Loading...
HomeMy WebLinkAboutItem 02.c Date: Proposed Staff reco final pay Project a Passage acceptan Overview Pember $9,311.8 original Bitumino but adde extended transition Valley P $39,547. original c Primary  W Supporti  P  P ________ Monica H Operatio Financial I Related Do Communit 14 Decembe APPR d Action ommends a yment for C and the Kens of this moti nce of the pr w Companies 6 for City contract a ous paving ed value to t d match po n into the D aving, Inc. 35 for City contract am Issues to Co Was all work o Yes, a admin ing Informa ay Estimate ay Estimate __________ Heil, PE ons and Main mpact: $ ocuments (CIP ty Values: G er 2015 ROVE FINA CI adoption of City Projects sington Bou ion will resu rojects. , Inc. is requ Project 12-1 mount was and storm the finished oints within Downtown P is requesti Project 15 mount was $7 onsider satisfactoril all work was nistrative req ation - Final 12-17 - Final 15-04 _________ ntenance En $1,156,626.06 P, ERP, etc.): Good Value for AL ACCEPTA TY PROJEC the followin s 12-17 and ulevard Impr ult in the ap uesting fina 17, the Dow s $428,336. sewer quan d project as the street arking Lot. ng final ac 5-04, the Ke 701,784.74. y completed s satisfactor quirements 7 4 ngineer Budge r Public Service ANCEAND CTS 12-17 A ng motion: 15-04, the rovement Pr proval of th al acceptanc wntown Pa 55. The f ntity overrun much need and parkin cceptance a ensington B The final co d? rily complet for final pay eted: Yes es Ite D FINAL PA AND 15-04 Move to ap Downtown roject, respe he final paym ce and final arking Lot I final contra ns lead to a ed storm se g lot areas and final p Boulevard I ontract amo ted and the yment. Source: em No. AYMENT FO pprove final n Parking Lo ectively. ment to the payment in mprovemen ct amount an increase ewer repairs provided a payment in mprovemen ount is $707, e contracto 429 Bonds, County TIF OR acceptance ot Improvem e contractors n the amou nt Project. is $449,42 in project c s were made a more seam the amoun nt Project. ,202.73. rs have me Utility Funds, & RIG Funds e and ment s and unt of The 23.33. costs, e and mless nt of The et the RECOMMENDATION FOR PAYMENT PROJECT: Downtown Parking Lot Project City Project No. 12-17 DATE: November 23, 2015 ESTIMATE NO. Final OWNER: City of Lakeville, Minnesota CONTRACTOR: Pember Companies N4449 469th Street Menomonie, WI 54751 ________________________________________________________ SUMMARY ORIGINAL CONTRACT AMOUNT: $428,336.55 TOTAL CONTRACT AMOUNT $428,336.55 _________________________________________________________ REQUEST THIS ESTIMATE REMARKS: Acct. 2271.6280 WORK COMPLETED TO DATE: 449,423.33$ MATERIALS ON HAND: -$ SUBTOTAL:449,423.33$ LESS AMOUNT RETAINED: 0% -$ LESS PREVIOUS