MEMORANDUM
TO: Daryl Morey
FROM: Daniel Licht, AICP
DATE: 3 September 2015
RE: Lakeville – SBF; 15th Addition
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted plans for Spirit of Brandtjen Farm 15th Addition.
The application involves platting a portion of Spirit of Brandtjen Farm located east of Eagleview
Drive and north of 167th Street with 93 single family lots and seven outlots. The applications to
be considered with the request include a PUD Development Stage Plan, Preliminary Plat and
Easement Vacation. The developer has also submitted a first phase Final Plat of 62 single family
lots. The subject site is zoned PUD, Planned Unit Development District as approved by the City
Council on 20 June 2005.
Exhibits:
A. Site Location Map
B. SBF PUD Master Site Plan
C. Title Sheet
D. Preliminary Plat (4 pages)
E. Final Plat (4 pages)
F. Grading and Drainage Plan (3 pages)
2
ANALYSIS
Comprehensive Plan. The 2008 Comprehensive Land Use Plan guides the subject site for
development of land uses based on the SBF Land Use Plan approved on 20 June 2005. The SBF
Land Use Plan (Page 3.4 of the SBF PUD Booklet) designates the area to be preliminary platted
for Low-Medium Density Residential land uses. Based on the maximum allowed development
density the following calculation is made for the maximum number of potential dwelling units
within the gross area of the preliminary plat less Diamond Path right-of-way and Outlot G
(future development): Low-Med Density = 36.11ac. x 6du/ac. = 216du.
The SBF Master Site Plan (Page 3.5 of the SBF PUD Booklet) illustrates development of single
family detached lots in the area of SBF 15th Addition. The preliminary plat includes 93 single
family lots on 28.6 net acres (excluding outlots and Diamond Path ROW) for a net density of
3.25 du/ac. consistent with the SBF Land Use Plan. The 93 lots within the proposed SBF 15th
Addition will be deducted from the total of 2,109 dwelling units allowed for the entire SBF PUD
District.
Surrounding Land Use. The subject site is surrounded by the following land uses:
Direction Land Use Plan Zoning Existing Use
North Low/Medium Density Residential PUD Undeveloped
East Medium Density Residential PUD Twinhomes
South Low/Medium Density Residential PUD Single Family
Farmstead Preservation Area
West Low Density Residential
Public Park/Greenway
PUD Eagleview Drive
Public/Private Open Space
The proposed single family lots will be compatible with existing and planned uses in the area.
MUSA. The majority of the subject site is within the current MUSA. Lots 5-18, Block 9 is north
of the section line dividing the MUSA and MUSA Expansion Area A. Extension of sanitary sewer
and water utilities to include that portion of the subject site will be accomplished with gravity
services and is consistent with the 2010 MUSA Expansion Area A Serviceability Plan.
Lot Requirements. The single family lots are proposed with a minimum 60 foot width
consistent with the minimum lot requirement for cottage lots as set forth in Section 7 of the
SBF PUD Booklet. Setbacks indicated on the preliminary plat are also consistent with those
required for cottage lots and provide a usable building envelope. Development of these lots as
cottage lots is acceptable given the SBF Land Use Plan designation for the subject site as Low-
Medium Density Residential land uses. However, the lots within Blocks 1, 2, 3 and 4 are larger
in width and lot area meeting the traditional lot, if not estate home lot, requirements.
Requiring setbacks applicable to the traditional lot standards would ensure that the homes
constructed upon the property are consistent with the intended scale and character of the
other similarly sized lots to the west and consistent with the purpose of the PUD District.
3
Access. The proposed preliminary plat will extend Draft Horse Boulevard north of the current
terminus at 167th Street and extend local streets east of Eagleview Drive. The proposed street
connections provide a much-needed second permanent public street access to the southeast
quadrant of SBF. The alignment of the streets is changed from the SBF Master Site Plan, which
would have directed Draft Horse Boulevard northwest to intersect with Eagleview Drive.
