Loading...
HomeMy WebLinkAboutItem 06City of Lakeville Planning Department Memorandum To Planning Commission From: Frank Dempsey, AICP, Associate Planner Date: June 11, 2015 Subject: Packet Material for the June 18, 2015 City Council Meeting Agenda Item: Preliminary and Final Plat of Grenada Business Park 2nd Addition and Easement Vacation BACKGROUND Representatives of Lakeville Technologies, LLC (aka Mendell) have submitted applications and plans for the preliminary and final plat and easement vacation for Outlot B, Grenada Business Park. The preliminary and final plat to be known as Grenada Business Park 2nd Addition includes one lot on 1.18 acres. The project is proposed in conjunction with plans for a 18,700 square foot addition to the existing 28,596 square foot Mendell Machine manufacturing, office and warehouse building located at 21463 Grenada Avenue. The total proposed building area will be 48,060 square feet over a combined lot area of 3.07 acres. The easement vacation is required to allow the building to expand to the north. The Grenada Business Park 2nd Addition plans have been reviewed by Planning Department and Engineering Division staff. The following exhibits are attached for your information: EXHIBITS A. Zoning Map B. Aerial Photo Location Map C. Preliminary Plat D. Final Plat E. Survey F. Grading, Drainage and Utility and Erosion Control Plans (3 Pages) G. Site Plan and Landscape Plan H. Building Floor Plan 2 I. Building Elevation Plan J. Lighting Specs Zoning and Surrounding Uses. The subject property is zoned I-2, General Industrial District. The proposed preliminary and final plat is surrounded by the following existing land uses: Direction Existing Use Zoning Map Land Use Plan North City Park Maintenance building I-2, General Industrial District Industrial South Existing Mendell building) I-2, General Industrial District Industrial East City stormwater management basin I-2, General Industrial District Restricted Development West J & E Manufacturing I-2, General Industrial District Industrial STAFF ANALYSIS PRELIMINARY AND FINAL PLAT The proposed preliminary and final plat will require approval of a Zoning Lot Letter to combine to two abutting parcels (Lot1,Block 1, Grenada Business Park and Lot 1, Block 1, Grenada Business Park 2nd Addition) as one zoning lot to allow the proposed building expansion. Zoning. The property is zoned I-2, General Industrial District. Comprehensive Plan. The Comprehensive Plan guides the property for industrial land use consistent with the current use of the industrial use of the property. The Planning Commission reviewed a proposed Tax Increment Financing (TIF) request by Mendell at their May 18, 2015 meeting. As required by State Statute, the Planning Commission determined that the proposed use of TIF for the Mendell expansion project was consistent with the Comprehensive Plan. Lots/Blocks. There is one lot and one block in the Grenada Business Park 2nd Addition preliminary and final plat. The preliminary and final plat is subject to the following minimum lot size (I-2 General Industrial District) requirements: Lot Area – 30,000 square feet Lot Width – 100 feet The final plat of Grenada Business Park 2nd Addition meets the minimum lot area and lot width requirements in the I-2, General Industrial District. Lot 1, Block 1, Grenada Business Park and Lot 1 Block 1, Grenada Business Park 2nd Addition will be combined into a one parcel totaling 48,060 square feet subject to administrative approval of a Zoning Lot Letter and through Dakota County. 3 The Zoning Lot Letter allows the two combined parcels to be considered one parcel for zoning purposes. Outlot. There are no outlots proposed with the Grenada Business Park 2nd Addition final. Streets. The preliminary and final plat abuts Grenada Avenue and is located at the end of the Grenada Avenue cul-de-sac which is classified as a local street. No additional road right-of-way is required with the Grenada Business Park 2nd Addition preliminary and final plat. Access. Public access to the property will remain at Grenada Avenue with two proposed driveways. The existing 25 foot wide driveway will remain and a new 34 foot wide driveway is proposed along the south boundary line at the end of the Grenada Avenue cul-de-sac north of Outlot A. Park and Open Space. Outlot B, Grenada Business Park did not pay park dedication at the time of plat approval in 1999. The proposed Grenada Business Park 2nd Addition is subject to park dedication fees total $5,378.44. The park dedication fee is based on the 2015 rate of $4,558 per acre for the 1.18 acres of proposed Lot 1, Block 1. The Parks, Recreation and Natural Resources Committee will review the preliminary and final plat at their June 17, 2015 meeting. Their recommendation will be forwarded to the Planning Commission. Grading, Drainage, Erosion Control, and Utilities. City sewer and water is currently available to the site. All public utilities will be constructed by the developer to serve the proposed final plat. The existing City sanitary sewer and water systems that serve the area are adequate to accommodate the proposed industrial building and parking lot expansion within the development. On and off-site storm sewer improvements are being constructed with the preliminary and final plat to accommodate the proposed building and parking lot expansion. Grading, drainage, erosion control, and utility details are addressed in the engineering report dated June 10, 2015. A copy of the engineering report is attached for your review. The Engineering Department recommends approval of the Grenada Business Park 2nd Addition preliminary and final plat. Tree Preservation. There are no trees located within the proposed Grenada Business Park 2nd Addition preliminary and final plat. Wetlands. There are no wetlands within the Grenada Business Park 2nd Addition final plat. Easement Vacation. An existing platted drainage and utility easement located on each side of the boundary of Lot 1, Block 1 and Outlot B is proposed to be vacated to allow for the building expansion. The proposed final plat of Grenada Business Park 2nd Addition will include new boundary drainage and utility easements. All utility companies have been sent the public hearing notice for the proposed easement vacation. Xcel Energy has responded stating that there are Xcel Energy electric power lines within the area of the proposed easement vacation and that they will have to be relocated. Xcel Energy asked that the developer work with Xcel Energy to coordinate the relocation. 4 SITE PLAN ANALYSIS Setbacks. The Grenada Business Park 2nd Addition final plat is subject to the following minimum building setback (I-2, General Industrial District) requirements: Front Yard: 40 feet Rear Yard: 30 feet Side Yards: 10 feet (west and east) Parking: 15 feet (abutting street), 5 feet (north and west) Parking. The existing 28,596 square foot building and the proposed 18,700 square foot addition will include office, manufacturing and warehouse space with a combined building area of 48,060 square feet. The existing building required a total of 50 parking spaces. The proposed addition will require 33 additional parking spaces for a total of 83 parking spaces. A total of 87 parking spaces are proposed. Parking requirements are based on the following formula: Required and Proposed Parking Total Building Square Footage 48,060 square feet Existing Building - Office, Manufacturing and Warehouse – 50 spaces New Warehouse – 9,350 sf 9 spaces New Manufacturing– 9,350 sf 24 spaces On-Site Parking Required 83 spaces On-Site Parking Proposed 87 spaces The proposed parking lot design, spaces and drive aisle dimensions and configurations meet the requirements of the Zoning Ordinance. Parking aisles will be 24 feet in width and parking stall dimensions will be 9 feet in width and 18 feet in length. Circulation. The driveways and interior layout provides adequate width and turning radii to accommodate truck turning movements and emergency vehicle access. Landscaping/Screening. A total of 21 trees and 13 shrubs are proposed to be planted with the development of the proposed site plan. A $10,000 escrow shall be submitted as security to guarantee installation of the landscaping. Building Exterior. The proposed addition will be precast concrete panels of a color and texture to match the existing building. The proposed exterior materials meet Zoning Ordinance requirements. Exterior Lighting. Building wall mounted lights are proposed on the building addition. The light fixtures are designed to be downcast as required by the Zoning Ordinance. Snow Storage. Snow storage may not take place in required parking spaces. 