PAYMENTS: 440,111.47$ AMOUNT DUE THIS PAYMENT:9,311.86$ This is to certify to the best of my knowledge, information and belief, the quantities and values of work certified herein are fair approximate estimates for the period covered by this voucher. Name of Contractor: SIGNED: _____________________________ Pember Companies, Inc. TITLE: _____________________________ DATE: _____________________________ This is to certify that the work shown in the Statement of Work certified herein has been actually furnished for the above-mentioned project in accordance with the plans and specifications heretofore approved and that the total work is 100% completed as of November 1, 2015. I hereby recommend payment of this voucher. SIGNED: ________________________________ Roberta A. McDonald DATE: ________________________________ ________________________________________________________ RECOMMENDED FOR PAYMENT BY THE CITY OF LAKEVILLE, MINNESOTA. SIGNED: __________________________ SIGNED: _____________________________ O & M Engineer Finance Director DATE: __________________________ DATE: _____________________________ PROJECT: Item Unit Quantity Current Pay Est. Quantity Current Pay Est. Extension Quantity to Date Extension to Date A: Downtown Parking Lot Improvements MOBILIZATION LUMP SUM 1 17,450.00$ 17,450.00$ -$ 1.00 17,450.00$ TREE REMOVAL WITH GRUBBING TREE 11 400.00$ 4,400.00$ -$ 10.00 4,000.00$ SITE EARTHWORK / EXCAVATION LUMP SUM 1 20,000.00$ 20,000.00$ -$ 1.00 20,000.00$ REMOVE CONCRETE CURB AND GUTTER LIN FT 790 4.00$ 3,160.00$ -$ 824.00 3,296.00$ REMOVE CASTING ASSEMBLY EACH 3 100.00$ 300.00$ -$ 7.00 700.00$ BITUMINOUS PAVEMENT RECLAMATION SQ YD 3,350 4.70$ 15,745.00$ -$ 3777.00 17,751.90$ REMOVE CONCRETE WALK SQ FT 2,190 1.35$ 2,956.50$ -$ 2232.00 3,013.20$ SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 80 4.60$ 368.00$ -$ 31.00 142.60$ SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 290 2.40$ 696.00$ -$ 546.00 1,310.40$ SALVAGE AND REINSTALL LIGHT EACH 4 5,040.00$ 20,160.00$ -$ 4.35 21,924.00$ Step Joint LIN FT 200 7.00$ 1,400.00$ -$ -$ BITUMINOUS MATERIAL FOR TACK COAT GALLON 175 2.75$ 481.25$ -$ 100.00 275.00$ TYPE SPWEB240C WEARING COURSE MIX TON 224 80.50$ 18,032.00$ -$ 341.33 27,477.07$ TYPE SPNWB230C NON WEAR COURSE MIX TON 300 82.00$ 24,600.00$ -$ 438.88 35,988.16$ CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 200 26.00$ 5,200.00$ -$ 155.00 4,030.00$ CONCRETE CURB & GUTTER DESIGN B612 LIN FT 950 24.00$ 22,800.00$ -$ 1051.00 25,224.00$ TRAFFIC CONTROL LUMP SUM 1 3,000.00$ 3,000.00$ -$ 1.00 3,000.00$ STREET SWEEPER (W/PICK UP BROOM) HOUR 5 125.00$ 625.00$ -$ 6.80 850.00$ 6" x 18" WIDE CONCRETE WALK BANDS SQ FT 550 10.50$ 5,775.00$ -$ 429.00 4,504.50$ 6" CONCRETE