The developer engaged a transportation engineer to evaluate the traffic volumes and traffic
disbursement of the proposed alignment of Draft Horse Boulevard along the perimeter of the
east half of SBF before connecting with Eagleview Drive at 162nd Street. Their study projected
that traffic volumes within the existing platted areas of SBF and the proposed SBF 15th Addition
would be within acceptable ranges for the applicable street designations consistent with the
Transportation Plan. The Dakota County Plat Commission, at their meeting on 24 August 2015,
recommended that the next development phase to the north of SBF 15th Addition include a
design for Draft Horse Boulevard North such that it has a continuous flow east-to-west from
Eagleview Drive to the intersection with Diamond Path consistent with Dakota County’s CSAH
46/CSAH 31 interchange study. Under this design scenario, Draft Horse Boulevard South would
form a “T” intersection with Draft Horse Boulevard North. This alignment requires that the
Diamond Path/Draft Horse Boulevard North intersection will need to shift to the north due to
the existing pond in this area of SBF. County staff would support this intersection being less
than ¼ mile south of CSAH 46 provided it is at least 1000 feet south in order to provide
adequate turn lanes.
The preliminary plat includes dedication of right-of-way for future Diamond Path, but the
grading plan does not include details for grading within the right-of-way for the future street or
trail along the west side of the road. Additional discussion is also required with the developer
at the time Outlot G is platted as to the timing of construction for Diamond Path (CSAH 33) to
provide additional major collector street access to the eastern portion of SBF.
Streets. Draft Horse Boulevard within the 15th Addition has a 60 foot right-of-way and 28 foot
wide street section with bump out parking stalls on one side consistent with street SC.3 within
the SBF PUD Booklet and existing sections of the roadway to the south. 165th Street and Duluth
Trail, which extend east from Eagleview Drive through the preliminary plat to intersect Draft
Horse Boulevard, are designed with a 52 foot right-of-way and 28 foot wide street section. The
proposed street section is consistent with an alternate version of street SC.3 within the SBF
PUD Booklet and appropriate for the proposed preliminary plat. All street section plans are
subject to review and approval of the City Engineer. The streets must be posted “No Parking”
along one side.
Pedestrian Access. The submitted plans indicate that five foot wide concrete sidewalk will be
constructed on both sides of the streets within SBF 15th Addition consistent with the street SC.3
design within the SBF PUD Booklet. A publicly accessible / privately maintained trail is
provided within Outlot B between Duluth Trail and the trails circulating Brandtjen Lake
consistent with the SBF Master Site Plan.
4
Open Space. The Park, Open Space, Trail and Sidewalk System included as page 5.3 of the SBF
PUD Booklet identified two publicly accessible/privately maintained park-greens within the area
of SBF 15th Addition. These park-greens were to be the visual and physical focus of individual
areas within the overall SBF development as described on page 5.5 of the SBF PUD booklet.
The proposed preliminary plat provides 6.5 acres of open space at the center of Blocks 3, 4, 5
and 8 at the rear of the abutting lots with multiple access corridors to Draft Horse Boulevard,
165th Street and Duluth Trail. The grading plan indicates that four separate berms will be
developed within the area of Outlot E to provide variation in the topography. The developer
must submit a landscape plan for Outlot E; City staff recommends dense plantings of trees
throughout the area to establish a canopy and increase privacy of the rear yards.
Landscape Plan. No landscape plan has been submitted. A landscape plan for the interior
street boulevards and Outlots A, C, D, E and F must be submitted prior to Planning Commission
review of the preliminary plat.
Grading Plan. The submitted plans included grading, drainage and erosion control plans.
Outlot C includes the slope of a storm water basin to the south and will be required to be
deeded to the City. All grading plans are subject to review and approval by the City Engineer.
Utility Plan. The developer has submitted a utility plan for extension of sanitary sewer and
water utilities to the proposed lots. All utility issues are subject to review and approval of the
City Engineer.
Easements. The preliminary plat illustrates drainage and utility easements at the perimeter of
all of the single family lots as required by Section 10-4-4 of the Subdivision Ordinance. Drainage
and utility easements are subject to review and approval of the City Engineer and must be
revised per the comments in their memorandum.
Easement Vacation. There are several existing public and private easements. Those public
drainage and utility easements that no longer serve a public purpose based on the
development plans for SBF 15th Addition or for which new drainage and utility easements are
dedicated upon approval of the final plat are to be vacated. The drainage and utility easements
to be vacated are:
A 10-foot wide drainage and utility easements on Outlot C, SBF Commercial 2nd Addition
along Eagleview Drive, Draft Horse Boulevard, and 167th Street to be re-dedicated as
permanent easement with the SBF 15th Addition final plat.
