HomeMy WebLinkAboutItem 09
January 4
PUBLI
AND
Proposed
Conduct
Street Re
bonds.
Followin
1. M
2
2. M
(2
B
3. M
Ex
Approva
Reconstr
in the res
Approva
member
Overview
The Cap
commun
The CIP w
Staff has
N
La
$
2
F
im
4, 2016
C HEARIN
D STREET R
O
d Action
t a public h
econstructio
g the public
Move to app
020);
Move to ap
2016-2020)
onds;
Move to app
xpenditures
l of these
ruction Plan
solution.
l on the S
rs present.
w
ital Improve
nity’s infrast
was discuss
updated th
North Creek G
and of Ama
357k by ent
015;
uture Dako
mpact on th
G FOR THE
RECONSTRU
OBLIGATIO
earing for t
on Plan and
c hearing, St
rove the Res
prove the
and Approv
prove the R
s from the P
motions w
n and provid
treet Recon
ement Plan
ructure imp
ed at multip
he Plans to re
Greenway T
azement - T
tering into a
ota County
e City of Lak
E PROPOSE
UCTION PL
ON STREET
the propose
d the intent
taff recomm
solution Ado
Resolution
ving the Issu
Resolution
roceeds of B
will result
des the City
nstruction P
(CIP) for 20
provements f
ple work ses
eflect subse
Trail– remov
The cost of
an agreeme
Highways-
keville’s bud
ED 2016-202
LAN AND T
T RECONST
ed 2016-202
t to issue ge
mends adopt
opting the 5
Adopting t
uance of Ge
Declaring t
Bonds to be
in adoptio
the flexibilit
Plan require
016-2020 pr
for the next
ssions in 20
quent coun
ed from CIP
the equipm
ent to purch
adjusted to
dget;
20 CAPITA
THE INTEN
TRUCTION
20 Capital Im
eneral oblig
tion of the fo
5-Year Capit
the 5-Year
eneral Oblig
he City’s In
Issued by th
on of the 2
ty to issue b
es an affirm
rovides the
t five years.
015, most re
ncil direction
P until develo
ment was re
hase the pro
o match the
AL IMPROV
NT TO ISSU
N BONDS
mprovemen
gation stree
ollowing mo
tal Improvem
Street Reco
gation Street
ntent to Re
he City.
2016-2020
bonds for th
mative vote
financial fra
cently on O
n provided a
opment occ
educed due
oduct prior t
e Dakota C
Item No
VEMENT PL
UE GENERA
nt Plan (CIP)
et reconstru
otions:
ment Plan (2
onstruction
t Reconstru
imburse Ce
CIP and S
he projects l
of ALL co
amework fo
October 26, 2
as follows:
curs;
e from $393
to Novembe
County CIP
o.
LAN
AL
) and
ction
2016-
Plan
ction
ertain
Street
listed
ouncil
or our
2015.
3k to
er 13,
– no
Equipment Fund – The 2016 budget included an additional Maintenance II position in
the Street Department. An additional dump truck was anticipated with this new
position in 2016 but was inadvertently left in 2017 of the Equipment Plan. The
Equipment Plan has been updated to reflect the dump truck in 2016. As part of the
consent agenda this evening, the Council considered approval of a 2016 budget
amendment for the dump truck.
The Planning Commission reviewed the CIP at their December 3, 2015 meeting. A motion
was passed recommending adoption of the CIP by the City Council and finding that the
capital improvements identified in the 2016-2020 CIP were consistent with the
Comprehensive Plan. A copy of the draft Planning Commission meeting minutes is attached
to this report.
The Internal Revenue Service has issued Treasury Reg. 1.150-2 which provides that proceeds
of tax-exempt bonds used to reimburse prior expenditures will not be deemed spent unless
certain requirements are met. In order to meet these requirements, the City should annually
declare its intent to bond for certain projects. The resolution includes projects that may use
bonds as a funding source.
Primary Issues to Consider
Does the plan adequately address the City of Lakeville’s infrastructure
requirements?
Does this resolution require the City to issue bonds for the projects? Approval of
this resolution only approves the City’s intent to bond. It does not approve the
sale of bonds or the projects. This declaration does not obligate the City to issue
bonds for the projects.
Supporting Information
Resolutions (3)
Capital Improvement Plan 2016-2020 (includes Street Reconstruction Plan 2016-
2020)
Draft Planning Commission 12/03/2015 Meeting Minutes
Jerilyn Erickson
Finance Director
Financial Impact: $133M in 2016-2020. Budget – Yes Source: Various
Related Documents (CIP, ERP, etc.): ___2016-2020 CIP___________________________
Community Values: _Good Value for Public Services____________________________
CITY OF LAKEVILLE
RESOLUTION NO. ___
RESOLUTION ADOPTING THE 5-YEAR CAPITAL IMPROVEMENT PLAN (2016-2020)
WHEREAS, The purpose of the Capital Improvement Plan (CIP) is to protect the
infrastructure and capital assets of the City of Lakeville by establishing a replacement plan for
existing infrastructure and capital assets and by identifying those improvements necessary to
accommodate the growth of the community; and
WHEREAS, The CIP is a flexible planning document that attempts to balance the
financial resources of the City with its needs; and
WHEREAS, The CIP covers a five-year period of 2016 - 2020; sets forth the estimated
schedule, timing, and details of specific capital improvements by year, together with the
estimated costs, the need for the improvements, and sources of revenue to pay for the
improvements; and
WHEREAS, During the course of the preparation and review of the Capital
Improvement Plan, the Council has considered, for each capital improvement: the condition of
the City’s existing infrastructure, including the projected need for repair or replacement; the
likely demand for the improvements; the estimated cost of the improvements; the available
public resources; the relative benefits and costs of alternative uses of the funds; operating costs of
the proposed improvements; and
WHEREAS, On January 4, 2016, the Lakeville City Council conducted a Public Hearing
on the 2016-2020 CIP and offered opportunity for public testimony on the capital spending
priorities of the City Council.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville
Minnesota as follows:
1. The recitals set forth above are incorporated herein.
2. The 2016-2020 Capital Improvement Plan is hereby adopted.
ADOPTED by the Lakeville City Council this 4th day of January, 2016.
CITY OF LAKEVILLE
___________________________
Matt Little, Mayor
ATTEST:
_____________________________
Charlene Friedges, City Clerk
VOTE Little Anderson Davis LaBeau Swecker
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
CITY OF LAKEVILLE
RESOLUTION NO. ___
RESOLUTION ADOPTING A 5-YEAR STREET RECONSTRUCTION PLAN (2016-2020)
AND APPROVING THE ISSUANCE OF GENERAL OBLIGATION
STREET RECONSTRUCTION BONDS
WHEREAS, pursuant to Minnesota Statutes, Section 475.58, subd. 3b (the "Street
Reconstruction Act"), the City has prepared a 2016-2020 street reconstruction plan dated January
4, 2016 (the "Street Reconstruction Plan") which sets forth various street reconstruction plan
projects to be undertaken in the City within the next five years (the "Street Reconstruction Plan
Projects"). The Street Reconstruction Plan recommends the issuance of general obligation street
reconstruction bonds under the Street Reconstruction Act in the approximate principal amount
of $39 million (the "Street Reconstruction Bonds") to finance a portion of the costs of the Street
Reconstruction Plan Projects; and
WHEREAS, pursuant to the Street Reconstruction Act, the City is authorized to issue
and sell obligations for street reconstruction under the circumstances and within the limitations
set forth in the Street Reconstruction Act. The Street Reconstruction Act provides that a street
reconstruction plan may be financed with bonds issued by the City, following a public hearing
and the adoption of such plan, and other proceedings conducted in accordance with the
requirements of the Street Reconstruction Act; and; and
WHEREAS, on January 4, 2016 the City Council held a public hearing on the adoption of
the Street Reconstruction Plan and the issuance of the Bonds after publication of the notice of
public hearing for the Street Reconstruction Plan not less than 10 days nor more than 28 days
prior to the date thereof in the City's official newspaper; and
WHEREAS, all parties who appeared at the hearing were given an opportunity to express
their views with respect to the proposal to adopt the Street Reconstruction Plan and to undertake
and finance a portion of the Street Reconstruction Plan Projects with Street Reconstruction
Bonds and any written comments submitted prior to the hearing were considered.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville
Minnesota as follows:
1. CITY POLICIES AND GOALS. The financing of the Street Reconstruction Plan
Projects and the issuance of the Street Reconstruction Bonds will further the policies and goals of
the City as set forth in the Street Reconstruction Plan.