WALK (SPECIAL 1 for Ped Ramps) SQ FT 550 6.35$ 3,492.50$ -$ 1126.00 7,150.10$ 6" CONCRETE WALK (SPECIAL 2 for Colored/Stamped) SQ FT 750 12.75$ 9,562.50$ -$ 693.00 8,835.75$ 7" FIBERMESH REINFORCED CONCRETE PAVEMENT (WITH TYPE I FINISH) SQ FT 800 6.76$ 5,408.00$ -$ 916.00 6,192.16$ 7" FIBERMESH REINFORCED CONCRETE PAVEMENT SPECIAL (DRIVEWAYS APRONS & PED RAMP APRON/GUTTER )SQ FT 1,600 6.75$ 10,800.00$ -$ 1510.40 10,195.20$ 4" CONCRETE WALK SQ FT 2,100 4.50$ 9,450.00$ -$ 1996.20 8,982.90$ TRUNCATED DOMES SQ FT 56 31.50$ 1,764.00$ -$ 36.00 1,134.00$ TRUNCATED DOMES (RADIAL) SQ FT 20 45.00$ 900.00$ -$ 16.00 720.00$ BRICK AND CAST STONE MONUMENT EACH 4 5,000.00$ 20,000.00$ -$ 4.00 20,000.00$ ORNAMENTAL FENCING LIN FT 13 140.00$ 1,820.00$ -$ 12.00 1,680.00$ H.C. SIGN PANELS ON POST EACH 3 210.00$ 630.00$ -$ -$ SIGN PANELS SPECIAL EACH 2 210.00$ 420.00$ -$ 2.00 420.00$ ELECTRICAL OUTLETS EACH 7 525.00$ 3,675.00$ -$ 7.00 3,675.00$ 6" PVC PIPE DRAIN (BENDS & ATTACHMENTS INCIDENTAL) LIN FT 300 34.00$ 10,200.00$ -$ 246.80 8,391.20$ 6" PVC CLEAN OUT EACH 2 550.00$ 1,100.00$ -$ 3.00 1,650.00$ CASTING ASSEMBLY EACH 4 765.00$ 3,060.00$ -$ 7.00 5,355.00$ ADJUST FRAME AND RING CASTING EACH 1 320.00$ 320.00$ -$ 2.00 640.00$ TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 500.00$ 500.00$ -$ 1.00 500.00$ CONST DRAINAGE STRUCT DES 48-4020 LIN FT 4 560.00$ 2,240.00$ -$ 14.36 8,041.60$ CONST DRAINAGE STRUCT DES. SPECIAL 1 w/CASTINGS EACH 4 1,520.00$ 6,080.00$ -$ 4.00 6,080.00$ CONNECT TO EXISTING STORM SEWER EACH 5 700.00$ 3,500.00$ -$ 5.00 3,500.00$ 15" RC PIPE SEWER DESIGN 3006 CL V LIN FT 110 49.00$ 5,390.00$ -$ 109.00 5,341.00$ 6" PVC CONDUIT W/TRACER WIRE LIN FT 80 24.50$ 1,960.00$ -$ 77.00 1,886.50$ 6" PVC 90 DEGREE ELBOW EACH 1 65.00$ 65.00$ -$ 1.00 65.00$ TOPSOIL/COMPOST MATERIAL CU YD 200 45.00$ 9,000.00$ -$ 206.33 9,284.85$ MULCH MATERIAL TYPE SPECIAL CU YD 50 45.60$ 2,280.00$ -$ 50.00 2,280.00$ SODDING TYPE LAWN (INCL TOPSOIL & FERT) SQ YD 550 12.00$ 6,600.00$ -$ 245.00 2,940.00$ DECIDUOUS TREE 2.5" CAL B&B TREE 13 585.00$ 7,605.00$ -$ 13.00 7,605.00$ PERENNIAL 1 GAL CONT EACH 94 20.20$ 1,898.80$ -$ 94.00 1,898.80$ SHRUB 5 GAL CONT EACH 30 85.00$ 2,550.00$ -$ 30.00 2,550.00$ PAVEMENT MESSAGE (HANDICAPPED) - EPOXY EACH 2 330.00$ 660.00$ -$ 3.00 990.00$ STORM DRAIN INLET PROTECTION EACH 5 100.00$ 500.00$ -$ 5.00 500.00$ 4" SOLID LINE WHITE - EPOXY LIN FT 1,400 5.40$ 7,560.00$ -$ 1058.00 5,713.20$ SUBTOTAL: 308,139.55$ -$ 335,134.09$ MOBILIZATION LUMP SUM 1 6,000.00$ 6,000.00$ -$ 1.00 6,000.00$ TREE REMOVAL WITH GRUBBING TREE 2 415.00$ 830.00$ -$ 2.00 830.00$ SITE EARTHWORK / EXCAVATION LUMP SUM 1 6,500.00$ 6,500.00$ -$ 1.00 6,500.00$ SALVAGE AND REINSTALL SIGN EACH 1 300.00$ 300.00$ -$ -$ REMOVE CHAINLINK FENCE LIN FT 140 12.00$ 1,680.00$ -$ 221.00 2,652.00$ REMOVE CONCRETE CURB & GUTTER/CURB STOPS LIN FT 100 5.50$ 550.00$ -$ -$ REMOVE CONCRETE WALK SQ FT 1,800 1.35$ 2,430.00$ -$ 1122.00 1,514.70$ SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 200.0 4.60$ 920.00$ -$ 20.00 92.00$ SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 210.0 2.40$ 504.00$ -$ 273.00 655.20$ B: Holyoke Avenue Improvements Pember Company Final - November 1, 2015 Pember Companies CITY OF LAKEVILLE CONTRACTOR: PAY ESTIMATE NO: OWNER: PROJECT NO. 12-17 DOWNTOWN PARKING LOT & HOLYOKE IMPROVEMENT PROJECT Item Unit Quantity Current Pay Est. Quantity Current Pay Est. Extension Quantity to Date Extension to DatePember Company CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 360.0 26.00$ 9,360.00$ -$ 354.90 9,227.40$ TRAFFIC CONTROL LUMP SUM 1.0 3,000.00$ 3,000.00$ -$ 1.00 3,000.00$ STREET SWEEPER (W/PICK UP BROOM) HOUR 3.0 125.00$ 375.00$ -$ 4.80 600.00$ 6" CONCRETE WALK (SPECIAL 2 for Colored/Stamped) SQ FT 120.0 12.80$ 1,536.00$ -$ 96.00 1,228.80$ 7" FIBERMESH REINFORCED CONCRETE PAVEMENT SPECIAL (DRIVEWAY APRON) WITH TYPE II FINISH SQ FT 500.0 6.85$ 3,425.00$ -$ 529.00 3,623.65$ 4" CONCRETE WALK SQ FT 1,200.0 4.60$ 5,520.00$ -$ 1270.00 5,842.00$ BRICK AND CAST STONE MONUMENT EACH 4.0 5,000.00$ 20,000.00$ -$ 4.00 20,000.00$ ORNAMENTAL FENCING LIN FT 13.0 140.00$ 1,820.00$ -$ 12.00 1,680.00$ SIGN PANELS SPECIAL EACH 2.0 210.00$ 420.00$ -$ 2.00 420.00$ TOPSOIL/COMPOST MATERIAL CU YD 133.0 45.00$ 5,985.00$ -$ 110.00 4,950.00$ MULCH MATERIAL TYPE SPECIAL CU YD 22.0 45.60$ 1,003.20$ -$ 22.00 1,003.20$ SODDING TYPE LAWN (INCL TOPSOIL & FERT) SQ YD 15.0 12.00$ 180.00$ -$ 10.80 129.60$ DECIDUOUS TREE 2.5" CAL B&B TREE 2.0 585.00$ 1,170.00$ -$ 2.00 1,170.00$ DECIDUOUS TREE 1.5" CAL B&B TREE 4.0 420.00$ 1,680.00$ -$ 4.00 1,680.00$ PERENNIAL 1 GAL CONT EACH 139.0 20.20$ 2,807.80$ -$ 139.00 2,807.80$ SHRUB 5 GAL CONT EACH 27.0 85.00$ 2,295.00$ -$ 27.00 2,295.00$ REINSTALL SALVAGED TREE GRATE EACH 2.0 175.00$ 350.00$ -$ 2.00 350.00$ PAVEMENT MESSAGE (HANDICAPPED) - EPOXY EACH 1.0 330.00$ 330.00$ 1.00 330.00$ 1.00 330.00$ STORM DRAIN INLET PROTECTION EACH 2.0 130.00$ 260.00$ -$ -$ 4" SOLID LINE WHITE - EPOXY LIN FT 430.0 5.40$ 2,322.00$ -$ 524.00 2,829.60$ 4" SOLID LINE BLACK - EPOXY OR GRIND OUT WHITE LINES LIN FT 60 5.25$ 315.00$ -$ 150.00 787.50$ SUBTOTAL: 83,868.00$ 330.00$ 82,198.45$ g Alternative 1 - Downtown Parking Lot TREE REMOVAL WITH GRUBBING TREE 3 500.00$ 1,500.00$ -$ 3.00 1,500.00$ REMOVE CONCRETE CURB AND GUTTER LIN FT 50 5.50$ 275.00$ -$ 27.00 148.50$ SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 24 4.60$ 110.40$ -$ 11.00 50.60$ MODULAR BLOCK RETAINING WALL SQ FT 140 