HomeMy WebLinkAboutItem 03.dMemorandum
To: Mayor and City Council
From: Justin Miller, City Administrator
Jerilyn Erickson, Finance Director
Chris Petree, Public Works Director
Zach Johnson, City Engineer
John Hennen, Interim Parks & Recreation Director
Date: October 26, 2015
Subject: 2016-2020 Capital Improvement Program (CIP)
The Capital Improvement Program is comprised of the following components:
1) Transportation
2) Utility
3) Parks and Recreation
4) Facilities
5) Equipment
City of Lakeville
We discussed the first three components of the draft 2016-2020 CIP at the July 27th workshop and the last
two components at the August 24th and September 14th workshops in conjunction with the preliminary
2016 budget.
Included with this report are the project descriptions, locations, revenues and expenditures.
Changes from Previous Draft CIP
A number of changes have been incorporated into this updated CIP version:
1) Updated cost estimates and funding sources for projects;
2) County led projects only reflect the City's share of the costs;
3) City led projects reflect the total estimated project costs;
4) Funds from the sale of the 183`d Street property were shown as funding sources for the
Avonlea Park property acquisition and Facility Plan improvements;
5) Funds from the repayment of the Southfork IRR loan were shown as funding sources for
Transportation Plan improvements.
Goals/Assumptions
The following goals/assumptions were kept in mind when evaluating the cash flows projections for
the various funds, debt projections and tax levies:
1) Minimize the issuance of debt;
2) Utilize advance funding from Dakota County;
3) Utilize advance funding from Municipal State Aid.
Challenges
The impact on future tax levies, fund balance reserve levels and fees should be considered. Rate
adjustments for fees charged to developers have not been incorporated into the cash flow
projections. Rate adjustments for utility customers will need to be evaluated further.
Financial Impact
The following chart shows the impact of this proposed CIP. It includes the debt issued for street
improvement projects (special assessments and city portion), utility improvement projects, and
equipment certificates issued for major equipment purchases per the Equipment Plan.
$180
$160
$140
$120
H
o $100
E $80
C_
�.. $60
$40
Projected Debt Balances (All Debt)
10-26-2015
$0-f-----a—r---a�
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Cumm. CIP Debt Projected Debt Existing Debt New CIP Debt
The estimated impact of this proposed CIP plus inflationary pressures on General Fund operations on
future property tax levies is as follows:
Year2016
2017
2018
2019
2020
Estimated Change
in Tax Levy
4.996
I
7.9%
5.8%
4.7%
4.0%
Council Direction
Staff will be finalizing the 2016 proposed budget in the coming weeks and is seeking direction
regarding the projects that have been proposed.
2
Summaries of funding sources and uses for Transportation projects anticipated during the upcoming five
year period are as follows:
SOURCES 2016 2017 2018 2019 2020 Total
Dakota County
1,556,250
385,000
365,000
-
-
2,306,250
Escrow Funds
512,000
276,041
104,480
-
1,620,000
892,521
General Fund
45,000
-
10,620,283
11,721,068
-
45,000
Bonds - SA
3,513,230
4,642,341
4,248,113
4,640,415
4,390,931
21,435,030
Bonds - Taxes
6,235,319
6,994,512
6,217,690
7,030,653
6,536,400
33,014,574
MSA
2,756,172
1,890,151
1,420,000
1,250,000
1,740,000
9,056,323
Taxes/Reserves
1,538,580
1,265,324
1,313,937
1,364,494
1,417,074
6,899,409
Sanitary Sewer Trunk Fund
150,000
-
-
150,000
Storm Sewer Trunk Fund
150,000
150,000
Water Trunk Fund
670,000
85,000
-
755,000
Tax Abatement
607,500
-
-
607,500
Bonds/Southfork IRR
TIF Fund
(79,750)
-
-
-
(79,750)
City of Lakeville
200,000
200,000
200,000
200,000
200,000
1,000,000
(Nonspecified)
Communications Fund
-
14,000
41,000
-
-
55,000
Total
17,854,301
15,667,369 r
13,995,220 .
14,485,562 R
14,284,405
76,286,857
USES
2016
2017
2018
2019
2020
Total
Improvement Projects
6,187,172
2,445,192
1,791,000
1,130,000
1,620,000
13,173,364
Street Reconstruction
9,798,549
11,686,853
10,620,283
11,721,068
10,977,331
54,804,084
Maintenance
1,668,580
1,335,324
1,383,937
1,434,494
1,487,074
7,309,409
ROW Management
200,000
200,000
200,000
200,000
200,000
1,000,000
Total
17,854,301
15,667,369
13,995,220
14,485,562
14,284,405
76,286,857
Street Reconstruction and Collector Overlay Projects
The City has adopted a pavement management plan which addresses maintenance issues based on
the OCI (Overall Condition Index) of the street. The City has a Street Reconstruction Policy whereby it
finances approximately 60% of the street reconstruction with debt repaid with property taxes.
Maintenance
Street pavement maintenance comprised primarily of patching and crack sealing is accounted for in
the Pavement Management Fund.
The primary revenue sources are property taxes and Municipal State Aid funds.
3
Pay-As=You-Go
The 2015 property tax levy included a $50,000 levy that was dedicated to the 2015 street
reconstruction project. The funding sources for street reconstruction projects assume that the
$50,000 levy will continue for projects in years 2016-2020.
Summaries of funding sources and uses for Utility projects anticipated during the upcoming five year
period are as follows:
SOURCES
2016
2017
2018
2019
2020
Total
Sanitary Swr Trunk
139,000
148,875
257,100
259,500
81,375
885,850
Sanitary Swr Operating
1,946,910
520,000
540,000
495,000
675,000
4,176,910
WaterTrunk
1,075,000
200,000
2,361,492
200,000
2,037,500
5,873,992
Water Operating
3,892,140
3,380,361
3,249,464
2,936,513
3,928,987
17,387,465
Special Assessments
211,500
-
239,922
-
204,000
239,922
Total
7,053,050
4,249,236
6,647,978
3,891,013
6,722,862
28,564,139
USES 2016
2017
2018
2019
2020
Total
Sanitary Sewer 2,085,910
668,875
797,100
754,500
756,375
5,062,760
Water 4,967,140
3,580,361
5,850,878
3,136,513
5,966,487
23,501,379
Total 7,053,050
4,249,236
6,647,978
3,891,013
6,722,862
28,564,139
Summaries of funding sources and uses for Parks and Recreation projects anticipated during the
upcoming five year period are as follows:
SOURCES 2016 2017 2018 2019 2020 Total
Dakota County
224,857
-
-
-
224,857
Escrow Funds
7,900
-
7,900
Federal Grant
899,410
-
-
899,410
General Fund
169,500
199,200
165,400
119,450
85,900
739,450
Other'
1,458,000
150,000
150,000
1,758,000
Park Improvement Fund
211,500
153,000
465,000
293,750
204,000
1,327,250
Trail Improvement Fund
251,520
332,880
227,684
295,236
245,000
1,352,320
Parc Dedication Fund
1,472,949
993,201
1,576,726
1,070,751
899,201
6,012,828
Total
4,687,736 `
1,678,281
2,592,710
1,929,187
1,434,101
12,322,015
*Includes donations, fundraising and sale ofland.
4
USES 2016 2017 2018 2019 2020 Total
Major Maintenance
169,500
199,200
165,400
119,450
85,900
739,450
ParkfTrail improvements
4,040,035
1,035,880
1,974,109
1,336,536
895,000
9,281,560
Park Development
45,000
10,000
20,000
40,000
20,000
135,000
Developer Credits
433,201
433,201
433,201
433,201
433,201
2,166,005
Total 4,687,736 1,678,281 2,592,710 1,929,187 1,434,101 12,322,013
Trail major maintenance and reconstruction were identified in a long-term plan prepared by WSB
Engineering. The Trail Improvement Fund was created with a one-time transfer from the General
Fund.
Parks major maintenance projects have been identified in previous five year Capital Improvement
Plans and financed with General Fund property tax levies.
Facility Plan
The funding sources for the Facility Plan were adjusted to inclucae the nalance of anticipated proceeds
($610k) from the sale of the 183" Street property ($1.56M less $950k dedicated to the purchase of
property for Avonlea Park). This results in a reduction in the 2016 property tax levy as well as future
tax levies that would be needed to fund facility projects.
Equipment Plan
There was no change in the Equipment Plan funding sources and uses for years 2016-2020.
Attachments:
1) Transportation Project and Financing Summaries
2) Transportation Projects (T1 -T13)
3) Utility Project and Financing Summaries
4) Utility Projects (U1-10)
5) Parks and Recreation Project and Financing Summaries
6) Parks and Recreation Projects (P1 -P14)
7) Facility Pian
8) Equipment Plan
5
TRANSPORTATION
Project Summary -
TP -9 202nd Street and Hambure Avenue
Dakota County
Municipal State Aid
Water Trunk Fund
TP -11 215th Street CotridQr_Stutly
General Fund
TP -12 Rist-ofWav Preservation and Manaeem�t
City of Lakeville (Unspecified)
TP -13 Dakota County Hhzbwav Expansion Pro'ects
Dakota County
110,000 385,000 365,000
- 860,000
90,000 315,000 300,000 -
- 705,000
- - 85,000
- 85,000
200,000 700,000 750,000 -
Total
CIP #
Project I Financing
2016
2017
2018
2019
2020
2016-2020
TP -1
Dodd Blvd (CR 9): 194th St -185th St
Municipal State Aid
1,978,000
1,978,000
Escrow Fund
452,000
-
452,000
Water Trunk Fund
520,000
-
-
-
-
520,000
2,950,000
-
-
2,950,000
TP -2
Kenwood Tri (CR50): Dodd Blvd (CR 91 to 185th
St
Municipal State Aid
568,172
1,455,151
1,000,000
1,000,000
1,000,000
5,023,323
Escrow Find
-
276,041
-
276,041
568,172
1,731,192
1,000,000
1,000,000
1,000,000
5,299,364
TP -3
Collector Road Reconstruction
G.O. Improvement Bonds - Taxes
250,019
2,112,892
1,408,704
2,591,644
665,933
7,029,192
G.O. Improvement Bonds - Sp. Assess.
166,680
1,354,594
1,008,789
1,647,742
443,955
4,621,760
Escrow Fund
-
-
I04,480
-
-
104,480
416,699
3,467,486
2,521,973
4,239,386
1,109,888
11,755,432
TPI
Pavement Management - Maintenance
Taws
1,488,580
1,215,324
1,263,937
1,314,494
1,367,074
6,649,409
Escrow Fund
60,000
-
-
60,000
Municipal State Aid
120,000
120,000
120,000
120,000
120,000
600,000
1,668,580
1,335,324
1,383,937
1,434,494
1,487,074
7,309,409
TP -5
Street Reconstruction
Property Tax Levy
50,000
50,000
50,000
50,000
50,000
250,000
G.O. Improvement Bonds -Taxes
5,985,300
4,881,620
4,808,986
4,439,009
5,870,467
25,985,382
G.O. Improvement Bonds - Sp. Assess.
