HomeMy WebLinkAboutItem 06City of Lakeville Planning Department Memorandum To: Planning Commission From: Kris Jenson, Associate Planner Date: 12 March 2015 Subject: Packet Material for the 19 March 2015 Planning Commission Meeting Agenda Item: 1) Preliminary and Final Plat of one commercial lot to be known as Minnesota Blue Skies Addition; and 2) PUD Development Stage Plan for the Goddard School; and 3) Vacation of public drainage and utility easements. Action Deadline: 11June 2015 BACKGROUND Cory Schubert, representing Thomas J. Walker, has submitted plans for Minnesota Blue Skies Addition consisting of one lot located at the intersection of Elmhurst Lane and 162nd Street, within the Spirit of Brandtjen Farm (SBF) commercial area. The lot is proposed for the development of The Goddard School, a daycare facility. The site is zoned PUD, Planned Unit Development as approved by the City Council on 20 June 2005. The proposed development requires a preliminary and final plat, PUD development stage plan, and vacation of existing drainage and utility easements. The Minnesota Blue Skies Addition plans have been distributed to Engineering Division and Parks and Recreation Department staff and the Parks, Recreation and Natural Resources Committee. EXHIBITS A. Aerial Photo Map B. Location and Existing Zoning C. Preliminary Plat D. Final Plat E. Erosion & Sediment Control Plan F. Grading & Drainage Plan G. Utility Plan H. Site Plan (Civil) I. Landscape Plan J. Turn Movement Exhibit K. Site Plan (Architectural) L. Building Elevations M. Color Elevation N. Photometric Plan O. Easement Vacation Sketch PLANNING ANALYSIS Comprehensive Plan. The 2008 Comprehensive Land Use Plan guides the subject site for commercial land uses reflecting the land uses designated by the SBF Land Use Plan approved by the City Council as a part of the SBF PUD Booklet dated 20 June 2005. SBF Land Use Plan. The SBF Land Use Plan guides the subject site for mixed use development based on the uses allowed in the O-R District and C-3 District as established by the Zoning Ordinance. The proposed day care center is an allowed use of the subject site and subject to compliance with applicable requirements of the Zoning Ordinance. Existing Conditions. The site was previously mined, has been reclamated, and is currently vacant and undeveloped. It was platted as Outlot C with the Spirit of Brandtjen Farm Commercial 1st Addition plat. MUSA. The subject site is within the current MUSA and sanitary sewer and water utilities will be available with the installation of the utilities within the SBF Commercial 1st Addition. Adjacent Land Uses. Adjacent land uses and zoning are as follows: North – Vacant land (PUD) East – Vacant land (PUD) South – Future residential (PUD) West – Future Hy-Vee Foods (PUD) Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer and water improvements for the area of Minnesota Blue Skies Addition will be financed and constructed by the developer. The development costs associated with the Minnesota Blue Skies Addition development are not programmed in the 2015 – 2019 CIP. Premature Subdivision Criteria. A preliminary plat may be deemed premature if any of the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans (discussed above). While utilities are not currently available at the proposed Minnesota Blue Skies Addition site, they will be constructed this spring as part of the SBF Commercial 1st Addition project. Staff review of the Minnesota Blue Skies Addition preliminary plat against these criteria finds that it is not a premature subdivision. Final Plat. The applicant has submitted a final plat for the proposed development consistent with the preliminary plat. The final plat is subject to applicable comments 2 pertaining to the preliminary plat design and is subject to approval by the City Council. Lot Requirements. The SBF Land Use Plan does not establish minimum lot area or width requirements for developments within the PUD District. The proposed lot area of 1.37 acres (59,773 sq. ft.) exceeds the C-3 District minimum lot size of 20,000 sq. ft. Streets/Site Access. The proposed site is located at the northwest corner of 162nd Street and Elmhurst Lane. Both streets are planned to be constructed this spring in conjunction with the SBF Commercial 1st Addition. No additional right-of-way is required for either street. Additional detailed information is outlined in the Engineering Division memorandum dated 28 February 2015. • 162nd Street – 162nd Street is a minor collector commercial roadway as identified in the City’s Transportation