streets. The sidewalk on
the north side of 162nd Street adjacent to the future commercial development is eight
feet wide and the sidewalk on the south side of the street adjacent to the future
residential development is five feet wide consistent with the approvals for SBF
Commercial 1st Addition. The sidewalks on Eagleview Drive between 160th Street
(CSAH 46) and 162nd Street are shown as five feet wide and must be increased to eight
feet wide consistent with the requirements for sidewalks in commercial areas. South
of 162nd Street, the sidewalks adjacent to Eagleview Drive are five feet wide appropriate
for the planned residential use abutting this section of roadway.
Park Dedication. The submitted plans provide for the open space connection from
East Community Park to Eagleview Drive, a box culvert crossing to be funded by
Dakota County under Eagleview Drive and a trail connection back to the east side of
Eagleview Drive. Outlots E and H are to be deeded to the City for public trail purposes.
Additional park dedication, either as land or a cash fee in lieu of land, will be required
with the final plats of the future development outlots within SBF Commercial 2nd
Addition.
Grading Plan. The applicant has submitted grading plans for the proposed SBF
Commercial 2nd Addition. Outlots A, D and H encompass storm water basins and are to
be deeded to the City. The grading, drainage and erosion control plans are subject to
review and approval by the City Engineer.
Utility Plan. The applicant has submitted plans for extension of public utilities with the
street construction within the proposed SBF Commercial 2nd Addition. These plans are
subject to review and approval by the City Engineer.
Easements. The preliminary plat illustrates 10 foot wide drainage and utility easements
adjacent to the public right-of-way for Eagleview Drive and 162nd Street as required by
Section 10-4-4 of the Subdivision Ordinance. All easements are subject to review and
approval by the City Engineer.
Development Contract. The developer is required to enter into a development
contract with the City for the public and private improvements, payment of applicable
fees and posting of required securities. The development agreement will be drafted by
3
the City Attorney and the developer is required to execute the development agreement
prior to City Council approval of the final plat.
CONCLUSION
The submitted plans for SBF Commercial 2nd Addition involves only construction of
street and utility infrastructure and trails that will provide for a continuation of
development within Spirit of Brandtjen Farm in the area where gravel mining activities
have ceased. City staff and our office recommend approval of the applications subject
to the following conditions:
1. Unless approved by amendment of the Comprehensive Plan and SBF PUD
District, the following land use designations will apply to the outlots within SBF
Commercial 2nd Addition and corresponding land uses allowed by the PUD
District:
Outlot Comprehensive Plan SBF Land Use
A Open Space Storm water basin
B Open Space HOA Irrigation Building
C L/M Density Residential Single Family
D Open Space Storm water basin
E Open Space City Greenway Trail Corridor
F L/M Density Residential
Med. Density Residential
High Density Residential
Multi-Family/ Future City
Greenway Trail Corridor
G Med. Density Residential
High Density Residential
Multi-Family/
Residential Village
H Open Space Wetland/City Trails/City
Greenway Trail Corridor
I High Density Residential Multi-Family
J Street HOA maintained center island
K Office/Residential Transition Residential Village
L Office/Residential Transition Residential Village
M High Density Residential Multi-Family
2. The developer shall submit a landscape plan and cost estimate for the Eagleview
Drive medians.
3. The sidewalks adjacent to Eagleview Drive from 160th Street to 162nd Street
(including the north half of the traffic circle) shall be revised to be eight feet wide.
4. Outlots E and H shall be deeded to the City for trail purposes.
4
5. Outlots A and D shall be deeded to the City for storm water management
purposes.
6. Prior to release of the final plat mylars, the plans must be revised to increase the
width of the undivided segment of Eagleview Drive to 36 feet. Eagleview Drive
must be posted as “No Parking”.
7. All street sections and construction plans are subject to review and approval of
the City Engineer.
8. All grading, drainage and erosion control plans are subject to review and
approval of the City Engineer.
9. All utility plans are subject to review and approval of the City Engineer.
10. The proposed right-of-way and drainage and utility easement vacation shall be
subject to approval of the SBF Commercial 2nd Addition final plat.