5 RECOMMENDATION Planning Department staff recommends approval of the Grenada Business Park 2nd Addition preliminary and final plat and easement vacation subject to the stipulations listed below: 1. Implementation of the recommendations listed in the June 10, 2015, engineering report. 2. The Grenada Business Park 2nd Addition shall be developed consistent with the plans approved by the City Council. 3. A $10,000 security escrow shall be submitted to guarantee installation of the landscaping identified on the approved landscape plan. All plant materials shall be set back at least 3 feet from all property lines, including street right-of-way lines. All areas not planted with trees shall be planted with sod, grass seed and mulch or other suitable ground cover. All landscaping shall be maintained and any dead materials removed and replaced as needed. 4. A maintenance agreement shall be entered into between the developer and the City. The maintenance agreement shall be drafted by the City Attorney, signed by the developer and approved by the City Council prior to issuance of a building permit for the building expansion. 5. A Zoning Lot Letter shall be approved by the Zoning Administrator to combine Lot 1, Block 1, Grenada Business Park and Lot 1, Block 1, Grenada Business Park 2nd Addition into a single parcel for zoning purposes. 6. The developer shall communicate with Xcel Energy regarding any necessary relocation of utilities in the easement areas to be vacated. 7. Snow storage cannot take place in required parking spaces. 8. Exterior lighting fixtures shall be in compliance with Zoning Ordinance requirements and shall not glare onto public right-of-way. cc: David Olson, Community and Economic Development Director Jim Connelly, APPRO Development Mendell Grenada Business Park 2nd Addition preliminary final plat and easement vacation G R E N A D A A V E . LOT 1BLOCK 1 OUTLOT B O U T L O T A BENCHMARK - TO P N U T H Y D R A N T ELEVATION = 951. 5 3 PROPOSEDBUILDINGF.F.=953.44 CONC. RET.WALL5 FT. CONC. WALK10' EASEMENT TO BEVACATED (HATCHED) 1 0 ' E A S E M E N T T O B E D E D I C A T E D 20' EASEMENT TO BEVACATED (HATCHED)15' EASEMENT TO BEVACATED (HATCHED) P R O P O S E D L E G E N D W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E L I G H T P O L E H Y D R A N T W A T E R V A L V E S A N I T A R Y M A N H O L E S T O R M M A N H O L E C A T C H B A S I N F L A R E D E N D G R A D I N G L I M I T S 9 5 0 C O N T O U R L I N E S P O T E L E V A T I O N D R A I N A G E A R R O W B I T U M I N O U S S U R F A C E C O N C R E T E S U R F A C E R I P - R A P W W W W S S S S 9 5 3 . 4 4 - 2 . 2 % E X I S T I N G L E G E N D L O T L I N E E A S E M E N T L I N E W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E C H A I N L I N K F E N C E X F M R . T R A N S F O R M E R C B L X . C A B L E B O X T E L . T E L E P H O N E B O X E . M . E L E C T R I C M E T E R T . E . T R A S H E N C L O S U R E G . M . G A S M E T E R H Y D R A N T W A T E R V A L V E P . I . V . P O S T I N D I C A T O R V A L V E S A N I T A R Y M A N H O L E C . O . C L E A N O U T S T O R M M A N H O L E A R E A C A T C H B A S I N C A T C H B A S I N F L A R E D E N D C O N T O U R L I N E N O T E S 1 . U T I L I T I E S S H O W N A R E A P P R O X I M A T E L O C A T I O N . L O C A T I O N S O F U N D E R G R O U N D U T I L I T I E S C O M P I L E D F R O M V I S U A L E V I D E N C E ( F L A G G I N G & P A I N T M A R K S ) A N D R E C O R D D R A W I N G S ( D E S I G N & A S - B U I L T ) . C A L L G O P H E R S T A T E O N E C A L L A T 8 1 1 F O R A L L U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . P R O P E R T Y C U R R E N T L Y Z O N E D I - 2 ( G E N E R A L I N D U S T R I A L D I S T R I C T ) . 3 . S U R V E Y C O M P L E T E D I N A P R I L , 2 0 1 5 . 4 . T O T A L A R E A O F P R O P E R T Y A S S H O W N : A . L O T 1 , B L O C K 1 = 8 2 , 5 2 1 S Q . F T . ( 1 . 8 9 A C . ) B . O U T L O T A = 2 2 , 7 0 0 S Q . F T . ( 0 . 5 2 A C . ) C . O U T L O T B = 5 1 , 3 7 2 S Q . F T . ( 1 . 1 8 A C . ) 5 . B E N C H M A R K - T O P N U T O F H Y D R A N T O N N O R T H S I D E O F O U T L O T B E L E V A T I O N = 9 5 1 . 5 3 PROPERTY DESCRIPTION:Lot 1, Block 1, and Outlot B, GRENADA BUSINESS PARK, Dakota County, Minnesota, according tothe recorded plat thereof. E X H I B I T C L O T 1 B L O C K 1 E X H I B I T D G R E N A D A A V E . LOT 1BLOCK 1 OUTLOT B O U T L O T A BENCHMARK - TO P N U T H Y D R A N T ELEVATION = 951. 5 3 E X I S T I N G L E G E N D L O T L I N E E A S E M E N T L I N E W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E C H A I N L I N K F E N C E X F M R . T R A N S F O R M E R C B L X . C A B L E B O X T E L . T E L E P H O N E B O X E . M . E L E C T R I C M E T E R T . E . T R A S H E N C L O S U R E G . M . G A S M E T E R H Y D R A N T W A T E R V A L V E P . I . V . P O S T I N D I C A T O R V A L V E S A N I T A R Y M A N H O L E C . O . C L E A N O U T S T O R M M A N H O L E A R E A C A T C H B A S I N C A T C H B A S I N F L A R E D E N D C O N T O U R L I N E N O T E S 1 . U T I L I T I E S S H O W N A R E A P P R O X I M A T E L O C A T I O N . L O C A T I O N S O F U N D E R G R O U N D U T I L I T I E S C O M P I L E D F R O M V I S U A L E V I D E N C E ( F L A G G I N G & P A I N T M A R K S ) A N D R E C O R D D R A W I N G S ( D E S I G N & A S - B U I L T ) . C A L L G O P H E R S T A T E O N E C A L L A T 8 1 1 F O R A L L U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . P R O P E R T Y C U R R E N T L Y Z O N E D I - 2 ( G E N E R A L I N D U S T R I A L D I S T R I C T ) . 3 . S U R V E Y C O M P L E T E D I N A P R I L , 2 0 1 5 . 4 . T O T A L A R E A O F P R O P E R T Y A S S H O W N : A . L O T 1 , B L O C K 1 = 8 2 , 5 2 1 S Q . F T . ( 1 . 8 9 A C . ) B . O U T L O T A = 2 2 , 7 0 0 S Q . F T . ( 0 . 5 2 A C . ) C . O U T L O T B = 5 1 , 3 7 2 S Q . F T . ( 1 . 1 8 A C . ) 5 . B E N C H M A R K - T O P N U T O F H Y D R A N T O N N O R T H S I D E O F O U T L O T B E L E V A T I O N = 9 5 1 . 5 3 P R O P E R T Y D E S C R I P T I O N : L o t 1 , B l o c k 1 , a n d O u t l o t B , G R E N A D A B U S I N E S S P A R K , D a k o t a C o u n t y , M i n n e s o t a , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f . E X H I B I T E G R E N A D A A V E . LOT 1BLOCK 1 OUTLOT B O U T L O T A BENCHMARK - TO P N U T H Y D R A N T ELEVATION = 951. 5 3 PROPOSEDBUILDINGF.F.=953.44 -5.0%-2.5%-2.4% - 3 . 0 % - 3 . 9 % - 3 . 9 % - 3 . 8 % -4.8%-4.0%-4.8%-2.0%-2.0%-3.9% - 2 . 1 % -3.3%-4.3%-4.6%CONC. RET.WALL5 FT. CONC. WALK SSSSSSSSSS S S -0.8%-0.8% R E V I S E D P O N D V O L . @ 9 4 6 . 0 = 3 7 , 5 9 0 C U . F T . V O L . @ 9 4 8 . 0 = 7 0 , 8 3 0 C U . F T . C . O . S H O R T E N E X I S T I N G P I P E A N D R E L O C A T E F . E . I N V . = 9 4 6 . 0 0 R E L O C A T E S T R E E T L I G H T -6:1-7:1-11:1 P R O P O S E D L E G E N D W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E L I G H T P O L E H Y D R A N T W A T E R V A L V E S A N I T A R Y M A N H O L E S T O R M M A N H O L E C A T C H B A S I N F L A R E D E N D G R A D I N G L I M I T S 9 5 0 C O N T O U R L I N E S P O T E L E V A T I O N D R A I N A G E A R R O W B I T U M I N O U S S U R F A C E C O N C R E T E S U R F A C E R I P - R A P W W W W S S S S 9 5 3 . 4 4 - 2 . 2 % C O N S T R U C T I O N & G R A D I N G N O T E S 1 . U T I L I T I E S S H O W N A R E A T A P P R O X I M A T E L O C A T I O N S . T H E R E M A Y B E A D D I T I O N A L U N D E R G R O U N D A N D O V E R H E A D U T I L I T I E S N O T S H O W N O N T H E P L A N . C A L L G O P H E R S T A T E O N E C A L L A T 6 5 1 - 4 5 4 - 0 0 0 2 F O R U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . A R E A O F D I S T U R B A N C E I S G R E A T E R T H A N 1 A C R E . A N N P D E S P E R M I T I S R E Q U I R E D F O R T H I S S I T E . 