Loading...
HomeMy WebLinkAbout15-073(Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 15-73 RESOLUTION APPROVING THE PRELIMINARY PLAT OF PHEASANT RUN OF LAKEVILLE WHEREAS, KJ Walk, Inc. has requested approval of the preliminary plat of 193 single family lots to be known as PHEASANT RUN OF LAKEVILLE, legally described as follows: The South Half of the Southwest Quarter (S 1/2 SW 1/4) of Section 12, Township 114, Range 20, Dakota County, Minnesota. WHEREAS, the Planning Commission held a public hearing at their May 21, 2015 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources Committee unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: PHEASANT RUN OF LAKEVILLE preliminary plat is approved subject to the following conditions: 1. Implementation of the recommendations listed in the 15 May 2015 engineering report. 2. The recommendation of the Parks, Recreation, and Natural Resources Committee. 3. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 4. The developer shall construct 5 foot wide concrete sidewalks along one side of all streets. The developer shall construct a 10 foot wide bituminous trail on the east side of Pilot Knob Road, both sides of 179th Street, and from Eclipse Avenue and Elgin Avenue through Outlot J. 5. Outlots A, B, C, D, F, G, H, I, and J shall be deeded to the City with the final plat. 6. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 1791h Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 7. The developer shall install a "Future Street Extension" sign and barricades at the terminus of 179th Street, English Avenue, Embers Avenue, and Eclipse Avenue. 8. A temporary turnaround is required at the north end of Eclipse Avenue and a temporary easement for the turnaround must be granted to the City by the developer. A cash escrow must also be provided for the future removal of the temporary turnaround. 9. The following lots shall have restricted driveway access: • Lot 9, Block 3 shall have driveway access from Essex Lane. • Lot 1, Block 5 shall have driveway access from Equinox Avenue. • Lot 1, Block 6 shall have driveway access from Enigma Way. • Lot 1, Block 9 shall have driveway access from Element Avenue. 10. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 11. The agreement between the Metropolitan Council, KJ Walk, Inc., the City of Farmington, and the City of Lakeville must be approved prior to the issuance of a permit for grading work on the site. DATED this 1 'day of June 2015 ATTEST: Charlene Friedges, City erk 2 CITY OF LAKEVILLE Matt Little, Mayo