2. ADOPTION OF STREET RECONSTRUCTION PLAN. Based on information
received at the public hearing, such written comments (if any) and such other facts and
circumstances as the City Council deems relevant, it is hereby found, determined and declared
that:
(a) the Street Reconstruction Plan Projects proposed in the Street Reconstruction
Plan will allow the City to construct and finance various street reconstruction
projects;
(b) the Street Reconstruction Plan is hereby approved and adopted in the forms
presently on file with the City.
3. AUTHORIZATION OF BONDS. The City hereby gives preliminary approval to
the issuance of the Bonds, the proceeds of which will be used, together with additional funds of
the City to finance costs of various Street Reconstruction Plan Projects and to pay costs of
issuance of the Bonds. The City staff is hereby authorized, in consultation with the City's
financial advisor and legal counsel, to take all necessary action to call for the sale of the Bonds
and to present proposals to this Council for approval at a subsequent meeting.
4. VOTER REFERENDUM CONTINGENCY. Pursuant to the Street
Reconstruction Act, if a petition requesting a vote on the question of issuing the Street
Reconstruction Bonds, signed by voters equal to five percent of the votes cast in the last
municipal general election, is filed within thirty days of the public hearing, the City may issue the
Street Reconstruction Bonds only after obtaining the approval of a majority of the voters voting
on the question of the issuance of the Street Reconstruction Bonds. The authorizations and
approvals contained herein are subject to and contingent upon not receiving such a petition, or,
in the event such a petition is filed, the approving vote of a majority of the voters voting on the
question of the issuance of the Street Reconstruction Bonds.
ADOPTED by the Lakeville City Council this 4th day of January, 2016.
CITY OF LAKEVILLE
___________________________
Matt Little, Mayor
ATTEST:
_____________________________
Charlene Friedges, City Clerk
VOTE Little Anderson Davis LaBeau Swecker
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
CITY OF LAKEVILLE
RESOLUTION NO. ___
RESOLUTION DECLARING THE OFFICIAL INTENT OF THE CITY OF LAKEVILLE TO
REIMBURSE CERTAIN EXPENDITURES FROM THE PROCEEDS OF BONDS TO BE
ISSUED BY THE CITY
WHEREAS, The Internal Revenue Service has issued Treasury Reg. 1.150-2 (the “
Reimbursement Regulations”) providing that proceeds of tax-exempt bonds used to reimburse
prior expenditures will not be deemed spent unless certain requirements are met; and
WHEREAS, The City expects to incur certain expenditures that may be financed
temporarily from sources other than bonds, and later reimbursed from the proceeds of tax-
exempt bonds; and
WHEREAS, The City has determined to make this declaration of official intent
(“Declaration”) to reimburse certain costs from proceeds of bonds in accordance with the
Reimbursement regulations; and
WHEREAS, The total estimated general obligation bonds for 2016 are $34,220,000.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville,
Minnesota as follows:
1. The recitals set forth above are incorporated herein.
2. The City proposes to undertake the following projects (the “Projects”):
a. #15-02 2015 Street Reconstruction (Phase II)
b. #15-02 2015 Watermain Replacement (Phase II)
c. #16-04 Highview Avenue (CR70-South City Limit)
d. #16-02 2016 Street Reconstruction
e. #16-02 2016 Watermain Replacement
f. #15-12 202nd Street/Hamburg Avenue Intersection
g. #15-16 Lift Station #6 Replacement
h. #13-09 Dodd Blvd: 194th Street to 185th Street
i. #14-10 Kenwood Trail: Dodd Blvd to 185th Street
j. #15-10 Well #21 Construction
3. The City reasonably expects to reimburse the expenditures made for certain costs of the
Projects from the proceeds of bonds in an estimated maximum principal amount of the
following:
a. #15-02 2015 Street Reconstruction (Phase II) - $8,100,000
b. #15-02 2015 Watermain Replacement (Phase II) - $3,555,000
c. #16-04 Highview Avenue (CR70-South City Limit) - $420,000
d. #16-02 2016 Street Reconstruction - $9,350,000
e. #16-02 2016 Watermain Replacement - $3,200,000
f. #15-12 202nd Street/Hamburg Avenue Intersection - $200,000
g. #15-16 Lift Station #6 Replacement - $720,000
h. #13-09 Dodd Blvd: 194th Street to 185th Street - $2,500,000
i. #14-10 Kenwood Trail: Dodd Blvd to 185th Street - $5,300,000
j. #15-10 Well #21 Construction - $875,000
The City may declare other separate statements of reimbursement intent in connection with
specific public improvements projects as they are initiated under Minnesota Statutes,
Chapters 429 and 444, or for other capital projects, with the understanding that such
additional declarations of reimbursement intent will supplement this resolution. All
reimbursed expenditures will be capital expenditures, costs of issuance of the bonds, or other
expenditures eligible for reimbursement under Section 1.150-2(d)(3) of the Reimbursement
Regulations.
4. This Declaration has been made no later than 60 days after payment of any original
expenditure to be subject to a reimbursement allocation with respect to the proceeds of
bonds, except for the following expenditures: a) costs of issuance of bonds; b) costs in an
amount not in excess of $100,000 or five percent of the proceeds of an issue; or c)
“preliminary expenditures” up to an amount not in excess of 20 percent of the aggregate issue
price of the issue or issues that are reasonably expected by the City to finance the project for
which the preliminary expenditures were incurred. The term preliminary expenditures”
includes architectural, engineering, surveying, bond issuance, and similar costs that are
incurred prior to commencement of acquisition, construction or rehabilitation of a project,
other than land acquisition, site preparation, and similar costs incident to commencement of
construction.
5. This Declaration is an expression of the reasonable expectations of the City based on the facts
and circumstances known to the City as the date hereof. The anticipated original
expenditures for the Projects and the principal amount of the bonds described in paragraph 3
are consistent with the City’s budgetary and financial circumstances. No sources other than
proceeds of bonds to be issued by the City are, or are reasonably expected to be, reserved,
allocated on a long term basis, or otherwise set aside pursuant to the City’s budget or
financial policies to pay such Project expenditures.
6. This Declaration is intended to constitute a declaration of the official intent for the purposes
of the Reimbursement Regulations.
ADOPTED by the Lakeville City Council this 4th day of January, 2016.
CITY OF LAKEVILLE
___________________________
Matt Little, Mayor
ATTEST:
_____________________________
Charlene Friedges, City Clerk
VOTE Little Anderson Davis LaBeau Swecker
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
IIMP
C
PRO
2
CAP
OVE
2016
PITA
ME
6 – 20
AL
NT
020
PLA
AN
20
Introducti
Transport
P
N
Utilities
Parks
Facility P
Equipmen
Street Rec
016-202
ion
tation
rogrammed
Non-program
Plan (2015-20
nt Plan (2015
construction
Table
20 Capit
mmed
025)
5-2025)
n Plan
of Cont
tal Impr
tents
rovemennt Plan
Page
2
7
22
24
37
53
54
55
1
The
infras
make
and a
The P
of no
(MSA
eleme
relian
The C
may
repre
in th
Comp
Coun
Cate
Tran
the C
Majo
prope
Utilit
system
sanita
new
build
Park
recre
park
are fi
Facil
and o
Liquo
Capital Im
structure nee
ers and the c
administratio
Plan identifi
on-tax reven
A), connecti
ents to finan
nce on prope
City should p
require cha
sents a sign
he years ah
prehensive
nty Capital Im
egories
nsportation
City with the
or funding so
erty taxes.