3 . P E R I M E T E R S E D I M E N T C O N T R O L B M P ' S S H A L L B E E S T A B L I S H E D P R I O R T O T H E C O M M E N C E M E N T O F A N Y U P G R A D I E N T L A N D D I S T U R B I N G A C T I V I T I E S A N D S H A L L R E M A I N I N P L A C E U N T I L F I N A L S T A B I L I Z A T I O N . 4 . D I S T U R B E D S O I L A R E A S A N D S T O C K P I L E S S H A L L B E S T A B I L I Z E D A S S O O N A S P O S S I B L E B U T I N N O C A S E L A T E R T H A N 7 D A Y S F R O M T H E L A S T C O N S T R U C T I O N A C T I V I T Y I N T H A T A R E A . 5 . T E M P O R A R Y S T A B I L I Z A T I O N S H A L L C O N S I S T O F M N D O T S E E D M I X 2 1 - 1 1 1 A P P L I E D A T A R A T E O F 1 0 0 L B S / A C R E . P E R M A N E N T S T A B I L I Z A T I O N S H A L L C O N S I S T O F M N D O T S E E D M I X 2 5 - 1 3 1 A P P L I E D A T A R A T E O F 2 2 0 L B S / A C R E . S T R A W M U L C H S H A L L B E A P P L I E D A T 2 T O N S P E R A C R E A N D D I S K A N C H O R E D F O R T E M P O R A R Y A N D F I N A L S T A B I L I Z A T I O N . 6 . S E D I M E N T O R D E B R I S D E P O S I T E D I N P U B L I C R I G H T - O F - W A Y S H A L L B E R E M O V E D B Y T H E E N D O F E A C H D A Y . 7 . C O N S T R U C T T E M P O R A R Y R O C K C O N S T R U C T I O N E N T R A N C E A T E N T R A N C E T O E A C H G R A D I N G A R E A . 8 . P R O P O S E D E L E V A T I O N S S H O W N O N T H E P L A N A R E T O T O P O F P A V I N G , G U T T E R F L O W L I N E , O R F I N I S H G R A D E U N L E S S N O T E D O T H E R W I S E . 9 . S I T E D E S I G N D O E S N O T N E C E S S A R I L Y B A L A N C E E A R T H W O R K M A T E R I A L O N S I T E . C O N T R A C T O R S H A L L P R O V I D E S U I T A B L E M A T E R I A L A S N E E D E D , O R D I S P O S E O F A N Y E X C E S S M A T E R I A L O F F S I T E . E X I S T I N G L E G E N D L O T L I N E E A S E M E N T L I N E W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E C H A I N L I N K F E N C E X F M R . T R A N S F O R M E R C B L X . C A B L E B O X T E L . T E L E P H O N E B O X E . M . E L E C T R I C M E T E R T . E . T R A S H E N C L O S U R E G . M . G A S M E T E R H Y D R A N T W A T E R V A L V E P . I . V . P O S T I N D I C A T O R V A L V E S A N I T A R Y M A N H O L E C . O . C L E A N O U T S T O R M M A N H O L E A R E A C A T C H B A S I N C A T C H B A S I N F L A R E D E N D C O N T O U R L I N E N O T E S 1 . U T I L I T I E S S H O W N A R E A P P R O X I M A T E L O C A T I O N . L O C A T I O N S O F U N D E R G R O U N D U T I L I T I E S C O M P I L E D F R O M V I S U A L E V I D E N C E ( F L A G G I N G & P A I N T M A R K S ) A N D R E C O R D D R A W I N G S ( D E S I G N & A S - B U I L T ) . C A L L G O P H E R S T A T E O N E C A L L A T 8 1 1 F O R A L L U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . P R O P E R T Y C U R R E N T L Y Z O N E D I - 2 ( G E N E R A L I N D U S T R I A L D I S T R I C T ) . 3 . S U R V E Y C O M P L E T E D I N A P R I L , 2 0 1 5 . 4 . T O T A L A R E A O F P R O P E R T Y A S S H O W N : A . L O T 1 , B L O C K 1 = 8 2 , 5 2 1 S Q . F T . ( 1 . 8 9 A C . ) B . O U T L O T A = 2 2 , 7 0 0 S Q . F T . ( 0 . 5 2 A C . ) C . O U T L O T B = 5 1 , 3 7 2 S Q . F T . ( 1 . 1 8 A C . ) 5 . B E N C H M A R K - T O P N U T O F H Y D R A N T O N N O R T H S I D E O F O U T L O T B E L E V A T I O N = 9 5 1 . 5 3 6 . T O T A L N E W I M P E R V I O U S S U R F A C E C R E A T E D = 0 . 9 2 A C . ( 4 0 , 0 7 5 S Q . F T . ) PROPERTY DESCRIPTION:Lot 1, Block 1, Outlot A, and Outlot B, GRENADA BUSINESS PARK, Dakota County, Minnesota,according to the recorded plat thereof. E X H I B I T F G R E N A D A A V E . LOT 1BLOCK 1 OUTLOTB O U T L O T A BENCHMARK - TO P N U T H Y D R A N T ELEVATION = 951. 5 3 PROPOSEDBUILDINGF.F.=953.44 -5.0%-2.5%-2.4% - 3 . 0 % - 3 . 9 % - 3 . 9 % - 3 . 8 % -4.8%-4.0%-4.8%-2.0%-2.0%-3.9% - 2 . 1 % -3.3%-4.3%-4.6%GRADINGLIMITSINSTALL INLETPROTECTION(TYP.) P R O V I D E R E D U N D A N T B M P D R A I N I N G T O P O N D P R O V I D E R E D U N D A N T B M P D R A I N I N G T O P O N D DRAINAGE SWALEMNDOT SEED MIX 33-26244 LBS/ACRE I N S T A L L R O C K C O N S T R U C T I O N E N T R A N C E CAT. 3 ECB CAT. 3 ECB C A T . 3 E C B SSSSSSSSSS S S -0.8%-0.8%DRAINAGE SWALEMNDOT SEED MIX 33-26244 LBS/ACRECAT. 3 ECB C . O . -6:1-7:1-11:1 C O N S T R U C T I O N & G R A D I N G N O T E S 1 . U T I L I T I E S S H O W N A R E A T A P P R O X I M A T E L O C A T I O N S . T H E R E M A Y B E A D D I T I O N A L U N D E R G R O U N D A N D O V E R H E A D U T I L I T I E S N O T S H O W N O N T H E P L A N . C A L L G O P H E R S T A T E O N E C A L L A T 6 5 1 - 4 5 4 - 0 0 0 2 F O R U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . A R E A O F D I S T U R B A N C E I S G R E A T E R T H A N 1 A C R E . A N N P D E S P E R M I T I S R E Q U I R E D F O R T H I S S I T E . 3 . P E R I M E T E R S E D I M E N T C O N T R O L B M P ' S S H A L L B E E S T A B L I S H E D P R I O R T O T H E C O M M E N C E M E N T O F A N Y U P G R A D I E N T L A N D D I S T U R B I N G A C T I V I T I E S A N D S H A L L R E M A I N I N P L A C E U N T I L F I N A L S T A B I L I Z A T I O N . 4 . D I S T U R B E D S O I L A R E A S A N D S T O C K P I L E S S H A L L B E S T A B I L I Z E D A S S O O N A S P O S S I B L E B U T I N N O C A S E L A T E R T H A N 7 D A Y S F R O M T H E L A S T C O N S T R U C T I O N A C T I V I T Y I N T H A T A R E A . 5 . T E M P O R A R Y S T A B I L I Z A T I O N S H A L L C O N S I S T O F M N D O T S E E D M I X 2 1 - 1 1 1 A P P L I E D A T A R A T E O F 1 0 0 L B S / A C R E . P E R M A N E N T S T A B I L I Z A T I O N S H A L L C O N S I S T O F M N D O T S E E D M I X 2 5 - 1 3 1 A P P L I E D A T A R A T E O F 2 2 0 L B S / A C R E . S T R A W M U L C H S H A L L B E A P P L I E D A T 2 T O N S P E R A C R E A N D D I S K A N C H O R E D F O R T E M P O R A R Y A N D F I N A L S T A B I L I Z A T I O N . 6 . S E D I M E N T O R D E B R I S D E P O S I T E D I N P U B L I C R I G H T - O F - W A Y S H A L L B E R E M O V E D B Y T H E E N D O F E A C H D A Y . 7 . C O N S T R U C T T E M P O R A R Y R O C K C O N S T R U C T I O N E N T R A N C E A T E N T R A N C E T O E A C H G R A D I N G A R E A . 8 . P R O P O S E D E L E V A T I O N S S H O W N O N T H E P L A N A R E T O T O P O F P A V I N G , G U T T E R F L O W L I N E , O R F I N I S H G R A D E U N L E S S N O T E D O T H E R W I S E . 9 . S I T E D E S I G N D O E S N O T N E C E S S A R I L Y B A L A N C E E A R T H W O R K M A T E R I A L O N S I T E . C O N T R A C T O R S H A L L P R O V I D E S U I T A B L E M A T E R I A L A S N E E D E D , O R D I S P O S E O F A N Y E X C E S S M A T E R I A L O F F S I T E . PROPERTY DESCRIPTION:Lot 1, Block 1, Outlot A, and Outlot B, GRENADA BUSINESS PARK, Dakota County, Minnesota,according to the recorded plat thereof. E X I S T I N G L E G E N D L O T L I N E E A S E M E N T L I N E W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E C H A I N L I N K F E N C E X F M R . T R A N S F O R M E R C B L X . C A B L E B O X T E L . T E L E P H O N E B O X E . M . E L E C T R I C M E T E R T . E . T R A S H E N C L O S U R E G . M . G A S M E T E R H Y D R A N T W A T E R V A L V E P . I . V . P O S T I N D I C A T O R V A L V E S A N I T A R Y M A N H O L E C . O . C L E A N O U T S T O R M M A N H O L E A R E A C A T C H B A S I N C A T C H B A S I N F L A R E D E N D C O N T O U R L I N E P R O P O S E D L E G E N D W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E L I G H T P O L E H Y D R A N T W A T E R V A L V E S A N I T A R Y M A N H O L E S T O R M M A N H O L E C A T C H B A S I N F L A R E D E N D G R A D I N G L I M I T S S I L T F E N C E I N L E T P R O T E C T I O N 9 5 0 C O N T O U R L I N E S P O T E L E V A T I O N D R A I N A G E A R R O W B I T U M I N O U S S U R F A C E C O N C R E T E S U R F A C E R I P - R A P C A T . 3 E C B R O C K C O N S T R . E N T R . W W W W S S S S 9 5 3 . 4 4 - 2 . 