HomeMy WebLinkAbout15-079CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 15-79
RESOLUTION APPROVING THE PRELIMINARY PLAT OF
CHOKECHERRY HILL 4T" ADDITION
WHEREAS, Shamrock Development has requested approval of the preliminary plat of 125
single family lots to be known as CHOKECHERRY HILL 4T" ADDITION, legally described as
follows:
The Southeast Quarter of the Southeast Quarter EXCEPT the north 335.00 feet of the east
391.00 feet thereof, and the East One -Half of the Southwest Quarter of the Southeast
Quarter, al in Section 17, Township 114, Range 20, Dakota County, Minnesota, and also
EXCEPT:
A tract of land in the Southeast Quarter of said Section 17; thence North 50 feet, thence
North 75 degrees 21 minutes West (assuming East line of said Section 17 being North-
South) 130 feet, thence North 49 degrees 10 minutes West approximately 130 feet to the
southeasterly right of way of the new alignment of County Road 15 (1970); thence
southwesterly along new southeasterly right of way of County Road 15 to the South line of
said Section 17; thence east to a point of beginning.
Together with:
All that part of the south 60.00 feet of the Northeast Quarter of the Southeast Quarter of
Section 17, Township 114, Range 20, Dakota County, Minnesota, lying westerly of the east
930.30 feet of said Northeast Quarter of the Southeast Quarter.
Together with:
The south 60.00 feet of the west 548.30 feet of the following described property: The
south 545 feet of the east 939.30 feet of the Northeast Quarter of the Southeast Quarter of
Section 17, Township 114, Range 20, Dakota County, Minnesota.
WHEREAS, the Planning Commission held a public hearing at their June 4, 2015 meeting,
preceded by notice as required by the Subdivision Ordinance; and
WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources
Committee unanimously recommended approval of the preliminary plat; and
WHEREAS, the preliminary plat is acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
CHOKECHERRY HILL 41 ADDITION preliminary plat is approved subject to the following
conditions:
1. The recommendations listed in the May 29, 2015 engineering report.
2. The recommendations of the Parks, Recreation, and Natural Resources Committee.
3. The developer shall construct 5 foot wide concrete sidewalks along one side of
188th Street, 189' Street, and Streets A, B, C, and E.
4. The developer shall submit a cash escrow with the final plat for future trail
construction on the north side of 190th Street and the west side of Highview
Avenue.
5. "Future Street Extension" signs and barricades must be placed at the end of Streets
B and E.
6. Driveway access for Lot 20, Block 7 shall be from Street B only.
7. The existing wells within the plat area shall be abandoned and the existing septic
system and buildings shall be removed in compliance with state and local
requirements. Building and septic removal and well abandonment shall require a
demolition permit from the City prior to removal.
8. Outlots A and E shall be deeded to the City with the final plat.
9. A security for the buffer yard landscaping shall be submitted with the final plat.
10. The landscape plan must be modified to reflect the following changes:
a) Evergreen trees must be planted in staggered rows no greater than 15 feet on
center.
b) Shrubs must be added to supplement the planting of deciduous trees such that
the buffer yard contains a continuous band of plants.
11. Preliminary plat and Zoning Map amendment approval is subject to approval of
the Comprehensive Plan Amendment by the Metropolitan Council.
12. Vacation of the road easements shall occur with the final plat review.
13. The Developer shall dedicate the necessary right of way for the Highview
Avenue/190th Street intersection improvements with the Chokecherry Hill 41h
Addition final plat.
14. The Developer is required to install dedicated southbound right -turn and
northbound left -turn lanes at the Highview Avenue/190th Street intersection. This
will require widening the existing pavement section to accommodate the
additional turn lanes.
15. A wetland delineation report must be completed and submitted to the City for
review prior to City consideration of the final plat.
DATED this 15"' day of June 2015
ATT 'ST:
Charlene Friedges, City C" rk
2
CITY OF LAKEVILLE
Ma Little, Vayor