3,346,550
3,287,747
3,239,324
2,992,673
3,946,976
16,813,270
9,381,850
8,219,367
8,098,310
7,481,682
9,867,443
43,048,652
TP -6
Pilot Knob Road and 160th Street
Communications Fund
-
14,000
41,000
-
-
55,000
14,000
41,000
-
-
55,000
77-7
Inava Avenue_ and 165th Street
Municipal State Aid
-
-
130,000
620,000
750,000
-
130,000
620,001r,
750,_000
TP -8
172nd Street: Realinnment at Kenwood Trail
Dakota County
822,250
-
-
-
822,250
Sanitary Sewer Truck Fund
150,000
-
-
-
150,000
Sturm Sewer Tnmk Fund
150,000
150,000
Water Trunk Fund
150,000
150,000
Tax Abatement Bonds/ Southfork IRR
607,500
607,500
TIF Fund
(79,750)
-
-
(79,750)
1,800,000
1,800,000
TP -9 202nd Street and Hambure Avenue
Dakota County
Municipal State Aid
Water Trunk Fund
TP -11 215th Street CotridQr_Stutly
General Fund
TP -12 Rist-ofWav Preservation and Manaeem�t
City of Lakeville (Unspecified)
TP -13 Dakota County Hhzbwav Expansion Pro'ects
Dakota County
110,000 385,000 365,000
- 860,000
90,000 315,000 300,000 -
- 705,000
- - 85,000
- 85,000
200,000 700,000 750,000 -
- 1,650,000
45,000 45,000
45,000 - - 45,000
200,000 200,000 200,000 200,000 200,000 1,000,000
20(1,000 200,000 200,000 200,000 200,000 1,000,000
624,000 - 624,000
624,000 - - - - 624,000
TOTAL $ I7,854,301 $ 15,667,369 $ 13,995,220 $ 14,485,562 $ 14,284,405 $ 76,286,857
TRANSPORTATION
Financing Summary
City of Lakeville (Unspecified)
TP -12 Right-of-way Preservation and Management 200,000 200,000 200,000 200,000 200,000 1,000,000
TOTAL 17,854,301 15,667,369 13,995,220 14,485,562 14,284,405 76,286,857
G.O. LamyementBMds - Sm Assess.
Total
CIP #
Financing /Project
2016
2017
2018 2019
2020 _ 2016-2020
3,239,324
Communications Fund
3,946,976
16,813,270
TP -3
Collector Road Reconstruction
TP -6
Pilot Knob Road and 165th Street
-
14,000
41,000 -
- 55,000
Total G.O. hnprovetnent Bonds - Special Assessments
3,513,230
4,642,341
TP -8
Dakota County
172nd Street: Realignment at Kenwood Trail
822,250
-
822,250
TP -9
202nd Street and Hamburg Avenue
110,000
385,000
365,000
860,000
TP -13
Dakota County Highway Expansion Projects
624,000
-
-
- 624,000
5,870,467
Total Dara County
1,556,250
385,000
365,000 -
- 2,306,250
1,408,704
Escrow
665,933
7,029,192
Total G.O. Improvement Bonds - Taxes
TP -1
Dodd Blvd (CR 9):1941h St - 185th St
452,000
-
-
452,000
TP -2
Kenwood Trl (CR50): Dodd Blvd (CR 9) to 185th St
-
276,041
-
- 276,041
TP -3
Collector Road Reconstruction
TP -1
-
104,480
104,480
TP -4
Pavement Management - Maintenance
60,000
-
TP -2
60,000
568,172
Total Escrows
512,000
276,041
104,480
892,521
TP -4
General Fund
120,000
120,000
120,000
120,000
TP -11
215th Street Corridor Study
45,000
-
-
45,000
City of Lakeville (Unspecified)
TP -12 Right-of-way Preservation and Management 200,000 200,000 200,000 200,000 200,000 1,000,000
TOTAL 17,854,301 15,667,369 13,995,220 14,485,562 14,284,405 76,286,857
G.O. LamyementBMds - Sm Assess.
TP -5
Street Reconstruction
3,346,550
3,287,747
3,239,324
2,992,673
3,946,976
16,813,270
TP -3
Collector Road Reconstruction
166,680
1,354,594
1,008,789
1,647,742
443,955
4,621,760
Total G.O. hnprovetnent Bonds - Special Assessments
3,513,230
4,642,341
4,248,113
4,640,415
4,390,931
21,435,030
G.O. Immbvement Bonds - Taxes
TP -5
Street Reconstruction
5,985,300
4,881,620
4,808,986
4,439,009
5,870,467
25,985,382
TP -3
Collector Road Reconstruction
250,019
2,112,892
1,408,704
2,591,644
665,933
7,029,192
Total G.O. Improvement Bonds - Taxes
6,235,319
6,994,512
6,217,690
7,030,653
6,536,400
33,014,574
Munieioal State Aid
TP -1
Dodd Blvd (CR 9): 194th St -185th St
1,978,000
-
-
1,978,000
TP -2
Kenwood Trl (CR50): Dodd Blvd (CR 9) to 185th St
568,172
1,455,151
1,000,000
1,000,000
1,000,000
5,023,323
TP -4
Pavement Management - Maintenance
120,000
120,000
120,000
120,000
120,000
600,000
TP -7
Ipava Avenue and 165th Street
-
-
-
130,000
620,000
750,000
TP -9
202nd Street and Hamburg Avenue
90,000
315,000
300,000
-
-
705,000
Total Municipal State Aid
2,756,172
1,890,151
1,420,000
1,250,000
1,740,000
9,056,323
Property Taxes and Fund Balance Reserves
TP -5
Street Reconstruction
50,000
50,000
50,000
50,000
50,000
250,000
TP -4
Pavement Management - Maintenance
1,488,580
1,215,324
1,263,937
1,314,494
1,367,074
6,649,409
Total Property Taxes and Fand Balance Reserves
1,538,580
1,265,324
1,313,937
1,364,494
1,417,074
6,899,409
Saidtary Sewer Trunk Fund
TP -8
172nd Street: Realignment at Kenwood Trail
150,000
-
-
-
150,000
Storm Sewer Trunk Fund
TP -8
172nd Street: Realignment at Kenwood Trail
150,000
-
150,000
Water TrunkFund
TP -1
Dodd Blvd (CR 9): 194th St - 185th St
520,000
-
520,000
TP -8
172nd Street: Realignment at Kenwood Trail
150,000
-
-
150,000
TPA
202nd StreEt and Hamburg Avenue
-
85,000
-
85,000
670,000
-
85,000
-
-
755,000
Tax Abatement Bonds / Southfork IRR
TP -8
172nd Street: Realignment at Kenwood Trail
607,500
-
-
607,500
TIF Fund
TP -8
172nd Street: Realignment at Kenwood Trail
(79,750)
-
-
(79,750)
City of Lakeville (Unspecified)
TP -12 Right-of-way Preservation and Management 200,000 200,000 200,000 200,000 200,000 1,000,000
TOTAL 17,854,301 15,667,369 13,995,220 14,485,562 14,284,405 76,286,857
TRANSPORTATION
PROGRAMMED
PROJECTS
Project Name: Dodd Boulevard: 194th Street to 185' Street
Project Number: City Project 13-09 and Dakota County Project 9-36
Project Manager: Chris Petree, Public Works Director
Anticipated Start: 2016 (construction)
Project Description and Location
Dakota County is Xroposing to expand Dodd Boulevard (CSAH 9) to a 4 -lane divided
highway from 194 Street to 185t` Street (CSAH 60) to alleviate congestion, make safety
improvements and provide for increased traffic levels. The project includes a traffic
signal at the intersection of Dodd Boulevard and 185t" Street.
2015 2016 Total (2016-2020) Total (Project
Revenues
Dakota County 27,777
-
167,394
Escrow Fund -
452,000
452,000
452,000
Municipal State Aid Fund 653,751
1,978,000
1,978,000
2,777,606
Water Trunk Fund -
520,000
520,000
_ 520,000
Total $681,528
$2,950,000 $
2,950,000
$ 3,917,000
Expenditures
Design 125,686 - 152,000
Land Acquisition 555,842 - 815,000
Construction 2,950,000 2,950,000 2,950,000
Total $681,528 $2,950,000 $ 2,950,000 $ 3,917,000
4
Project Name: Kenwood Trail: Dodd Boulevard to 185" Street
Project Number: City Project 14-•10 and Dakota County Project 50-19
Project Manager: Chris Petree, Public Works Director
Anticipated Start: 2017 (construction)
Project Description and Location
Dakota County isroposing to expand Kenwood Trail (CSAR 50) to a 4 -lane divided
highway from 185 Street (CSAH 60) to Dodd Boulevard (CSAR 9) to improve roadway
operations, make safety improvements and provide for increased traffic levels. The
project includes an access road connecting Kenwood Trail and Icenic Trail, and a
temporary secondary access to the Jaguar Path neighborhood. Dakota County will
advance fund $3 million of the City's share of the project costs, with equal $1 million
payments made in 2018-2020.
JBgw r Ava
A cz;mLs
Total Total
=5 Z01 W 2018 2019 2020(2016-2020) Pro ect
Revenues
Escrow Fund - 276,041 276,041 276,041
Municipal State Aid Fund 1,230,293 568,172 1,455,151 1,000,000 1,000,000 1,000,000 5,023,323 6,771,239
Total $1,230,293 $ 568,172 $ 1,731,192 $1,000,000 $1,000,000 $1,000,000 $ 5,299,364 $ 7,047,280
Expenditures
Design 415,000 - - - 415,000
Land Acquisition 815,293 568,172 - - - 568,172 1,901,088
Construction - - 1,731,192 1,000,000 1,000,000 1,000,000 4,731,192 4,731,192
Total $1,230,293 $ 568,172 $ 1,731,192 $1,000,000 $1,000,000 $1,000,000 $ 5,299,364 $ 7,047,280
5
L
Total Total
=5 Z01 W 2018 2019 2020(2016-2020) Pro ect
Revenues
Escrow Fund - 276,041 276,041 276,041
Municipal State Aid Fund 1,230,293 568,172 1,455,151 1,000,000 1,000,000 1,000,000 5,023,323 6,771,239
Total $1,230,293 $ 568,172 $ 1,731,192 $1,000,000 $1,000,000 $1,000,000 $ 5,299,364 $ 7,047,280
Expenditures
Design 415,000 - - - 415,000
Land Acquisition 815,293 568,172 - - - 568,172 1,901,088
Construction - - 1,731,192 1,000,000 1,000,000 1,000,000 4,731,192 4,731,192
Total $1,230,293 $ 568,172 $ 1,731,192 $1,000,000 $1,000,000 $1,000,000 $ 5,299,364 $ 7,047,280
5
Project Name: Collector Road Reconstruction
Project Manager: Chris Petree, Public Works Director
Anticipated Start: Annual
Project Description and Location
Lakeville's collector road reconstruction program is designed to provide maintenance to
City collector roadways, to maintain the overall condition of the road surface, and gain
the maximum service life at the best overall cost.