2 % N O T E S 1 . U T I L I T I E S S H O W N A R E A P P R O X I M A T E L O C A T I O N . L O C A T I O N S O F U N D E R G R O U N D U T I L I T I E S C O M P I L E D F R O M V I S U A L E V I D E N C E ( F L A G G I N G & P A I N T M A R K S ) A N D R E C O R D D R A W I N G S ( D E S I G N & A S - B U I L T ) . C A L L G O P H E R S T A T E O N E C A L L A T 8 1 1 F O R A L L U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . P R O P E R T Y C U R R E N T L Y Z O N E D I - 2 ( G E N E R A L I N D U S T R I A L D I S T R I C T ) . 3 . S U R V E Y C O M P L E T E D I N A P R I L , 2 0 1 5 . 4 . T O T A L A R E A O F P R O P E R T Y A S S H O W N : A . L O T 1 , B L O C K 1 = 8 2 , 5 2 1 S Q . F T . ( 1 . 8 9 A C . ) B . O U T L O T A = 2 2 , 7 0 0 S Q . F T . ( 0 . 5 2 A C . ) C . O U T L O T B = 5 1 , 3 7 2 S Q . F T . ( 1 . 1 8 A C . ) 5 . B E N C H M A R K - T O P N U T O F H Y D R A N T O N N O R T H S I D E O F O U T L O T B E L E V A T I O N = 9 5 1 . 5 3 6 . T O T A L N E W I M P E R V I O U S S U R F A C E C R E A T E D = 0 . 9 2 A C . ( 4 0 , 0 7 5 S Q . F T . ) OUTLOTB O U T L O T A SSSSSSSSSSSS C.O.OUTLOTB O U T L O T A PROPOSEDBUILDINGF.F.=953.44 -5.0%-2.5%-2.4%-3.0%-3.9%-3.9%-3.8%-4.8%-4.0%-4.8%-2.0%-2.0%-3.9%-2.1%-3.3%-4.3%-4.6%SSSSSSSSSSSS-0.8%-0.8%C.O.-6:1-7:1-11:1 P R O P E R T Y D E S C R I P T I O N : L o t 1 , B l o c k 1 , O u t l o t A , a n d O u t l o t B , G R E N A D A B U S I N E S S P A R K , D a k o t a C o u n t y , M i n n e s o t a , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f . E X I S T I N G L E G E N D L O T L I N E E A S E M E N T L I N E W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E C H A I N L I N K F E N C E X F M R . T R A N S F O R M E R C B L X . C A B L E B O X T E L . T E L E P H O N E B O X E . M . E L E C T R I C M E T E R T . E . T R A S H E N C L O S U R E G . M . G A S M E T E R H Y D R A N T W A T E R V A L V E P . I . V . P O S T I N D I C A T O R V A L V E S A N I T A R Y M A N H O L E C . O . C L E A N O U T S T O R M M A N H O L E A R E A C A T C H B A S I N C A T C H B A S I N F L A R E D E N D C O N T O U R L I N E N O T E S 1 . U T I L I T I E S S H O W N A R E A P P R O X I M A T E L O C A T I O N . L O C A T I O N S O F U N D E R G R O U N D U T I L I T I E S C O M P I L E D F R O M V I S U A L E V I D E N C E ( F L A G G I N G & P A I N T M A R K S ) A N D R E C O R D D R A W I N G S ( D E S I G N & A S - B U I L T ) . C A L L G O P H E R S T A T E O N E C A L L A T 8 1 1 F O R A L L U T I L I T Y , G A S L I N E , A N D E L E C T R I C A L L I N E L O C A T I O N S P R I O R T O E X C A V A T I O N . 2 . P R O P E R T Y C U R R E N T L Y Z O N E D I - 2 ( G E N E R A L I N D U S T R I A L D I S T R I C T ) . 3 . S U R V E Y C O M P L E T E D I N A P R I L , 2 0 1 5 . 4 . T O T A L A R E A O F P R O P E R T Y A S S H O W N : A . L O T 1 , B L O C K 1 = 8 2 , 5 2 1 S Q . F T . ( 1 . 8 9 A C . ) B . O U T L O T A = 2 2 , 7 0 0 S Q . F T . ( 0 . 5 2 A C . ) C . O U T L O T B = 5 1 , 3 7 2 S Q . F T . ( 1 . 1 8 A C . ) 5 . B E N C H M A R K - T O P N U T O F H Y D R A N T O N N O R T H S I D E O F O U T L O T B E L E V A T I O N = 9 5 1 . 5 3 P R O P O S E D L E G E N D W A T E R M A I N S A N I T A R Y S E W E R S T O R M S E W E R W A T E R S E R V I C E S A N I T A R Y S E R V I C E L I G H T P O L E H Y D R A N T W A T E R V A L V E S A N I T A R Y M A N H O L E S T O R M M A N H O L E C A T C H B A S I N F L A R E D E N D G R A D I N G L I M I T S S I L T F E N C E I N L E T P R O T E C T I O N 9 5 0 C O N T O U R L I N E S P O T E L E V A T I O N D R A I N A G E A R R O W B I T U M I N O U S S U R F A C E C O N C R E T E S U R F A C E R I P - R A P C A T . 3 E C B R O C K C O N S T R . E N T R . W W W W S S S S 9 5 3 . 4 4 - 2 . 2 % 97' - 0" 97' - 0" 9 8 ' - 0 " 98' - 0" 9 9 ' - 0 " 99' - 0" 20 ' - 0 " 189' - 1 1/8"18' - 0"24' - 0"18' - 0"14' - 3 11/16" 2 4 ' - 1 1 3 / 8 " 1 0 0 ' - 0 " 6 ' - 3 5 / 1 6 " 5 ' - 0 " 1 8 ' - 0 " 2 6 ' - 2 1 / 8 " 20 2748 2 7 9 10 2 1 5 t h S T R E E T EX I S T I N G O N E S T O R Y B U I L D I N G 28 , 5 9 6 S . F . PROPOSED ONE STORY ADDITION 18,700 S.F. 21 E X I S T I N G P A R K I N G S T A L L S TO B E R E M O V E D A L O N G N O R T H S I D E O F BU I L D I N G D U E T O B U I L D I N G E X P A N S I O N 47 NEW PARKING STALLS TO BE ADDED NE W E L E C T R I C A L T R A N S F O R M E R LO C A T I O N NEW TRASH ENCLOSURE NEW DRIVE-IN DOOR NEW RETAINING/TRUCK SCREEN WALLTWOLOADINGDOCKS AD J A C E N T B U I L D I N G A D J A C E N T B U I L D I N G AD J A C E N T B L D G GRENADA AVENUE EXISTING STORM WATER POND P R O P E R T Y L I N E 2 1 0 ' + / - PR O P E R T Y L I N E 5 7 5 ' + / - PROPERTY LINE 266' +/- PR O P E R T Y L I N E 2 5 7 ' + / - P R O P E R T Y L I N E 1 8 7 '+/- LI N E I N D I C A T E S D R A I N A G E A N D U T I L I T Y S E T B A C K LI N E I N D I C A T E S 1 5 ' - 0 " B U I L D I N G S E T B A C K L I N E I N D I C A T E S 1 5 ' - 0 " P A R K I N G S E T B A C K L I N E I N D I C A T E S 3 0 ' - 0 " B U I L D I N G S E T B A C K LI N E I N D I C A T E S 5 ' - 0 " P A R K I N G S E T B A C K LI N E I N D I C A T E S 1 5 ' - 0 " B U I L D I N G S E T B A C K EX I S T . E D G E O F B I T U M I N O U S TU R F EX I S T DR I V E W A Y L I N E I N D I C A T E S 5 '-0 "P A R K I N G S E T B A C K L I N E I N D I C A T E S 3 0 '-0 "B U I L D I N G S E T B A C K EX I S T L A N D S C A P E R O C K M U L C H A R E A T O BE R E P A I R E D A F T E R E X C A V A T I O N EX I S T T R E E EX I S T S I D E W A L K EX I S T F R O N T EN T R Y TU R F TU R F EX I S T . B I T U M I N O U S S U R F A C E LINE INDICATES 5'-0" PARKING SETBACKNEW BITUMINOUS SURFACE CURB AND GUTTER AT PERIMETER 4" WIDE PAINT STRIPING 248' - 0"180' - 0"TURF H. C . S I G N A G E H. C . R A M P W / T R U N I C A T E D D O M E S DU A L P U R P O S E C O N C S I D E W A L K 4" W I D E P A I N T S T R I P I N G 42" HIGH STL.PIPE RAILING -PT.OPAGUE SWINGING GATE NE W 3 4 F T . WI D E DR I V E W A Y EX I S T AD J A C E N T DR I V E W A Y TU R F NEW BITUMINOUS SURFACETURFTURF EX I S T E V E R G R E E N T R E E EX I S T D E C I D U O U S T R E E ROCK MULCH 2 NEW TREES - TYPE "A" 3 N E W T R E E S T Y P E " B " 2 NEW TREES - TYPE "C" 13 N E W S H R U B S - T Y P E " D " NE W R O O F H A T C H @ N E W S H I P ' S LA D D E R T O T H E R O O F L O C A T I O N 2 NEW TREES - TYPE "A"2 NEW TREES - TYPE "B"2 NEW TREES - TYPE "C"2 NEW TREES - TYPE "C" 3 N E W T R E E S - T Y P E " A " 3 N E W T R E E S - T Y P E " B " 3 4 ' - 0 " EX I S T I N G A U T O P A R K I N G AR E A T O R E M A I N SI T E I N F O R M A T I O N : TO T A L L O T A R E A : EX I S T I N G L O T A R E A = 1 . 8 9 A C R E S OU T L O T A R E A = 1 . 1 8 A C R E S TO T A L = 3 . 0 7 A C R E S ZO N I N G : I- 2 G E N E R A L I N D U S T R I A L D I S T R I C T BU I L D I N G S E T B A C K S : FR O N T 40 ' - 0 " SI D E 15 ' - 0 " RE A R 30 ' - 0 " PA R K I N G S E T B A C K S : FR O N T 15 ' - 0 " SI D E 5' - 0 " RE A R 5' - 0 " PR O P O S E D B U I L D I N G S I Z E : 28 , 5 9 6 S F E X I S T I N G + 1 8 , 7 0 0 S F ( P R O P O S E D ) = 4 7 , 2 9 6 S F F O O T P R I N T PA R K I N G R E Q U I R E M E N T S : RE Q U I R E D : OF F I C E : ON E ( 1 ) S P A C E P E R 2 0 0 S F O F F L O O R A R E A PR O D U C T I O N : ON E ( 1 ) S P A C E P E R 3 5 0 S F O F F L O O R A R E A WA R E H O U S E : ON E ( 1 ) S P A C E P E R 1 , 0 0 0 S F O F F L O O R A R E A RE Q U I R E D P A R K I N G S T A L L S I Z E = 9 ' - 0 " x 2 0 ' - 0 " ( R E D U C E D B Y 2 ' - 0 " W I T H O V E R H A N G ) NO T E : F L O O R A R E A I S B A S E D O N 9 0 % O F G R O S S F L O O R A R E A EX I S T I N G B U I L D I N G : TO T A L R E Q U I R E D B Y O R D I N A N C E F R O M L A S T E X P A N S I O N = 5 0 S P A C E S PR O P O S E D E X P A N S I O N : MA N U F A C T U R I N G 9, 3 5 0 S F - 1 0 % = 8 , 4 1 5 S F / 3 5 0 = 2 4 S P A C E S WA R E H O U S E 9, 3 5 0 S F - 1 0 % = 8 , 4 1 5 S F / 1 , 0 0 0 = 9 S P A C E S TO T A L A M O U N T O F P A R K I N G R E Q U I R E D B Y C I T Y O R D I N A N C E = 8 3 S P A C E S TO T A L A M O U N T O F A M O U N T A U T O P A R K I N G S H O W N O N S I T E = 8 7 S P A C E S AM O U N T O F S P A C E S T O B E A C C E S S I B L E P E R B U I L D I N G C O D E = 4 S P A C E S OT H E R P A R K I N G N O T E S : EX I S T I N G P A R K I N G O N S I T E - 6 1 S T A L L S EX I S T I N G P A R K I N G O N S I T E R E M O V E D F O R C O N S T R U C T I O N - 2 1 S T A L L S TO T A L P A R K I N G S T A L L S O N S I T E W H E N C O M P L E T E - 8 7 S T A L L S LA N D S C A P E N O T E S L E G E N D : TY P E A = N O R W A Y M A P L E ' A C E R P L A T A N O I D E S ' 2 1 / 2 " B A L L E D A N D B U R L A P P E D TY P E B = B L A C K H I L L S S P R U C E ' P I C E A G L A U C A D E N S A T A ' 8 ' - 0 " H I G H TY P E C = S P R I N G S N O W C R A B A P P L E , ' M A L U S S P R I N G S N O W ' , 2 1 / 2 " B A L L E D A N D B U R L A P P E D TY P E D = N E O N F L A S H S P I R E A , ' S P I R A E A J A P O N I C A ' S H I B O R I ' , 1 8 " H I G H ScaleProject number Date Drawn by Checked by21476 GRENADA AVENUE LAKEVILLE, MN 55044 PH: 952-469-2171 FAX: 952-469-2173 EMAIL:office@approdevelopment.com PRELIMINARY NOT FOR CONSTRUCTION As indicated 6/11/2015 8:58:21 AM A1-1SITE PLAN 1 5-02-0030MENDELLMACHINEADDITION 06/11/15 SWC SWCNo. Description Date 1 " = 3 0 ' - 0 " A1 - 1 1 Si t e P l a n NO R T H EXHIBIT G RE F . R E F . 