Plan. It will be a 44-foot roadway within an 80 foot right-of-way and will intersect with Pilot Knob Road to the west. • Elmhurst Lane – Elmhurst Lane is a local commercial roadway. It will be a 44 foot wide roadway within an 80 foot wide right-of-way and will intersect with 160th Street (CSAH 46) to the north. All streets meet the minimum width and design requirements of the Subdivision Ordinance. Sidewalks/Trails. Eight-foot wide concrete sidewalks will be constructed along both 162nd Street and Elmhurst Lane, adjacent to the subject site, as part of the construction of both 162nd Street and Elmhurst Lane. A private sidewalk located between the front of the building and the parking area will connect to the sidewalk along Elmhurst Lane. Setbacks. The location of the building on the lot exceeds the setback requirements of the C-3 District. Front Rear Side Corner Side Required 30' 10' 10' 30' Proposed 163.79' 39.82' 52.35' 60' The site plans indicate a possible future expansion area at the rear of the building. This would result in a setback of 20 feet to the rear property line. Off-street Parking. The table below illustrates the calculation of required off-street parking: Use Requirement Student Cap. Req. Stalls Stalls Provided Daycare Facility 1 stall/4 persons of licensed capacity 144 36 42 As noted above, the Goddard School plans indicate an area for a possible building expansion, which would increase the school capacity by 20 students. An additional five spaces would be required for a total of 41 parking spaces. The proposed number of parking spaces to be provided exceeds this requirement. Proposed parking stall 3 dimensions, drive aisle widths, and parking lots setbacks meet Zoning Ordinance requirements. Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage, erosion control, and utilities for the Minnesota Blue Skies Addition preliminary plat is shown on the erosion and sediment control, grading and drainage, and utility plans. All new local utilities shall be placed underground. Grading, drainage, erosion control, and utilities details are outlined in the 11 March 2015 engineering report prepared by Alex Jordan, Civil Engineer and Mac Cafferty, Environmental Resources Manager. The Engineering Division recommends approval of the preliminary plat. Loading. A designated loading zone has not been included on this site. The developer has provided a plan showing that the site can accommodate truck turning movements for large delivery vehicles. This is consistent with other daycare centers in Lakeville. Landscaping. The overall site includes a variety of overstory shade and ornamental trees, shrubs, and ornamental grasses. The parking lot is buffered on the south and east by Northern Red Oaks, Black Hills Spruce, Compact American Cranberrybush, Isanti Dogwood, and Hameln Fountain Grass to shield the view from the right-of-way. The parking lot islands are landscaped with Autumn Blaze Maple trees and feather reed grass and there is an area on either side of the front door landscaped with Prairie Rose crabapple trees, Endless Summer Hydrangea, and Palace Purple Coral Bells. Just outside the fence surrounding the children’s play area, Quaking Aspen trees interspersed with Neon Flash Spirea and Feather Reed Grass break up the expanse of fence along the east and north sides of the property. Staff recommends the landscape plan be revised to include additional landscaping along the east side of the outdoor play area adjacent to Elmhurst Lane to break up the view of the proposed privacy fence from the public street. The landscape plan is attached as Exhibit I. A $37,300 security is required to guarantee installation of the approved landscaping. Fencing. The east, west, and north sides of the property will include a six-foot tall white vinyl privacy fence to enclose the outdoor play areas for the children at the center. Gates will be located on the south side of the fence, one on either side of the front entrance of the building. A detail of the fence is included on the architectural site plan (Exhibit K.) Park Dedication. In accordance with the SBF Master PUD Agreement, park dedication will be collected as a cash fee that must be paid with the final plat. The park dedication amount per the agreement is $5,400 per acre, for a total of $7,398.00. The Parks, Recreation and Natural Resources Committee will review the preliminary and final plat at their 18 March 2015 meeting. Their comments will be forwarded to the Planning Commission at the public hearing. Signs. A free-standing sign is proposed to be located north of