11. The developer is required to execute a development agreement with the City
prior to City Council approval of the final plat.
c. Justin Miller, City Administrator
Brett Altergott, Parks and Recreation Director
Zach Johnson, City Engineer
Alex Jordan, Assistant City Engineer
Roger Knutson, City Attorney
5
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Civil Engineer
McKenzie Cafferty, Environmental Resources Manager
Brett Altergott, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Dennis Feller, Finance Director
Gene Abbott, Building Official
Date: February 27, 2015, REVISED March 11, 2015
Subject: Spirit of Brandtjen Farm Commercial 2nd Addition
• Final Plat Review
• Final Grading Plan Review
• Utility Plan Review
• Final Erosion Control Plan Review
• Final Tree Preservation Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm
Commercial (SBFC) 2nd Addition. The proposed development is located south of and adjacent
to 160th Street (CSAH 46), east of and adjacent to Elmhurst Lane, north of 170th Street and
west of future Diamond Path (CSAH 33). The parent parcels consists of Outlot F, Spirit of
Brandtjen Farm Commercial 1st Addition; Outlots AA, EE, GG, and TT, Spirit of Brandtjen Farm;
Outlot B, Diamonte at Spirit of Brandtjen Farm; and Outlot C, Spirit of Brandtjen Farm 6th
Addition. The Development is zoned PUD, Planned Unit Development. The Developer is
dedicating 0.12 acres as County right-of-way (CSAH 46).
The final plat consists of thirteen (13) outlots. The outlots created with the final plat will have
the following uses:
Outlot A: Stormwater management basins and trails; to be deeded to the City (14.19
acres)
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 22
Outlot B: Private Irrigation Pumping Building; to be retained by the Developer (0.23
acres)
Outlot C: Future Residential Development; to be retained by the Developer (33.90 acres)
Outlot D: Stormwater management basin; to be deeded to the City (2.72 acres)
Outlot E: Greenway Corridor, pedestrian underpass and trails; to be deeded to the City
(1.07 acres)
Outlot F: Future Residential Development and Future Greenway Corridor; to be retained
by the Developer (36.30 acres)
Outlot G: Future Residential Development and existing wash basin; to be retained by the
Developer (15.13 acres)
Outlot H: East Lake Wetland, Greenway Corridor, and existing trails; to be deeded to the
City (5.32 acres)
Outlot I: Future Residential Development and existing wash basin; to be retained by the
Developer (5.42 acres)
Outlot J: Landscaped Median Island in Roundabout; to be retained by the Developer
(0.07 acres)
Outlot K: Future Commercial Development; to be retained by the Developer (5.12 acres)
Outlot L: Future Commercial Development; to be retained by the Developer (12.09acres)
Outlot M: Future Residential Development and existing wash basin; to be retained by the
Developer (16.67 acres)
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site was previously a gravel processing operation. The gravel processing on the parent
parcels has been completed and the site encroachments are in the process of being removed. An
existing office building and parking lot is located along the interior gravel roadways, adjacent to
the gravel processing site on Outlot EE, Spirit of Brandtjen Farm. The Developer requests to leave
the building in place, with plans to maybe utilize it as a future amenity for the Development. All
other site encroachments shall be removed with the final plat improvements, including but not
limited to the parking lot, processing equipment, signs, mailboxes, and outbuildings. A $20,000
security will be required with the final plat for the removal of the site encroachments.
The site has a gently sloped topography predominately downward from north to south. Two
existing wash basins are located within Outlot F, SBFC 1st Addition and Outlot EE, Spirit of
Brandtjen Farm. These basins were constructed for sand processing of the gravel operations, to
be referred to as Nordic 1 and Nordic 2. Several other stormwater management basins exist on
the parent parcels that were constructed to treat the runoff generated from the previously
constructed residential developments.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 33
EEAASSEEMMEENNTT VVAACCAATTIIOONN
Several public easements currently exist on the parent parcels and will be vacated contingent
upon City Council approval of the final plat:
• 10-foot wide drainage and utility easement per SBFC 1st Addition plat, located on
Outlot F, SBFC 1st Addition.
• 20-foot wide drainage and utility easement, per Spirit of Brandtjen Farm plat, located
on Outlots GG, and EE, Spirit of Brandtjen Farm.
• 30-foot wide drainage and utility easement, per Spirit of Brandtjen Farm plat, Spirit of
Brandtjen Farm 3rd Addition plat, Spirit of Brandtjen Farm 7th Addition plat, Spirit of
Brandtjen Farm 10th Addition plat, and Diamonte at Spirit of Brandtjen Farm plat,
located on Outlot B, Diamonte at Spirit of Brandtjen Farm.
• Drainage and utility easement per Spirit of Brandtjen Farm plat, located within Outlot
AA, Spirit of Brandtjen Farm.
• Temporary public turnaround easement located on Outlot B, Diamonte at Spirit of
Brandtjen Farm. This easement will expire upon approval of the final plat. The
Developer shall dedicate a temporary turnaround easement to replace the easement
to expire for the temporary cul-de-sac constructed within the outlot.
The following easements exist on the parent parcels and will remain with the development
and not be impacted:
• 20-foot wide public right-of-way, drainage, and utility easement per Doc. No. 1656358.
• 35-foot wide Metropolitan Council Sanitary Sewer Easement per Doc. No. 1292581.