ty infrastruc
ms such as
ary sewer an
systems is
ding permit.
ks system inc
ation faciliti
dedication f
inanced with
lities include
other munic
or Fund cont
mprovement
eds and dev
community
on of improv
es the alloca
nues to finan
ion charges
ncing City im
erty taxes to
pursue the fi
anges in bo
nificant finan
ead. The
Plan and ta
mprovement
includes all
e exception o
ources includ
cture includ
wells, towe
nd storm sew
connection
Maintenanc
cludes region
ies such as th
fees collecte
h property ta
e the city ha
cipal buildin
tributions, sa
Plan prov
velopment ob
with a strat
vement proje
ation of the C
nce the imp
, special as
mprovement
finance thes
inancing stra
oth costs a
ncial, engine
Capital Imp
akes into c
t Plan.
roads, street
of Interstate
de Municipa
des the con
ers and the
wer systems.
charges whe
ce projects ar
nal, commun
he Arts Cent
d when prop
xes and othe
all, police st
ngs. Primar
ale of assets
vides a lon
bjectives of
tegic (docum
ects and equi
City’s financ
provements.
sessments a
ts. The use
se improvem
ategy as pres
and revenue
eering and d
provement
onsideration
ts, street ligh
e I-35 and ro
al State Aid S
struction an
water treatm
The primar
en property
re financed w
nity and neig
ter and Herit
perty develo
er revenue so
tation, fire s
ry revenue
and propert
ng range fr
f our commu
mented) app
ipment acqu
cial resource
Municipal
and other re
of these rev
ments.
sented, but b
es. The Cap
development
Plan is con
n projects i
hts, bridges
outine maint
Street funds
nd major m
ment facility
ry source of
develops o
with user fee
ghborhood p
tage Center.
ops and gran
ources.
stations, cen
sources incl
ty taxes.
framework t
unity. It pro
proach to im
uisitions.
es and maxim
l State Aid
evenue sour
venue source
bear in mind
pital Impro
undertaking
nsistent wit
identified in
and traffic s
tenance of C
s, special ass
maintenance
y. Utilities
f financing fo
or with the i
es.
parks as wel
Major reso
nts. Mainten
ntral mainten
lude, but no
to meet th
ovides polic
mplementatio
mizes the us
Street Fund
rces are vita
es reduces th
future event
ovement Pla
g for the Cit
th the City
n the Dakot
signals withi
County road
sessments an
of all wate
also includ
or developin
issuance of
ll as trails an
ources includ
nance project
nance facilit
ot limited to
he
cy
on
se
ds
al
he
ts
an
ty
’s
ta
in
ds.
nd
er
de
ng
a
nd
de
ts
ty
o,
2
Equi
sourc
sale o
Prog
The o
years
show
C
Transp
Utility
Parks
Facilit
Equipm
Tot
ipment inclu
ces include,
of assets and
gram Sum
overwhelmin
s. The total
wn on subseq
ategory
portation
y
ties
ment
tal
Tran
$7
udes all majo
but not limi
d property tax
mmary
ng majority
budgeted ca
quent pages.
2016
17,896,30$
7,053,050
3,415,259
955,350
3,427,082
32,747,042$
nsportation
6,328,857
58%
Equ
$13,
1
or equipmen
ited to, Liqu
xes.
of capital in
apital expend
2017
1 15,667$
0 4,249
9 1,678
0 645
2 3,083
2 25,323$
Exp
ipment
,818,464
10%
2016 ‐2
$13
nt acquisition
uor Fund con
nvestments a
ditures by ca
20
,369 13,9$
,236 6,6
,281 2,5
,042 4
,950 3,1
,878 26,8$
penditures
Faciliti
$2,798,8
2%
2020 PRO
32,559,8
ns and replac
ntributions,
are in transp
ategory are s
18
995,220 1$
647,978
592,710
432,625
191,854
860,387 2$
$1es
817
OJECTS
815
cement. Prim
Cable TV fr
portation for
shown below
2019
14,485,562 $
3,891,013
1,929,187
491,200
2,155,434
22,952,396 $
Parks
1,049,538
8%
mary revenu
ranchise fee
the next fiv
w. Details ar
2020
14,284,405
6,722,862
1,434,101
274,600
1,960,144
24,676,112
Utility
$28,564,139
22%
ue
s,
ve
re
3
Financing Summary
The projects are financed from diverse revenues sources. A summary is shown below.
Source 2016 2017 2018 2019 2020
Taxes 8,707,419$ 10,644,916$ 11,139,711$ 11,103,583$ 9,938,374$
Dakota County 1,598,250 385,000 365,000 - -
Municipal State Aid 2,756,172 1,890,151 1,420,000 1,250,000 1,740,000
Special Assessments 3,513,230 4,642,341 4,488,035 4,640,415 4,390,931
Utility Operating Fees 5,908,625 3,946,361 3,820,464 3,462,513 4,634,987
Utility Trunk Fees 2,184,000 348,875 2,703,592 459,500 2,118,875
Liquor Fund 575,975 648,600 606,400 600,000 713,000
Other 7,503,371 2,817,634 2,317,185 1,436,385 1,139,945
Total 32,747,042$ 25,323,878$ 26,860,387$ 22,952,396$ 24,676,112$
Revenue Sources
The predominant revenue source is taxes.
Taxes
39%
Dakota County
2%
Municipal State Aid
7%
Special Assessments
16%
Utility Operating
Fees
16%
Utility Trunk Fees
6%Liquor Fund
2%
Other
12%
REVENUE SOURCES
2016 - 2020
4
Debt Issuance
The City will issue debt over the next five years to finance street construction projects
and utility infrastructure improvements. The debt will be repaid from various revenue
sources. A majority of the debt is paid for from property tax levies and the remaining
generated by other revenue sources such as water connection charges, state-aid for street
construction, special assessments, tax increments, utility user fees, and liquor funds.
A summary of outstanding long-term debt is shown below:
2015 2016 2017 2018 2019 2020
Governmental Activities:
General Obligation Bonds 54,865,000$ 50,705,000$ 37,325,000$ 34,970,000$ 32,475,000$ 29,865,000$
G.O. Improvement Bonds 34,130,000 31,790,000 29,075,000 26,350,000 23,635,000 21,145,000
Tax Increment Bonds 1,680,000 1,460,000 1,240,000 1,010,000 770,000 525,000
State-Aid Street Revenue Bonds 7,895,000 7,145,000 6,205,000 5,235,000 4,685,000 4,125,000
Arena Revenue Bonds 635,000 490,000 335,000 170,000 - -
HRA Lease Revenue Bonds 7,855,000 7,585,000 7,270,000 6,930,000 6,575,000 6,205,000
Business-Type Activities:
Liquor Revenue Bonds 2,895,000 2,715,000 2,525,000 2,325,000 2,115,000 1,895,000
Total Bonded Indebtedness 109,955,000$ 101,890,000$ 83,975,000$ 76,990,000$ 70,255,000$ 63,760,000$
*Does not include debt to be issued in conjunction with CIP
Financial Impact of the Capital Improvement Plan
The following chart shows the impact of the CIP. It includes the debt that would be
issued for street improvement projects (special assessments and city portion), utility
improvement projects, and equipment certificates issued for major equipment purchases
per the Equipment Plan.
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
(i
n
mi
l
l
i
o
n
s
)
Projected Debt Balances (All Debt)
01‐04‐2016
Cumm. CIP Debt Projected Debt Existing Debt New CIP Debt
5
Impact of the Capital Improvement Plan on the Operating Budget
The City’s Operating Budget is affected by the Capital Improvement Plan. Capital
improvements typically result in ongoing expenses for routine operation, repair and
maintenance upon completion or acquisition. Existing City facilities and equipment will
eventually require rehabilitation, renovation or upgrades to accommodate new uses or
address needed improvements. Older facilities usually involve higher maintenance and
repair costs as well.