the parking lot, near the driveway access. The proposed location as shown meets the required 15 foot setback from public street right-of-way for free-standing signs. The architectural site plan (Exhibit K) proposes a five foot, six inch tall sign. The building elevation plans indicate that there will be a wall sign on the front of the building. Both signs are shown for 4 illustrative purposes at this time and a separate sign permit must be issued for each sign prior to being erected or placed on the building. Exterior Materials. The proposed building is primarily red brick, with a slightly darker color band at the base of the building (Exhibit L). The Zoning Ordinance requires three Class A materials to be used on commercial buildings, but allows buildings to be “constructed primarily of one specific Grade A material provided the design is obviously superior to the general intent of this title, provides variation in detailing, footprint of the structure or deviations in long wall section to provide visual interest.” Staff feels that the red brick proposed, along with the regular placement of windows and doors on each elevation, meets the intent of this provision. A color rendering is attached as Exhibit M. Trash Enclosure. A trash enclosure is proposed north of the parking lot on the west side of the site. As shown on Exhibit K, the trash enclosure will brick to match the building and will be over six feet in height. The trash enclosure gate will be made of composite wood planking. Exterior Lighting. Lighting on the site includes two 12 foot high light poles within the parking lot and eight wall mounted lights around the exterior of the building (Exhibit N). According to the architect, these lights are down cast fixtures with glare shields that are activated by a photocell and turned off by a time clock. The operation hours of the facility will stop around 6 pm, so the lights should go off around that time. Exterior lighting must comply with the requirements of Section 11-16-17 of the Zoning Ordinance. Easement Vacation. When the Spirit of Brandtjen Farm Commercial 1st Addition final plat was approved last year, public drainage and utility easements were added to Outlot C, adjacent to the right-of-way of 162nd Street and Elmhurst Lane. In order to plat the property for development, those easements must be vacated. New 10 foot wide public drainage and utility easements have been included on the plat adjacent to 162nd Street and Elmhurst Lane. Exhibit O illustrates the easements to be vacated. RECOMMENDATION Planning Department staff recommends approval of the Minnesota Blue Skies Addition preliminary and final plat, PUD Development Stage plans for The Goddard School, and the vacation of public drainage and utility easements subject to the following stipulations: 1. The recommendations listed in the 11 March 2015 engineering report. 2. The recommendations of the Parks, Recreation, and Natural Resources Committee. 3. The vacation of the public drainage and utility easements shall be recorded with the final plat. 4. The Goddard School site shall be developed in accordance with the plans approved by the City Council. 5 5. The landscape plan shall be revised to include additional landscaping along the east side of the outdoor play area adjacent to Elmhurst Lane to break up the view of the proposed privacy fence from the public street. A $37,300 security is required to guarantee installation of the approved landscaping. 6. Signs as shown on the plans are illustrative only. All signs must comply with the requirements of Chapter 23 of the Zoning Ordinance. A sign permit must be issued prior to any signs being placed or erected on site. 7. Exterior lighting must comply with the requirements of Section 11-16-17 of the Zoning Ordinance. 6 ± Minnesota Blue Skies Add. (Goddard School) Pi l o t K n o b R o a d ( C S A H 3 1 ) 162nd St (Future) City of LakevilleAerial MapMinnesota Blue Skies Add.Preliminary/Final PlatEasement VacationEXHIBIT A 160th St (CSAH 46) El m h u r s t L a n e ( F u t u r e ) Future Hy-Vee Grocery Store E n v oy Way E q u e s t r i a n T r a i l PUD PUD PUDPUD PUD PUD PUD P/OS RST-2 RM-2 160TH ST W DODD BLVD PI L O T K N O B R D ± EXHIBIT B City of LakevilleLocation and Zoning Map Minnesota BlueSkies AdditionPreliminary/Final Plat Minnesota Blue Skies AddThe Goddard School Site 2 A 8 G 20 R 3 D 10 G 23 O 6 Q 7 Q 32 R6 P 2 Q 6 J 8 L 1 E 2 A 6 Q 1 C 10 K 10 S 10 S 1 C 19 I 1 C 12 K 1 B 8 G 20 R 2 B Ca l y x D e s i g n G r o u p , L L C La n d s c a p e A r c h i t e c t u r e - S u s t a i n a b l e D e s i g n - P l a n n i n g     % H U N H O H \  $ Y H Q X H       6 D L Q W   3 D X O   0 1        te l e p h o n e : 6 5 1 . 