RRIIGGHHTT--OOFF--WWAAYY VVAACCAATTIIOONN
The existing Eagleview Drive terminates just east of Dynamic Drive. The PUD Master Site Plan
identified the location just east of the roadway terminus to include the construction of a
roundabout. The Developer has decided that an intersection at the roundabout location is no
longer feasible, and will extend the roadway through the proposed roundabout location.
Right-of-way for the roundabout on Eagleview Drive was dedicated with the plat of Spirit of
Brandtjen Farm. This right-of-way is no longer required and the Developer requests that it be
vacated with the final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
SBFC 2nd Addition is located south of and adjacent to 160th Street, a minor arterial roadway as
identified in the City’s Transportation Plan. 160th Street adjacent to the site is a four lane divided
urban roadway, with a continuous concrete center median island. Dakota County controls the
right-of-way requirements and access locations along 160th Street. The Dakota County Plat
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 44
Review Needs Map, dated April 16, 2013, indicates a half right-of-way requirement of 100-feet
and designates this roadway as a future six-lane divided urban roadway over its entire length
adjacent to the plat. The widening of 160th Street is not identified in the City’s or County’s current
Capital Improvement Plans. 160th Street is currently constructed within a 200-foot right-of-way
adjacent to Outlot L, and 185-foot right-of-way adjacent to Outlots G and K. The Developer is
dedicating additional right-of-way for 160th Street adjacent to Outlots G and K to satisfy the
County’s right-of-way requirement. The final plat was reviewed and recommended for approval
by the Dakota County Plat Commission at their January 26, 2015 meeting.
Eastbound right and westbound left turn lanes exist along 160th Street at the proposed Eagleview
Drive intersection, aligning with Elm Creek Lane to the north in Apple Valley. This intersection will
provide a full access for SBFC 2nd Addition, and meets the County’s ½ mile spacing guidelines for
160th Street. The Developer shall coordinate with Dakota County for any additional improvements
that will be required along 160th Street.
Diamond Path (CSAH 33)
SBFC 2nd Addition is located west of and adjacent to Diamond Path, a future major collector
roadway as identified in the City’s Transportation Plan. The Dakota County Road Plat Review
Needs Map identifies Diamond Path as a future four-lane undivided County State Aid
Highway with a ½ right of way requirement of 60 feet. 80-feet of right-of-way for Diamond
Path adjacent to the plat was dedicated with the Diamonte at Spirit of Brandtjen Farm plat.
The additional right-of-way required for Diamond Path will be provided on the adjacent
property located in Empire Township. No additional right-of-way is required at this time.
The construction of Diamond Path is not identified in the City’s or County’s current Capital
Improvement Plans.
Eagleview Drive
Development of SBFC 2nd Addition includes the construction of Eagleview Drive, a minor
collector roadway as identified in the City’s Transportation Plan. The proposed construction of
Eagleview Drive will connect the existing roadway terminus to 160th Street.
The roadway design and right-of-way for Eagleview Drive varies over its entire length as
follows:
• 100-feet of right-of-way from 160th Street to just south of the 162nd Street intersection.
Designed as a divided urban roadway with one 16-foot lane in each direction and a
continuous concrete center median. 5-foot wide concrete sidewalks will be
constructed along both sides of the street, with the exception of an 8-foot wide
concrete sidewalk along the west side from 160th Street to 162nd Street. The design of
Eagleview Drive includes the construction of dedicated left and right turn lanes at the
intersection with 160th Street. In addition, median openings and curb radii will be
constructed at the proposed locations for future intersections, meeting the City’s
spacing guidelines.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 55
• 70-feet of right-of-way from just south of the 162nd Street intersection to the location
of the future greenway corridor. Designed as a 31-foot wide undivided urban roadway
with 5-foot wide concrete sidewalks along both sides of the street. The Developer shall
design Eagleview Drive to a 36-foot wide undivided roadway, prior to City Council
consideration of the final plat.
• 130-feet of right-of-way from the future location of the greenway corridor to the
existing terminus. Designed as a divided urban roadway with one 16-foot lane in each
direction and a continuous landscaped center median. The median width varies from
10-feet to 50-feet along this segment to allow for a unique landscaped design for the
transition between residential and commercial development. 5-foot wide concrete
sidewalks will be constructed along both sides of the street. Median openings and
curb radii will be constructed at the proposed locations for future intersections,
meeting the City’s spacing guidelines.
The 50-foot wide landscaped median will provide a limited sight distance for drivers entering
or existing Eagleview Drive. The Developer is required to provide the required sight distance
and therefore will adjust the landscaping in the median to meet this requirement. In addition,
street signage consisting of one way and yield signs may be required to maintain safe traffic
along this roadway. The street signage will be further reviewed with the final construction
plans.