Generally speaking, capital improvements make a positive contribution to the economic
vitality, quality of life and fiscal well-being of our community in spite of potential
recurring operating costs. Capital projects such as the redevelopment of under-
performing or under-used areas of the City, and the infrastructure expansion needed to
support new development, help promote the economic development and growth that
generates additional operating revenues. These new revenue sources provide the funding
needed to maintain, improve and expand the City’s infrastructure.
6
TRA
P
AN
PRO
P
SPO
OGR
PRO
ORT
RAM
OJEC
TAT
MM
CTS
TIO
MED
S
ON
D
7
Total
CIP # Project / Financing 2016 2017 2018 2019 2020 2016-2020
TP-1 Dodd Blvd (CR 9): 194th St - 185th St
Municipal State Aid 1,978,000 - - - - 1,978,000
Escrow Fund 452,000 - - - - 452,000
Water Trunk Fund 520,000 - - - - 520,000
2,950,000 - - - - 2,950,000
TP-2 Kenwood Trl (CR50): Dodd Blvd (CR 9) to 185th St
Municipal State Aid 568,172 1,455,151 1,000,000 1,000,000 1,000,000 5,023,323
Escrow Fund - 276,041 - - - 276,041
568,172 1,731,192 1,000,000 1,000,000 1,000,000 5,299,364
TP-3 Collector Road Reconstruction
G.O. Improvement Bonds - Taxes 250,019 2,112,892 1,408,704 2,591,644 665,933 7,029,192
G.O. Improvement Bonds - Sp. Assess.166,680 1,354,594 1,008,789 1,647,742 443,955 4,621,760
Escrow Fund - - 104,480 - - 104,480
416,699 3,467,486 2,521,973 4,239,386 1,109,888 11,755,432
TP-4 Pavement Management - Maintenance
Taxes 1,488,580 1,215,324 1,263,937 1,314,494 1,367,074 6,649,409
Escrow Fund 60,000 - - - - 60,000
Municipal State Aid 120,000 120,000 120,000 120,000 120,000 600,000
1,668,580 1,335,324 1,383,937 1,434,494 1,487,074 7,309,409
TP-5 Street Reconstruction
Property Tax Levy 50,000 50,000 50,000 50,000 50,000 250,000
G.O. Improvement Bonds - Taxes 5,985,300 4,881,620 4,808,986 4,439,009 5,870,467 25,985,382
G.O. Improvement Bonds - Sp. Assess.3,346,550 3,287,747 3,239,324 2,992,673 3,946,976 16,813,270
9,381,850 8,219,367 8,098,310 7,481,682 9,867,443 43,048,652
TP-6 Pilot Knob Road and 160th Street
Communications Fund - 14,000 41,000 - - 55,000
- 14,000 41,000 - - 55,000
TP-7 Ipava Avenue and 165th Street
Municipal State Aid - - - 130,000 620,000 750,000
- - - 130,000 620,000 750,000
TP-8 172nd Street: Realignment at Kenwood Trail
Dakota County 822,250 - - - - 822,250
Sanitary Sewer Trunk Fund 150,000 - - - - 150,000
Storm Sewer Trunk Fund 150,000 - - - - 150,000
Water Trunk Fund 150,000 - - - - 150,000
Tax Abatement Bonds/ Southfork IRR 607,500 - - - - 607,500
TIF Fund (79,750) - - - - (79,750)
1,800,000 - - - - 1,800,000
TP-9 202nd Street and Hamburg Avenue
Dakota County 110,000 385,000 365,000 - - 860,000
Municipal State Aid 90,000 315,000 300,000 - - 705,000
Water Trunk Fund - - 85,000 - - 85,000
200,000 700,000 750,000 - - 1,650,000
TP-11 215th Street Principal Arterial Study
General Fund 45,000 45,000
45,000 - - - - 45,000
TP-12 Right-of-Way Preservation and Management
City of Lakeville (Unspecified)200,000 200,000 200,000 200,000 200,000 1,000,000
200,000 200,000 200,000 200,000 200,000 1,000,000
TP-13 Future Dakota County Highways
Dakota County 666,000 - - - - 666,000
666,000 - - - - 666,000
TOTAL 17,896,301$ 15,667,369$ 13,995,220$ 14,485,562$ 14,284,405$ 76,328,857$
TRANSPORTATION
8
Total
CIP # Financing / Project 2016 2017 2018 2019 2020 2016-2020
Communications Fund
TP-6 Pilot Knob Road and 165th Street - 14,000 41,000 - - 55,000
Dakota County
TP-8 172nd Street: Realignment at Kenwood Trail 822,250 - - - - 822,250
TP-9 202nd Street and Hamburg Avenue 110,000 385,000 365,000 - - 860,000
TP-13 Future Dakota County Highways 666,000 - - - - 666,000
Total Dakota County 1,598,250 385,000 365,000 - - 2,348,250
Escrow
TP-1 Dodd Blvd (CR 9): 194th St - 185th St 452,000 - - - - 452,000
TP-2 Kenwood Trl (CR50): Dodd Blvd (CR 9) to 185th St - 276,041 - - - 276,041
TP-3 Collector Road Reconstruction - - 104,480 - - 104,480
TP-4 Pavement Management - Maintenance 60,000 - - - - 60,000
179th Street: Hayes Ave -0 Cedar/175th Street: Dodd to 179th - - - - - -
Total Escrows 512,000 276,041 104,480 - - 892,521
General Fund
TP-11 215th Street Arterial Study 45,000 - - - - 45,000
G.O. Improvement Bonds - Sp. Assess.
TP-5 Street Reconstruction 3,346,550 3,287,747 3,239,324 2,992,673 3,946,976 16,813,270
TP-3 Collector Road Reconstruction 166,680 1,354,594 1,008,789 1,647,742 443,955 4,621,760
Total G.O. Improvement Bonds - Special Assessments 3,513,230 4,642,341 4,248,113 4,640,415 4,390,931 21,435,030
G.O. Improvement Bonds - Taxes
TP-5 Street Reconstruction 5,985,300 4,881,620 4,808,986 4,439,009 5,870,467 25,985,382
TP-3 Collector Road Reconstruction 250,019 2,112,892 1,408,704 2,591,644 665,933 7,029,192
Total G.O. Improvement Bonds - Taxes 6,235,319 6,994,512 6,217,690 7,030,653 6,536,400 33,014,574
Municipal State Aid
TP-1 Dodd Blvd (CR 9): 194th St - 185th St 1,978,000 - - - - 1,978,000
TP-2 Kenwood Trl (CR50): Dodd Blvd (CR 9) to 185th St 568,172 1,455,151 1,000,000 1,000,000 1,000,000 5,023,323
TP-4 Pavement Management - Maintenance 120,000 120,000 120,000 120,000 120,000 600,000
TP-7 Ipava Avenue and 165th Street - - - 130,000 620,000 750,000
TP-9 202nd Street and Hamburg Avenue 90,000 315,000 300,000 - - 705,000
Total Municipal State Aid 2,756,172 1,890,151 1,420,000 1,250,000 1,740,000 9,056,323
Property Taxes and Fund Balance Reserves
TP-5 Street Reconstruction 50,000 50,000 50,000 50,000 50,000 250,000
TP-4 Pavement Management - Maintenance 1,488,580 1,215,324 1,263,937 1,314,494 1,367,074 6,649,409
Total Property Taxes and Fund Balance Reserves 1,538,580 1,265,324 1,313,937 1,364,494 1,417,074 6,899,409
Sanitary Sewer Trunk Fund
TP-8 172nd Street: Realignment at Kenwood Trail 150,000 - - - - 150,000
Storm Sewer Trunk Fund
TP-8 172nd Street: Realignment at Kenwood Trail 150,000 - - - - 150,000
Water Trunk Fund
TP-1 Dodd Blvd (CR 9): 194th St - 185th St 520,000 - - - - 520,000
TP-8 172nd Street: Realignment at Kenwood Trail 150,000 - - - - 150,000
TP-9 202nd Street and Hamburg Avenue - - 85,000 - - 85,000
670,000 - 85,000 - - 755,000
Tax Abatement Bonds / Southfork IRR
TP-8 172nd Street: Realignment at Kenwood Trail 607,500 - - - - 607,500
TIF Fund
TP-8 172nd Street: Realignment at Kenwood Trail (79,750) - - - - (79,750)
City of Lakeville (Unspecified)
TP-12 Right-of-way Preservation and Management 200,000 200,000 200,000 200,000 200,000 1,000,000
TOTAL 17,896,301 15,667,369 13,995,220 14,485,562 14,284,405 76,328,857
TRANSPORTATION
Financing Summary
9
Proje
Proje
Proje
Antic
Proje
Proje
Dako
highw
impro
signa
the pr
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
ota County i
way from 19
ovements an
al at the inte
roject costs i
TRA
r:
r:
rt:
tion and Lo
is proposing
94th Street to
nd provide f
ersection of D
is shown.