3 3 4 . 5 4 9 8 LQ W H U Q H W    Z Z Z  F D O \ [ G H V L J Q J U R X S  F R P  H P D L O       in f o @ c a l y x d e s i g n g r o u p . c o m  cd g I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , or r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y di r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y Li c e n s e d L a n d s c a p e A r c h i t e c t u n d e r t h e la w s O f t h e S t a t e o f M i n n e s o t a . Pr i n t N a m e : Si g n a t u r e : Da t e : Be n j a m i n D . H a r t b e r g , A S L A Li c e n s e N o . 4 8 0 8 4 12 / 1 2 / 1 4 LANDSCAPE DETAILS, NOTES, AND SCHEDULES:LANDSCAPE PLAN 2 6.1 TYP. PERENNIAL PLANTING DETAIL NOT TO SCALE . 4 6.1 TYP. SHRUB PLANTING - SECTION NOT TO SCALE 3 6.1 DECIDUOUS TREE PLANTING - SECTION NOT TO SCALE 5 6.1 CONIFEROUS TREE PLANTING - SECTION TOMAHAWK TREE STABILIZER STAKES. MINIMUM (2) PER TREE. SOD ROOT BALL TO SIT ON MOUNDED MULCH - 4" DEEP - SEE SPEC PLANTING SOIL - SEE SPEC. TOPSOIL SUBGRADE OTHERWISE. NO MULCH TO BE IN CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED PLACE ROOT BALL SO THAT BASAL FLARE IS 1" ABOVE SURROUNDING CONTACT WITH TRUNK. NOTE: SUBGRADE, REMOVE BURLAP DRAIN SYSTEM IS NECESSARY 4" DIAMETER AUGERED HOLE, 42" MIN. DEPTH. FILLED W/ 3/4" DIAMETER DRAIN ROCK. COVER W/ 6" FILTER FABRIC. FOR HEAVY CLAY SOILS. FROM TOP 1/3 OF ROOT BALL GRADE. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE TREES ARE IN A PLUMB POSITION THROUGHOUT THE WARRANTY PERIOD. Landscape Notes: 1. Tree saucer mulch to be four inches (4") depth natural single-shred hardwood mulch for trees outside of a plant bed. Install per tree planting detail. 2. Refer to civil plan sheets for grading, drainage, site dimensions, survey, tree removal, proposed utilities & erosion control. 3. All plant material shall comply with the latest edition of the American Standard for Nursery, American Association of Nurserymen. Unless noted otherwise, deciduous shrubs shall have at least 5 canes at the specified shrub height. Plant material shall be delivered as specified. 4. Plan takes precedence over plant schedule if discrepancies in quantities exist. 5. All proposed plants shall be located and staked as shown. 6. Adjustment in location of proposed plant material may be needed in field. Should an adjustment be required, the client will provide field approval. Significant changes may require city review and approval. 7. The project landscape contractor shall be held responsible for watering and properly handling all plant materials brought on the site both before and after installation. Schedule plant deliveries to coincide with expected installation time within 36 hours. 8. Refer to the civil engineer's plans for erosion control measures on graded slopes. Coordinate seeding activities with the erosion control installer. 9. The landscape contractor shall provide the owner with a watering schedule appropriate to the project site conditions and to plant material growth requirements. 10. If the landscape contractor is concerned or perceives any deficiencies in the plant selections, soil conditions, drainage or any other site condition that might negatively affect plant establishment, survival or guarantee, they must bring these deficiences to the attention of the landscape architect & client prior to bid submission. 11. Contractor shall establish to his/ her satisfaction that soil and compaction conditions are adequate to allow for proper drainage at and around the building site. 12. Contractor is responsible for ongoing maintenance of all newly installed material until time of owner acceptance. Any acts of vandalism or damage which may occur prior to owner acceptance shall be the responsibility of the contractor. Contractor shall provide the owner with a maintenance program including, but not limited to, pruning, fertilization and disease/pest control. 13. The contractor shall guarantee newly planted material through one calendar year from the date of written owner acceptance. Plants that exhibit more than 10% die-back damage shall be replaced at no additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodent protection measures for the plantings during the warranty period. 14. This layout plan constitutes our understanding of the landscape requirements listed in the ordinance. Changes and modifications may be requested by the city based on applicant information, public input, council decisions, etc. 15. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process. 16. Plant size & species substitutions must be approved in writing prior to acceptance in the field. 17. The landscape contractor shall furnish an Irrigation Layout Plan for head-to-head coverage of all turf and shrub planting areas. Use commercial-grade irrigation equipment (Hunter Industries) and provide product cut-sheets and (4) copies of the proposed layout plan to the landscape architect for review and approval. Coordinate irrigation connection point, controller, backflow and valving locations with the architect & general contractor. Valve boxes shall have lockable lids and be concealed in plant beds when posssible. Do not locate any valve boxes or irrigation controls within fenced play area . 18. All edger shall be professional grade black steel edger, 1/8" thick, Ryerson or Equal. Anchor every 18" on-center (minimum). Submit sample. 19. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new improvements on and off-site during landscape work activities. Report any damage to the General Contractor immediately. 20. Unless otherwise noted/indicated, plant beds shall receive 4" depth of 3/4"-1" dia. washed river stone mineral mulch over fabric weed barrier (DeWitt Pro 3.2oz. Needlepunch, Nonwoven), per detail. Submit mulch sample for Owner approval. Do not install weed mat under perennial plantings areas, except if under rip-rap stone. 21. Retaining walls (if not specified on civil plans) shall be 6" precast segmental units, straight-faced, gray in color with matching cap units. Wall engineering by wall manufacturer. Submit wall plans and color chart for approval prior to installation. Boulder (gravity) walls are not acceptable. 22. All sod areas shall be prepared prior to planting with a harley power box rake or equal to provide a firm planting bed free of stones, sticks, construction debris, etc. Any alternate seed mixtures, rates, & application method noted shall be sumbitted to the landscape architect for approval. 23. The general contractor shall be responsible for procurement of site furnishings, storage, un-crating, assembly, & installation. Furnishings noted as surface-mount shall have a quick-bolt anchor concealed with an escutcheon plate or bolt painted to match furnishing color. Use stainless steel hardware and tamper-proof bolts. 24. The Landscape Contractor shall furnish samples of all landscape materials for approval prior to installation. 25. The landscape contractor shall contact Gopher State One Call no less than 48 hours before digging for field utility locations. 26. The landscape contractor shall be responsible for the removal of erosion control measures once vegetation has been established to the satisfaction of the municipal staff. This includes silt curtain fencing and sediment logs placed in the landscape. 27. The landscape contractor shall be responsible for visiting the site to become familiar with the conditions prior to bidding and installation. Coordinate with the general contractors on matters such as fine grading, landscaped area conditions, staging areas, irrigation connection to building, etc. Field verify locations of adjacent, existing trees as part of the HyVee Store Build-Out. 28. The Landscape Contractor shall furnish a mixture of seasonal annual flowers (4" pots) planted at 12" On-Center, to fill all proposed annual planting areas shown on the plan. Annual planting areas shall have 12" of premium planting soil installed by the landscape contractor and shall be drip-irrigated. Mulch perennial areas with 4" depth of clean, steamed & imported finish compost. Submit sample to Owner for approval. Submit a schedule of proposed plant materials to the landscape architect for review and approval. Use locally-available annual plants only. 30. Proposed fencing by Others. See Architect's plans and specifications. 4 B A TR E E S : Qty.NotesRootSizeCommon NameScientific NameKey 6 Neon Flash SpireaSpiraea japonica 'Neon Flash'POT#3 I SH R U B S : Qty.NotesRootSizeCommon NameScientific NameKey POT#5Compact American CranberrybushViburnum trilobum 'Bailey Compact' J O PE R E N N I A L S : Qty.NotesRootSizeCommon NameScientific NameKey P POT#2Dwarf Bush HoneysuckleDiervilla lonicera 0 B&BAutumn Blaze MapleAcer x freemanii 'Jeffersred' 3 19 H POT#1Black-Eyed SusanRudbeckia fulgida 'Goldsturm'23 POT#1Autumn Joy SedumSedum x 'Autumn Joy'6 2.5" Cal. B&B2" Cal.Prairie Rose CrabappleMalus x 'Prairie Rose' 22 POT#5Isanti DogwoodCornus sericea 'Isanti' C3 B&B3.5" Cal.Northern Red OakQuercus rubra Spring Dug D3 B&B6' Hgt.Black Hills SprucePicea