162nd Street
Development of SBFC 2nd Addition includes the construction and extension of 162nd Street, a
minor collector commercial roadway as identified in the City’s Transportation Plan. 162nd
Street is being constructed with the SBFC 1st Addition improvements and is designed as a 44-
foot wide two-lane urban roadway, within 80-feet of right-of-way. A portion of 162nd Street is
divided by a concrete median island, while west of the intersection with Eagleview Drive will
include a striped continuous center to center left turn lane. 8-foot wide concrete sidewalks
will be installed along the north side of the street adjacent to the future commercial
development and a 5-foot wide concrete sidewalk will be installed along the south side
adjacent to the future residential development.
162nd Street will provide a connection to Eagleview Drive and Elmhurst Lane and will be
extended east in the future to provide a collector roadway to the future residential
development. Future street extension signs and barricades shall be installed at the terminus
of 162nd Street, until it is extended in the future.
Eagleview Drive/162nd Street Intersection
Development of SBFC 2nd Addition includes the construction of a single lane roundabout at
the intersection of Eagleview Drive and 162nd Street. The roundabout construction includes a
landscaped median island that will be privately owned and maintained within Outlot J, SBFC
2nd Addition. The roundabout design shall be reviewed by the City’s traffic engineering
consultant prior to approval of the final construction plans and shall be paid for 100% by the
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 66
Developer. 5-foot wide concrete sidewalks will be installed circulating the roundabout, with
pedestrian curb ramps installed within the median islands.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for SBFC 2nd
Addition shall be restricted to Eagleview Drive by way of 160th Street.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of SBFC 2nd Addition includes the construction of public sidewalks and trails. 5-
foot wide concrete sidewalks will be constructed along both sides of the collector roads
within the development. 8-foot wide concrete sidewalks will be constructed along the north
side of 162nd Street and along the west side of Eagleview Drive, north of 162nd Street, adjacent
to the future commercial development parcels.
The Parks, Trails and Open Space Plan identifies the area of the parent parcels as a location for
a future greenway corridor and trail system. The greenway corridor will follow the alignment
of the existing Metropolitan Council Sanitary Sewer easement, extending from the existing
trail located north of East Lake. The Developer proposes to construct a portion of this
greenway corridor trail, which includes the construction of trails and a 10-foot by 12-foot
pedestrian underpass under Eagleview Drive. The pedestrian underpass will allow for a
continuous extension of the existing greenway corridor to the northeast, connecting to the
existing corridor in the Cobblestone Lake development in Apple Valley. The Developer will
construct bituminous trails within Outlots E and H to provide connections to the greenway
corridor from an existing trail network within Spirit of Brandtjen Farm. In addition, the
Developer shall pave the existing gravel trails located within Outlot H, SBFC 2nd Addition and
Outlots VV and XX, Spirit of Brandtjen Farm. The City will credit the Developer’s cash fees the
cost of the bituminous pavement and aggregate base for the public trail construction with
the final plat, estimated as follows:
(325 tons X $91.30/ton) +(13,750 tons X $16.50/ton) = $52,360.00
Bituminous Trail
Quantity (tons)
Bituminous Unit Cost Aggregate Base for Trail
Quantity
Aggregate Base Unit
Cost
Total Credit to the
Developer’s Park Dedication
Requirement
The private trails within the City-owned Outlot E that will be publicly accessible, and privately
maintained by the homeowners association. The City will grant the Developer an access
easement within Outlot E for maintenance purposes.
The pedestrian underpass will be subject to issuance of a building permit and the City’s
Building Official must approve the plans. The pedestrian underpass must meet all MnDOT
requirements. A registered structural engineer must design the pedestrian underpass and
certify the inspection and installation. The Developer shall pay for and install the pedestrian
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 77
underpass. The City will reimburse the Developer the cost of the pedestrian underpass, to be
determined prior to final plat consideration, when the following conditions have been met:
• The City has inspected and accepted the pedestrian underpass improvements.
• Dakota County has provided the City with the full amount of the agreed upon
reimbursement of the pedestrian underpass installation.
The Parks, Trails, and Open Space Plan also identifies a 10-foot wide bituminous trail along the
south side of 160th Street adjacent to the development. The trail will be constructed at the
time that Outlots G, K, and L are final platted into lots and blocks.
The Park Dedication fee has not been collected on the parent parcels and will be satisfied
through a cash contribution that must be paid with the final plat. The Park Dedication fee for
commercial areas in SBF is $5,400 per acre, consistent with the SBF Master PUD Agreement.