Revenues
Escrow Fun
Municipal S
Water Trun
Expenditur
Constructio
ANSPOR
Dodd Boul
City Projec
Chris Petre
2016 (cons
Dakota Cou
cation
g to expand
185th Street
for increasin
Dodd Boule
nd
State Aid Fund
nk Fund
Tot
res
on
Tot
RTATIO
levard:
ct 13-09 and
ee, Public W
struction)
unty
Dodd Boule
t (CSAH 60)
ng traffic le
evard and 18
2016
452,000
1,978,000
520,000
tal 2,950,000$
2,950,000
tal 2,950,000$
ON (TP-1
194th Street
d Dakota Cou
Works Directo
evard (CSA
) to alleviate
evels. The p
85th Street.
Total (2016
0 45
0 1,97
0 52
0 2,95$
0 2,95
0 2,95$
)
to 185th Stre
unty Project
or
H 9) to a 4
e congestion
project inclu
Only the C
6-2020)
52,000
78,000
20,000
50,000
50,000
50,000
eet
9-36
-lane divide
n, make safet
udes a traffi
ity’s share o
ed
ty
fic
of
10
Proje
Proje
Proje
Antic
Proje
Proje
Dako
highw
opera
proje
Kenw
neigh
proje
of the
Reven
Escrow
Munic
Expen
Design
Land A
Constr
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
ota County i
way from 18
ations, make
ct may also
wood Trail a
hborhood. D
ct costs, wit
e project cos
nues
w Fund
cipal State Aid Fu
T
nditures
n
Acquisition
ruction
T
TRA
r:
r:
rt:
tion and Lo
is proposing
85th Street (C
e safety imp
o include loc
and Icenic T
Dakota Coun
th equal $1 m
sts is shown.
2015
und 1,230,2
Total 1,230,2$
415,0
815,2
Total 1,230,2$
ANSPOR
Kenwood T
City Projec
Chris Petre
2017 (cons
Dakota Cou
cation
g to expand
CSAH 60) to
provements
cal road con
Trail, and a
nty will adv
million paym
2016
- -
293 568,172
293 568,172$
000 -
293 568,172
- -
293 568,172$
RTATIO
Trail: Dodd
ct 14-10 and
ee, Public W
struction)
unty
Kenwood T
o Dodd Boul
and provide
nstruction, i
temporary s
vance fund $
ments made
2017
276,041
1,455,151
1,731,192 $ $
-
-
1,731,192
1,731,192 $ $
ON (TP-2
d Boulevard t
d Dakota Cou
Works Directo
Trail (CSAH
evard (CSA
e for increa
involving an
secondary a
$3 million o
in 2018-202
2018
-
1,000,000 1,
1,000,000$1,$
-
-
1,000,000 1,
1,000,000$1,$
)
to 185th Stre
unty Project
or
H 50) to a 4
AH 9) to impr
asing traffic
n access roa
access to the
of the City’s
20. Only the
2019 20
-
,000,000 1,00
,000,000 1,00$
-
-
,000,000 1,00
,000,000 1,00$
eet
50-19
-lane divide
rove roadwa
levels. Th
ad connectin
e Jaguar Pat
s share of th
e City’s shar
020
Tota
(2016-2
276
00,000 5,023
00,000 5,299$
568
00,000 4,731
00,000 5,299$
ed
ay
he
ng
th
he
re
al
2020)
Tota
(Proje
6,041 27
3,323 6,77
9,364 7,04$
- 41
8,172 1,90
1,192 4,73
9,364 7,04$
al
ect)
76,041
71,239
47,280
5,000
01,088
1,192
47,280
11
Proje
Proje
Antic
Proje
Lakev
City
the m
R
I
E
*
E
C
ect Name:
ect Manage
cipated Star
ect Descript
ville’s colle
collector roa
maximum ser
Revenues
Improvement Const.
Debt Issuance - G.
Property Taxes (fu
Est. Special Assess
Escrow Fund
*Estimated Special A
Expenditures
Collector Rehabilitati
Highview Avenue:
Kenrick Ave: N. C
Holyoke Ave: 215t
Holyoke Ave/210th
Ipava Ave: 185th -
Hamburg Avenue:
172nd St: Kenyon A
Klamath Tr: S. CR
Kodiak/175th Stree
Judicial/168th Stre
Heritage Dr/Iberia
Highview Avenue:
TRA
r:
rt:
tion and Lo
ctor road rec
adways, to m
rvice life at t
Fund
O. Improvement Bon
ture years)
sments*
Tota
Assessments include
on
CR 70 - S. City Lim
ity Limit - 173rd
th - Heritage Dr
h Intersection
Kenwood Tr
202nd - Lkvl. Blvd
Ave - Kodiak Ave
R 5 - N. CR 5
et
et
Ave
CR 46 - 175th
To
ANSPOR
Collector R
Chris Petre
Annual
cation
construction
maintain the
the best over
2016
nds
250,019
166,680
-
al 416,699$ $
assessments to City-
mit 416,699
-
-
-
-
. -
-
-
-
-
-
-
tal 416,699$ $
RTATIO
Road Recons
ee, Public W
n program is
e overall con
rall cost.
2017 20
2,112,892 1,4
1,354,594 1,0
- 1
3,467,486$ 2,5$
-owned properties w
-
2,234,045
1,152,441
81,000
- 1,4
- 1,1
-
-
-
-
-
-
3,467,486$ 2,5$
ON (TP-3
struction
Works Directo
s designed to
ndition of th
018 2019
408,704 2,591,64
008,789 1,647,74
04,480
521,973 4,239,3$
with front footage alo
-
-
-
-
405,366
16,607
- 701,73
- 1,534,10
- 796,52
- 744,04
- 462,9
-
521,973 4,239,3$
)
or
o provide m
he road surf
2020
44 665,933
42 443,955
- -
86 1,109,888$
ong the project.
- -
- -
- -
- -
- -
- -
31 -
03 -
25 -
44-
83 -
- 1,109,888
86 1,109,888$
maintenance t
face, and gai
Total
(2016-2020)
7,029,192
4,621,760
104,480
11,755,432$
11,755,432$
to
in
12
TRANSPORTATION (TP-4)
Project Name: Pavement Management - Maintenance
Project Manager: Chris Petree, Public Works Director
Anticipated Start: Annual
Project Description and Location
Lakeville’s pavement management program is designed to provide basic maintenance to
City streets, to maintain the overall condition of the road surface, and gain the maximum
service life at the best overall cost. The program includes miscellaneous repairs, crack
sealing, velocity patching, curb & sidewalk repair, bridge inspections & repairs, and
transportation safety improvements.