glauca densata Full Form K Q POT#1Feather Reed GrassCalamagrostis x acutiflora 'Karl Forester' 21 72 R Palace Purple Coral BellsHeuchera micrantha POT#1'Palace Purple' Hameln Fountain GrassPennisetum hamelnS20 POT#1 8 POT4' Hgt.Techny ArborvitaeThuja occidentalis 'Techny'L G POT#3Endless Summer HydrangeaHydrangea macrophylla 'Bailmer'26 E1 B&BQuaking AspenPopulus tremuloides 2" Cal. Planting Palette: 1 6.1 ROCK MULCH DETAIL NOT TO SCALE City of Lakeville Public Works– Engineering Division Memorandum To: Kris Jenson, Associate Planner From: Alex Jordan, Civil Engineer McKenzie Cafferty, Environmental Resources Manager Brett Altergott, Parks and Recreation Director Copy: Zach Johnson, City Engineer Daryl Morey, Planning Director Gene Abbott, Building Official Date: March 11, 2015 Subject: Minnesota Blue Skies Addition • Preliminary and Final Plat Review • Site Plan Review • Final Grading Plan Review • Utility Plan Review • Final Erosion Control Plan Review BBAACCKKGGRROOUUNNDD Minnesota Blue Skies, LLC has submitted a preliminary and final plat named Minnesota Blue Skies Addition; Big-D Construction Corporation has submitted a site plan for a daycare facility on Lot 1, Block 1, Minnesota Blue Skies Addition. The proposed development is located north of and adjacent to 162nd Street, west of and adjacent to Elmhurst Lane, south of 160th Street (CSAH 46) and east of Pilot Knob Road (CSAH 31). The parent parcel is Outlot C, Spirit of Brandtjen Farm Commercial (SBFC) 1st Addition. The Development is zoned PUD, planned unit development. The preliminary and final plat consists of one lot on one block. The proposed development will be completed by: Developer: Minnesota Blue Skies, LLC Engineer/Surveyor: James R. Hill, Inc. MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 22 SSIITTEE CCOONNDDIITTIIOONNSS The site was previously a gravel processing operation. The site is now vacant, undeveloped land that was mass graded as part of the reclamation and gravel processing area in 2010. A gravel road used for internal navigation of the gravel processing operation is located on site. The parent parcel is proposed to be mass graded with the SBFC 1st Addition improvements in 2015, consistent with the approved grading plan. EEAASSEEMMEENNTT VVAACCAATTIIOONN A public easement exists on the parent parcel and will be vacated contingent on City Council approval of the final plat: • 10-foot wide drainage and utility easement per plat of Spirit of Brandtjen Farm Commercial (SBFC) 1st Addition, located adjacent to both 162nd Street and Elmhurst Lane. SSIITTEE PPLLAANN RREEVVIIEEWW Big-D Construction Corporation proposes to construct an 8,800 square foot daycare facility to be known as Goddard School on Lot 1, Block 1, Minnesota Blue Skies Addition. A driveway is proposed to be constructed to provide access to the site from Elmhurst Lane. The access driveway includes a stop sign, stop bar, zebra crosswalk striping and pedestrian curb ramps for the public sidewalk. A $2,000 security is required for the public pedestrian curb ramps located within the public right-of-way. The construction of the driveway will include a revision to the SBFC 1st Addition approved construction plans. The Developer is required to coordinate any plan revisions necessary for the construction of the driveway with the Developer of SBFC 1st Addition. The Developer shall submit a $1,000 security for the coordination of engineering design and inspection of the changes to the approved SBFC 1st Addition construction plans. The Developer shall install a mast arm street light at the proposed driveway entrance. The site plans includes the construction of a private parking lot, designed to provide a capacity of 42 stalls, including two handicapped accessible stalls. Turning movement templates were provided to demonstrate that proper circulation can be attained throughout the parking lot. Private interior lighting and freestanding signs will be constructed within the parking lot and site. Two tot lot playgrounds and an outdoor play area are proposed to be constructed on the north, east, and west sides of the building. The outdoor play areas will be sodded, and screened by a landscaped fence as shown on the architectural plans. MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 33 SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT 162nd Street Minnesota Blue Skies Addition is located north of and adjacent to 162nd Street, a minor collector commercial roadway, as identified in the City’s Transportation Plan. 162nd Street adjacent to the Development is being constructed with the SBFC 1st Addition improvements. 