Loading...
HomeMy WebLinkAboutItem 05.dPositioned to Thrive Public Works November 2015 Public Works November 2015 2 Holyoke Avenue Water Tower. Work on the ring beam is complete and dome sections are being installed. The dome sections will enclose the top of the shaft and serve as support for the tank when the tank is hoisted on to the shaft. The shaft must be complete before fabrication of the tank begins. The tower is expected to be online by the fall of 2016. 3