2016 2017 2018 2019 2020
Total
(2016-2020)
Revenues
Pavement Management Fund
Property taxes/fund balance 1,488,580 1,215,324 1,263,937 1,314,494 1,367,074 6,649,409
Escrow Fund 60,000 - - - - 60,000
Municipal State Aid 120,000 120,000 120,000 120,000 120,000 600,000
Total 1,668,580$ 1,335,324$ 1,383,937$ 1,434,494$ 1,487,074$ 7,309,409$
Expenditures
Maintenance
Crack sealing 135,200 140,608 146,232 152,082 158,165 732,287
Velocity Patching 105,000 109,200 113,568 118,111 122,835 568,714
Patching & Minor Overlays 928,380 965,516 1,004,136 1,044,302 1,086,074 5,028,408
Sidewalk 25,000 25,000 25,000 25,000 25,000 125,000
Conc Curb, Draintile 25,000 25,000 25,000 25,000 25,000 125,000
County Road Utility Improv. 25,000 25,000 25,000 25,000 25,000 125,000
Bridge Insp & Repairs/Guardrail 15,000 15,000 15,000 15,000 15,000 75,000
Safety Improvements 410,000 30,000 30,000 30,000 30,000 530,000
Total 1,668,580$ 1,335,324$ 1,383,937$ 1,434,494$ 1,487,074$ 7,309,409$
13
Proje
Proje
Antic
Proje
The C
long-
system
advan
The C
the p
City w
Revenues
Improvement C
Property Taxe
Debt Issuanc
Property Tax
Special Asses
Expenditures
Construction
Legal, Enginee
& Financing
ect Name:
ect Manage
cipated Star
ect Descript
City embrac
-term plan fo
ms degradat
ncement of t
City Counci
property own
will finance
Const. Fund
es
e - G.O. Imp Bon
xes (future years)
ssments
T
ering, Administra
T
TRA
r:
rt:
tion and Lo
ced a pavem
or maintainin
tion has acc
the schedule
il approved
ners will be
its 60% sha
2 0
ds
s)5
3
Total 9$
6
ation
2
Total 9$
ANSPOR
Street Reco
Chris Petre
Annual
cation
ment manage
ng City stree
celerated in
as shown be
a Street Rec
assessed fo
are of the pro
016 20
50,000
5,985,300 4
3,346,550 3
9,381,850 8 $
6,661,114 5
2,720,736 2
9,381,850 8 $
RTATIO
onstruction
ee, Public W
ement study
ets based on
recent year
elow.
construction
or 40% of th
oject cost wit
017 20
50,000
,881,620 4
,287,747 3
,219,367 8$
,870,976 5
,348,391 2
,219,367 8$
ON (TP-5
Works Directo
prepared in
n pre-establis
rs. Staff is
n Policy in N
he street rec
th property t
018 20
50,000
4,808,986 4,
3,239,324 2,
8,098,310 7,$
,784,507 4,
2,313,803 3,
8,098,310 7,$
)
or
n 2009 which
shed standar
therefore re
November 2
onstruction
taxes.
0 19 2
50,000
,439,009 5
,992,673 3
,481,682 9$
,468,498 7
,013,184 2
,481,682 9$
h sets forth
rds. The roa
ecommendin
2006 whereb
project. Th
020
T
(201
50,000
5,870,467 2
3,946,976 1
9,867,443 4$
7,048,173 2
2,819,270 1
9,867,443 4$
a
ad
ng
by
he
Total
6-2020)
250,000
25,985,382
16,813,270
43,048,652
29,833,268
13,215,384
43,048,652
14
Proje
Proje
Proje
Antic
Proje
Proje
Dako
along
effici
fiber
arrow
170th
Lavo
Fund
betwe
share
R
E
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
ota County i
g Pilot Kno
ient operatio
for intercon
ws; and c). in
St. and Do
n Rd., High
ding provide
een Dakota
e of the proje
Revenues
Communication
Expenditures
Design
Land Acquisiti
Construction
TRA
r:
r:
rt:
tion and Lo
is proposing
b Road (CS
on of traffic s
nnectivity; b
nstall traffic
odd Bouleva
hview Ave.,
es 80% of t
County and
ect costs is sh
2
ns Fund 1
Total 1$
1
on
Total 1$
ANSPOR
Pilot Knob
Advanced T
City Projec
Chris Petre
2018 (cons
Dakota Cou
cation
g to install
SAH 31) an
signals along
b). modify tr
monitoring
ard. Intersec
, Galaxie A
the project c
d the cities o
hown.
2017 2018
14,000 41,0
14,000 41,0$
14,000
-
- 41,0
14,000 41,0$
RTATIO
Road and 1
Traffic Man
ct 17-03 and
ee, Public W
struction)
unty
advanced tr
nd 160th Str
g these corri
raffic signals
cameras. I
ctions along
Ave., Foliage
costs. The
of Apple Va
8 Total (20
00
00 $
-
-
00
00 $
ON (TP-6
60th Street
nagement Sy
d Dakota Cou
Works Directo
raffic manag
reet (CSAH
idors. The p
s to include
Intersections
g CSAH 46
e Ave. and
remaining
alley and La
016-2020)To
55,000
55,000 $
14,000
-
41,000
55,000 $
6)
ystems
unty Project
or
gement syste
H 46) to pro
project inclu
flashing lef
s along CSA
include Ipa
Flagstaff A
cost will b
akeville. On
otal (Project)
55,000
55,000
14,000
-
41,000
55,000
31-87
ems (ATMS
ovide for th
udes a). insta
ft-turn yellow
AH 31 includ
ava Ave., La
Ave. Federa
e split 55/4
nly the City
S)
he
all
w
de
ac
al
45
’s
15
Proje
Proje
Proje
Antic
Proje
Proje
The
inters
incre
(i.e. t
Reven
Muni
Expe
Desig
Land
Cons
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
City of La
section oper
ased traffic
turn lanes), f
nues
icipal State Aid
nditures
gn
d Acquisition
struction
TRA
r:
r:
rt:
tion and Lo
keville is p
ations, allev
levels. The
flashing yello
2
d Fund 13
Total 13$
5
8
Total 13$
ANSPOR
Ipava Aven
City Projec
Chris Petre
2020 (cons
City of Lak
cation
proposing to
viate congest
e project inc
ow arrows a
019 2020
30,000 620,0
30,000 620,0$
50,000
80,000
- 620,0
30,000 620,0$
RTATIO
nue and 165t
ct XX-XX
ee, Public W
struction)
keville
o make inte
tion, make s
ludes a traff
and pedestria
0 Total (20
000
000 $
-
-
000
000 $
ON (TP-7
th Street:
Works Directo
ersection im
safety impro
fic signal, in
an ramp imp
016-2020)To
750,000
750,000 $
50,000
80,000
620,000
750,000 $
7)
Intersecti
or
mprovements
ovements an
ntersection r
provements.
otal (Project)
750,000
750,000
50,000
80,000
620,000
750,000
ion Improve
s to improv
nd provide fo
reconstructio
ment
ve
or
on
16
Proje
Proje
Proje
Antic
Proje
Proje
The
Railr
to im
provi
inters
Rev
Dak
San
Sto
Wa
Tax
TIF
Exp
Des
Lan
Con
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
City of Lak
oad right-of
mprove inter
ide for incre
section of Ke
venues
kota County
nitary Sewer Tru
orm Sewer Trun
ater Trunk Fund
x Abatement Bo
F Fund
penditures
sign
nd Acquisition
nstruction
TRA
r:
r:
rt:
tion and Lo
keville is pr
f-way to the
rsection geo
easing traffi
enwood Trai
unk Fund
nk Fund
d
onds/Southfork
ANSPOR
172nd Stree
City Projec
Chris Petre
2016 (cons
City of Lak
cation
oposing to
Kenwood T
ometrics an
ic levels. T
il and Kenyo
20
IRR
145
Total 145$
145
Total 145$
RTATIO
et: Realign
ct 13-07 and
ee, Public W
struction)
keville
realign 172n
Trail (CSAH
nd operation
This project
on Avenue.