A 10-foot wide drainage and utility easement on Outlot F, SBF Commercial 2nd Addition
along Eagleview Drive, which will be re-dedicated as a temporary easement with the SBF
15th Addition plat.
5
Park Dedication. No public park land will be dedicated to the City as part of SBF 15th Addition.
Park dedication requirements will be met based on the formula established by the SBF Master
PUD Development Agreement.
Outlots. The PUD Development Stage Plan/preliminary plat and final plat includes seven
outlots:
Preliminary
Plat Outlot
Purpose Ownership Final Plat
Outlot
A Buffer yard abutting
Eagleview Drive
HOA A
B Publicly
Accessible/Privately
Maintained Trail corridor
HOA B
C Stormwater basin Deed to City C
D Publicly
Accessible/Privately
Maintained Open Space
HOA D
E Publicly
Accessible/Privately
Maintained Open Space
HOA E
F Publicly
Accessible/Privately
Maintained Open Space
HOA NA
G Future Phase Developer F, G
Final Plat. The applicant has submitted a final plat for the proposed development consistent
with the preliminary plat, which includes 62 single family lots, public right-of-way and seven
outlots. The final plat is subject to applicable comments pertaining to the preliminary plat
design and is subject to approval by the City Council.
Development Contract. The applicant is required to enter into a development contract with
the City for the public and private improvements, payment of applicable fees and posting of
required securities. The development agreement will be drafted by the City Attorney and the
applicant is required to execute the development agreement prior to City Council approval of
the final plat.
CONCLUSION
The Spirit of Brandtjen Farm 15th Addition PUD Development Stage Plan, Preliminary Plat,
Easement Vacation, and Final Plat are consistent with the requirements of the Comprehensive
Plan, Zoning Ordinance, Subdivision Ordinance and the approved SBF PUD. Our office
recommends approval subject to the conditions outlined below:
1. SBF 15th Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated 20 June 2005 and the PUD Development Stage Plan/Preliminary Plat.
6
2. The lots within Blocks 1, 2, 3 and 4, SBF 15th Addition preliminary plat are subject to the
requirements established for traditional lots; all other lots within SBF 15th Addition shall
be subject to the requirements established for cottage lots:
Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
Cottage 60ft. 20ft. 25ft. 15ft. 7ft. 15ft 25ft 15ft 20ft. 10ft.
Traditional 75ft. 20ft. 25ft. 15ft. 7ft. 15ft. 25ft. 15ft. 20ft. 10ft.
3. All street section plans are subject to review and approval of the City Engineer.
4. One side of Draft Horse Boulevard, 165th Street and Duluth Trail shall be designated as
“No Parking”.
5. An agreement on the design and construction timing for Diamond Path (CSAH 33) shall
occur between the Developer, City and Dakota County when a preliminary plat is
submitted for Outlot G.
6. A landscape plan for the interior street boulevards and Outlots A, C, D, E and F must be
submitted prior to Planning Commission review of the preliminary plat; the landscape
plan for Outlot E shall provide for plantings of trees intended to establish a
comprehensive canopy over the open space.
7. All grading, drainage and erosion control plans shall be subject to review and approval
of the City Engineer.
8. All utility plans shall be subject to review and approval of the City Engineer.
9. All drainage and utility easements shall be subject to review and approval of the City
Engineer.
10. Park dedication requirements shall be satisfied at the time of final plat approval as a
cash fee in lieu of land based on the formula established by the SBF Master PUD
Development Agreement subject to the recommendations of the Parks, Recreation and
Natural Resources Committee.
11. Outlots A, B, D, E and F as identified on the preliminary plat shall be owned and
maintained by the homeowners association and designated as publicly
accessible/privately maintained open space.
12. Outlot C shall be deeded to the City with the final plat.
7
13. The final plat shall be revised consistent with the conditions applicable to the
preliminary plat, subject to review and approval of City staff.
