Loading...
HomeMy WebLinkAboutItem 06.j Date: 6 Proposed Staff rec Miscellan the amo Passage intersect roundab Overview This cha intersect intersect the inter to the m of pavin This wor traffic sig Work at t 60 round pavemen improve closure, this work Staff has Primary  What to a t Supporti  Copie ________ Monica H Operatio Financial I Notes: Communit 6 July 2015 APPROVA d Action commends neous Road unt of $135, of this mo tion of 175th bout. w ange order tion of 175th tion have be rsection. Sta atch points g joints at t k will also a gnal installat the intersec dabout, but nt repairs ments that w and had bu k. reviewed th Issues to Co t is the impa total of $1,2 ing Informa es of Chang __________ Heil, PE ons and Main mpact: Increases ty Values: AL OF THE 20 adoption way Repairs ,310. otion acknow h Street and includes m h Street and een rehabili aff is propos with recent the intersec ddress that tion. ction is prop t prior to th at the int were made dgeted suff he change o onsider act to the co 11,042.78. ation e Order No. ___________ ntenance En $135,310 s the contract Good Value fo 015 MISCEL CITY P CHANG of the fol s Project Ch wledges the Ipava Aven milling and o Ipava Aven tated within sing to mill a t roadway re ction, and w portion of t posed to be c he start of t ersection w to accomm ficiently wit order and re ontract? Thi 1 and the C _________ ngineer Budgeted: amount to $1, or Public Servic LENEOUS R PROJECT 15 GE ORDER N llowing mo hange Orde e mill and ue following overlaying ue. Each of n the last 10 and overlay ehabilitation will serve to the intersec completed a the 2015-20 would be odate traffic hin the Pave commends s change or Change Orde :Yes ,211,042.78 ces Ite ROADWAY R -01 NO. 1 otion: Mo er No. 1 incr overlay wo g the openi the existing f the four ro 0-years, but all of the ex n projects. T extend the ction that wa after the op 016 school y necessary c detouring ement Man approval. rder increase er No. 1 deta Source: em No. REPAIRS PR ove to app reasing the or k t o b e co ng of the CS g pavemen adway legs t have stopp xisting pave This will red e useful life as disturbed pening of the year. Staff following t from the CS agement Fu ed the cont ail are attach Pavement M ROJECT prove the contract su ompleted a SAH 50/CSA t surface at coming int ped just sho ment leadin duce the num of the road d with the re e CSAH 50/C had anticip the interse SAH 50/CSA und to com ract by $135 hed. anagement Fun 2015 um in t the AH 60 t the o the ort of ng up mber dway. ecent CSAH pated ction AH 60 plete 5,310 nd O P C C To b O D N M T T T Owner: roject: Contractor: Contract Dat o: McNama elow in the Owner: Date: Nature of the Markings Qu hese change Contrac Net Inc Current he above ch he above ch City of 2015 Projec McNam te: M ara Contract subject Con Cit J e Changes: uote) for a d es result in t ct Price Prio rease/Decre t Contract P hanges are a hanges are a f Lakeville Miscellaneo ct mara Contra May 4, 2015 ting, Inc. (C ntract: ty of Lakevil July 6, 2015 See the at description the followin r to this Cha ease Resultin rice, Includi approved: accepted: CHANG ous Roadw acting, Inc. Orig ontractor), y le ttached Ch n of the chan g adjustme ange Order ng from this ng this Chan GE ORDER N Project way Repairs inal Contra you are her By: By: hange Orde nge and su nt of Contra s Change Ord nge Order By: Date: By: Date: NO. 1 t No.: s act Amount reby directe Charl er No. 1 (Sc pporting in act Price and $ der $ $ CIT Monica He Operations 6 July 2015 t: ed to make Matt Little, lene Friedge chedule B a nformation d Contract T 1,075 1 1,211 TY OF LAKEV eil, PE s and Maint 5 15-01 $1,075,732. the change Mayor es, City Clerk and the Pav . Time: 5,732.78 135,310 ,042.78 VILLE enance Eng 78 es noted k vement gineer