.� - 6 • � 20lfi-192,ri
Y i i Slrcrf RrmxsUutfiwe CiP
It
.Z
Total
2016
2017
2018
2019
2020 (2016-2020)
Revenues
Improvement Const. fund
Debt Issuance - G. 0. Improvement Bonds
Property Taxes (future years)
250,019
2,112,892
1,408,704
2,591,644
665,933 7,029,192
Est. Special Assessments*
166,680
1,354,594
1,008,789
1,647,742
443,955 4,621,760
Escrow Fund
-
-
104,480
-
- 104,480
Total
$ 416,699
$ 3,467,486
$ 2,521,973
$ 4,239,386
$ 1,109 888 S 11,755432
*Estimated Special Assessments include assessments to City -owned properties with front footage along the project.
Expenditures
Collector Rehabilitation
Highview Avenue: CR 70 - S. City Limit
416,699
-
-
Kenrick Ave: N. City Limit -173rd
2,234,045
-
Holyoke Ave: 215th - Heritage Dr
-
1,152,441
-
-
Holyoke Ave/2I0th Intersection
81,000
-
-
Ipava Ave: 185th - Kenwood Tr
-
-
1,405,366
Hamburg Avenue: 202nd - Lkvl. Blvd.
1,116,607
-
172nd St: Kenyon Ave - Kodiak Ave
-
701,731
Klamath Tr: S. CR 5 - N. CR 5
-
-
1,534,103
Kodiak/175th Street
796,525
Judicial/168th Street
-
-
744,044
Heritage Drllberia Ave
462,983
-
Highview Avenue: CR 46 -175th
-
-
-
-
1,109,888
Total
$ 416.699
$ 3.467.486
$ 2,521,973
$ 4,239386
$ 1,109,888 $ 11,755,432
.Z
Project Name: Pavement Management - Maintenance
Project Manager: Chris Petree, Public Works Director
Anticipated Start: Annual
Project Description and Location
Lakeville's pavement management program is designed to provide basic maintenance to
City streets, to maintain the overall condition of the road surface, and gain the maximum
service life at the best overall cost. The program includes miscellaneous repairs, crack
sealing, seal coating, velocity patching, curb & sidewalk repair, bridge inspections &
repairs, transportation safety improvements and asset management support.
Total
2016 2017 2018 2019 2020 (2016-2020)
Revenues
Pavement Management Fund
Property taxes/fund balance 1,488,580 1,215,324 1,263,937 1,314,494 1,367,074 6,649,409
Escrow Fund 60,000 - - - - 60,000
Municipal State Aid 120,000 120,000 120,000 120,000 120,000 600,000
Total $ 1,668 580 $ 1,335,324 $ 1,383,937 $ 1,434,494 $ 1,487,074 $ 7,309,409
Exvenditures
Maintenance
Crack sealing
Velocity Patching
Patching & Minor Overlays
Sidewalk
Cone Curb, Draintile
County Road Utility Improv
Bridge Insp & Repairs/Guardrail
Safety Improvements
Total
135,200
140,608
146,232
152,082
158,165
732,287
105,000
109,200
113,568
118,111
122,835
568,714
928,380
965,516
1,004,136
1,044,302
1,086,074
5,028,408
25,000
25,000
25,000
25,000
25,000
125,000
25,000
25,000
25,000
25,000
25,000
125,000
25,000
25,000
25,000
25,000
25,000
125,000
15,000
15,000
15,000
15,000
15,000
75,000
410,000
30,000
30,000
30,000
30,000
530,000
$ 1.668.580
$ 1.335.324
$ 1.383.937
1 1.434.494
$ 1.487.074
$ 7.309.409
7
Project Name: Street Reconstruction
Project Manager: Chris Petree, Public Works Director
Anticipated Start: Annual
Project Description and Location
The City embraced a pavement management study prepared in 2009 which sets forth a
long-term plan for maintaining City streets based on pre -established standards. The road
systems degradation has accelerated in recent years. Staff is therefore recommending
advancement of the schedule as shown below.
The City Council approved a Street Reconstruction Policy in November 2006 whereby
the property owners will be assessed for 40% of the street reconstruction project. The
Citv will finance its 60% share of the project cost with property taxes.
2016-+0a.;
.Shin Pti mnstraefips Op
mn
7016
2.17
2018
2d19
2020 [2016-2020)
Re%enues
. g•�.
.r-�<1.
PaW 2V .s :,x—,
Improvement Const. Fund
Property Taxes
50,000
50,000
50,000
50,000
50,000
Total
7016
2.17
2018
2d19
2020 [2016-2020)
Re%enues
Improvement Const. Fund
Property Taxes
50,000
50,000
50,000
50,000
50,000
250,000
Debt issuance - G.O. Imp Bonds
Property Taxes (future years)
5,985,300
4,881,620
4,808,986
4,439,009
5,870,467
25,985,382
Special Assessments
3,346,550
3,287,747
3,239,324
2,992,673
3,946,976
16,813,270
Total
$ 9,381,850 $
V19,367 $
8,098,310 $
71481,682 $
9,867,443 $
43,048,652
M=nditures
Construction
6,661,114
5,870,976
5,784,507
4,468,498
7,048,173
29,833,268
Legal, Engineering, Administration
& Financing
2,720,736
2,348,391
2,313,803
3,013,184
2,819,270
13,215,384
Total
$ 9281,850 $
8,219,367 $
8,098,310 $
7,4819682 $
9,867,443 $
43,048,652
Project Name: Pilot Knob Road and 160" Street
Fiber Interconnect and Signal Revisions
Project Number: City Project 17-03 and Dakota County Project 31-87
Project Manager: Chris Petree, Public Works Director
Anticipated Start: 2018 (construction)
Project Description and Location
Dakota County is proposing to install traffic signal management systems along Pilot
Knob Road (CSAH 31) and 16CP Street (CSAH 46) to provide for the efficient operation,
of traffic signals along these corridors. The project includes a). install fiber fort
interconnectivity; b). modify traffic signals to include flashing left -turn yellow arrows;
and c). install traffic monitoring cameras. Intersections along CSAH 31 include 17e St.
and Dodd Blvd. Intersections along CSAH 46 include Ipava Ave., Lac Lavon Rd.,
Highview Ave., Galaxie Ave., Foliage Ave. and Flagstaff Ave. Federal Funding provides
80% of the project costs. The remaining cost will be split 55/45 between Dakota County
and the cities of Apple Valley and Lakeville.
r
F
� k.in nn�u:c.
s
11U.i 3
2017 2018 Total (2016-2020) Total (Project)
Revenues
Communications Fund 14,000 41,000 55,000 55,000 -
Total $14,000 $ 41,000 $_ _ 552000 $ 55000
Expenditures
Design 14,000 14,000 14,000
Land Acquisition
Construction - 41,000 41,000 41,000
'rte $14,000 $41,000 $ 55,000 $ 55,000
6
Project Name:
Project Number:
Project Manager:
Anticipated Start:
Ipava Avenue and 165' Street:
City Project XX -XX
Chris Petree, Public Works Director
2020 (construction)
Intersection Improvement
Project Description and Location
The City of Lakeville is proposing to make intersection improvements to improve
intersection operations, alleviate congestion, make safety improvements and provide for
increased traffic levels. The project includes a traffic signal, intersection reconstruction
(i.e. turn lanes), flashing yellow arrows and pedestrian ramp improvements.
' r .."�.p
J `.h
e` ✓� F
2019
2020 'Total (2016-2020) Total (Project)
Revenues
Municipal State Aid Fund 130,000 620,000 750,000 750,000
Total $130,000 $620,000 $ 750,000 $ 750 000
Expenditures
Design 50,000 - 50,000 50,000
Land Acquisition 80,000 - 80,000 80,000
Construction - 620,000 620,000 620,000
Total $130,000 $620,000 $ 750,000 $ 750,000
10
Project Name: 172"" Street: Realignment at Kenwood Trail
Project Number: City Project 13-07 and Dakota County Project 5-50
Project Manager: Chris Petree, Public Works Director
Anticipated Start: 2016 (construction)
Project Description and Location
The City of Lakeville is proposing to realign 172nd Street from the Canadian Pacific
Railroad right-of-way to the Kenwood Trail (CSAR 5) and Kenyon Avenue intersection
to improve intersection operations, alleviate congestion, make safety improvements and
provide for increased traffic levels. This project may include a traffic signal at the
f intersection of Kenwood Trail and Kenyon Avenue. Wetlands and topography limit the
potential development of this property and the owners have expressed interest in working
with the City and County to make this project viable. Property taxes received from the
subject properties will be abated and pledged toward the payment of the debt.
Connection charges collected with development of the property may be also be pledged
toward the payment of the debt. Right-of-way dedication will be provided by the
[property owners prior to construction.
Revenues
PAITr� �l _i� '11/�IIIUY'3N"Is em « M.
Dakota County -
822,250
822,250
822,250
Sanitary Sewer Trunk Fund
150,000
150,000
150,000
Storm Sewer Trunk Fund
150,000
150,000
150,000
Water Trunk Fund
150,000
150,000
150,000
Tax Abatement Bonds/Southfork IRR
607,500
607,500
607,500
TIF Fund 145,000
(79,750)
(79,750)
65,250
Total $145,000
$1,800,000 $
1,800,000 $
1,945,000
Expenditures
Design 145,000 - - 145,000
Land Acquisition 400,000 400,000 400,000
Construction 1,400,000 1,400,000 1,400,000
Total $145,000 $1,800,000_ $ 1,800,000 _ $ 1,945,000
11
Project Name:
Project Number:
Project Manager:
Anticipated Start:
202n° Street and Hamburg Avenue: Intersection Improvement
City Project XX -XX and Dakota County Project 50 -XX
Chris Petree, Public Works Director
2017 (construction)
Project Description and Location
The City of Lakeville is proposing to make intersection improvements to improve
intersection operations, alleviate congestion, make safety improvements and provide for
increased traffic levels. The project includes intersection reconstruction (i.e. turn lanes)
and pedestrian ramp improvements. Preliminary engineering/design of the 202nd Street
(CSAH 50) corridor was programmed for 2015.