015 2016
- 822,
- 150,
- 150,
- 150,
- 607,
5,000 (79,
5,000 1,800,$
5,000
- 400,
- 1,400,
5,000 1,800,$
ON (TP-8
nment at Ken
d Dakota Cou
Works Directo
nd Street fro
H 5) and Ken
ns, make sa
may includ
6 Total (2
,250
,000
,000
,000
,500
,750)
,000 $
-
,000
,000
,000 $
)
nwood Trail
unty Project
or
om the Can
nyon Avenu
afety impro
de a traffic
2016-2020)T
822,250
150,000
150,000
150,000
607,500
(79,750)
1,800,000 $
-
400,000
1,400,000
1,800,000 $
5-50
nadian Pacifi
e intersectio
ovements an
signal at th
Total (Project)
822,250
150,000
150,000
150,000
607,500
65,250
1,945,000
145,000
400,000
1,400,000
1,945,000
fic
on
nd
he
17
Proje
Proje
Proje
Antic
Proje
Proje
The
Hamb
safety
Revenues
Dakota Co
Municipal
Water Tru
Expenditu
Design
Land Acqu
Constructi
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
City of Lak
burg Avenu
y improveme
ounty
l State Aid Fund
unk Fund
T
ures
uisition
ion
T
TRA
r:
r:
rt:
tion and Lo
keville is p
e intersectio
ents and pro
2016
110,00
d 90,00
Total 200,00$
200,00
Total 200,00$
ANSPOR
202nd Stree
City Projec
Chris Petre
2018 (cons
City of Lak
cation
proposing to
on to improv
ovide for incr
2017
0 385,000
0 315,000
-
0 700,000$
0
- 700,000
-
0 700,000$
RTATIO
et and Hamb
ct 15-12 and
ee, Public W
struction)
keville
o reconstruc
ve intersecti
reasing traff
2018 T
365,000
300,000
85,000
750,000$$
750,000
750,000$$
ON (TP-9
burg Avenue
d Dakota Cou
Works Directo
ct the 202nd
ion geometri
fic levels.
Total (2016-202
860,0
705,0
85,0
1,650,0
200,0
700,0
750,0
1,650,0
)
: Intersecti
unty Project
or
Street (CS
ics and oper
20)Total (Pr
000 86
000 70
000 8
000 1,65$
000 20
000 70
000 75
000 1,65$
ion Improve
50-03
SAH 50) an
rations, mak
roject)
60,000
05,000
85,000
50,000
00,000
00,000
50,000
50,000
ment
nd
ke
18
Proje
Proje
Proje
Antic
Proje
Proje
Dako
study
classi
be in
Coun
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
ota County is
y to evalua
ification as p
ncluded in th
ncil, Scott Co
Revenues
General Fu
Expenditu
Roadway C
TRA
r:
r:
rt:
tion and Lo
s proposing
ate potentia
principal arte
he study. Th
o., and other
und
To
ures
Corridor Study
To
ANSPOR
215th Street
City Projec
Chris Petre
2016
Dakota Cou
cation
to conduct
al east-west
erials. The C
he study wi
r cities); only
2016
45,000
otal 45,000$
45,000
otal 45,000$
RTATION
t: P
ct 16-06 and
ee, Public W
unty
a county-wi
t alignment
CSAH 70 (2
ill involve m
y the City’s s
Total (2016-2
45
45$
45
45$
N (TP-11
Principal Ar
d Dakota Cou
Works Directo
ide principal
s south of
210th Street/2
multiple par
share of the
2020)Total (P
5,000
5,000 $
5,000
5,000 $
1)
rterial Study
unty Project
or
l arterial sys
f CSAH 42
215th Street)
rtners (i.e. M
study costs
Project)
45,000
45,000
45,000
45,000
97-165
stem plannin
2 for futur
) corridor wi
MnDOT, Me
is shown.
ng
re
ill
et
19
TRANSPORTATION (TP-12)
Project Name: Right-of-Way Preservation and Management
Project Number: City Project XX-XX
Project Manager: Chris Petree, Public Works Director
Anticipated Start: TBD (construction)
Project Description and Location
The City may acquire land or right-of-way for existing or future transportation facilities
at various locations within the City as opportunities arise. The land or right-of-way
acquisition may include partnering with Dakota County for acquisition opportunities to
support future roadway projects consistent with existing Official Maps and the City and
County Transportation Plans. Dakota County annually budgets $550,000 for right-of-
way acquisition at various locations throughout the County (55/45 cost share).
2016 2017 2018 2019 2020 Total (2016-2020)Total (Project)
Revenues
City of Lakeville 200,000 200,000 200,000 200,000 200,000 1,000,000 1,000,000
Total 200,000$ 200,000$ 200,000$ 200,000 $ 200,000 $ 1,000,000$ 1,000,000$
Expenditures
Design - - - - - - -
Land Acquisition 200,000 200,000 200,000 200,000 200,000 1,000,000 1,000,000
Construction - - - - - - -
Total 200,000$ 200,000$ 200,000$ 200,000 $ 200,000 $ 1,000,000$ 1,000,000$
20
Proje
Proje
Proje
Antic
Proje
Proje
The D
Prefe
future
inclu
inclu
ident
Plan.
Coun
Coun
ect Name:
ect Number
ect Manage
cipated Star
ect Lead:
ect Descript
Dakota Cou
erred System
e east-west
des the cons
des the con
ified as Alig
T h e D a ko
nty will parti
nty transporta
Revenues
Dakota Cou
Expenditure
Design
Land Acquis
Construction
Construction
TRA
r:
r:
rt:
tion and Lo
unty East-W
m Plan (East
roadway co
struction of
nstruction o
gnment “B”
ota County
icipate in th
ation faciliti
nty
To
es
sition
n - 179th Street
n - 185th Street
To
ANSPOR
Future Dak
City Projec
Chris Petre
2016 (cons
City of Lak
cation
West Corridor
t-West Plan)
onnections.
179th Street
of 185th Str
and Alignm
2030 Trans
he engineerin
ies to County
2016
666,000
otal 666,000$
-
-
t 250,000
t 416,000
otal 666,000$
RTATION
kota County
ct XX-XX an
ee, Public W
struction)
keville
r Preservatio
), identifies
The Pheas
(future CSA
reet (future
ment “C” Tr
sportation P
ng and const
y standards.
Total (2016
66
66$
25
4
66$
N (TP-13
Highways
nd Dakota C
Works Directo
on Study, P
preservation
sant Run of
AH 9) and t
CSAH 60)
ransitional S
Plan include
truction cos
-2020)Total
66,000
66,000 $
-
-
50,000
16,000
66,000 $
3)
County Proje
or
Phase II – R
n corridor al
f Lakeville
the Avonlea
). These r
Segment in t
s a policy
ts for constr
l (Project)
666,000
666,000
-
-
250,000
416,000
666,000
ect 97-162/3
Refinement o
lignments fo
developmen
developmen
roadways ar
the East-We
in which th
ructing futur
of
or
nt
nt
re
st
he
re
21
N
TRA
NON
AN
N‐P
P
SPO
PRO
PRO
ORT
OGR
OJEC
TAT
RAM
CTS
TIO
MM
S
ON
MED
22
Proje
Proje
Proje
Antic
Proje
The C
Aven
that
South
ect Name:
ect Number
ect Manage
cipated Star
ect Descript
City of Lak
nue as an art
provides a
hfork Village
TRA
r:
r:
rt Date:
tion and Lo
keville’s Tra
terial roadwa
connection
e/Argonne V
Revenues
General O
Expenditu
Design
Land Acq
Construct
ANSPOR
Kenrick Av
City Projec
Chris Petre
TBD (cons
cation
ansportation
ay from 181
n between t
Village busin
s
Obligation Impr
ures
quisition
tion - Roadway
RTATION
venue: 181st
ct XX-XX
ee, Public W
struction)
Plan identif
1st Street to t
the Timber
ness districts
rovement Fund
Tot
y
Tot
N (TP-10
Street – CP
Works Directo
fies the futu
the Canadia
rcrest comm
s.