35.00$ 4,900.00$ -$ 100.00 3,500.00$ CONCRETE CURB & GUTTER DESIGN B612 LIN FT 50 30.00$ 1,500.00$ -$ 27.00 810.00$ 6" CONCRETE PAVEMENT SQ FT 100 6.40$ 640.00$ -$ 59.00 377.60$ 4" CONCRETE WALK SQ FT 1,300 6.00$ 7,800.00$ -$ 1237.00 7,422.00$ TRUNCATED DOMES SQ FT 24 32.00$ 768.00$ -$ 16.00 512.00$ ADJUST EXISTING STRUCTURES EACH 2 320.00$ 640.00$ -$ 2.00 640.00$ SALVAGE AND REINSTALL LANDSCAPING LUMP SUM 1 1,300.00$ 1,300.00$ -$ 1.00 1,300.00$ SALVAGE AND REINSTALL SIGN EACH 1 300.00$ 300.00$ -$ -$ SODDING TYPE LAWN (INCL TOPSOIL & FERT) SQ YD 100 12.00$ 1,200.00$ -$ 91.00 1,092.00$ STORM DRAIN INLET PROTECTION EACH 1 125.00$ 125.00$ -$ -$ MULCH MATERIAL TYPE SPECIAL CU YD 1.00 45.60$ 45.60$ -$ 1.00 45.60$ SODDING TYPE LAWN (INCL TOPSOIL & FERT) SQ YD 120.00 12.00$ 1,440.00$ -$ -$ DECIDUOUS TREE 2.5" CAL B&B TREE 3.00 585.00$ 1,755.00$ -$ 3.00 1,755.00$ IRRIGATION SYSTEM REPAIR LUMP SUM 1 1,050.00$ 1,050.00$ -$ 1.95 2,047.50$ SUBTOTAL: 25,349.00$ -$ 21,200.80$ 4" CONCRETE WALK SQ FT 700 6.00$ 4,200.00$ -$ 700.00 4,200.00$ REMOVE AND RELOCATE LIGHTPOLE EACH 1 5,040.00$ 5,040.00$ -$ 1.00 5,040.00$ SALVAGE AND REINSTALL SIGN EACH 1 300.00$ 300.00$ -$ 0.50 150.00$ SODDING TYPE LAWN (INCL TOPSOIL & FERT) SQ YD 120 12.00$ 1,440.00$ -$ 125.00 1,500.00$ SUBTOTAL: 10,980.00$ -$ 10,890.00$ 308,139.55$ -$ 335,134.08$ SCHEDULE B: Holyoke Avenue Improvements 83,868.00$ 330.00$ 82,198.45$ TOTAL: 392,007.55$ 330.00$ 417,332.53$ ALTERNATE 1 - Downtown Parking Lot SUBTOTAL: $25,349.00 $0.00 $21,200.80 ALTERNATE 2 - Downtown Parking Lot SUBTOTAL: $10,980.00 $0.00 $10,890.00 TOTAL: 428,336.55$ 330.00$ 449,423.33$ SCHEDULE A: Downtown Parking Lot Improvements Alternative 2 - Downtown Parking Lot RECOMMENDATION FOR PAYMENT PROJECT: 2015 Kensington Boulevard Improvement Project City Improvement Project 15-04 DATE: November 23, 2015 ESTIMATE NO. Final OWNER: City of Lakeville, Minnesota CONTRACTOR: Valley Paving, Inc 8800 13th Avenue E. Shakopee, MN 55379 ________________________________________________________ SUMMARY ORIGINAL CONTRACT AMOUNT: $701,784.74 TOTAL CONTRACT AMOUNT $701,784.74 _________________________________________________________ REQUEST THIS ESTIMATE REMARKS: WORK COMPLETED TO DATE: 707,202.73$ MATERIALS ON HAND: -$ SUBTOTAL:707,202.73$ LESS AMOUNT RETAINED: 0% -$ LESS PREVIOUS PAYMENTS: 667,655.38$ AMOUNT DUE THIS PAYMENT:39,547.35$ This is to certify to the best of my knowledge, information and belief, the quantities and values of work certified herein are fair approximate estimates for the period covered by this voucher. Name of Contractor: SIGNED: _____________________________ Valley Paving Inc. TITLE: _____________________________ DATE: _____________________________ This is to certify