162nd Street is designed as a 44-foot wide two-lane urban roadway, within 80-feet of right-of- way. A dedicated eastbound left turn lane will be striped on 162nd Street at the intersection with Elmhurst Lane. Access to 162nd Street is not proposed with the Minnesota Blue Skies Addition development. Elmhurst Lane Minnesota Blue Skies Addition is located west of and adjacent to Elmhurst Lane, a local commercial roadway, as identified in the City’s Transportation Plan. Elmhurst Lane adjacent to the Development is being constructed with the SBFC 1st Addition improvements. Elmhurst Lane is designed as a 44-foot wide two-lane urban roadway with a continuous center to center left turn lane, within 80-feet of right-of-way. The proposed access driveway to the site will be from Elmhurst Lane and is consistent with the City’s access spacing requirements. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and site construction for Minnesota Blue Skies Addition shall be restricted to Elmhurst Lane, via 160th Street. PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS The Park Dedication fee has not been collected on the parent parcel and will be satisfied through a cash contribution that must be paid with the final plat. The Park Dedication fee for commercial areas in Spirit of Brandtjen Farm is $5,400 per acre, consistent with the Spirit of Brandtjen Farm master PUD agreement. The park dedication requirement is calculated as follows: 1.37 acres X $5,400/acre = $7,398.00 Total Area of the Parent Parcel Commercial Park Dedication Rate Total 8-foot wide concrete sidewalks will be installed along the north side of 162nd Street and west side of Elmhurst Lane adjacent to the plat with the SBFC 1st Addition improvements. MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 44 UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR:: The parent parcel is located within NC-20060 of the North Creek sanitary sewer district as identified in the City’s Comprehensive Sewer plan. Wastewater will be conveyed via existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire Treatment Facility. 8-inch public sanitary sewer is being installed along Elmhurst Lane adjacent to the parent parcel with the SBFC 1st Addition improvements. An 8-inch private sanitary sewer service will be stubbed to the parent parcel to provide sanitary sewer service for the development. The private sanitary sewer service will be extended within the site with the site improvements to serve the proposed building. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and must be paid with the building permit. The Sanitary Sewer Availability Charge will be calculated at $327/SAC Unit, as determined by the Building Official. WWAATTEERRMMAAIINN:: 12-inch watermain is being installed along Elmhurst Lane adjacent to the parent parcel with the SBFC 1st Addition improvements. An 8-inch private water service will be stubbed to the parent parcel. The private water service will be extended within the site with the site improvements to provide water and fire suppression service to the proposed building. The downstream sanitary sewer and watermain to serve the development is not yet constructed and will be installed with the SBFC 1st and 2nd Addition improvements. The Developer for SBFC 1st and 2nd Addition has submitted a letter to the City outlining the construction schedule of the utilities stating that they will be completed by the end of July, 2015. A sewer/water connection permit from the City’s Inspection Department for Minnesota Blue Skies Addition will not be issued until all testing and inspection has been completed for the utilities within SBFC 1st and 2nd Addition. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG The parent parcel is located within subdistrict NC-14A of the North Creek Stormwater District, as identified in the City’s Water Resources Management Plan. The stormwater management system for SBFC 1st Addition will collect and convey all runoff generated from impervious surfaces in the trunk storm sewer system that will then outlet to two in-line temporary sedimentation basins that will provide pre-treatment and infiltration prior to discharging to a regional basin downstream. The sedimentation and regional basins were designed and sized to treat the additional runoff generated from the impervious surfaces within the parent parcel. No on-site stormwater management is required with the development. MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 55 The final grading plan must indicate any