Revenues
Dakota County
Municipal State Aid Fund
Water Trunk Fund
Total
Expenditures
Design
Land Acquisition
Construction
Total
2016 9Q12 2018 Total (2016-2020) Total (Proiect)
110,000
385,000
365,000
860,000
860,000
90,000
315,000
300,000
705,000
705,000
85,000
85,000
85,000
$ 200,000
$ 700,000
$ 750,000 $
1,650,000 $
1,650,000
200,000
200,000
200,000
-
700,000
700,000
700,000
-
750,000
750,000
750,000
$ 200.000
$ 700.000
$ 750,000 $
1,650,000 $
1,650,000
12
Project Name: 215` Street: Corridor Study
Project Number: City Project XX -XX and Dakota County Project 97 -XX
Project Manager: Chris Pettee, Public Warks Director
Anticipated Start: 2016
Project Description and Location
Dakota County is proposing to conduct a county -wide principal arterial corridor study of
CSAR 70 (2100' Street/215'h Street) to develop recommendations (i.e. access spacing,
right-of-way preservation and roadway design characteristics) that meet the
transportation needs along this corridor in relation to surrounding land use and future
roadway/intersection projects. The study will include multiple partners (i.e. MnDOT,
Met Council, Dakota Co., Scott Co., and other cities); the estimate below represents the
City of Lakeville's share.
2016 Total (2016-2020)Total (Proiect)
Revenues
General Fund 45,000 45,000 45,000
Total $45,000 $ 45,000 $ 45,000
Expenditures
Roadway Corridor Study 45,000 45,000 45,000
Total $45,000 $ 45,000 $ 45,000
13
Project Name: Right -of -Way Preservation and Management
Project Number: City Project XX -XX
Project Manager: Chris Petree, Public Works Director
Anticipated Start: TBD (construction)
Project Description and Location
The City may acquire land or right-of-way for existing or future transportation facilities
at various locations within the City as opportunities arise. The land or right-of-way
acquisition may include partnering with Dakota County for acquisition opportunities to
support future roadway projects consistent with existing Official Maps and the City and
County Transportation Plans. Dakota County annually budgets $550,000 for right-of-
way acquisition at various locations throughout the County (55145 cost share).
2016 2017 2018 2019 2020 Total (2016-2020) Total (Proiect)
Revenues
City of Lakeville 200,000
Total $ 200.000
Expenditures
Design - -
Land Acquisition 200,000 200,000 200,000 200,000 200,000 1,000,000 1,000,000
Construction - - - - -
Total $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000 $ 1,000,000
14
Project Name: Dakota County Highway Expansion Projects
Project Number: City Project XX -XX and Dakota County Project 97-16213
Project Manager: Chris Petree, Public Works Director
Anticipated Start: 2016 (construction)
Project Description and Location
The 2030 Dakota County Transportation Plan includes cost participation toward future
County transportation facilities. This includes cost participation for engineering and
constructing future County transportation facilities to County standards, over and above
the costs to construct the segment to City collector standards. The City is required to
request the County's cost share participation through the CIP process. The Avonlea
development includes the construction of 185th Street (CSAR 60) and the Pheasant Run
of Lakeville development includes the construction of 179x' Street (CSAH 9).
2016 Total (2016-2020) Total (Proiect)
Revenues
Dakota County 624,000 624,000 624,000
Total $624,000 $ 624,000 $ 624,000
Expenditures
Design - -
Land Acquisition - -
Construction - 179th Street 208,000 208,000 208,000
Construction - 185th Street 416,000 416,000 416,000
Total $624,000 $ 624,000 $ 624,000
15
TRANSPORTATION
NON -PROGRAMMED
PROJECTS
16
Project Name: Kenrick Avenue: 181st Street — CP Railroad Tracks
Project :Number: City Project XX -XX
Project Manager: Chris Petree, Public Works Director
Anticipated Start Date: TBD (construction)
Project Description and Location
The City of Lakeville is proposing to extend Kenrick Avenue as 2 -lane divided roadway
from 181St Street to the Canadian Pacific Railroad tracks to provide a connection between
the Timbercrest commercial campus and the Southfork Village/Argonne Village business
districts. Wetlands and topography limit the potential development of this property and
the owner has expressed interest in working with the City to make this project viable.
Right-of-way dedication will be provided by the property owner prior to construction.
The benefitted property could be specially assessed a minimum of 24% of the project
costs; the special assessments would be deferred until the property develops. Debt
service costs may be financed with property tax levies until such time the deferment ends.
5
5
k4
�6
I
_ 1'y
17
e
Total
Revenues
General Obligation Improvement Fund
2,575,000
Total
$ 2,575,000
Expenditures
Design
594,400
Land Acquisition
Construction - Roadway
1,980,600
Total
$ 2,575,000
17
e
UTILITIES
Project Summary
18
Water Operating Fund - User Fees
3,199,500
2,828,773
2,650,099
2,429,083
3,298,981
Total
CIP #
Project 1 Financing
2016
2017
2018
2019
2020
2016-2020
U4
Sanitary Sewer Trunk Extensions
Water Trunk Fund - Fees
Sanitary Sewer Trunk Fund - Fees
139,000
148,875
257,100
259,500
81,375
885,850
U-1
Sanitary Sewer Lift Station Rehabilitation
Water Trunk Fund - Fees
Sanitary Sewer Operating Fund - User Fees
835,000
45,000
65,000
20,000
200,000
1,165,000
U-3
Sanitary Sewer Rehabilitation
Water Trunk Fund - Fees
Sanitary Sewer Operating Fund -User Fees
851,910
250,000
250,000
250,000
250,000
1,851,910
U-2
Sanitary Sewer Inilowllntiltration Repairs
Water Trunk Fund - Fees
Sanitary Sewer Operating Fund - User Fees
260,000
225,000
225,000
225,000
225,000
1,160,000
U-6
Watermain Replacement
18
Water Operating Fund - User Fees
3,199,500
2,828,773
2,650,099
2,429,083
3,298,981
14,406,436
Special assessments
-
239,922
-
239,922
U-6
WaternWn Extensions - Hambur¢ Ave: 202nd - Hartford
Water Trunk Fund - Fees
23,992
23,992
U-10
Well Construction
Water Trunk Fund - Fees
875,000
1,837,500
1,837,500
4,550,000
IJ -10
Well Collection Pipe
Water Trunk Fund - Fees
-
-
300,000
-
-
300,000
U-7
Water Main Trunk Extensions
Water Trunk Fund - Fees
200,000
200,000
200,000
200,000
200,000
1,000,000
U-9
Well and Pump Rehabilitation
Water Operating Fund - User Fees
145,000
180,000
225,000
120,000
240,000
910,000
U-5
Tower and Reservoir Maintenance
Water Operating Fund - User Fees
125,000
-
-
-
-
125,000
U-8
Water meter replacement
Water Operating Fund - User Fees
422,640
371,588
374,365
387,430
390,006
1,946,029
Total $ 7,053,050
$ 4,249,236
$ 6,647,978 $
3,891,013
$ 6,722,862
28,564,139
18
UTILITIES
Financing Summary
Total
CIP # Financing I Project 2016 2017 2018 2019 2020 2016-2020
19
WqW Trunk Fund - Fees
U-10
Well Construction
$
875,000
$
$ 1,837,500
$ -
$ 1,837,500
$
4,550,000
U-10
Wen Collection Pipe
-
300,000
-
300,000
U-7
Water Main Trunk Extensions
200,000
200,000
200,000
200,000
200,000
1,000,000
U-6
Hamburg Ave: 202nd - Hartford
-
23,992
-
-
23,992
Total $
1,075,000
$
200,000
$ 2,361,492
$ 200,000
$ 2,037,500
$
5,873,992
Water Operating Fund - Fees
U-8
Water Meter Replacement
422,640
371,588
374,365
387,430
390,006
1,946,029
U-6
Watermain Replacement
3,199,500
2,828,773
2,650,099
2,429,083
3,298,981
14,406,436
U-9
Well and Pump Rehabilitation
145,000
180,000
225,000
120,000
240,000
910,000
U-5
Tower and Reservoir Maintenance
125,000
125,000
Total
3,892,140
3,380,361
3,249,464
2,936,513
3,928,987
17,387,465
Sanitary Sewer Trunk Fund - Fees
U4
Sanitary Sewer Trunk Extensions
139,000
148,875
257,100
259,500
81,375
885,850
Total $
139,000
$
I48,875
$ 257,100
$ 259,500
$ 81,375
$
885,850
Sanitary Sewer Operating Fund - User Fees
U-2
Sanitary Sewer Inflow/lnfiltration Repairs
260,000
225,000
225,000
225,000
225,000
1,160,000
U-3
Sanitary Sewer Rehabilitation
851,910
250,000
250,000
250,000
250,000
1,851,910
U-1
Sanitary Sewer Lift Station Rehabilitation
835,000
45,000
65,000
20,000
200,000
1,165,000
Total $
1,946,910
$
520,000
$ 540,000
$ 495,000
$ 675,000
$
4,176,910
Special assessments
U-6
Watermain Replacement
-
239,922
-
-
239,922
Total $
-
$
-
$ 239,922
$ -
$ -
$
239,922
Total $
7,053,050
$
4,249,236
$ 6,647,978
$ 3,891,013
$ 6,722,862
$ 28,564,139
19
UTILITIES
PROGRAMMED
PROJECTS
20
Project name: Lift Station Rehabilitation
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
The City has 20 sanitary sewer lift stations which pump sewage from low lying areas to
gravity lines. The pumps, motors, and other equipment within each lift station are
periodically inspected and rehabilitated to ensure uninterrupted service. The expected
service life for a lift station is approximately 15-20 years but can vary. Each lift station is
scheduled for inspection and rehabilitation every 15 years. In 2016, Lift Station 6 will
undergo a major rehabilitation to replace the existing lift station with a submersible
station.
Revenues
Sanitary Sewer Operating Fund
Fees
Expenditures
Lift Station #6
Lift Station #7
Lift Station #23
Lift Station #8
Lift Station #16
Lift Station #24
Lift Station #9
Lift Station #10
2016 2017 2018 2019 2020 Total
$ 835,000 $ 45,000 $ 65,000 $ 20,000 $ 200,000 $ 1,165,000
720,000
100,000
15,000
45,000
45,000
20,000
20,000
200,000 -
Total $ 835,000 $ 45,000 $ 65,000 $ 20,000 $ 2002000 $ 1,165,000
Operations and operating costs impacts
No anticipated significant impact on operations or operating costs.
21
Project name: Sanitary sewer system inflow/infiltration repairs
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
A section of the sanitary sewer system is inspected each year for damage to the pipes that
would result in inflow (direct entry of storm water) and infiltration (ground water seeping
into the sanitary sewer) within the sanitary sewer system. This additional water
penetrating the system increases stress to the capacity of the wastewater treatment
facilities thereby resulting in higher sanitary sewer rates for Lakeville customers.