9 10 11 12 13 8 A A B B B. 7 C 14 D 7 6 5 4 3 2 1 A. 9 B.5 44 0 ' - 0 " 26 0 ' - 0 " 180' - 0" 30 ' - 0 " 30 ' - 0 " 30 ' - 0 " 40 ' - 0 " 35 ' - 0 " 35 ' - 0 " 40 ' - 0 " 20 ' - 0 " 4' - 0 " 35 ' - 0 " 35 ' - 0 " 35' - 0"35' - 0"36' - 0"100' - 0" 1 3 0 ' - 0 " 1 0 ' - 0 " 1 4 ' - 0 " 2 1 ' - 6 " 9 ' - 6 " 7 5 ' - 0 " 3 5 ' - 0 " 6 5 ' - 0 " B.6 B. 6 9. 1 50' - 0"50' - 0" EX I S T I N G B U I L D I N G : ED G E O F E X I S T I N G B U I L D I N G EX I S T . D O O R T O B E N E W O P N G B E T W E E N B U I L D I N G S NO W O R K W A R E H O U S E A N D P R O D U C T I O N A R E A : TY P . F L O O R E L E V . R E F E R E N C E 1 0 0 ' - 0 " - M A T C H EX I S T I N G B U I L D I N G F L O O R E L E V A T I O N PR O V I D E S . O . G . F L O O R W I T H R E I N F . O N CO M P A C T E D G R A N U L A R B A S E STL. BLDG. COL.12 x 14 O.H.DRIVE-IN DOOR10x10 O.H.DOCK DOOR10x10 O.H.DOCK DOOR TR A S H E N C L O S U R E W / O P A G U E G A T E S EXTERIOR WALLSERVICE DOOR ScaleProject number Date Drawn by Checked by21476 GRENADA AVENUE LAKEVILLE, MN 55044 PH: 952-469-2171 FAX: 952-469-2173 EMAIL:office@approdevelopment.com PRELIMINARY NOT FOR CONSTRUCTION 1/16" = 1'-0"5/13/2015 2:32:40 PM A2-1OVERALLFLOOR PLAN 15-03-0030MENDELLMACHINEADDITION 05/13/15 SWC SWCNo. Description Date 1 / 1 6 " = 1 ' - 0 " A2 - 1 1 OV E R A L L F L O O R P L A N EXHIBIT H First Floor 100' - 0" Top of Wall 122' - 0" 9 10 11 12 138 1476 EXISTING BUILDING PROPOSED ADDITION ALUM 1" INSUL WDW TO MATCH EXIST PREFINISHED SECTIONAL OH DOOR W/ DOCK SEALS & BUMPERS C.I.P. CONC RETAINING WALL PREFINISHED SECTIONAL DRIVE-IN OH DOOR 10' WIDE PRECAST CONC PANEL TO MATCH EXISTING PRECAST CONC TRASH ENCLOSURE 9.1 First Floor 100' - 0" Top of Wall 122' - 0" ABB.7CD A.9B.5 PROPOSED ADDITIONEXIST BLDG 10' WIDE PRECAST CONC PANEL - SMOOTH GRAY FINISH, DOES NOT MATCH REMAINDER OF BUILDING VIISBLE TO THE PUBLIC B.6 HM DOOR AND FRAME - PT. PRE-FIN. MTL. CAP FLASHING GRADE First Floor 100' - 0" Top of Wall 122' - 0" A B B.7 C DA.9 B.5B.6 First Floor 100' - 0" Top of Wall 122' - 0" 910111213 814 7 6 PROPOSED ADDITION EXISTING BUILDING ALUM 1" INSUL WDW TO MATCH EXIST 10' WIDE PRECAST CONC PANEL TO MATCH EXISTING, INTEGRAL COLOR WITH ACCENT AREAS 9.1 Scale Project number Date Drawn by Checked by 21476 GRENADA AVENUE LAKEVILLE, MN 55044 PH: 952-469-2171 FAX: 952-469-2173 EMAIL: office@approdevelopment.com PRELIMINARY NOT FOR CONSTRUCTION 3/32" = 1'-0" 5/ 1 3 / 2 0 1 5 2 : 3 3 : 3 4 P M A3-1 EXTERIOR ELEVATIONS 15-03-0030 MENDELL MACHINE ADDITION 05/13/15 SWC SWC No. Description Date 3/32" = 1'-0"A3-1 1 East Elevation 3/32" = 1'-0"A3-1 2 NORTH EXTERIOR ELEVATION 3/32" = 1'-0"A3-1 3 SOUTH EXTERIOR ELEVATION 3/32" = 1'-0"A3-1 4 WEST EXTERIOR ELEVATION EXHIBIT I COOPER LIGHTING - LUMARK ® NOTE: Specifications and dimensions subject to change without notice. Visit our web site at www.cooperlighting.com Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 The Lumark Wal-Pak Series of wall luminaires provides traditional architectural style with high performance energy efficient illumination. Rugged die-cast aluminum construction, stainless steel hardware along with a sealed and gasketed optical compartment make the Wal-Pak virtually impenetrable to contaminants. IP65 Rated. Six available lamp sources including patent pending energy efficient LED, pulse start metal halide, compact fluorescent, ceramic metal halide, standard metal halide and high pressure sodium. UL/cUL wet location listed. The Wal-Pak wall luminaire is ideal for pathway illumination, building entrances, vehicle ramps, schools, tunnels, stairways and loading docks. DESCRIPTION Catalog # Type Date Project Comments Prepared by SPECIFICATION FEATURES Housing Rugged one-piece die-cast aluminum housing and hinged, removable die-cast aluminum door. One-piece silicone gasket seals the optical chamber. UL 1598 wet location listed and IP65 ingress protection rated. Not recommended for car wash applications. Electrical Ballasts, LED driver and related electrical components are hard mounted to the die-cast housing for optimal heat sinking and operating efficiency. Wiring is extended through a silicone gasket at the back of the housing. Three ½” threaded conduit entry points allow for thru-branch wiring. LED thermal management system incorporates both conduction and natural convection to transfer heat rapidly away from LED source. Integral LED electronic driver incorporates internal fusing designed to withstand a 3kV surge test and is Class 2 rated for 120-277V with an operating temperature of -30º to 60ºC. Wal-Pak LED systems maintain greater than 70% of the initial light output after 50,000 hours of operation. UL listed HID high power factor ballasts are Class H insulation rated (metal halide: 150, 175, 200, 250, 320, 350, 400W [-30ºC / -20ºF], (high pressure sodium: 50, 70, 100, 150, 250, 400W [-40ºC / -40ºF]. High efficiency HID ballasts are available in 120V, 208V, 240V, 277V, 347V and 480V. Compact fluorescent high power factor ballasts are Class P insulation rated for 120-277V and have a starting temperature of -18ºC / 0ºF. Optical Highly reflective anodized aluminum reflectors provide high efficiency illumination. Optical assemblies include impact resistant borosilicate refractive glass, Solite™ flat diamond patterned glass and full cutoff IESNA compliant configurations. Patent pending, solid state LED luminaires are thermally optimized with 2400 or 4000 sourced lumen package modules. HID models are offered in horizontal medium or mogul- based metal halide [MH / MP] or high pressure sodium [HP] lamps. T6 ceramic metal halide [CM] and 4-pin compact fluorescent [CF] lamp models offer high efficiency energy saving illumination. Door Assembly Single point, captive stainless steel hardware secures the removable hinged door allowing for ease of installation and maintenance. Door assembly is hinged at the bottom for easy removal, installation and re-lamping. Finish Housing and door are protected with 5-stage TGIC dark bronze polyester powder coat paint. Premium TGIC power coat finishes withstand extreme climate changes while providing optimal color and gloss retention. Optional premium colors are available.WP WAL-PAK 2400 - 4000 Lumens LED 39 - 400W High Pressure Sodium Pulse Start Metal Halide Metal Halide Ceramic Metal Halide 32 - 140W Compact Fluorescent WALL MOUNT LUMINAIRE 16-5/8" [422mm] Small 11-3/8" [290mm] Large 12-3/4" [323mm] Small 15" [381mm] Large 16-1/4" [414mm] 10" [254mm] 16-5/8" [422mm] 10" [254mm] 16-5/8" [422mm] 10" [254mm] Small 11-3/8" [290mm] Large 12-3/4" [323mm] BOROSILICATE GLASS DOOR (GL) FULL CUTOFF DOOR (FC)FLAT SOLITE GLASS DOOR (FL) DIMENSIONS ADH092103 pc 2013-06-14 09:08:16 TECHNICAL DATA UL/cUL Wet Location Listed IP65 Rated 40°C Maximum Ambient Temperature External Supply Wiring 90°C Minimum EISA G, ARRA, Title 20 Compliant LM79 / LM80 Compliant ENERGY DATA Reactor Ballast Input Watts 50W HPS NPF (58 Watts) 70W HPS NPF (82 Watts) 100W HPS NPF (118 Watts) 150W HPS NPF (175 