HomeMy WebLinkAboutItem 03.bCity of Lakeville Administration Memorandum To: From: Copy: Copy: Date: Subject: Mayor and Members of the City Council Danny Barth, Information Systems Manager Justin Miller, City Administrator Allyn Kuennen, Assistant, City Administrator December 9, 2015 Fiber Connections to City Facilities City staff has been working with Elert & Associates to design a city-wide plan to develop a fiber network to connect the City’s 21 facilities, including 15 buildings and 6 water towers. The report provided three scenarios to develop the network; a complete build with no partnerships estimated at $2,702,866; a two-way partnership with the City and Dakota County estimated at $2,267,920 and a three-way partnership with the City, Dakota County and ISD#194, estimated at $1,421,041. Elert & Associates is currently working on a communications project for the Holyoke Water Tower. If approved and funded with the water tower project, the 3rd scenario in the report would be reduced to $1,327,071. After reviewing the options, staff has concentrated on the 3rd scenario which is a recommendation to utilize ISD#194’s existing fiber as a backbone along Ipava Avenue as well as other key locations throughout the city. Dakota County would provide the materials (fiber strands, conduit, manholes, hand-holes and splice enclosures) in return for access to unused fiber strands. The City would pay for the installation of the County provided conduit and fiber network to connect the 21 facilities. The benefits of a City owned fiber network include: o Increased bandwidth up to 1 GB service: Improve network connectivity between primary and secondary sites to facilitate data transfer rates for backup and recovery. Help reduce data bottleneck at police station, caused by current 100MB limit, with video uploads and anticipated increases with high definition units. Utilize features of current virtual infrastructure software to leverage high availability and site to site mirroring. Currently limited by available capacity. o Redundancy options; permit alternate routing during outages both locally and regionally. o Eliminate dependency on Charter Business, and annual payment of $42,000, for service to City facilities. o Remote monitoring of water tower sites. o Collaborate, with public and private interties, on projects with mutual interest and benefit. o Lease of unused fiber capacity could be used as a revenue source. Attached for review and discussion are the City Fiber Network Schematic Design by Elert & Associates, a map showing the approximate locations of existing as well as proposed fiber locations. I have included a cost break down of each run for your review as well. At this time staff is seeking authorization from the City Council to begin formal conversations with Dakota County and ISD 194 to further investigate the possible development of a joint fiber infrastructure network. The next steps in the project could include preparation and advertisement for a Request for Proposal (RFP) to determine actual build costs. Staff will be available at the December 14th work session to discuss and review the attached materials. If you have questions or want additional information prior to the meeting, please contact me at 952-985-2641 or at dbarth@lakevillemn.gov . City of Lakeville City Fiber Network Schematic Design October 19, 2015 Prepared by: Felix Fayngersh ELERT & ASSOCIATES (651) 430-2772 www.elert.com City of Lakeville City Fiber Network Schematic Design Elert & Associates Page 2 Overview The City of Lakeville plans to develop a city-wide broadband network to better provide services to all of its sites. The purposes of this initiative are to improve access to broadband and to boost public employees’ productivity by ensuring always-on networking and sufficient capacity to eliminate network delays. The City of Lakeville would supplement existing fiber links and, in many cases, replace current leased-bandwidth connections among facilities. The City has identified 21 sites to be connected to a City Fiber Network (CFN). Among these are: 1. Arena-Ames 2. Arena-Hasse 3. Arts Center 4. Central Maintenance Facility 5. City Hall 6. Fire Station #1 7. Fire Station #2 8. Fire Station #3 9. Fire