Additionally, exceeding the City's calculated peak flow can result in the imposition of
surcharge by MCES. Should Lakeville exceed that peak flow, the minimum surcharge
would be $216,000 per year for five years. The Utilities Division endeavors to reduce the
inflow and infiltration by initiating repairs such as manhole structure sealing, cured in
place pipe lining, and the replacement of manhole covers. In 2015 project was not
completed and is recommended to be carried forward and included as part of the 2016
Operations and operating costs impacts
No anticipated significant impact on operations or operating costs.
22
2016
2017
2018
2019
2020 Total
Revenues
Sanitary Sewer Oper. Fund
Fees
$ 260,400
$ 225,000
$ 225,000
$ 225,000
$ 225,000 $ 1,160,000
Expenditures
Pipe Repairs and Lining
200,000
150,000
150,000
150,000
150,000
Manhole Sealing
60,000
75,000
75,000
75,000
75,000 -
Total
$ 260,000
$ 225,040
$ 225,000
$ 225,400
$ 225,000 $ 1,160,000
Operations and operating costs impacts
No anticipated significant impact on operations or operating costs.
22
Project name: Sanitary Sewer Rehabilitation
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
The sanitary sewer in areas around the City is subject to breaks, root intrusion, and
cracking. Rehabilitating these portions of the sewer infrastructure is important to
maintaining a closed system and reducing the potential for inflow and infiltration. The
sanitary sewer system will be evaluated in conjunction with planned street reconstruction
projects and will be programmed based on that evaluation.
2016
2017
glnwt NermN7rmaimr C!P
mia
mrs
Pat'" 1D21.2M
----- Calor R�hebmf+tron
LT4
+9117)
H 3
WF
a l
"Al 2019 2020 Total
Revenues
Sanitary Sewer Operating Fund
Fees $ 851,910 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,851,910
ErMnditures
Sanitary Sewer Rehabilitation 851,910 250,000 250,000 250,000 250,000 1,851,910
Total $ 851,910 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,851,910
Operations and operating costs impacts
This will result in a reduction of expenses for sanitary sewer repairs in future years.
23
Project Name: Sanitary Sewer Trunk System Improvements
Project Manager: Chris Petree, Public Works Director
Anticipated Start: As development occurs
Project Description and Location
The Comprehensive Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk
facilities to accommodate anticipated growth. Timing of future sanitary sewer trunk
facilities depends on the growth rate and location of planned community development.
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
24
2M
I Z
1 $
2019
2020
Total
Revenues
Sanitary Sewer Trunk Fund
139,000
148,875
257,100
259,500
81,375
885,850
Total
$139,000
$148,875
$ 257,100
$ 259,500
$ 81,375
$ 885,850
Expenditures
Trunk Sanitary Sewer Oversizing
139,000
148,875
257,100
259,500
81,375
885,850
Total
$139,000
$148,875
$ 257,100
$ 259,500
$ 81,375
$ 885,850
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
24
Project name: Tower and Reservoir Maintenance
Project Manager: Chris Petree, Public Works Director
Anticipated start date: 2015
Project Description and location
Inspections of the interior and exterior of water towers are used to determine the timing
and extent of any required maintenance. Periodic cleaning of the tower exteriors removes
dust and dirt that collects over time that can reduce the life of the coating system. Interior
and exterior coatings on water towers and reservoirs protect the metal structure from
corrosion and rust and maintain the quality of the treated water passing through to
residential and other users. The service life of the towers and reservoirs can be extended
through periodic inspection and necessary maintenance.
Revenues
Water Operating Fund - Fees
Expenditures
Tower Cleaning/Inspections
Dakota Heights Tower
Fairfield Tower
Airlake Tower
CMF Tower
Michaud Park Tower
Total
2016
2017 2018
2019 2020 Total
$ 125,000 $ - $ - $ - $ - $ 125,000
25,000
25,000
25,000
25,000
25,000
$ 125,000 $ - $ - $ - $ - $ 125,000
Operations and operating costs impacts
No anticipated impact on operations or operating costs.
25
Project name: Water Main Replacement
Project Manager: Chris Petree, Public Works Director
Anticipated start date: As required
Project Description and location
The water mains in areas around the City that have been subject to numerous breaks in
recent years and are candidates for replacement. The water main will be replaced in
conjunction with street reconstruction projects. All water main replacement is based on
the number of breaks in a particular area and an evaluation of soils. This represents
replacing 10% of our water system infrastructure in each reconstruction area annually,
and installing cathodic protection and replacing bolts elsewhere within the project area.
Revenues
Special Assessments
Water Trunk Funds
Water Operating Fund
Exnenditures
Water main extension
Water main replacement
FYI -
IMS -ZM5
IIi� a �• �Y�. �r -
2016
2017
_V17
MW
s ton
2M
Pohl, ]G1sm
rwpol®b
—.—.aawrnK.rm�,en
.awx Iwlb
w ,
c
2018 2019
239,922
23,992
2020 Total
239,922
23,992
3,199,500 2,828,773 2,650,099 2,429,083 3,298,981 14,406,436
Total $ 3$ 3 199500 $ 2,828,773 $ 2,914,013 $ 2,429,083 $ 3,298,981 $ 14,670,350
263,914 263,914
3,199,500 2,828,773 2,650,099 2,429,083 3,298,981 14,406,436
Total $ 3,199,500 $ 2,828,773 $ 2,914,013 $ 2,429,083 $ 3,298,981 $ 14,670,350
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
26
Project Name: Watermain Trunk System Improvements
Project Manager: Chris Petree, Public Works Director
Anticipated Start: As development occurs
Project Description and Location
The Comprehensive Water Plan anticipates the extension of watermain trunk facilities to
accommodate anticipated growth. Timing of fixture watermain trunk facilities depends on
the growth rate and location of planned community development.
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
27
2016
2017
2018
2019
2020
Total
Revenues
Water Trunk Fund
200,000
200,000
200,000
200,000
200,000
1,000,000
Total
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,000,000
Expenditures
Trunk Watermain Oversizing
200,000
200,000
200,000
200,000
200,000
1,000,000
Total
_L200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$1,000,000
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
27
Project name: Water meter replacement
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
The Utilities Division replaces residential and commercial water meters that reach the
end of their service life. The expected service life for a water meter is approximately 20
years. The Utilities Division currently schedules approximately 800 meter replacements
per based on the age of the meter and to stay on a 20 year replacement schedule. Being
able to change out water meters at the end of their service life is important to managing
the water system and monitoring water use for reporting to the Department of Natural
Resources. Replacement of meters is done by Utilities Division staff.
Revenues
Water Operating Fund - Fees
Expenditures
Water meters
Residential
Meter Install
Transmitter Install
Industrial/Commercial
Total
0
2016 2017 2018 2019 2020 Total
$ 422,640 $ 371,588 $ 374,365 $ 387,430 $ 390,006 $ 1,946,029
232,739 215,675 214,945 220,012 219,014 1,102,385
149,901 155,913 159,420 167,418 170,992 803,644
40,000 42,017
$ 422,640 $ 371,588 $ 374,365 $ 387,430 $ 390,006 $ 1,946,029
Operations and operating costs impacts
No anticipated significant impact on operations or operating costs.
Project name: Well and Pump Rehabilitation
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
The City's wells provide water for the distribution system which operates on demand 24 hours a
day, 7 days a week. This puts the motors and pump components under tremendous stress.
Additionally, being constantly exposed to water can corrode pipes and other well components.
Periodic inspection and maintenance, with replacement as needed, ensures the efficient operation
of the wells and water system at maximum pumping capacity
The City has 17 wells which are a combination of vertical turbine and submersible pumps and
motors. Vertical turbine pumps and motors are scheduled for rehabilitation every 8 years and
submersible pumps and motors are scheduled for rehabilitation every 10 years.
2016 2017
2018 2019 2020
Total
Revenues
Water Operating Fund - Fees $ 145,000 _L 180,000 $ 225,000 $ 120,000 $ 240,000 $ 910,000
Expenditures
Well 4 roof replacement
Well 6 rehabilitation
Well 8 rehabilitation
HSPS 600HP Pump
Well 11 rehabilitation
Well 19 rehabilitation
Well 12 rehabilitation
Well 13 rehabilitation
Filter Backwash Pump
Well 14 rehabilitation
Well 15 rehabilitation
Well 16 rehabilitation
Well 2 rehabilitation
Well 9 rehabilitation
Well 10 rehabilitation
Well 18 rehabilitation
25,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
45,000
60,000
60,000
60,000
60,000
60,000
60,000
60,000
Total $ 145,000 $ 180,000 $ 225,000 $ 120,000 $ 240,000 $ 910,000
Operations and operating costs impacts:
No anticipated significant impact of operations or operating costs.
29
Project name: Well Construction — Well 21
Project Manager: Chris Petree, Public Works Director
Anticipated start date: 2016
Project Description and Location
Well 21 is programmed for construction in 2016 to provide adequate water supply to
accommodate existing and anticipated growth. The well will draw water from the Prairie Du
Chien, Jordan, and/or the Tunnel City/Wonewoc aquifers. Well 21 is planned to be located
adjacent to the Highview Avenue/Dodd Boulevard roundabout. Wells 22 and 23 are planned for
2018 and Wells 24 and 25 are planned for 2020. Construction will depend on population demand
and water needs. Locations will be based on data provided in the Water Supply Plan.
The Minnesota Department of Health requires the City to amend its Wellhead and Source Water
Protection Plan in order to receive permits to construct future wells.
Revenues
Water Trunk Fund
Total
Expenditures
Well Construction
Well 21
Well 22
Well 23
Well 24
Well 25
Well Collection Pipe
Total
Tw
2016 2017 2018 2019
2020 Total
875,000 - 2,137,500 1,837,500 4,850,000
$ 875,000 $ - $ 2,137,500 $ - $ 1,837,500 $ 4,850,000
875,000
918,750
918,750
918,750
918,750
300,000 -
$ 875,000 $ - $ 2,137,500 $ - $ 1,837,500 $ 4,850,000
Operations and operating costs impacts
Maintenance costs are an additional $1,000 per year per well.