The park dedication requirement is calculated as follows:
Total Area of the SBFC 2nd Addition Final Plat 157.98 acres
Less:
County Road Right-of-Way (CSAH 46) -0.12 acres
Outlots A, C, D, E, F, G, H, I, K, L, M -147.91 acres
ROW Adjacent to Residential Development -7.59 acres
Commercial Park Dedication Area Required 2.36 acres
The area within the plat that will be commercial development will be along the north side of
162nd Street and east and west side of Eagleview Drive. The $5,400/acre commercial park
dedication rate will be applied to the right-of-way area dedicated for these street segments,
estimated as follows:
2.36 acres X $5,400/acre = $12,744.00
Eagleview Drive Right-of-Way and
162nd Street ½ Right-of-Way
Commercial Park Dedication Rate Total
If the outlots adjacent to Eagleview Drive or 162nd Street right-of-way are developed as a land
use other than Commercial, the Developer shall receive a credit to the Park Dedication for the
difference in land use at the time the outlots are final platted into lots and blocks.
The Developer shall receive a credit to the Park Dedication for the area to be dedicated as
park land, calculated at the Detached Dwelling Unit rate of $45,343/acre consistent with the
SBF Master PUD Agreement. The Park Dedication credit is calculated as follows:
1.41 acres X $45,343/acre = $63,933.63
Outlot E and Portion of Outlot H to
be Deeded as Park Land
Detached Dwelling Unit Rate Total
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 88
The Park Dedication Fee and cash escrow for trail construction costs along 160th Street will be
required at the time the outlots are final platted into lots and blocks at a rate consistent with
the Master PUD Agreement.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
SBFC 2nd Addition is located within sub-district NC-20060 of the North Creek sanitary sewer
district as identified in the City’s Comprehensive Sewer plan. No wastewater will be generated
with the development of SBFC 2nd Addition.
The Comprehensive Sewer Plan identifies the construction of 10-inch sanitary sewer,
extending from existing 33-inch Metropolitan Council trunk sanitary sewer. The Developer
will construct 10-inch sanitary sewer from the trunk sewer along Eagleview Drive to the
intersection with 162nd Street, consistent with the Comprehensive Plan. The Developer will
receive a credit for the over-sizing of sanitary sewer from 8-inch to 10-inch within Eagleview
Drive. The credit will be applied to the Developer’s cash requirements with the final plat and
is estimated as follows:
1,823 LF x $2.55 = $4,647.46
Quantity of 10-inch sanitary sewer within Eagleview Drive Oversizing Cost Total
8-inch sanitary sewer will be extended to the north of 162nd Street and west of Eagleview
Drive to serve the future commercial and residential development. The 8-inch sanitary sewer
that will be extended to the west will provide service to the outlots platted with SBCF 1st
Addition. The portion of sanitary sewer within SBFC 1st Addition will be constructed once the
sanitary sewer is extended from the south within SBFC 2nd Addition.
Public 8-inch sanitary sewer will be extended to the outlots platted with SBFC 2nd addition to
provide service to the future residential and commercial development areas. The extension of
the services to the outlots is allowed to reduce the construction impacts of excavating the
roadway to install services in the future. The public sanitary sewer on the outlots will be
located within temporary drainage and utility easements.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must
be paid at the time the outlots are final platted into lots and blocks, at the rate in effect at the
time of final plat approval.
WWAATTEERRMMAAIINN::
12-inch watermain is being installed along 162nd Street to the west plat boundary of SBFC 2nd
Addition with the SBFC 1st Addition improvements. The City’s Comprehensive Water Plan
identifies 12-inch trunk watermain to be constructed along 162nd Street to Eagleview Drive,
and along Eagleview Drive from 162nd Street south to the 12-inch watermain located at the
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 99
existing terminus of the road. The Developer will construct the trunk watermain, in
accordance with the Comprehensive Water Plan. The Developer will receive a credit for the
trunk watermain oversizing from 8-inch to 12-inch that is not adjacent to commercial
development. The credit will be applied to the Developer cash requirements with the final
plat and is estimated as follows:
(2877 LF x $17.43) +$14,674.11 = $64,820.22
Quantity of 12-inch watermain
within Eagleview Drive
Oversizing Cost Oversized Fittings
Cost
Total
Public 8-inch watermain will be extended to the outlots platted with SBFC 2nd addition to
provide service to the future residential and commercial development areas. The extension of
the services to the outlots is allowed to reduce the construction impacts of excavating the
roadway to install services in the future. The public watermain on the outlots will be located
within temporary drainage and utility easements.