Station #4 10. Heritage Center 11. Liquor Store-Galaxie 12. Liquor Store-Heritage 13. Liquor Store-Kenrick 14. Police Station 15. Water Treatment Facility 16. Dakota Heights Water Tower 17. Michaud Water Tower 18. CMF Water Tower 19. Airlake Water Tower 20. Fairfield Water Tower 21.Holyoke Water Tower City of Lakeville City Fiber Network Schematic Design Elert & Associates Page 3 Existing and Future Fiber Optic Assets ISD #194 has the existing fiber optic network installed in 2004. The existing fiber infrastructure interconnects 15 schools and administrative offices. Additionally, this network connects to the City Hall, Ames Arena, and Hasse Arena. The network design was established such that each school was connected to Lakeville High School with 24 fiber strands. The District uses 4 fiber strands for data/video connection to each school. This leaves approximately 18-20 fiber strands unutilized in a fiber link to each school. For example, the District has 72 unutilized fiber strands that run along Ipava Avenue from 202nd Street to 162nd Street. Those unutilized strands can be potentially used for the City fiber optic backbone. The vast majority of the City sites listed above can be connected to the network as lateral connections of this backbone. Elert & Associates believes that the City should negotiate with the District for use of the unutilized fiber optic infrastructure for CFN. Dakota County has very limited fiber infrastructure within the City of Lakeville. The County has only one connection from City Hall to Heritage Library. However, the County plans on negotiating with ISD #194 for use of the unutilized fiber for the traffic signals control along Ipava. E&A believes that it will be a good opportunity for the City to join the County in negotiation of those used fibers. The County also has plans on installing new 288 strands fiber cable from the Western Service Center (WSC) to the ISD #194 District Office. The fiber cable will be installed along 210th Street in the City. This connection will provide an opportunity for the City to establish a redundant connection from WSC to the City and boost economic activity in the City of Lakeville’s Business Park. Redundant Wireless Data Link The City can create a completely separate network path between the City Hall and Police building in order to remove the risk of failure of fiber cuts off-site and out of the City’s control. Redundant wireless backhaul links, such as a point-to-point microwave link, will have a lower throughput as the City’s primary fiber network. Today, licensed point to point microwave radios can provide interference-free GigE full duplex connectivity at 99.999% predictable reliability and with <2ms latency. Estimated cost for microwave equipment and installation of wireless redundant point-to- point microwave radios is $150,000 for a link. The estimated cost does not include a line of sight study. Please be aware that a potential outcome of a line of sight study might be the necessity of building radio towers in order to house microwave antennas. The line of sight study can be conducted as part of construction documents development. Since the line of sight study is not part of this engagement, the cost of the radio towers construction is not included in the estimate. City of Lakeville City Fiber Network Schematic Design Elert & Associates Page 4 Schematic Designs for the City of Lakeville New CFN As part of the schematic design, E&A estimated three scenarios for building CFN: 1. In the first scenario, the City will build new fiber optic infrastructure to connect the City facilities listed above by means of employing a contractor who will provide materials and labor for CFN. The only area where the City will utilize the existing conduit is a fiber run along Cedar Street from the maintenance facility to the intersection of 160th Street and Cedar Avenue. When E&A was estimating a probable cost for the first scenario, we assumed that the City will be able to use the County- owned fiber installed along 160th Street to get to Fire Station #2 and Galaxie Liquor Store. Estimated cost for this scenario is $2,702,866. The estimated cost includes $96,000 of the engineering fees 2. In the second scenario, the