30
31
PARKS AND RECREATION
Project Summary
Total
CIP #
Park 1 Project
2016
2017
2018
2019
2020
2016-2020
P-1
Parks Maior Maintenance
General Fund
General Maintenance
40,225
45,950
45,950
46,200
46,400
224,725
BuildingslSheiterslGrounds
12,100
92,850
19,250
25,000
149,200
Field Imprwmments/Maintenance
10,000
61500
6,500
6,500
6,500
36,000
Open space improvement and maintenance
107,175
53,900
93,700
41,750
33,000
329,525
169,500
199,200
165,400
119,450
85,900
739,450
P-2
North Creek Greenway Tra% Restroom- Amenities
Federal Grant
899,410
-
899,410
Dakota County
224,857
224,857
Park Dedication Fund - Fees
112,210
112,210
1,236,477
1,236,477
P-3
Sbmmerlm Park
Park Dedication Fund
325,000
325,000
325,000
325,000
P4
Khm Park ImRLgMmeats
Park Dedication Fund - Fees
412,538
857,825
597,550
-
1,867,913
Miracle League4.11A Lighting Donation
150,000
150,000
150,000
450,000
562,538
1,007,825
747,550
2,317,913
P-5
Avoolea Park
King Creek Greenway - Sale
950,000
950,000
Park Dedication Fund - Fees
-
550,000
-
550,000
950,000
550,000
-
1,500,000
P-6
OviEW-4hne Parkins Lot Pavine
Park Dedication Fund - Fees
-
-
180,000
180,000
-
180,000
-
180,000
P-7
Park Development-AAWi)stradve ProiecJI
Patio Dedication Fend - Fees
45,000
10,000
20,000
40,000
20,000
135,000
45,000
10,000
20,000
40,000
20,000
135,000
P-8
Park Development - Developer Credits
Park Dedication Fund - Fees
433,201
433,201
433,201
433,201
433,201
2,166,005
433,201
433,201
433,201
433,201
433,201
2,166,005
P-9
Parklmprovements {Various Parks)
Park lmprovementFund
211,500
153,000
465,000
293,750
204,000
1,327,250
Fundraising
258,000
258,000
Donations - LAA - Rotary
50,000
-
50,000
Donations - Quail Meadows - ISD 4192
50,000
50,000
569,500
153,000
465,000
293,750
204,000
1,685,250
P-10
Ritter Farm Dgg Park
Park Dedication Fund - Fees
145,000
-
-
-
145,000
145,000
-
-
145,000
P-11
Leaacv Park
Park Dedication Fund - Fees
-
350,000
350,000
350,000
350,000
P-12
AlkitaudPogk
Park Dedication Fund - Fees
96,000
96,000
-
96,000
96,000
P-13
Trail Improvements
Trail hWrovement Fund
251,520
332,880
227,684
295,236
245,000
1,352,320
251,520
332,880
227,684
295,236
245,000
1,352,320
P-14
Trail -175th: lsleton Ave to Jasmine Ave
Park Dedication Fund - Fees
-
85,700
-
85,700
Escrow Funds
-
71900
7,900
93,600
93,600
TOTAT, S 4,687,736 $
1,678,281 S
2,592,710 $
1,929,187 $
1,434,101 S
12,322,015
31
32
PARKS AND RECREATION
Financing
Summary
Total
CIF #
Funding Source! Project
2016
2017
2018
2019
2020
2016-2020
Dakota County
P-2
North Creek Greenway Trail, Restroom, Amenities
224,857
224,857
P-14
Facrows
Trail - 175th: Isleton Ave to Jasmine Ave
7,900
7,900
P-2
j?ederal Grant
North Creek Greenway Trail, Restroom, Amenities
899,410
899,410
P-1
Genera] Fund
Park Major Maintenance
169,500
199,200
165,400
119,450
85,900
739,450
Other
P4
King Park Improvements - LBA Lighting Donation
150,000
-
150,000
150,000
-
450,000
P-5
Avonlca Park
950,000
950,000
P-9
Park Improvements - Fundraising/Donations
358,000
358,000
Total Other
1,458,000
150,000
150,000
1,758,000
Park Improvgplent Fund - Taxes
PA
Park Improvements (Various Parks)
211,500
153,000
465,000
293,750
204,000
1,327,250
P-13
Trail laarovement Fund - Taxes
Trail improvement
251,520
332,880
227,684
295,236
245,000
1,352,320
Park Ded:raPian Fund - Fees
P-2
North Creek Greenway Trail, Restroom, Amenities
112,210
-
-
112,210
P-3
Srmmerlyn Park
325,000
-
325,000
P4
King Park Improvements
412,538
-
857,825
597,550
1,867,913
P-5
Avonlea Park
-
550,000
-
-
550,000
P-6
Quigk7-Sime Parking Lot Paving
-
-
180,000
-
180,000
P-7
Park Development -Administrative Projects
45,000
10,000
20,000
40,000
20,000
135,000
P-8
Paris Development -Developer Credits
433,201
433,201
433,201
433,201
433,201
2,166,005
P-10
RitlerFarm Dog Park
145,000
-
145,000
P-11
Legacy Park
-
350,000
350,000
P-12
Michaud Paris
-
96,000
96,000
P-14
Trail - 175th: Isleton Ave to Jasmine Ave
-
85,700
-
-
85,700
Total Park Dedication Fund
1,472,949
993,201
1,576,726
1,070,751
899,201
6,012,828
TOTAL
$ 4,687,736
$ 1,678,2K $2,59Z710
$
1,929,187 $
1,434,101
S 12,322,015
32
Buildines/Shelters/Grounds
PARKS AND RECREATION (P-1)
30,500
32,000
26,250
Meadows-reshingle warming house
Parks - Major Maintenance
-
-
1,600
Antlers-reshingle shelters B&C
-
5,000
-
5,000
Cherryview-reshingle warming house
Totals
-
2016 2017
2018
2019
2020
2016-2020
General Maintenance
7,500
Casperson-reshingle shelters B&C
-
-
2,700
STS labor
16,225 16,750
16,750
17,000
17,000
83,725
Tree Trust labor
1,500 1,700
1,700
1,700
1,900
8,500
Tree Trust/Eagle Scout project materials
12,000 12,000
12,000
12,000
12,000
60,000
Tree plantings
5,000 10,000
10,000
10,000
10,000
45,000
Picnic table construction
3,000 3,000
3,000
3,000
3,000
15,000
Sign replacement
2,500 2,500
2,500
2,500
2,500
12,500
Prairie Lake -replace carpet w/rubber floor
40,225 45,950
45,950
46,200
46,400
224,725
Buildines/Shelters/Grounds
21,750
30,500
32,000
26,250
Meadows-reshingle warming house
1,600
-
-
1,600
Antlers-reshingle shelters B&C
-
5,000
-
5,000
Cherryview-reshingle warming house
1,700
-
-
1,700
Casperson-reshingle building (contractual)
-
-
7,500
7,500
Casperson-reshingle shelters B&C
-
-
2,700
2,700
Bunker Hill-reshingle shelter
1,300
-
-
1,300
Orchard Lake-reshingle shelter
-
-
1,400
1,400
Meadows rink end -board replacement
-
-
1,200 -
- 1,200
Rolling Oaks-reshingle warming house
-
1,700
- -
- 1,700
Dakota Heights-reshingle warming house
-
1,700
- -
- 1,700
Dakota Heights -rubber floor replacement
-
2,500
-
- 2,500
Meadows -rubber floor replacement
-
2,500
- -
2,500
Prairie Lake -replace carpet w/rubber floor
-
4,000
- -
- 4,000
McGuire -rubber floor replacement
2,500
- -
- 2,500
Foxborough-1D sign replacement
4,000
- -
- 4,000
Antlers -replace plumbing fixtures
6,000
-
6,000
Steve Michaud Park -building window replacement
-
18,000
-
18,000
Steve Michaud Park -door replacement (1&3)
1,000
4,000
-
5,000
Parkview -door replacement (1)
-
1,000
-
- 1,000
Dakota Heights -trail and door installation
1,000 -
- 1,000
Meadows -trail and door installation
-
650 -
650
Auto bldg door opener/closers-Valley & Michaud
6,500
- -
- 6,500
Drinking fountain replacements (4):
-
-
4,800 -
- 4,800
Aronson Field #3 fence improvements (3rd baseline)
7,200
- -
7,200
Aronson Fields #1 & 3 -outfield fence improvements
15,500
- -
- 15,500
King Field #2 -backstop fence repair
4,750
- -
- 4,750
Jaycee -fence replacement
- 15,000
- 15,000
Upper 205th Street trail fence
12.500
-
- 12,500
Ritter-ELC roof replacement (contractual)
-
-
- 10,000
- 10,000
12,100
92,850
19,250 25f000
- 149,200
Fields
Field improvements/maintenance 10,000 6,500 6,500 6,500 6,500 36,000
Open Space
Fogseal parking Iots
21,750
30,500
32,000
26,250
25,500
136,000
Bench refurbishment
2,500
2,500
2,500
2,500
2,500
12,500
Resurface BBltennis courts
19,200
20,900
20,700
13,000
5,000
78,800
Oak Shores-BBltennis court reconstruction
63,725
-
-
-
-
63,725
Dodd Pointe -overlay BB court
-
6,500
6,500
Meadows -BB court reconstruction
-
-
17,000
-
17,000
Quigley -Sime trail extension
-
-
15,000
-
-
15,000
107,175
53,900
93,700
41,750
33,000
329,525
Total Major Maintenance
169,500
199,200
165,400
119,450
85,900
739,450
33
Project name: North Creek Greenway Trail, Restroom & Amenities
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2016
Project description and location
The City of Lakeville and Dakota County jointly submitted a grant application for Transportation
Enhancement funds through the Transportation Advisory Board (TAB) of the Metropolitan
Council in 2012. The City of Lakeville was informed they were awarded approximately
$900,000 for the North Creek Greenway Trail Project which includes the construction of a
restroom building in East Community Park. Dakota County will also participate in the funding of
the project as noted below. Park Dedication fees are proposed to be used for the project design
and administration of project. Trail design commenced in 2014.
Revenues
Federal Grant
Dakota County
Park Dedication Fund - Fees
Total
E_rnenditures
Trail Design & Adm.
Trail/Amcnity Construction
Total
�•f
Total
2016 2017 2018 2019 2020 (2016-2020)
899,410 899,410
224,857 224,857
112,210 112,210
$1,236,477 $ - $ - $ - $ - $ 1,236,477
112,210 112,210
1,124,267 1,124,267
$1,236,477 $ - $ - $ - $ - $ 1,236,477
Operations and operating costs impacts
When complete, the City of Lakeville and Dakota County will have to execute an agreement
which indicates the cost for the maintenance of the trail will be paid for by Dakota County as this
will be a part of the Dakota County Regional Trail system.
34
Project name: Summerlyn Park
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2016
Project description and location
The Parks, Trails and Open Space Plan calls for a neighborhood park north of Donnelly
Farms in the Summerlyn Development. Staff commenced the preliminary design of the
park in 2014 with construction proposed for 2016. This neighborhood park would not
only serve Summerlyn Development but also the Donnelly Farms Development and the
Chokecherry Development. The park would include items such as shelter, playground,
basketball half -court, benches, walking trails, open green space and other small
amenities_
Total
2016 2017 2018 2019 2020 2016-202_1
Revenues
Park Dedication Fund $ 325,000 $ - $ - $ - $ - $ 325,000
Expenditures
Park Construction $ 325,000 $ - $ - $ - $ - $ -
Operations and operating costs impacts
Summerlyn Park construction will add work load to the maintenance division which will
include items such as pavement management, turf management, playground maintenance,
etc. Staff recommended adding a full time staff member in 2016 to meet the Park
Division's maintenance needs. Considering at this time no additional staff has been
approved in 2016, the addition of this park will necessitate other maintenance tasks not
being completed on a timely basis.