The proposed sanitary sewer and watermain layout is in accordance with the City’s
Comprehensive Sewer and Water Plan. Final locations and sizes of all sanitary sewer and
watermain facilities shall be reviewed by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
An overhead power line and poles are located on the parent parcels extending from 160th
Street along the proposed Eagleview Drive to provide power to the existing building and
gravel processing operation. Consistent with City policy, the overhead power lines and poles
that serve the existing building shall be buried or removed with the Development of SBFC 2nd
Addition. These lines shall be removed or buried as they conflict with the roadway
improvements. A $10,000 security will be required with the final plat for the removal of the
overhead utilities. All other overhead lines located on outlots in the development will be
required to be buried as the outlots are final platted into lots and blocks.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
BBAACCKKGGRROOUUNNDD
Spirit of Brandtjen Farm (SBF) is a planned unit development of which development began in
2005. The proposed development encompasses nearly all of the north half of Section 1,
Township 114 Range 20 and a substantial portion of the south half of said section. The initial
stormwater modeling and drainage plan for SBF, located on the south half of Section 1, was
prepared by Westwood Professional Services. The original design consisted of a main basin,
Spirit, surrounded by six National Urban Runoff Program (NURP) basins.
The Spirit basin design did not include a gravity outlet other than infiltration. A system of
pumps was incorporated into the design to serve three functions: 1) Irrigation supply, 2)
Recirculation for water features, and 3) Drawdown, if needed. During 2008, a decision was
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1100
made to not construct the recirculation features. As a result, the proposed pumping station
was not constructed, however, the pump station draw intake line was.
As development has continued, Spirit basin appears to have adequately infiltrated all runoff
from the development without the presence of the pumping system.
A gravel processing area has been in operation on the north half of Section 1 in excess of forty
years. As part of gravel operations years ago, two basins were constructed as wash basins for
sand processing. The operational need for these basins ended approximately five years ago
and a reclamation plan was prepared for the gravel processing area. As part of the
reclamation plan, the two existing basins were measured and quantified, and incorporated
into the reclamation plan with intended use as stormwater management basins. These two
basins are referred to as Nordic 1 (westerly basin) and Nordic 2 (easterly basin).
PPRROOPPOOSSEEDD SSTTOORRMMWWAATTEERR MMAANNAAGGEEMMEENNTT PPLLAANN
SBFC 2nd Addition is located within the North Creek drainage district as identified in the City’s
Water Resources Management Plan. The plat is located within sub-districts NC-9B, NC-10, NC-
11A, NC-11C, NC-13,NC-14A, and NC-14B.The North Creek Stormwater District management
plan identifies a regional basin, NC-14-1, in this area. Nordic 1 and Nordic 2 basins are
intended to fulfill the intent of Basin NC-14-1.
The proposed stormwater management plan is a regional plan that connects the new SBF
commercial areas with the existing SBF residential phases and discharges to the existing Spirit
basin system. A major component of the proposed stormwater management system will be
the installation of a trunk irrigation system to serve green spaces and landscaped areas
throughout the SBF development. A portion of the SBF development is currently being
irrigated with the public potable system but will be converted over to the proposed
stormwater management system. The source for the irrigation system will be Spirit basin. The
Developer will construct a privately owned and maintained irrigation pumping building on
Outlot B, connecting to the existing pump station draw line. The Developer will install a 10-
inch private forcemain from the pumping building adjacent to Eagleview Drive and 162nd
Street, on private property. This forcemain will be privately owned and maintained. An
encroachment agreement will be required for the construction of the forcemain on any City
owned property. The agreement must be finalized prior to construction of the private utilities.
The proposed stormwater management system for SBFC 2nd Addition will collect a portion of
runoff generated from 162nd street in the trunk storm sewer system that will then outlet to
two in-line temporary sedimentation basins which will provide pre-treatment and infiltration
prior to discharging to Nordic 1. The construction of the two temporary sedimentation basins
will occur as part of the SBFC 1st Addition improvements. The temporary sedimentation basins
will be located within a temporary drainage and utility easement.
The majority of the runoff from SBFC 2nd Addition will collect within the trunk storm sewer
system and discharge to Nordic 1. The Developer is proposing to cross connect Nordic 1 and
Nordic 2 to equalize the water surfaces of the two basins, then outlet Nordic 2 to an existing
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1111
stormwater basin in Outlot D, which outlets to Spirit basin. The intent of the two Nordic basin
outlet controls is to capture and retain as much runoff as possible and control the discharge
to Spirit basin for irrigation uses. Nordic 1 basin will also have a secondary outlet to East Lake.
As part of the Spirit of Brandtjen Farm improvements, an outlet from East Lake was partially
constructed, allowing East Lake to discharge to the downstream stormwater management
basins, to be used as irrigation. The Developer shall remove this outlet with the SBFC 2nd
Addition improvements, as discharging a public and impaired water to the public stormwater
management system is not permitted.
An as-built certified grading plan will be required within 30-days of final stabilization of the
disturbed areas to verify that the basins were constructed in accordance with the final
grading plan.