that the work shown in the Statement of Work certified herein has been actually furnished for the above-mentioned project in accordance with the plans and specifications heretofore approved and that the total work is 100% completed as of November 1, 2015. I hereby recommend payment of this voucher. SIGNED: ________________________________ Roberta A. McDonald DATE: ________________________________ ________________________________________________________ RECOMMENDED FOR PAYMENT BY THE CITY OF LAKEVILLE, MINNESOTA. SIGNED: __________________________ SIGNED: _____________________________ Operations & Maintenance Finance Director Engineer DATE: __________________________ DATE: _____________________________ PROJECT: 2015 KENSINGTON BOULEVARD IMPROVEMENT PROJECT (15-04) OWNER: CITY OF LAKEVILLE CONTRACTOR: VALLEY PAVING, INC PAY ESTIMATE NO: Final - November 1, 2015 Item Unit Quantity Current Pay Est. Quantity Current Pay Est. Extension Quantity to Date Extension to Date SCHEDULE A: Surface Improvements MOBILIZATION LS 1 42,631.74$ 42,631.74$ 0-$ 1 42,631.74$ TRAFFIC CONTROL LS 1 6,180.00$ 6,180.00$ 0-$ 1 6,180.00$ CLEARING TREE 15 129.00$ 1,935.00$ 0-$ 22 2,838.00$ GRUBBING TREE 22 129.00$ 2,838.00$ 0-$ 32 4,128.00$ RECLAIM BITUMINOUS SQ YD 20,875 3.26$ 68,052.50$ 0-$ 20875 68,052.50$ REMOVE AND REPLACE CONCRETE CURB AND GUTTER (ALL TYPES)LF 2,370 8.75$ 20,737.50$ 22 192.50$ 2223 19,451.25$ REMOVE BITUMINOUS (DRIVEWAYS) SQ YD 260 8.75$ 2,275.00$ 0-$ 302 2,642.50$ REMOVE BITUMINOUS WALK SF 3,305 0.90$ 2,974.50$ 0-$ 4674 4,206.60$ REMOVE CONCRETE WALK SF 825 1.05$ 866.25$ 0-$ 1245 1,307.25$ REMOVE CONCRETE VALLEY GUTTER SY 40 9.50$ 380.00$ 0-$ 37 351.50$ REMOVE SIGNS EACH 26 36.00$ 936.00$ 0-$ 12 432.00$ SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 325 3.10$ 1,007.50$ 0-$ 93 288.30$ SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 50 5.15$ 257.50$ 0-$ 14 72.10$ MILL BITUMINOUS STEP JOINT LIN FT 325 3.75$ 1,218.75$ 0-$ 0 -$ SUBGRADE EXCAVATION CU YD 400 28.00$ 11,200.00$ 0-$ 130 3,640.00$ SELECT GRANULAR BORROW (LV) CU YD 400 23.50$ 9,400.00$ 0-$ 0 -$ WATER MGAL 45 98.00$ 4,410.00$ 0-$ 24 2,352.00$ CALCIUM CHLORIDE GALLON 75 2.00$ 150.00$ 0-$ 0 -$ AGGREGATE BASE CLASS 5 - (PATCHING) TON 100 13.00$ 1,300.00$ 0-$ 24 312.00$ FOUNDATION MATERIAL (3" MINUS) TON 50 0.01$ 0.50$ 0-$ 0 -$ 9.5" WEARING COURSE MIXTURE SPWEA240B (2,B) TON 91 111.65$ 10,160.15$ 0-$ 136.94 15,289.35$ 12.5" WEARING COURSE MIXTURE SPWEB340C (3,C) TON 1,763 64.02$ 112,867.26$ 0-$ 1931.72 123,668.71$ 12.5" NON WEARING COURSE MIXTURE SPNWB330C (3,C) TON 2,938 65.23$ 191,645.74$ 0-$ 3125.73 203,891.37$ 6" CONCRETE SY 92 59.75$ 5,497.00$ 52 3,107.00$ 122 7,289.50$ 7" CONCRETE VALLEY GUTTER SY 40 87.55$ 3,502.00$ 