Watts) High Reactance Ballast Input Watts 50W MP HPF (69 Watts) 70W MP HPF (94 Watts) 100W MP HPF (129 Watts) 150W MP HPF (185 Watts) CWA Ballast Input Watts 200W HPS HPF (250 Watts) 200W MP HPF (227 Watts) G 250W MP HPF (283 Watts) G 320W MP HPF (365 Watts) G 350W MP HPF (400 Watts) G 400W HPS HPF (465 Watts) 400W MP HPF (452 Watts) G SHIPPING DATA Approximate Net Weight: 32-42 lbs. (15-19 kgs.) EXHIBIT J NOTE: Specifications and dimensions subject to change without notice. Visit our web site at www.cooperlighting.com Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 WP WAL-PAK LAMP TYPE WATTAGE Pulse Start Metal Halide 50, 70, 100, 150, 200, 250, 320, 350, 400W Metal Halide 175, 250, 400W High Pressure Sodium 50, 70, 100, 150, 250, 400W T6 Ceramic Metal Halide 39, 70, 100, 150W Compact Fluorescent (1) 32, (1) 42, (1) 57, (1) 70, (2) 32, (2) 42, (2) 57, (2) 70 LED 2A (2 Package) 28W, 4A (4 Package) 40W VOLTAGE CHART DT=Dual-Tap 120/277 (wired 277V) MT=Multi-Tap 120/208/240/277 (wired 277V) TT=Tri-Tap 120/277/347 (wired 347V) 5T=5 Tap 120/208/240/277/480 (wired 480V) E=Electronic Ballast 120-277V (Universal) (50/60 HZ) ED=Electronic LED Driver 120-277V (Universal) (50/60 HZ) ADH092103 pc 2013-06-14 09:08:16 SAMPLE NUMBER: MPWP-GL-250-MT-2EM/SC/MR Voltage 6 Options 9 CEC=California Title 20 Compliant Ballast (200-400W Pulse Start MP Only) F1 =Single fuse 10 F2 =Double fuse 10 PE =Photocontrol button 10 LL =Includes lamp 2 BK =Black housing WH =White housing GM =Graphite Metallic housing AP =Grey housing DP =Dark Platinum housing DIMA=CF Dimming Ballast 11 DIMB=CF Dimming Ballast 11 SGL=Solite Glass Lens 12 Q=Quartz Restrike T4 Lamp 13 EM =Emergency Quartz Restrike T4 Lamp with Time Delay Relay 13 EM/SC=Emergency Separate Circuit T4 Lamp 13 QMR=Emergency Back-Up 1-MR16 Lamp 14,15 2QMR=Emergency Back-Up 2-MR16 Lamps 14,15 2QMR/SC=Emergency Back-Up MR16 and EM separate circuit 2-MR16 Lamp 14,16 EMMR=Emergency Back-Up 1-MR16 Lamp with Time Delay Relay 14,15 2EMMR=Emergency Back-Up 2-MR16 Lamps with Time Delay Relay 14,15 2EMMR/SC=Emergency Back-Up 1-MR16 Lamp with Time Delay Relay and EM Separate Circuit 14, 15, 16 EM/SC/MR=Emergency Back-Up Separate Circuit 1-MR16 Lamp 14, 15, 16 2EM/SC/MR=Emergency Back-Up Separate Circuit 2-MR16 Lamps 14, 15, 16 EM/SC/12V=Emergency Separate Circuit 12V 1-MR16 Lamp 14, 16, 17 2EM/SC/12V=Emergency Separate Circuit 12V 2-MR16 Lamps 14, 16, 17 EMI40=Emergency Cold Temperature UL 924 CF Power Pack 1 Lamp 18 EMI40/2L=Emergency Cold Temperature UL 924 CF Power Pack 2 Lamp 18 CF-EM=Emergency UL924 CF Power Pack 1 Lamp 19 CF-EM/2L=Emergency UL924 CF Power Pack 2 Lamp 19 EMLED-CD=LED Battery Back-Up Cold Temperature 20 Accessories 21 Lamp Type MP = Pulse Start Metal Halide HP = High Pressure Sodium LD =Solid State Light-Emitting Diodes (LED) CF = Compact Fluorescent 1 CM = Ceramic Metal Halide 2 MH = Metal Halide 3 GL = Borosilicate Glass Door FC = Full Cutoff Door FL = Flat Solite Glass Door PL = Polycarb Refractor Door 50 =50W 70 =70W 100=100W 150=150W 200=200W 250=250W 320=320W 350=350W 400=400W 120V=120V 208V=208V 240V=240V 277V=277V 347V=347V 7 480V=480V DT =Dual-Tap MT =Multi-Tap TT =Tri-Tap 5T =5-Tap E= Electronic Ballast 8 ED = Electronic LED Driver 50 =50W 70 =70W 100=100W 150=150W 250=250W 400=400W Door Type 4 Lamp Wattage 5 MP 175=175W 250=250W 400=400W MH HP 39 =39W 70 =70W 100=100W 150=150W CM 32 =32W 42 =42W 57 =57W 70 =70W 64 =(2-32) 84 =(2-42) 114=(2-57) 140=(2-70) CF 2A =(2 Package), 28W 4A =(4 Package), 40W LED Series WP = Wal-Pak NOTES: 1 CF Single lamp offered in all door configurations. CF dual lamp models not offered with FL door type. 70W models not available with EMI40-2L, CF-EM, CF-EM-2L. CF not available in 347V. 2 All CM models offered with T6 envelope G12 lamp base. T6 Lamp included with CM models. Order LL with CM models. Ceramic Metal Halide (CM) is available with (MP) pulse start metal halide or E - Electronic Ballast. 400W MP must be ordered with LL option to be Title 20 Complaint. 3 MH products available for non-US markets only. 4 Small housing offered for 175W and below, CF and LD models. Large housing for 200W-400W. FL door not available with CF or 200-400W models. Polycarbonate lens available in models up to 175W max including LD. Polycarbonate lens not available with full cutoff door or FL models. Solite stipple glass is standard for FL lens. Clear glass is standard for full cutoff door types except for LD. LD full cutoff door is standard with solite glass. 5 LED packages based on 67 CRI/5000K package at 25°C ambient. MH and MP 175W and below are medium base all others are mogul base. CF 64, 84, 114 and 140 models are offered in borosilicate glass and full cutoff doors only. In cold temperatures, compact fluorescent lamps produce lower illumination levels. CF 140 models and 400W HPS rated for 25°C. 6 See Voltage Chart for descriptions. 5T available in 400W MH models only. 90°C Rated wire required for thru-branch wiring for units 175W and lower. 105°C Rated wire required for thru-branch wiring for units 200W and higher. Thru-branch wiring is rated for 40°C for LD and 175W and below. Higher wattage thru-branch wiring is rated for use in 25°C ambient operating environments. 7 347V not available with thru-branch wiring. For 347 or 480V LD specify voltage. ED will be supplied with integral step down transformer. 347V not available with CF lamps. 8 Available with 70-150W MP or CM lamps. E is standard for all CF models. All electronic ballasts are universal 120-277V. 9 Not all options can be combined. Only one emergency or battery back-up option available within the fixture. CF Models utilize EMI40, EMI40/2L, CF/EM or CF-EM/2L option for emergency egress. LD Models utilize EM-LED or EMLED-CD options only for battery back-up. 10 Must specify voltage. F1=120, 277 or 347V. F2=208, 240 or 480V. PE=120, 208, 240 or 277V. 11 DIMA dimming ballast, specify number of lamps, available for 1 or 2-26W or 1-32W, 1-42W. DIMB available for 2-42W, 1-57W or 1-70W. 12 SGL optional on HID and CF models only. See note number 4. 13 Q or EM not available with LD or E electronic ballast. Q or EM Minimum HID wattage is 70 watts. EM/SC available in 120V only, EM/SC not available with LD. Maximum 100W 120V T4 DC Bayonet Quartz lamp. Lamp supplied by others. 14 QMR, 2QMR, EMMR, 2EMMR & 2EMMR/SC not available with LD or E electronic ballast. Minimum HID wattage is 70 watts. 15 1 or 2 GU10 base 50W max - 120V Halogen. Lamps supplied by others. EM/SC/MR, 2EM/SC/MR, EM/SC/12V, 2EM/SC/12V not available with LD. 16 Emergency lamp leads out of the back of the unit to auxillary power. Lamps independently wired to separate circuits. 17 Low Voltage 1 or 2 GU5.3 MR16 base, 12V DC, 35W max. Lamps supplied by others. 18 For use in 25°C ambient operating temperature environments. EMI40, EMI40/2L used for CF lamps. Specify 120 or 277V. EMI40 supports 1-70W CF max, EMI40/2L supports 2-32W CF max. Minimum -18°C/-4°F. 19 For use in 25°C ambient operating temperature environments. Specify 120 or 277V, CF-EM supports up to 1-57W CF. CF-EM/2L supports 2-18W CF, 18W lamps supplied by others. Minimum temperature is 32°C/0°F. 20 EMLED-CD available with 4A models only. For use in 25°C ambient operating temperature environments. Specify 120 or 277V. EMLED-CD minimum -20°C/-4°F. Battery pack is a UL recognized component. 21 Order separately. 22 Delivered lumens subject to change. Consult IES file for details. WG/WPGL=Wire Guard Borosilicate Glass Lens Door WG/WPFC=Wire Guard Full Cutoff Door WG/WPFL=Wire Guard FL Lens Door TR/WP= Tamper Resistant Screw and Bit VS/WPGL=Polycarbonate Vandal Shield for Borosilicate Glass Lens Door WP ORDERING INFORMATION Borosilicate Glass Door (GL) LDWP-GL-2A-ED 0 3 2 1836 LDWP-GL-4A-ED 1 3 2 2795 Polycarbonate Lens (PL) LDWP-PL-2A-ED 0 3 2 1508 LDWP-PL-4A-ED 1 3 2 2297 For more information on the IES BUG (Backlight-Uplight-Glare) Rating visit www.iesna.org/PDF/Erratas/TM-15-07BugRatingsAddendum.pdf Flat Lens Door (FL) LDWP-FL-2A-ED 0 2 1 1454 LDWP-FL-4A-ED 0 3 1 2084 Full Cutoff Door (FC) LDWP-FC-2A-ED 0 1 1 1090 LDWP-FC-4A-ED 0 1 1 1313 BUG RATING B U G Delivered Lumens B U G Delivered Lumens22 22 LED LUMEN TABLE NOTES: Options not available with stock products. Refer to standard order information to add options. MT is standard. Lamp Type: MP not available in 100W. HPS not available in 320W or Full Cutoff [C] Door. Borosilicate glass door is standard. 