The final grading plan must indicate any proposed borrow areas. Any borrow area locations
must be approved by the City Engineer prior to the commencement of the borrow activity.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of SBFC 2nd Addition includes the construction of a public storm sewer system.
Storm sewer will be installed to collect and convey stormwater runoff generated from the
streets and open space within the development. The constructed public storm sewer will be
located within public right-of-way and/or temporary public drainage and utility easements
until the outlots are final platted into lots and blocks. The storm sewer will convey the runoff
to the stormwater management basins within the development.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and shall be
paid with the final plat and is calculated as follows:
Gross Area of the SBFC 2nd Addition Final Plat 6,881,739.00 s.f.
Less Area of County Road Right-of-Way (CSAH 46) (-) 5,080.00 s.f.
Less Area of Outlots A, C, D, E, F, G, H, I, K, L, M, (-) 6,443,127.00 s.f.
Total Area required to pay Trunk Storm Sewer Area Charge = 433,532.00 s.f.
The area within the plat that will be commercial development will be along the north side of
162nd Street and east and west side of Eagleview Drive, north of 162nd Street. The $0.250/s.f.
commercial Trunk Storm Sewer Area Charge will be applied the right-of-way area dedicated
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1122
for these street segments. The remaining Trunk Storm Sewer Area Charge will be collected at
the single family residential rate, calculated as follows:
(37,500 s.f. +65,600 s.f.) X $0.25/s.f. = $25,775.00
162nd Street ½ Right-of-Way Eagleview Drive Right-of-Way Commercial Trunk Storm Sewer
Area Charge Total
(433,532.00 s.f. -103,100 s.f.) X $0.178 /s.f. = $58,816.90
Trunk Storm Sewer Area Required 162nd Street/Eagleview Drive
Right-of-Way
Single Family Trunk Storm Sewer Area
Charge Total
$25,775.00 +$58,816.90 = $84,591.90
Commercial Trunk Storm Sewer Area Single Family Trunk Storm Sewer Area Trunk Storm Sewer Area Charge due with the
final plat
If the outlots adjacent to Eagleview Drive or 162nd Street right-of-way are developed as a land
use other than Commercial, the Developer shall receive a credit to the Trunk Storm Sewer
Area Charge for the difference in land use at the time the outlots are final platted into lots and
blocks.
The Trunk Storm Sewer Area Charge for the outlots within the Development will be collected
at the time they are final platted into lots and blocks, at the rate in effect at the time of final
plat.
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding the
portion of Outlot H, not previously credited as Park Dedication, and the portion of Outlot D
that was not previously deeded to the City, consistent with City policy. The Developer is
proposing to revise the lot lines of Outlot A, which was previously deeded to the City with the
Spirit of Brandtjen Farm plat, and will credit the City for the area of the Outlot that will be
acquired by the Developer (0.127 acres). The credit is based on the area of the outlots and is
calculated at the rate of $5,500.00 per acre, and will be applied to the SBFC 2nd Addition final
plat cash fees. The credit is calculated as follows:
(6.15 acres -0.127 acres) x $5,500/acre = $33,126.50
Portion of Outlot H and the portion of D not previously
deeded to the City minus portion of Outlot A acquired by
Developer
Per Acre Credit Total
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
Several parent parcels (Outlots EE and GG, Spirit of Brandtjen Farm and Outlot F, SBFC 1st
Addition) are located within areas shown on the Flood Insurance Rate Map (FIRM) as Zones AE
and A, Floodway and Flood Fringe respectively. Based on this designation, a portion of the
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1133
Development is located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
The Developer is proposing to construct roadway, trail, and utility improvements within the
Floodway and Floodplain Districts, both allowed per Zoning Ordinance Section 11-101-11.
The Developer shall be responsible for any requirements deemed necessary for construction
of the streets and utilities within the Floodway or Flood Fringe Districts, including but not
limited to obtaining a CLOM-R. The Developer shall provide a security for the Floodway and
Flood Fringe mitigation requirements, to be calculated with the final plat.
The remaining area of SBFC 2nd Addition is shown on the Flood Insurance Rate Map (FIRM) as
Zone X by the Federal Emergency Management Agency (FEMA).
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
EERROOSSIIOONN CCOONNTTRROOLL
An erosion control plan has been submitted and includes the following:
• A single rock construction entrance.
• A seed and mulch specification that meets City requirements.
• Inlet protection on all storm sewer structures.
• All 3:1 slopes must be seeded and stabilized with fiber blanket.
• All streets shall be cleared of debris at the end of each day. Street sweeping shall
be done weekly or more often as needed. All streets shall be maintained to
provide safe driving conditions.