2 175.10$ 39 3,414.45$ PEDESTRIAN CURB RAMP EACH 23 1,390.50$ 31,981.50$ 0-$ 23 31,981.50$ TRUNCATED DOMES SF 368 49.50$ 18,216.00$ 4 198.00$ 372 18,414.00$ SODDING, TYPE LAWN (INCL. TOPSOIL & FERT) SY 1,200 8.90$ 10,680.00$ 0-$ 963 8,570.70$ REPAIR SPRINKLER SYSTEM EACH 14 105.00$ 1,470.00$ 7 735.00$ 7 735.00$ STORM DRAIN INLET PROTECTION EACH 40 146.00$ 5,840.00$ 0-$ 45 6,570.00$ CONSTRUCTION ROCK ENTRANCE EACH 15 0.01$ 0.15$ 0-$ 0 -$ ADA COMPLIANCE SUPERVISOR LS 1 360.50$ 360.50$ 0-$ 1 360.50$ PAVEMENT MESSAGE (RIGHT ARROW) - PAINT EACH 3 134.00$ 402.00$ 0-$ 3 402.00$ PAVEMENT MESSAGE (LEFT ARROW) - PAINT EACH 3 134.00$ 402.00$ 0-$ 3 402.00$ PAVEMENT MESSAGE (LEFT STRAIGHT ARROW) - PAINT EACH 1 191.00$ 191.00$ 0-$ 1 191.00$ 24" SOLID LINE WHITE - PAINT LIN FT 25 8.45$ 211.25$ 0-$ 24 202.80$ 24" SOLID LINE YELLOW - PAINT LIN FT 88 8.45$ 743.60$ 0-$ 22 185.90$ 4" SOLID LINE WHITE - PAINT LIN FT 748 0.53$ 396.44$ 0-$ 740 392.20$ 4" WHITE SKIP - PAINT LIN FT 1,220 0.53$ 646.60$ 0-$ 1100 583.00$ 4" SOLID LINE YELLOW - PAINT LIN FT 408 0.53$ 216.24$ 0-$ 0 -$ 4" DOUBLE SOLID LINE YELLOW - PAINT LIN FT 822 1.05$ 863.10$ 0-$ 1324 1,390.20$ CROSS WALK STRIPING - PAINT SF 288 5.00$ 1,440.00$ 0-$ 270 1,350.00$ SUBTOTAL: 576,483.27$ 4,407.60$ 584,169.92$ ADJUST FRAME & RING CASTING SANITARY SEWER EACH 6 570.00$ 3,420.00$ 0-$ 6 3,420.00$ EXTERNIAL CHIMNEY SEALS EACH 6 163.00$ 978.00$ 0-$ 6 978.00$ SUBTOTAL: 4,398.00$ -$ 4,398.00$ SCHEDULE C: Watermain Improvements CATHODIC PROTECTION LIN FT 3,100 27.50$ 85,250.00$ 0-$ 3059 84,122.50$ ADJUST VALVE BOX EACH 10 248.00$ 2,480.00$ 0-$ 5 1,240.00$ ADJUST VALVE BOX & TOP SECTION EACH 2 343.00$ 686.00$ 0-$ 9 3,087.00$ ADJUST VALVE BOX & TOP & MID SECTION EACH 2 647.00$ 1,294.00$ 0-$ 1 647.00$ RECONSTRUCT VALVE BOX EACH 1 1,033.00$ 1,033.00$ 0-$ 0 -$ SUBTOTAL: 90,743.00$ -$ 89,096.50$ REMOVE PVC DRAIN TILE LF 50 2.60$ 130.00$ 0-$ 69 179.40$ 4" PERFORATED DRAINTILE LF 50 36.15$ 1,807.50$ 0-$ 50 1,807.50$ ADJUST FRAME & RING CASTING STORM SEWER EACH 32 346.30$ 11,081.60$ 0-$ 31 10,735.30$ FLEX SEAL INTERNAL CHIMMY SEAL EACH 34 494.40$ 16,809.60$ 0-$ 32 15,820.80$ CASTING ASSEMBLY STORM SEWER EACH 1 331.77$ 331.77$ 0-$ 3 995.31$ SUBTOTAL: 30,160.47$ -$ 29,538.31$ SCHEDULE D: Strom Sewer Improvements SCHEDULE B: Sanitary sewer Improvements VALLEY PAVING Item Unit Quantity Current Pay Est. Quantity Current Pay Est. Extension Quantity to Date Extension to DateVALLEY PAVING 576,483.27$ 4,407.60$ 584,169.92$ SCHEDULE B: Sanitary Sewer Improvements 4,398.00$ -$ 4,398.00$ SCHEDULE C: Watermain Improvements 90,743.00$ -$ 89,096.50$ 30,160.47$ -$ 29,538.31$ TOTAL: 701,784.74$ 4,407.60$ 707,202.73$ SCHEDULE A: Surface Improvements SCHEDULE D: Storm Sewer Improvements