Memorandum
To: Mayor and City Council
Justin Miller, City Administrator
From: Brett Altergott, Parks & Recreation Director
Copy: John Hennen, Parks & Operations Manager
Date: August 20, 2015
Subject: Land of Amazement Playground Replacement
City of Lakeville
Parks & Recreation
The Land of Amazement (LOA) playground at Steve Michaud Park has been identified by staff as a priority
replacement due to the wear and tear it has experienced over the course of the past 23 years. This signature
playground is our largest playground and is one of the most heavily used structures within the City. In fact it
is a popular destination for both residents and visitors.
The goal is to replace the LOA, in the fall 2016 or spring 2017, with a modern play structure that stays true to
the original in creativity and playability while at the same time meeting today's accessibility and safety
standards. In March, staff had Minnesota/Wisconsin Playground put together a concept design that has a
similar look to the current LOA, however this design is packed with many new play amenities that kids and
families seek out in a destination playground. In addition, the structure is made up of maintenance friendly
materials, like steel posts, ramps, and decks, composite lumber, and steel reinforced netting to name just a
few.
In 2015 dollars, the estimated cost to replace the existing structure and make site improvements (cement
curb border and drain tile) is $393,158. To date $135,000 has been dedicated towards the project: $85,000
from the 2014 unencumbered balance and $50,000 from the Lakeville Rotary Club. The remaining $258,158
will come from a variety of sources that include individual giving, major donor groups, special events, grants,
corporate giving and general fund tax levy. Upon a consensus of the City Council, a fundraising campaign
and special events will be finalized, and letters will be sent to businesses, foundations and individuals
seeking contributions.
Included in your packet is an breakdown of the estimated revenues and expenditures as of August 19, an
aerial view of the current playground, and a rendering of the proposed playground. Harlan Lehman of
Minnesota/Wisconsin Playground and staff will be in attendance to answer any questions that the City
Council may have regarding the design and cost estimates.
Enclosed:
Estimated Replacement Cost Worksheet
Aerial view of current LOA
Rendering of proposed playground
LAND OF AMAZEMENT
Estimated Replacement Costs
8/19/2015
Expenditures
Replacement structure
Gametime Owners Kit
US Communities Discount
Freight
Site prep/grading/installation supervision
Concrete curbing
Poured in Place
Pea rock/Drain Tile (1,000 If @ $2.50)
Engineered Wood Fiber (surfacing)
Disposal of existing playstructure
Revenue
2014 Unencumbered Balance
Rotary Donation
General Fund Tax Levy
Corporate Donations & Grants
Special Events (Liquor round -up, auction items, waffle breakfast)
Est.
Cost
$374,717
$50
-$89,932
$21,954
$18,000
$10,844
$39,400
$2,500
$13,125
$2,500
Total $393,158
$85,000
$50,000
$233,158
$2�G00
Total $393,158
sr
i
Land of Amazement
a.
r
I
-�-�leii
-�.t
40
{
" 4` ,
If
1
i
Disclay er; Map and parcel data are believed to be accurate, taut -accuracy is not guaranteed. This is not a legate _ Map Scale
document and should not be substituted for a title search,appraisal, survey, or for zoning verification. Dakota County 1 inch = 31 feet
assumes no legal responsibility for the information contained in this data. 8/20/2015
.1