Silt fence must be installed adjacent to all stormwater basin slopes and slopes adjacent to
wetland areas. Temporary rock check must be installed in high flow areas. The Developer
shall install and maintain any additional erosion control measures deemed necessary during
construction by City staff or the Dakota County Soil and Water Conservation District.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1144
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to SBFC 2nd Addition. Construction costs are based upon estimates
submitted by the Developer’s engineer on February 25, 2015.
CONSTRUCTION COSTS
Sanitary Sewer $ 315,266.51
Watermain 249,667.93
Storm Sewer 440,545.57
Street Construction 1,070,515.30
Erosion Control, Stormwater and Infiltration Basins,
Restoration, Grading and Grading Certification
221,434.86
SUBTOTAL - CONSTRUCTION COSTS $ 2,297,430.17
OTHER COSTS
Developer’s Design (6.0%) $ 137,845.81
Developer’s Construction Survey (2.5%) 57,435.75
City’s Legal Expense (0.5%) 11,487.15
City Construction Observation (7.0%) 160,820.11
Developer’s Record Drawing (0.5%) 11,487.15
Remove Overhead Utilities 10,000.00
Remove Site Encroachments 20,000.00
Street Lights 31,800.00
Lot Corners/Iron Monuments 1,300.00
Floodway/Flood Fringe Mitigation 10,000.00
SUBTOTAL - OTHER COSTS $452,175.97
TOTAL PROJECT SECURITY $ 2,749,606.14
The street light security totals $31,800 which consists of fifteen mast-arm street lights at
$1,400 each and 9 decorative post tops at $1,200 each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$1,300. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1155
CCAASSHH FFEEEESS
A cash fee for traffic control signs is due with SBFC 2nd Addition. The street signing consists of
the following:
SBFC 2ND ADDITION SIGN TOTALS
Sign Type Quantity Unit Cost Total Cost
Speed Limit Signs 3 $225.00 $675.00
9 Button Delineators 27 $100.00 2,700.00
Future Thru Street Signs 7 $75.00 525.00
Keep Right Symbols 12 $275.00 3,300.00
Roundabout w/ Speed Placards 3 $375.00 1,125.00
Pedestrian Advance Warning 3 $375.00 1,125.00
Pedestrian Crossing w/ Arrow 8 $375.00 3,000.00
One Way w/ Arrow 4 $250.00 1,000.00
Stop Ahead Symbol 1 $275.00 275.00
Yield 3 $275.00 825.00
TOTAL $14,550.00
If the street signs are installed during frost conditions, the developer shall pay an additional
$150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses for SBFC 2nd Addition shall be paid
with the final plat. Consistent with City policy, the streetlight operating fee is based on
commercial development as to provide a more comparable rate to the anticipated usage. The
cash fee is calculated as follows:
4550 f.f. x $0.2277/f.f./qtr. x 4 qtrs. = $4,144.14
162nd Street and Eagleview Drive
Frontage Streetlight Operating Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
13
x $75.00/unit
= $975.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $68,922.91.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMMSS CCOOMMMMEERRCCIIAALL 22NNDD AADDDDIITTIIOONN FFIINNAALL PPLL AATT
FFEEBBRRUUAARRYY 2277,, 22001155 RREEVVIISSEEDD MMAARRCCHH 1111,, 22001155
PPAAGGEE 1166
CASH REQUIREMENTS
Trunk Storm Sewer Area Charge 84,591.90
Traffic Control Signs 14,550.00
Streetlight Operating Fee 4,144.14
City Base Map Updating Fee 975.00
City Engineering Administration (3.00%) 68,922.91
SUBTOTAL CASH REQUIREMENTS $173,183.95
CREDITS TO THE CASH REQUIREMENTS
Trunk Watermain Oversizing (Trunk Water Fund)* $ 64,820.22
Trunk Sanitary Sewer Oversizing * 4,647.6
Portion of Outlots H and D Deeded to the City (Trunk Storm Sewer) 33,126.50
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS* = $102,594.18
TOTAL CASH REQUIREMENTS* $70,589.77
PARK DEDICATION CASH REQUIREMENTS
Park Dedication Fee $ 12,744.00
SUBTOTAL CASH REQUIREMENTS $12,744.00
CREDITS TO THE PARK DEDICATION REQUIREMENTS
Bituminous Trail Cost (Park Dedication)* 52,360.00
Outlot E and Portion of Outlot D Deeded to City (Park Dedication)* 63,933.63
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS* = $116,293.63
CITY CREDIT TO DEVELOPER* $103,549.63
*The cash requirements are estimated totals and will be finalized prior to recording of the
final plat mylars.
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the SBFC 2nd Addition final plat, grading plan, utility
plan, erosion control plan, and tree preservation plan subject to the requirements and
stipulations of this report.