14. The developer shall execute a development agreement with the City prior to City
Council approval of the final plat, subject to review and approval of the City Engineer
c. Justin Miller, City Administrator
Zachary Johnson, City Engineer
Brett Altergott, Parks and Recreation Director
Roger Knutson, City Attorney
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
Brett Altergott, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: September 2, 2015
Subject: Spirit of Brandtjen Farm 15th Addition
• Preliminary Plat Review
• Preliminary Grading and Erosion Control Plan Review
• Preliminary Utility Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a preliminary plat named Spirit of Brandtjen
Farm 15th Addition. The proposed subdivision is located north of 167th Street, east of and
adjacent to Eagleview Drive and west and adjacent to the future extension of Diamond Path
(CSAH 33). The parcel parcels consist of Outlots C and F, Spirit of Brandtjen Farm Commercial
2nd Addition (PID Nos. 222020500020 and 227130000107), and a portion of Outlot HH, Spirit of
Brandtjen Farm (PID No. 227130000143) and are zoned PUD, Planned Unit Development.
The preliminary plat consists of ninety-three (93) single family lots within nine (9) blocks, and
seven (7) outlots on 92.84 acres. The Developer is dedicating 1.38 acres as Diamond Path
right-of-way.
The outlots created with the preliminary plat shall have the following use:
Outlot A: Landscaping Buffer; to be retained by the Developer (0.19 acres)
Outlot B: Public Utilities and Trail; to be retained by the Developer (0.07 acres)
Outlot C: Existing Stormwater Management Basin; to be deeded to the City (0.30 acres)
Outlot D: Open Space and Landscaping; to be retained by the Developer (0.22 acres)
Outlot E: Open Space and Landscaping; to be retained by the Developer (6.51 acres)
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 22 OOFF 77
Outlot F: Open Space and Public Utility Easement; to be retained by the Developer (0.23
acres)
Outlot G: Future Development; to be retained by the Developer (55.36 acres)
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
A portion of the Spirit of Brandtjen Farm 15th Addition site was previously mass graded with
the Diamonte at Spirit of Brandtjen Farm development improvements. Trunk sanitary sewer
was constructed within the site to provide utility service for the Diamonte at Spirit of
Brandtjen Farm townhome plat. The remainder of the site (all of Outlot G) was previously
used for a gravel processing operation, which is in the process of being removed. All site
encroachments, with the exception of those on Outlot G, shall be removed with the final plat.
A security will be required with the final plat to ensure that this work is completed.
EEAASSEEMMEENNTTSS
The parent parcels contain existing public and private easements. The following public
easements shall be vacated with the final plat:
• 10-foot wide drainage and utility easements on Outlot C, Spirit of Brandtjen Farm
Commercial 2nd Addition along Eagleview Drive, Draft Horse Boulevard, and 167th
Street. These easements will be re-dedicated with the Spirit of Brandtjen Farm 15th
Addition plat.
• 10-foot wide drainage and utility easement on Outlot F, Spirit of Brandtjen Farm
Commercial 2nd Addition along Eagleview Drive. The easement will be re-dedicated as
a temporary easement with the Spirit of Brandtjen Farm 15th Addition plat.
The following easements will remain:
• 20-foot wide public right-of-way, drainage, and utility easement per Document No.
1656358.
• 35-foot wide Metropolitan Council Sanitary Sewer Easement per Document No.
1292581.
• Williams Brothers pipeline easement per book 80 of miscellaneous records page 186
and amended by Document No. 545492.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Diamond Path (CSAH 33)
Spirit of Brandtjen Farm 15th Addition is located west of and adjacent to Diamond Path, a
future major collector roadway as identified in the City’s Transportation Plan. The current
Dakota County Plat Review Needs Map identifies Diamond Path as a future four-lane
undivided County State Aid Highway with a ½ right-of-way requirement of 60 feet. The
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 33 OOFF 77
Developer is dedicating right-of-way as shown on the preliminary plat. The preliminary plat
was reviewed and recommended for approval by the Dakota County Plat Commission at their
August 24, 2015 meeting.
The construction of Diamond Path is not identified in the City’s or County’s current Capital
Improvement Plans. At the time a preliminary plat is submitted for Outlot G, the Developer and
City and County staff will meet to discuss the construction timing and design for Diamond Path.