2A and 4A models available in LED only. LED models are 120-277V. SAMPLE NUMBER: WPP40C Series WP =Wal-Pak Lamp Type S=High Pressure Sodium P=Pulse Start Metal Halide L=LED Lamp Wattage 10 =100W 15 =150W 2A =28W 4A =40W 25 =250W 32 =320W 40 =400W Door/Glass Type Blank =Standard C =Full Cutoff Door STOCK SAMPLE NUMBER - LAMP INCLUDED City of Lakeville Public Works – Engineering Division Memorandum To: Frank Dempsey, Associate Planner From: Matt Decur, Project Engineer McKenzie L. Cafferty, Environmental Resources Manager Brett Altergott, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Date: June 10, 2015 Subject: Grenada Business Park 2nd Addition • Preliminary and Final Plat Review • Easement Vacation Review • Lot Combination Review • Site Plan Review • Final Grading Plan Review • Utility Plan Review • Final Erosion Control Plan Review • Tree Preservation Plan Review BACKGROUND Appro Development, on behalf of Lakeville Technologies LLC, has submitted a preliminary and final plat named Grenada Business Park 2nd Addition. The property is located west of and adjacent to Grenada Avenue; and north of 215th Street (CSAH 70). The parent parcel is Outlot B, Grenada Business Park and is zoned I-2, General Industrial District. The preliminary and final plat consists of one lot on one block. Appro Development, on behalf of Lakeville Technologies LLC, has also submitted an application to vacate a Drainage and Utility Easement along a portion of the north property line of Lot 1, Block 1, Grenada Business Park. This Easement Vacation will facilitate the combination of Lot 1, Block 1, Grenada Business Park and Lot 1, Block 1, Grenada Business Park 2nd Addition. GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 22 OOFF 88 Appro Development, on behalf of Lakeville Technologies LLC, has also submitted a site plan application to construct a building addition , parking lot, and stormwater improvements for Mendell Machine and Manufacturing on the combined Lot 1, Block 1, Grenada Business Park and Lot 1, Block 1, Grenada Business Park 2nd Addition. The proposed development will be completed by: Developer: Appro Development, Inc. Engineer: Jacobson Engineers & Surveyors SSIITTEE CCOONNDDIITTIIOONNSS Outlot B, Grenada Business Park is currently undeveloped land. There are existing public drainage and utility easements along the parcel’s north and west property lines and along Grenada Avenue. There is a 16” watermain in the utility easement on the north property line. The site generally slopes west to east, draining to the existing public stormwater basin in Outlot A, Grenada Business Park. Lot 1, Block 1, Grenada Business Park contains a 28,596 square foot single story building housing Mendel Machine and Manufacturing. The site has two parking lots with 61 stalls. There are public drainage and utility easements on all the parcel’s property lines, per the Grenada Business Park plat. A private storm sewer system collects runoff from the site and conveys it to a swale on Grenada Avenue, which drains to the existing public stormwater basin in Outlot A, Grenada Business Park. EEAASSEEMMEENNTT VVAACCAATTIIOONN The public drainage and utility easement adjoining the north line of Lot 1, Block 1, Grenada Business Park and all easements in Outlot B, Grenada Business Park will be vacated by City Council Resolution. The easements vacated in Outlot B will be re-established with the Grenada Business Park 2nd Addition final plat. There is an existing underground electric line owned by Xcel Energy in the easement proposed to be vacated along the north line of Lot 1, Block 1, Grenada Business Park. The Developer will work with the owner of the underground electric line to have it removed or relocated to accommodate the proposed building addition. SSIITTEE PPLLAANN RREEVVIIEEWW Appro Development proposes to construct an 18,700 square foot building addition on the combined Lot 1, Block 1, Grenada Business Park and Lot 1, Block 1, Grenada Business Park 2nd Addition. The existing driveway to Grenada Avenue will be reconstructed, and a second driveway is proposed to be constructed to Grenada Avenue. A $6,000 security will be required with the final plat for work in the right of way associated with driveway construction. GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 33 OOFF 88 A portion of the existing private parking lot will remain, and the site plan includes the construction of an additional private parking lot. Parking lots on the site are designed to provide a total of 87 stalls, including four handicapped accessible stalls. Turning movement templates were provided to demonstrate that proper circulation can be attained throughout the parking lot and at truck docks. The proposed parking lot meets the required setbacks from lot lines and street surfaces. Some of the proposed parking lot will be located within public drainage and utility easements. The Developer is responsible for the costs of replacing parking lots damaged by any future drainage and utility construction within these public easements. PPUUBBLLIICC SSTTRREEEETTSS AANNDD AACCCCEESSSS Grenada Avenue The parent parcel is located west of and adjacent to Grenada Avenue, a local roadway, as identified in the City’s Transportation Plan. Grenada Avenue is currently constructed as a two lane rural roadway with gravel shoulders. 60-feet of right-of-way with a 70-foot cul-de-sac bulb was dedicated for Grenada Avenue with the Grenada Business Park plat. No additional right-of-way will need to be dedicated at this time. 215th Street (CSAH 70) Lot 1, Block 1, Grenada Business Park is north of and adjacent to 215th Street (CSAH 70), a principal arterial County Highway, as identified in the City’s Transportation Plan. 215th Street is currently constructed as a two lane rural roadway with dedicated right turn lanes for east and west bound traffic at the intersection with Grenada Avenue. The current Dakota County Road Plat Review Needs Map indicates the ultimate design for the section of 215th Street adjacent to the site is a four lane divided roadway. The ½ right-of-way requirement for a four lane divided roadway is 75 feet. The current ½ right-of-way is 85-feet adjacent to the site. No additional right-of-way will be dedicated at this time. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for site grading, utility and building construction shall be restricted to one entrance off of Grenada Avenue. PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS The Park Dedication fee has not been collected on the parent parcel and will be satisfied through a cash contribution that must be paid with the final plat. The park dedication requirement is calculated as follows: 1.18 acres X $4,558/acre = $5,378.44 Total Area of Lot 1, Block 1, Grenada Business Park 2nd Addition 2015 Industrial Park Dedication Rate Total There are no sidewalks or trails proposed within Grenada Business Park 2nd Addition. GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 44 OOFF 88 UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR The parent parcel is located within SC-10220 of the South Creek sanitary sewer district as identified in the City’s Sanitary Sewer Plan. Wastewater will be conveyed via existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to serve the proposed industrial subdivision. An existing private sanitary sewer service stub extends from sanitary sewer within Grenada Avenue to provide service to the parent parcel. The Sanitary Sewer Availability Charge must be paid with the building permit. The Sanitary Sewer Availability Charge will be calculated at $327/MCES SAC Unit, as determined by the Building Official. WWAATTEERRMMAAIINN Existing 16-inch public watermain extends through the parent parcel along the north property line within a drainage and utility easement. A private 6-inch and 8-inch watermain service serves the existing Mendell Machine building. The private system connects to the public 16-inch watermain at the intersection of Grenada Avenue and 215th Street, and loops to the public 12-inch watermain in 215th Street. Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City staff with the building permit application. OOVVEERRHHEEAADD LLIINNEESS There are no existing overhead utility lines adjacent to the Grenada Park 2nd Addition development. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG The parent parcel is located within subdistrict SC-13 of the South Creek Stormwater District, as identified in the City’s Water Resources Management Plan. The parent parcel was previously graded with the Grenada Business Park improvements. The site drains to the east to an existing stormwater basin located in Outlot A, Grenada Business Park. The basin discharges to a swale in the Airlake Development 2nd Addition and flows north to South Creek. The proposed stormwater management plan consists of a privately owned and maintained underground stormwater chamber, designed to provide a water quality volume equivalent to GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 55 OOFF 88 1.5 inches over the new impervious roof area. New paved parking lot impervious area and rooftop drains on the new addition will be directed to the underground chambers. The new stormwater chambers will discharge to the existing stormwater basin east of the site. The stormwater management plan provides rate control for the 1, 10, and 100-year rainfall events, meeting the requirements in the City’s Water Resources Management Plan and South Creek Management Plan. The system must be bypassed during construction to ensure that sediments are not entering the system at the heavier loads during construction per the manufacturer’s recommendations. The system will not be put on line until the site is fully stabilized. The system must be checked and cleaned as needed. Engineering recommends that the system be visually checked and inspected for sediment deposits following the Manufacturer’s recommendations. A copy of the inspection and cleaning records must be submitted to the City. The Developer shall sign a private maintenance agreement for the private stormwater chamber and dedicate a drainage and utility easement over the chamber area prior to City Council consideration of the final plat. Existing roof and paved areas will continue to drain to swales along Grenada Avenue. A culvert will be installed under the proposed driveway to convey the swales to the existing stormwater basin in Outlot A, Grenada Business Park. Portions of the existing basin will be excavated as part of the proposed site plan and will be restored using MN DOT seed mix 33- 262. The final grading plan must indicate any proposed borrow areas in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be issued until an as-built certified grading plan has been submitted and approved by the City Engineer. The proposed site plan and improvements contain more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR A private storm sewer system will be installed to convey the discharge from new and existing impervious surfaces. New roof and parking lot runoff will be conveyed by 12-inch storm sewer to a new underground stormwater chamber. Roof and parking lot runoff from the extisting site will be routed by existing swales through a new 15-inch culvert to the existing stormwater pond in Outlot A, Grenada Business Park. GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 66 OOFF 88 The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and shall be paid with the final plat. The Trunk Storm Sewer Area Charge for Grenada Business Park 2nd Addition is calculated as follows: 51,372 s.f. X $0.25/s.f. = $12,843.00 Gross Area of Grenada Business Park 2nd Addition 2015 Industrial Trunk Storm Sewer Area Charge Total Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. RREETTAAIINNIINNGG WWAALLLLSS The Mendel Machine Expansion Site Plan includes the construction of a privately owned and maintained retaining wall at the loading dock. Retaining walls shall be constructed outside of the established drainage and utility easements, as shown on the plans. Retaining walls with a combined height greater than four feet shall be designed by a registered geotechnical or structural engineer and constructed in accordance with plans and specifications consistent with MnDOT requirements. A separate building permit from the City’s Building Official is required prior to the construction of the wall. The walls shall be inspected during construction and certified by the design engineer following construction. FEMA FLOODPLAIN ANALYSIS Grenada Business Park 2nd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS There are no wetlands on the site. TTRREEEE PPRREESSEERRVVAATTIIOONN There are no trees on the site. EERROOSSIIOONN CCOONNTTRROOLL An erosion control plan was submitted and has been reviewed that includes the following: • A gravel construction entrance is included at the new driveway location. • A seed/mulch specification that meets City requirements. MN Dot seed mix 33-262 should be used in the infiltration basins. • Erosion control blanket is shown on all pond slopes. • Silt fence will be installed to protect offsite areas from sediment transport. GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 77 OOFF 88 • Streets must be cleared of debris at the end of each day. • Stormwater treatment areas will be graded first with the exception of the infiltration/filtration areas. Inlet protection must be installed both on the site and on Grenada Avenue. Additional erosion control measures may be required during construction as deemed necessary by City staff. The Applicant is responsible for meeting the requirements outlined in the MPCA Construction Permit. Any additional measures required shall be installed and maintained by the Applicant. SSEECCUURRIITTIIEESS The Applicant shall provide a Letter of Credit as security for the Applicant-installed improvements relating to the site plan. CONSTRUCTION COSTS Removal and Restoration of Grenada Avenue for Driveways $ 6,000.00 Storm Sewer 74,466.00 Sanitary Sewer 3,000.00 Water Distribution 4,200.00 Grading, Erosion Control, and Restoration 39,737.50 SUBTOTAL - CONSTRUCTION COSTS $ 127,403.50 OTHER COSTS Developer’s Design (6.0%) $ 7,644.21 Developer’s Construction Survey (2.5%) 3,185.09 City’s Legal Expense (0.5%) 637.02 City Construction Observation (7.0%) 8,918.25 Developer’s Record Drawing (0.5%) 637.02 Landscaping 10,000.00 SUBTOTAL - OTHER COSTS $ 31,021.59 TOTAL PROJECT SECURITIES $ 158,425.09 CASH FEES A cash fee for one-year of streetlight operating expenses for Lots 1, Block 1, Grenada Business Park 2nd Addition shall be paid with the final plat. The cash fee is calculated as follows: 96.68 f.f. x $0.2277/f.f./qtr. x 4 qtrs. = $88.06 Grenada Avenue Front Footage 2015 Streetlight Operating Fee Total A cash fee for one-year of surface water management expenses for Lot 1, Block 1, Grenada Business Park 2nd Addition shall be paid with the final plat and is calculated as follows: GGRREENNAADDAA BBUUSSIINNEESSSS PPAARRKK 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT MMEENNDDEELLLL MMAACCHHIINNEE AADDDDIITTIIOONN SSIITTEE PPLLAANN JJUUNNEE 1100,, 22001155 PPAAGGEE 88 OOFF 88 1.18 acres X 4.2 REU x $7.00/unit/qtr. x 4 qtrs. = $138.77 Area of Lot 1, Block 1, Grenada Business Park 2nd Addition Residential Equivalent Utility Factor 2015 Surface Water Management Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 1 x $75.00/unit = $75.00 Lots/Outlots 2015 City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Applicant shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $3,822.11. CASH REQUIREMENTS Park Dedication Fee $ 5,378.44 Trunk Storm Sewer Area Charge 12,843.00 Streetlight Operating Fee 88.06 Surface Water Management Fee 138.77 City Base Map Updating Fee 75.00 City Engineering Administration (3.00%) $ 3,822.11 TOTAL CASH REQUIREMENT $ 21,985.38 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the preliminary plat, final plat, easement vacation, lot combination, grading and erosion control plan, utility plan and tree preservation plan for Grenada Business Park 2nd Addition and the Mendell Machine Addition, subject to the requirements and stipulations within this report.