City will build new fiber optic infrastructure to connect the City facilities listed above by means of employing a contractor who will provide only labor and miscellaneous material for CFN. Dakota County will provide fiber optic cable, conduits, splice enclosures, manholes, and handholes for this project for an exchange of a right to use some of the fibers that will be installed by the City. Only the area where the City will utilize the existing conduit is a fiber run along Cedar Street from the maintenance facility to the intersection of 160th Street and Cedar Avenue. When E&A was estimating a probable cost for the second scenario, we assumed that the City will be able to use the County-owned fiber installed along 160th Street to get to Fire Station #2 and Galaxie Liquor Store. Estimated cost for this scenario is $2,267,920. The estimated cost includes $96,000 of the engineering fees 3. In the third scenario, the City will build some lateral connection to the City facilities from the backbone utilizing the County-provided materials and negotiate with the District for the use of the existing District-owned infrastructure along Ipava, from 210th to Art Center, along 215th Street to Airlake Tower, along 162th Street to Kenrick Liquor Store and existing conduit from Marian Lake ES to City Hall. Dakota County will provide fiber optic cable, conduits, splice enclosures, manholes, and handholes for the areas where the new construction is required for an exchange of a right to use some of the fibers that will be installed by the City. As described in Scenario 1 and 2, the City will utilize the existing conduits along Cedar and the County fiber along 162nd. Estimated cost for this scenario is $1,421,041 The estimated cost includes $96,000 of the engineering fees Costs are based on the Elert & Associates Schematic Design analysis - 10-19-2015 Materials are supplied by Dakota County as noted in Scenario #3 of report Keynotes Estimate Estimate Location 5 & 11 117,602.00 Ipava Avenue to Heritage Liquor and City Hall 6 & 10 35,837.25 City Hall to Heritage Center and Fire #1 3 25,616.00 City Hall to Preforming Arts Center 4, 14 & 15 274,091.75 Ipava/185th to WTF, FS#4, PD, CMF & CMF Tower 7 & 12 126,376.50 CMF to Galaxie Liquor and Fire #2 16 - 125,092.25 Ipava/185th to Dakota Heights Water Tower 17 - 47,881.75 Ipava/175th to Michaud Park Water Tower 8 163,309.25 Ipava/175th to Fire #3 13 21,148.25 Ipava/162nd to Kenrick Liquor 20 - 111,037.00 Hasse Arena to Airlake Water Tower 19 - 157,414.25 Hasse Arena to Fairfield Water Tower 21 - 93,970.75 Ipava/185th to Holyoke Water Tower 25,664.75 Ipava Avenue from 162nd Street to 202nd Street 96,000.00 Engineering fees 885,645.75 535,396.00 1,421,041.75 City Fiber Network Design Cost Estimates Removal of Water Towers Based on access to ISD #194 fiber along the Ipava Avenue corridor & 162nd for LS#4 IS D 1 9 4 IS D 1 9 4 47 , 8 8 1 16 3 , 3 0 9 27 4 , 0 9 1 12 5 , 0 9 2 93 , 9 7 0 IS D 1 9 4 IS D 1 9 4 IS D 1 9 4 15 2 , 4 1 4 11 1 , 0 3 7 25 , 6 6 4 35 , 8 3 7 11 7 , 6 0 2 12 6 , 3 7 6 25 , 6 1 6 1. ORANGE - FIBER INFRASTRUCTURE OWNED BY SCHOOL DISTRICT (ISD 194) HO L Y O K E W A T E R T O W E R Costs are based on the Elert & Associates Schematic Design analysis - 10-19-2015 Materials are supplied by Dakota County as noted in Scenario #3 of report Keynotes Estimate Estimate Location 5 & 11 117,602.00 Ipava Avenue to Heritage Liquor and City Hall 6 & 10 35,837.25 City Hall to Heritage Center and Fire #1 3 25,616.00 City Hall to Preforming Arts Center 4, 14 & 15 274,091.75 Ipava/185th to WTF, FS#4, PD, CMF & CMF Tower 7 & 12 126,376.50 CMF to Galaxie Liquor and Fire #2 16 - 125,092.25 Ipava/185th to Dakota Heights Water Tower 17 - 47,881.75 Ipava/175th to Michaud Park Water Tower 8 163,309.25 Ipava/175th to Fire #3 13 21,148.25 Ipava/162nd to Kenrick Liquor 20 - 111,037.00 Hasse Arena to Airlake Water Tower 19 - 157,414.25 Hasse Arena to Fairfield Water Tower 21 - 93,970.75 Ipava/185th to Holyoke Water Tower 25,664.75 Ipava Avenue from 162nd Street to 202nd Street 96,000.00 Engineering fees 885,645.75 535,396.00 1,421,041.75$ City Fiber Network Design Cost Estimates Based on access to ISD #194 fiber along the Ipava Avenue corridor & 162nd for LS#4