Draft Horse Boulevard
Development of Spirit of Brandtjen Farm 15th Addition includes the construction of Draft
Horse Boulevard, a local roadway. Draft Horse Boulevard will be constructed and extended
from its existing terminus at the intersection with 167th Street. Draft Horse Boulevard is
designed as a 28-foot wide urban roadway with a 5-foot wide concrete sidewalk along both
sides of the street. The Developer is dedicating 60-feet of right-of-way. The street and
landscaped boulevard design is consistent with the Spirit of Brandtjen Farm Planned Unit
Development Plan. A “Future Street Extension” sign and barricades must be placed at the
north end of Draft Horse Boulevard until it is extended in the future.
165th Street
Development of Spirit of Brandtjen Farm 15th Addition includes the construction of 165th
Street, a local roadway. 165th Street is designed as a 28-foot wide urban roadway with a 5-foot
wide concrete sidewalk along both sides of the street. 165th Street will connect Eagleview
Drive with Draft Horse Boulevard. The Developer is dedicating 60-feet of right-of-way. The
street and landscaped boulevard design is consistent with the Spirit of Brandtjen Farm
Planned Unit Development Plan.
Duluth Trail
Development of Spirit of Brandtjen Farm 15th Addition includes the construction of Duluth
Trail, a local roadway. Duluth Trail is designed as a 28-foot wide urban roadway with a 5-foot
wide concrete sidewalk along both sides of the street. The Developer is dedicating 60-feet of
right-of-way. A “Future Street Extension” sign and barricades must be placed at the north end
of Duluth Trail until it is extended in the future. The street and landscaped boulevard design is
consistent with the Spirit of Brandtjen Farm Planned Unit Development Plan.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction shall be from
a rock construction entrance on 165th Street, via Eagleview Drive. No construction access shall
be allowed from Draft Horse Boulevard south of the development.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Park Dedication requirement has not been collected on the parent parcels and will be
satisfied through a cash contribution that shall be paid with the final plat. The Park Dedication
Fee will be based upon the rate established in the Spirit of Brandtjen Farm Master Planned
Unit Development Agreement.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 44 OOFF 77
Development of Spirit of Brandtjen Farm 15th Addition includes the construction of public
sidewalks and a privately owned and publicly accessible trail. A maintenance agreement will
be required with the final plat for the privately maintained trails. 5-foot wide concrete
sidewalks, with pedestrian curb ramps, will be installed along both sides of all local streets. A
bituminous trail will be constructed within Outlot B, connecting the sidewalk along Duluth
Trail to the existing trail network constructed with previous phases of Spirit of Brandtjen
Farm.
The current City’s Parks Trails, and Open Space Plan identifies a greenway corridor in the area
of the preliminary plat. Trails within previous phases of Spirit of Brandtjen Farm were
designed to meet the intent of the Parks, Trails, and Open Space Plan approved by the City’s
Parks and Natural Resources Committee.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Spirit of Brandtjen Farm 15th Addition is located within subdistrict N-20050 of the North Creek
sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will
be conveyed via existing trunk sanitary sewer to the MCES Farmington Interceptor and
continue to the Empire Wastewater Treatment Facility. The downstream facilities have
sufficient capacity to serve the proposed subdivision.
Trunk sanitary sewer that will serve a portion of the Spirit of Brandtjen Farm 15th Addition
development was previously constructed with the Diamonte at Spirit of Brandtjen Farm
improvements. The existing sanitary sewer will be located within the Draft Horse Boulevard
and Duluth Trail right-of-way. The existing utility improvements will be tested and accepted
with the Spirit of Brandtjen Farm 15th Addition development. The Developer shall be
responsible for any repairs to the existing sanitary sewer system. 8-inch sanitary sewer will be
constructed and extended from the existing trunk sewer to serve the remaining portion of
the development.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and shall
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval.