35
Project name: King Park Improvements
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2016
Project description and location
Improvements to King Park include installation of irrigation systems on four fields along with
field, parking lot and trail lighting, installation of drain tile system and trail extension. The
project will increase the playability, safety and overall quality of the fields and will allow for
additional games to be played at the facility ultimately preventing the need to acquire land for the
construction of additional fields. Lakeville Baseball Association (LBA) has and will continue to
donate funds for the lighting project.
-41 king Pork
Revenues
Park Dedication Fund - Fees
Miracle League 1
LBA Lighting Donation
Total
Exu aditures
King Park:
Irrigate four fields
Drainage system
Lighting (Design & Const.)
Total
2016 2017
412,538 -
Total
2018 2019 2020 (2016-2020)
857,825 597,550 1,867,913
150,000 150,000 150,000 450,000
$ 562,538 $ - $1,007,825 $ 747,550 $ - $ 2,317,913
232,500 - 232,500
140,000 185,000 325,000
562,538 635,325 562,550 1,760,413
$ 562,538 $ - $1,007,825 _L747,550 $ - $ 2,317,913
Operations and operating costs impacts
Planned improvements to King Park will add workload to the maintenance division regarding
additional staff time required for turf management including servicing irrigation system and
increasing mowing frequency. The purchase and installation of the lighting system will include a
100% Maintenance Free Plan for 25 years. The installation of the drain tile system will reduce
the staff time that has been required to remove standing water from fields after rain events.
36
Project name: Avonlea Park
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2017
Project description and location
The Parks, Trails and Open Space Plan calls for the acquisition of land along the Cedar Avenue
corridor for community playfields. Staff has been working with Mattamy Development to set
aside 66.5 acres at the corner of future 185' and Cedar Avenue for the development of an athletic
Revenues
King Creek Greenway - Sale
Park Dedication Fund - Pees
Total
Expenditures
Avonlea Park
Total
2016
2017
Total
2018 2019 2020 (2016-20201
950,000 - - 950,000
- 550,000 - - - 550,000
—F9 5 0, 0-0 0 $ 550,000 $ - $ - $ - $ 1,500,000
950,000550,000 1,500,000
$ 950,000 $_L50,000 $ - $ - $ $ 1,500,000
Operations and operating costs impacts
Until the park land is developed, operational cost for the 66.5 acres after the purchase of land
would include rough cutting the site approximately four times/year which is estimated to cost
$7,400 for labor and equipment. No additional operational cost is anticipated until the park land
is developed into its final use. There is the potential to rent out the land after purchased and until
it is developed for agricultural use for approximately $250 - $400/year.
MrA
Project name: Quigley -Sime Parking Lot Paving
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2018
Project description and location
Funding is being scheduled for paving Quigley -Sime parking lot. Paving and striping of
lot will maximize parking capacity, eliminate dust -control issues and reduce maintenance
of the lot.
Revenues
Park Dedication Fund - Fees
EWCEAJurgj
Pave Quigley -Sime parking lot
Parking lot Eng (Design, Insp,
Adrn-20%)
Total
Total
IM 2017 2018 2019 2020 (;016-2029)
$ - $ - $ 180,000 $ - $ - $ -
150,000
30,000
$ - $ - $ 180,000 $ - $ - $ -
Operations and operating costs impacts
Operating cost impacts include pavement management maintenance (i.e. fog sealing and
striping) increasing the budget two years after the lot has been constructed and every five
years after initial fog seal application. This parking lot will not be plowed.
38
Project name: Park Development — Administrative Projects
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: On-going
Project description and location
The Park Dedication Fund budget provides appropriations for a number of activities including
planning, design and feasibility reports for park projects such as Summerlyn Park, Antlers Park
Master Plan, Legacy Park, Chokecherry Hill Greenway and Avonlea Development Concept
Plan. It also includes appraisal and professional fees for the bi-annual review of park
dedication fee analysis for commercial and industrial properties.
Revenues
Park Dedication Fund - Fees
EE gnndltures
Park Fees analysis - CI values
Summerlyn - Design & Construction
Antlers Park Master Plan
Legacy Planning & Design
Planning & Design
Total
Total
2016 2017 2018 2019 2020 (2016-2020)
$ 35,000 $ 10,000 $ 20,000 $ 50,000 $ 20,000 $ 135,000
10,000 10,000 10,000 30,000
25,000 - - - 25,000
10,000 - - - 10,000
- - - 40,000 - 40,000
- 10,000 10,000 - 10,000 30,000
$ 45,000 $ 10,000 $ 20,000 $ 40,000 $ 20,000 $ 135,000
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost as a result of
completing planning and design work.
39
Project name: Park Development — Developer Credits
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: On-going
Project description and location
Developer credits: Represents credits associated with new development when the park
dedication requirement is fulfilled through a land dedication.
Total
2016 2017 2018 2019 2020 [2016-20201
Revenues
Paik Dedication Fund - Fees $ 433,201 $ 433,201 $ 433,201 $ 433,201 $ 433,201 $ 2,166,005
bmenditares
Developer Credits $ 433,201 $ 433,201 $ 433,201 $ 433,201 $ 433,201 $ 2,166,005
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost at this time.
40
Project name: Park Improvement Fund
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: Various
Project description and location
The Park Improvement Fund provides funding for replacement and upgrades to items such as
Aronson building improvements, Antlers building and playground replacements. The existing
Land of Amazement (LOA) play structure (23 years old) at Steve Michaud Park was
constructed in 1992. LOA is a destination site whereby residents and non-residents travel to
the site to play on this unique play structure. This unit is an old type wood structure that is in
need of replacement as many of the wooden poles, decking, handrails and balusters are
deteriorating, splitting or cracking along with a significant number of play apparatus pieces
that no longer can be repaired/replaced. LOA was preliminary designed in 2015 in order to
facilitate fundraising efforts for construction in 2016.
2016 2017 2018 2019 2020
Revenues
Park improvement Fund 211,500 153,000 465,000 293,750 204,000
Fundraising 258,000 - - -
Donations - Rotary - LOA 50,000
Donations - ISD # 192 - Quad Meadows 50,000 - -
Total $ 569,500 $ 153,000 S 465,000 $ 293,750 $ 204,000
Expenditures
*Aronson building upgrades
**Replacement of Antlers building
Plaveround Renlacements
Steve Michaud LOA
Oak Shores
Quail. Meadows
Dodd Trail
Highview Heights
Hypointe Crossing
Cherryview
Independence
Greenidge
Dodd Pointe
Bunker Hill
Bracketts Crossing
Total
140,000
325,000
393,000
76,500 -
100,000 -
76,500
76,500
65,500
78,750
73,000
76,500
77,000
77,000
- - - 50,000
$ 569,500 $ 153,000 $ 465,000 $ 293,750 $ 204,000
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost.
*Includes architectural design, construction plans and misc. expenses.
**City staff will work with Dakota County to obtain funding for the construction of this building as Antlers
Park will be considered a trailhead along the Lake Marion/South Creek Trail Project, which will be a part
of the Dakota County Regional Trail System. The building will also be incorporated into the Antlers Park
Master Plan.
41
Project name: Ritter Farm Dog Park
Project Manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2016
Project Description and location
The Ritter Farm Dog Park would be approximately 9-11 acres in size. Amenities include
a large and small dog area, pet drinking and wash off area, gravel parking lot and picnic
tables.
tlFs
E
Operations and operating costs impacts
The construction of the dog park will add work load to the maintenance division which
will include items such as refuse collection, periodic flail mowing, winterization of
drinking fountain and gravel parking lot maintenance along with the general up -keep of
site.
!J
2016
2017
2018
2019
2020
Revenues
Park Dedication Funds -Fees
$
145,000
$ -
$ -
$
$ -
Total
$
145,000
$ -
$ -
$ -
$ -
Expenditures
Dog Park Construction
$
145,000
$ -
$ -
$ -
$ -
Total
$
145,000
$ -
$ -
$ -
$ -
Operations and operating costs impacts
The construction of the dog park will add work load to the maintenance division which
will include items such as refuse collection, periodic flail mowing, winterization of
drinking fountain and gravel parking lot maintenance along with the general up -keep of
site.
!J
Project name: Legacy Park
Project Manager: John Hennen, interim Parks and Recreation Director
Anticipated start date: 2020
Project Description and location
The Parks, Trails and Open Space Plan calls for a neighborhood park in the area serving
the Legacy, Crescent Ridge and Berres Ridge Developments. The park would include
more non-traditional amenities versus what has been installed in the previous
iieipJi orliood parks,
I� �L� 1•
N er
d 1.L.0 h.4
Vx
Revenues
Park Dedication Funds -Fees
Expenditures
Park Construction
Total
2016 2017 2018
4 A t' 'i
2019 2020
$ $ - $ - $ - $ 350,000
$ - $ - $ - $ - $ 350,000
$ - $ - $ - $ - $ 350,000
Operations and operating costs impacts
i Legacy Park construction will add workload to the maintenance division which will
include items such as turf management, pavement management, possibly playground
maintenance, etc. Staff recommended adding a full time staff member in 2016 to meet
the Park Division's maintenance needs. Considering at this time no additional staff has
been approved in 2016, the addition of this park will necessitate other maintenance tasks
not being completed on a timely basis.
43
Project name: Steve Michaud Soccer #8 & #9 Drain Tile Installation
Project Manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2020
Project Description and location
Improvements to Steve Michaud Park include the installation of drain file system in
soccer fields 8 and 9. The project will increase the playability, safety and overall quality
of the fields. At this time the fields are prone to becoming saturated and unplayable
during periods of continued or heavy rains. These conditions have forced the closure of
the fields during tournaments and regularly scheduled games. In addition the increase in
soil moisture has had a negative impact on the turf conditions and an increase in turf
stress. The installation of a sport field drain tile system will minimize or eliminate these
negative conditions and allow for consistent field conditions and playability.
Revenues
Park Dedication Funds -Fees
Expenditures
Drain Tile Installation
Fields #8 and #9
Total
2016 2017 2018 2019 2020
$ 96,000
96,000
$ - $ - $ - $ - $ 96,000
Operations and operating costs impacts
No impact on operations or operating costs.
44
Project name: Trail Improvement Fund
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: Various
Project description and location
The City retained the services of WSB Engineering who evaluated the condition of all
trail segments and provided recommendations for maintenance. Staff has developed a
plan for either overlaying or reclaiming trail segments. Staff is proposing to have WSB
inspect 113 of trail system each year to perform pavement ratings and analysis.
Revenues
Trail Improvement Find - Taxes
Exmncltures
Trail crack and fog sealing
Trail inspections (1/3 of system)
S side 165th - Hudson to Highview (reclamation)
Dakota Heights Park Trails (reclamation)
The Greenway Trail - W segment
N side 165th - Ipava to Holbrook Ave (reclamation)
Casperson soccer field trail
W side Flagstaff Ave - Fontina Path to Dodd Blvd (reclam.)