proposed borrow areas in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be issued until an as-built certified grading plan has been submitted and approved by the City Engineer. The proposed site plan and improvements contain more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR No public storm sewer will be installed with the Minnesota Blue Skies Addition improvements. A privately owned and maintained storm sewer system will be constructed and will collect and convey stormwater runoff generated from the parking lot, roof-tops and open space to the public storm sewer system. Private draintile will also be installed within the playground areas connecting to the private storm sewer. The Developer proposes to make a connection to the public storm sewer to be installed with the SBFC 1st Addition improvements that will require a change to the approved construction plans. The Developer shall submit a $1,000 security for the connection to the public storm sewer system and a $1,000 security for the coordination of engineering design and inspection of the changes to the approved SBFC 1st Addition storm sewer construction plans. The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and shall be paid with the final plat, calculated as follows: 59,772 s.f. X $0.25/s.f. = $14,943.00 Gross Area of Minnesota Blue Skies Addition Commercial Trunk Storm Sewer Area Charge Total FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS Minnesota Blue Skies Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS There are no wetlands within the project area. MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 66 TTRREEEE PPRREESSEERRVVAATTIIOONN There are no significant trees within the project area. EERROOSSIIOONN CCOONNTTRROOLL The plans include a detailed erosion and sediment plan. The developer is responsible for meeting all the requirements of the MPCA Construction Permit. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Dakota County Soil and Water District. Any additional measures required shall be installed and maintained by the developer. SECURITIES The Developer shall provide a Letter of Credit as security for the Developer-installed improvements relating to Minnesota Blue Skies Addition. CONSTRUCTION COSTS Public Pedestrian Curb Ramps $ 2,000.00 Connection to Public Storm Sewer 1,000.00 Erosion Control, Restoration, Grading and Grading Certification 5,000.00 SUBTOTAL - CONSTRUCTION COSTS $ 8,000.00 OTHER COSTS Developer’s Design (6.0%) $ 480.00 Developer’s Construction Survey (2.5%) 200.00 City’s Legal Expense (0.5%) 40.00 City Construction Observation (7.0%) 560.00 Developer’s Record Drawing (0.5%) 40.00 SBFC 1st Addition Plan Changes 2,000.00 Street Lights 1,400.00 Landscaping 32,885.00 Lot Corners/Iron Monuments 100.00 SUBTOTAL - OTHER COSTS $37,705.00 TOTAL PROJECT SECURITY $ 45,705.00 The street light security totals $1,400 which consists of one mast-arm street light at $1,400 each. The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 77 $100. The City shall hold this security until the Developer’s Land Surveyor certifies that all irons have been placed following site grading, street and utility construction. CCAASSHH FFEEEESS A cash fee for one-year of streetlight operating expenses for Minnesota Blue Skies Addition shall be paid with the final plat. The cash fee is calculated as follows: 501.93 f.f. x $0.2277/f.f./qtr. x 4 qtrs. = $457.16 162nd Street and Elmhurst Lane Frontage Streetlight Operating Fee Total A cash fee for one-year of surface water management expenses for Minnesota Blue Skies Addition shall be paid with the final plat and is calculated as follows: 1.37 acres X 4.2 REU x $7.00/unit/qtr. x 4 qtrs. = $161.11 Gross area of Development Residential Equivalent Utility Factor Surface Water Management Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 1 x $75.00/unit = $75.00 Lots/Outlots City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $240.00. CASH REQUIREMENTS Park Dedication Fee $ 7,398.00 Trunk Storm Sewer Area Charge 14,943.00 Streetlight Operating Fee 457.16 Surface Water Management Fee 161.11 City Base Map Updating Fee 75.00 City Engineering Administration (3.00%) 240.00 TOTAL CASH REQUIREMENTS $23,274.27 MMIINNNNEESSOOTTAA BBLLUUEE SSKKIIEESS AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMAARRCCHH 1111,, 22001155 PPAAGGEE 88 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the Minnesota Blue Skies Addition preliminary and final plat, site plan, grading plan, utility plan, and erosion control plan subject to the requirements and stipulations of this report.