WWAATTEERRMMAAIINN
Development of Spirit of Brandtjen Farm 15th Addition includes the extension of public
watermain. Watermain will be extended within the development from existing stubs at
Eagleview Drive, Draft Horse Boulevard, and Diamonte Path to provide a looped system and
water service to the subdivision.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 55 OOFF 77
OOVVEERRHHEEAADD LLIINNEESS
An existing overhead electric transmission line extends north from 170th Street, east of and
outside the parent parcels. The overhead transmission line is not subject to Title 7 of the City
Code and the City’s Right-of-Way Management Policy and will not be buried with the
development of Spirit of Brandtjen Farm 15th Addition.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Spirit of Brandtjen Farm 15th Addition is located within subdistricts NC-10, NC-11A, NC-11B,
NC-11C, and NC-12 of the North Creek stormwater district as identified in the City’s Water
Resources Management Plan.
Stormwater runoff generated from the subdivision will be conveyed to an existing regional
stormwater management system located within Outlot A, Spirit of Brandtjen Farm
Commercial 2nd Addition and Outlot A, Spirit of Brandtjen Farm 10th Addition. The basins will
provide water quality treatment and rate control of the stormwater runoff generated from the
subdivision.
A portion of the stormwater basin in Outlot A, Spirit of Brandtjen Farm Commercial 2nd
Addition will be regraded to meet the City’s freeboard requirements for adjacent lots within
Spirit of Brandtjen Farm 15th Addition. The stormwater basin design is consistent with City
requirements.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Spirit of Brandtjen Farm 15th Addition contains more than one acre of site disturbance. A
National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Spirit of Brandtjen Farm 15th Addition includes the construction of public and
private storm sewer. A privately owned and maintained storm sewer system will be installed
within Outlot E to collect and convey runoff from the open space and landscaped area to the
public storm sewer system. Public storm sewer will extend within a drainage and utility
easement on Outlot E which conveys runoff from the public right-of-way through the outlot.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 66 OOFF 77
The Developer shall sign an encroachment agreement to be included in the development
contract with the final plat for the private storm sewer to be installed within public drainage
and utility easements on private lots (Lots 1 and 6, Block 4).
Public storm sewer will be installed within the subdivision to collect and convey stormwater
runoff generated from within the public right-of-way and lots to the existing regional
stormwater management basins.
Draintile construction is required in areas of non-granular soils within Spirit of Brandtjen Farm
15th Addition for the street sub-cuts and lots. Any additional draintile construction, including
perimeter draintile required for building footings, which is deemed necessary during
construction shall be the developer’s responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must
be paid with the Spirit of Brandtjen Farm 15th Addition final plat. The Developer will receive a
credit to the Trunk Storm Sewer Area Charge for deeding Outlot C to the City, calculated at
$5,500/acre consistent with City policy.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
The majority of Spirit of Brandtjen Farm 15th Addition is shown on the Flood Insurance Rate
Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). A small
portion of Outlot G (retained by the Developer for future development) is shown on the FIRM
as Zones AE and A, which are designated as Special Flood Hazard Areas (SFHA). The
Developer is currently in the process of submitting a LOMR (Letter of Map Revision) to FEMA.
The portion of the plat platted into lots and blocks with Spirit of Brandtjen Farm 15th Addition
is located entirely within Zone X. Based on this designation there are no areas in the
residential portion of the plat located within a SFHA, as determined by FEMA.
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN 1155TTHH AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY PPLLAATT
SSEEPPTTEEMMBBEERR 22,, 22001155
PPAAGGEE 77 OOFF 77
EERROOSSIIOONN CCOONNTTRROOLL
The developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
The erosion control plan was reviewed and includes the following:
• A gravel construction entrances is shown on the plan sheets, and included in the
erosion control notes.
• All 3:1 slopes will be seeded and stabilized with fiber blanket.
• Stormwater treatment areas will be graded first.
• Silt fence will be installed to protect offsite areas from sediment transport.
• Erosion control blanket is shown on all pond slopes.
• Streets must be cleared of debris at the end of each day.
• Pond Maintenance: A maintenance schedule for the first 2 years must be included
in the plans. This must include mowing 2 to 3 times, 30 days apart during the first
year with the mower deck set about 6-8 inches off the ground. The second year,
the pond areas must be mowed once before weeds set their seeds. This will
reduce weed establishment, and help stimulate the desirable vegetation. This will
cut down on maintenance in the long-term.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the preliminary plat, grading and erosion control plan,
and utility plan for Spirit of Brandtjen Farm 15th Addition, subject to the requirements and
stipulations within this report.