E side Flagstaff - Fontina Path to Dodd (overlay)
N Creek Trail - E from Flagstaff to N Creek MHP (reclam.)
Dodd Trail Park Trails - Flagstaff to Dodd Blvd (reclamation)
King park trail extension
Aronson Park Trails (reclamation)
Cedar Highlands Park Trails (reclamation)
Hypointe Park Trails (reclamation)
Oak Shores Park Trails (reclamation)
Parkview Park Trails (reclamation)
Quail Meadows Park Trails (reclamation)
N side of 175th - Ipava to Highview
*W side Cedar - 190th to 202nd (reclamation)
*N side 160th - 1pava to Interlachen (reclamation)
*S side 160th - Ipava to Cedar Ave (overlay)
Misc. Trails - TSD
Engineering costs for reclamation/overlay projects (20%)
Total
2016 2017 2018 2019 2020
$ 251,520 $ 332,880 $ 227,684 $ 295,236 $ 245,000
60,000
60,000 60,000
5,000
5,000 5,000
35,469
16,141
24,087
78,236
1,800
78,517
51,914
47,035
32,434
16,000
18,508
30,295
9,869
46,532
16,281
14,085
60,000 60,000
5,000 5,000
78,509
50,148
14,321
50,659
$ 150,000
30,787 41,980 27,114 36,599 30,000
$$ 2® $ 332,880 $ 227,684 $ 295,236 $ 245,000
*Budget number is City's cost (45%) - Dakota County to pay 55%
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost.
45
Project name:
Street Trail — Isleton Ave. to Jasmine Avenue (S side)
Project Manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2018
Protect Description and location
Revenues
Park Dedication Funds -Fees
Escrow Funds
Total
Expenditures
Travel Construction
Engineering (20%)
Total
2016 2017 2018 2019
2020
85,700 - -
7,900 - -
$ - $ - $ 93,600 $ - $ -
- 78,000 -
15,600
$ - $ - $ 93,600 $ - $ -
Operations and operating costs impacts
The trail segment will be added to the fog sealing maintenance schedule increasing the
budget two years after the trail is constructed and every 3-4 years after that point.
46
I
IL
Iu
J
J J
W
5LL
N
LL. N
d 1
In
r
V N
UIi-a'ap•a°aC�ywavili �� mU.
'i m 0.9 .2 S m N W 0 O
v w w w w o_ H I
2eLDe �
C CEMM_.
a.
v'
U.
IL
p
7
C O O O-�O- O C O 2 0�= C C C
rq
LL a s IL +��+� W M ID a 0 OD � ISL m w Ts
c -_T T, Fz m mm
W°
LL LL
L3= z @g
Ii — m J 0 ~ yp7W
rs Q (7 a V m
LCE
O Q
w v
egg'
4
r: 0 00 0 O O a M O
Q
�`
ti 10
O
0
m
w
oo10olnooho
0 .
n
O
O
tD O p7 _ a a N CD b
Ifi
@
1+
C
o C CO
O@
fV
O M
h N n6 li O m c
h
N
!-
O CO 1+
O
h
ICJ
N
NV IC O f- a N m M~ (V
mO
lh
T
0
T
b m
W
r
[h0
r
M
M
In
T
r
O
N
rri
Eli
to
eB
a9
'
w O
N
I
IOC
R
i d'
CO17
m N
N
r N
Hi
M
"}
`f9
EpR
di vi
O
O
O
Rx
of
Vi
4i
fR
vi
(a
C9 69
O
c
c
O
a m r r 1
r
O
0
O
r C
1
r
O
O
OOp
N
E
h_ O
E9
1�
O
O
06
00
N
ER
bU
E9
64
E9 H
O
O
O
' I
O
O
A
N
�
N
C)
�
N
a
M
O h
m @
N
Hi
YP
E9 N
' Egg
NO
gjg
S
N
.8
m A 1If 07 m
O
N
c�l
1
m N
N
T
a eD
F9
fA
Ga
4,
d9
EA r9
000
Op
O
00
O p O O O
r ' 0 0 EO 0 I C
O
ID
O
l a
O
U5 U7M
b
m
m
m
T
r 0 r
N
1[7
N
N
tfi
f9
to
bi
E9 ,w
ap
o
a o o p
o
a
a
pap
N
coc to
e'
MIn
r
OT m
v
v
N
7
&
N@
46
69
00 1000
0
1W.�7
E669
i1m
fCMN
co
E9
in
E9 Vi
N O Q O O O 01 1J0
O
O
N
0
O O
O
N
h LO
@ o YT O O O b b b
N h IO ' M M N O N T
O
r W
04
o
o
O
O 8
O
N 40
ti In a n M N
m
7D
I1C
a
V IE7
v
�,
� N
r
o ON7
r N
1p
""
0
N
T
ED m
N
E9
69
"
F9
EA
CJs E9
O O O 011y O O O b M Op
O
117
O
Q ID ID
O
b
Op
I+ l�
rc`F IO� o R Iff
o
�
�
n
v
N
CNOo
`° NO
a (D M r$ Y m
@
�
W
po�Ih+
ID A m
O
Qh
V
0
� f
ro
N T M T r T
r
W
T
w
0
Uq 0
N
M
N
N
49
Vi N
Lq �'
0
04
U
r t f c
1 m 1 I
11
1 $ 1
1 Q 0 I 1
1 ! h
7La
T
Q
V
�ICrII t�A� eM0 I{��7 pp17
P cR O N 0 m a0
M
1,
0
117
F.
ro N N
((��
N
O
A ti
a 0
e�rTs
W
h
m
+-
m
M IA
N N
f9
Hi
0%
d?
GF}
Vi E9
00000 0 0 a OO
a
117
O
O o0
�
O ID
h O a 0 O
>n m Ily rr O '
a
' I
M
' Ep
h
O
' O '
O O O
' a a ' '
n
' ' M
h
r
O
b
O
C O
IR
(C O O
@'1 O N d7 @
'e
r
M
0
EA N
N
CV
0 m
'7 7 07 In M r- @ m
LVV
w
m
IL7
CO N
N
00f
m
M A
M
Hi
E9
rA
419,
M w
UIi-a'ap•a°aC�ywavili �� mU.
'i m 0.9 .2 S m N W 0 O
v w w w w o_ H I
2eLDe �
C CEMM_.
a.
v'
U.
IL
p
7
C O O O-�O- O C O 2 0�= C C C
rq
LL a s IL +��+� W M ID a 0 OD � ISL m w Ts
c -_T T, Fz m mm
W°
LL LL
L3= z @g
Ii — m J 0 ~ yp7W
rs Q (7 a V m
LCE
O Q
w v
egg'
4
a
H
Z
W
W �
J a
7
Y W
J N
LL N
V N
In
v00Nrr-
'r 'r N
�n
mo
o
0 0 o 0
0000-
o
o
w
v
N
14
N 16
' w O CO Cb O� 1a '
o m m m Lo m
m O CO S O
m
0
W
0? O
M
O O O O r'
pOp O In O LO
Q N LO N
O
CJ
O
N
N
m
Cl) M M 147 aD
C
OIn
Of
N
c'+
N
N
N
.I
N
U9
i
w
u9
w
w
—7
CO S V N
M
IO S
S O O
m
co
m O
w
• m' m n• m
Om N
�
O
r o
COo
o" o o
O O
r
n
o
o r
0111
O
N a m
m
�O
c m N
!�
U)
�u
N
r
r
li
Ij{N
w
N• wp
47 h 0)
Ln O •
O O S
CYpD►
01
D O
N
PS
N
N
r
r
H9
w
CR
to
go w
O mp IA 10
N
O
O O
10
m
OO r
�n�p �wpp
IIn
ppO
m
N
Im+ O
C4
� N m$
r�i
m
$ 'o
m
m
alm a
N
CV
1
r
CD
CV
w
SH
iH
wO
wR HS3
N
NmSNVCV3'
NV {o O
N
'
SSSpO
O
O O
OO
'
CO
�➢
r n
NC;
CJ N v o v
N
Lo O
0 r LO
Call)
N r
O
N Imo N ['� [W') Cm9
C-
N
m m N
V3
N S
N
r
N
s9
w
w
w
w
w w
`l,
SO�$IFiR
SS
O OO
O
Go
N
N
w
w
w
Ito
w
m fH
o
O S
T
O m
C' r aG
r
INS• pOp -
O,
i o
S S O
'
NNC�I
C•
co
p
CD
S
_
N g
w m n
a.
m N
co
N
r
r
6e
to
w
w
fA
w w
to
SQS mMOS
' O G O C-
V
to O
S S O
O O
S
F
CQ O
a
p
m
h O
O LC?
O
m
N
N N N
r
N
co
v
N'
cq
m co
°
w
w
w
Y! tp9p
pp q� q p
' O 1� ��-• O/
�
�
S O Q
1
�
CCYe��►
�y OA?
cOcppl
gG
�Oy
p�
�C.¢j
CY
M
W
Pi
w
to
w
w
wUil
N e h} m �{�p7 w
N
Ca 0
O O O O
pO
m
C4
N O 1� 9
IN O '
O ' S S s
8'
INO•
W
N cq
A
C, N" N CV
'� C? N
S
N
N
M1
CO
"NQ CD I--
N
N
R
S C'N
o
m
O N
00
r
N
w
w
w
w
w
w w
N V W ((yy r 0
N a^ N a1 r` m
W
h
Ih 0
, O
0 0 0
0 0 0 0=
f J I'tU O10 01 P
IQ
o] O'
O C! O O
J.
Lo
O
C9 N
G fo
9
m
N
CD In m
pOp O O m O�
O
A
ai
1�0 �
N
l° N
r
C
t0 r r CI
Cb
v
m C
N—
e s
wS
wm
wp
%%49
app 1lp] pp CC�y �I
pwy
Op 8 pO p.
L? O O ' 4pi '
'
O•
pO
1(0{07
CCNy7
L,
M
Ori
w 5
�C91eD�7
1RpJ
tl'
.
rp
co
N
La7
00 N
N
m
a1
N N
N
w
V9
w
w
w
w w
m VD N A N
' ' '
to
p CD N O S O
' 8 ' '
'
®
m
h
r
to
CO 1q Ox 0
O
m O O O
a1
N C,
�fl mC�6
CV
a�
ID 9
m N
C
�
Q C7
N
m
N c
w
w
w
to
w
N w
LL CD Or -
L a N LL c c.16
C C c LL
U W o c c c o o c C D a m
p a e 3 3 C.
W W 'o 'g '� C '� �/2J $ LL pLL� LL
LL L IL L IL O ^ C LP
7 f SCD
W
IL
:7,
o
e
v a '�
o' w
w