Total
2,575,00
tal 2,575,00$
594,40
1,980,60
tal 2,575,00$
0)
P Railroad Tr
or
ure extensio
an Pacific Ra
mercial cam
0
0
0
-
0
0
racks
on of Kenric
ailroad track
mpus and th
ck
ks
he
23
P
U
PRO
P
UTIL
OGR
PRO
LITI
RAM
OJEC
IES
MM
CTS
MED
S
D
24
Total
CIP # Project / Financing 2016 2017 2018 2019 2020 2016-2020
U-4 Sanitary Sewer Trunk Extensions
Sanitary Sewer Trunk Fund - Fees 139,000 148,875 257,100 259,500 81,375 885,850
U-1 Sanitary Sewer Lift Station Rehabilitation
Sanitary Sewer Operating Fund - User Fees 835,000 45,000 65,000 20,000 200,000 1,165,000
U-3 Sanitary Sewer Rehabilitation
Sanitary Sewer Operating Fund - User Fees 851,910 250,000 250,000 250,000 250,000 1,851,910
U-2 Sanitary Sewer Inflow/Infiltration Repairs
Sanitary Sewer Operating Fund - User Fees 260,000 225,000 225,000 225,000 225,000 1,160,000
U-6 Watermain Replacement
Water Operating Fund - User Fees 3,199,500 2,828,773 2,650,099 2,429,083 3,298,981 14,406,436
Special assessments - - 239,922 - - 239,922
U-6 Watermain Extensions - Hamburg Ave: 202nd - Hartford
Water Trunk Fund - Fees - - 23,992 - - 23,992
U-10 Well Construction
Water Trunk Fund - Fees 875,000 - 1,837,500 - 1,837,500 4,550,000
U-10 Well Collection Pipe
Water Trunk Fund - Fees - - 300,000 - - 300,000
U-7 Water Main Trunk Extensions
Water Trunk Fund - Fees 200,000 200,000 200,000 200,000 200,000 1,000,000
U-9 Well and Pump Rehabilitation
Water Operating Fund - User Fees 145,000 180,000 225,000 120,000 240,000 910,000
U-5 Tower and Reservoir Maintenance
Water Operating Fund - User Fees 125,000 - - - - 125,000
U-8 Water meter replacement
Water Operating Fund - User Fees 422,640 371,588 374,365 387,430 390,006 1,946,029
Total 7,053,050$ 4,249,236$ 6,647,978$ 3,891,013$ 6,722,862$ 28,564,139
UTILITIES
Project Summary
25
Total
CIP # Financing / Project 2016 2017 2018 2019 2020 2016-2020
Water Trunk Fund - Fees
U-10 Well Construction 875,000$ - $ 1,837,500$ -$ 1,837,500$ 4,550,000$
U-10 Well Collection Pipe - - 300,000 - - 300,000
U-7 Water Main Trunk Extensions 200,000 200,000 200,000 200,000 200,000 1,000,000
U-6 Hamburg Ave: 202nd - Hartford - - 23,992 - - 23,992
Total 1,075,000$ 200,000$ 2,361,492$ 200,000$ 2,037,500$ 5,873,992$
Water Operating Fund - Fees
U-8 Water Meter Replacement 422,640 371,588 374,365 387,430 390,006 1,946,029
U-6 Watermain Replacement 3,199,500 2,828,773 2,650,099 2,429,083 3,298,981 14,406,436
U-9 Well and Pump Rehabilitation 145,000 180,000 225,000 120,000 240,000 910,000
U-5 Tower and Reservoir Maintenance 125,000 - - - - 125,000
Total 3,892,140 3,380,361 3,249,464 2,936,513 3,928,987 17,387,465
Sanitary Sewer Trunk Fund - Fees
U-4 Sanitary Sewer Trunk Extensions 139,000 148,875 257,100 259,500 81,375 885,850
Total 139,000$ 148,875$ 257,100 $ 259,500 $ 81,375 $ 885,850$
Sanitary Sewer Operating Fund - User Fees
U-2 Sanitary Sewer Inflow/Infiltration Repairs 260,000 225,000 225,000 225,000 225,000 1,160,000
U-3 Sanitary Sewer Rehabilitation 851,910 250,000 250,000 250,000 250,000 1,851,910
U-1 Sanitary Sewer Lift Station Rehabilitation 835,000 45,000 65,000 20,000 200,000 1,165,000
Total 1,946,910$ 520,000$ 540,000 $ 495,000 $ 675,000 $ 4,176,910$
Special assessments
U-6 Watermain Replacement - - 239,922 - - 239,922
Total - $ - $ 239,922 $ - $ - $ 239,922$
Total 7,053,050$ 4,249,236$ 6,647,978$ 3,891,013 $ 6,722,862 $ 28,564,139$
UTILITIES
Financing Summary
26
Proje
Proje
Antic
Proje
The C
gravi
perio
servic
sched
under
statio
Revenues
Sanitary S
Fees
Expenditu
Lift Statio
Lift Statio
Lift Statio
Lift Statio
Lift Statio
Lift Statio
Lift Statio
Lift Statio
Oper
No an
ect name:
ect Manage
cipated star
ect Descript
City has 20
ity lines. T
dically insp
ce life for a
duled for ins
rgo a major
on.
Sewer Operatin
ures
n #6
n #7
n #23
n #8
n #16
n #24
n #9
n #10
rations and
nticipated si
r:
rt date:
tion and loc
sanitary sew
The pumps,
pected and r
lift station is
spection and
r rehabilitati
g Fund
$
Total $
operating c
gnificant im
UTIL
Lift Station
Chris Petre
Annual
cation
wer lift statio
motors, an
ehabilitated
s approximat
d rehabilitati
ion to repla
2016
835,000
720,000
100,000
15,000
835,000
costs impact
mpact on oper
LITY (U-
n Rehabilitat
ee, Public W
ons which pu
nd other equ
to ensure u
tely 15-20 y
ion every 15
ace the exis
2017
45,000$
45,000
45,000$
ts
rations or op
-1)
tion
Works Directo
ump sewage
uipment wit
uninterrupted
years but can
5 years. In
sting lift sta
2018
65,000$
45,000
20,000
65,000$
perating cost
or
e from low l
thin each lif
d service. T
n vary. Each
2016, Lift S
ation with a
2019
20,00$
20,00
20,00$
ts.
lying areas t
ft station ar
The expecte
h lift station
Station 6 wi
a submersibl
2020
00 200,00$
00
200,00
00 200,00$
to
re
ed
is
ill
le
Total
0 1,165,00$
0
0 1,165,00$
00
-
00
27
UTILITY (U-2)
Project name: Sanitary sewer system inflow/infiltration repairs
Project Manager: Chris Petree, Public Works Director
Anticipated start date: Annual
Project Description and location
A section of the sanitary sewer system is inspected each year for damage to the pipes that
would result in inflow (direct entry of storm water) and infiltration (ground water seeping
into the sanitary sewer) within the sanitary sewer system. This additional water
penetrating the system increases stress to the capacity of the wastewater treatment
facilities thereby resulting in higher sanitary sewer rates for Lakeville customers.
Additionally, exceeding the City’s calculated peak flow can result in the imposition of
surcharge by MCES. Should Lakeville exceed that peak flow, the minimum surcharge
would be $216,000 per year for five years. The Utilities Division endeavors to reduce the
inflow and infiltration by initiating repairs such as manhole structure sealing, cured in
place pipe lining, and the replacement of manhole covers. A project was not completed in
2015 such that a larger project could be bid in 2016 to realize economies of scale benefits
associated with combining two years’ worth of projects. As such, it is recommended the
2015 budget to be carried forward and included as part of the 2016 project.
2016 2017 2018 2019 2020 Total
Revenues
Sanitary Sewer Oper. Fund
Fees 260,000$ 225,000 $ 225,000$ 225,000 $ 225,000$ 1,160,000$
Expenditures
Pipe Repairs and Lining 200,000 150,000 150,000 150,000 150,000
Manhole Sealing 60,000 75,000 75,000 75,000 75,000 -
Total 260,000$ 225,000 $ 225,000$ 225,000 $ 225,000$ 1,160,000$
Operations and operating costs impacts
No anticipated significant impact on operations or operating costs.
28
Proje
Proje
Antic
Proje
The
crack
maint
sanita
proje
Opera
This w
Revenues
Sanitary Se
Fees
Ex penditur
Sanitary Se
ect name:
ect Manage
cipated star
ect Descript
sanitary sew
king. Reha
taining a clo
ary sewer sy
cts and will
ations and o
will result in
ewer Operating
res
ewer Rehabilit a
T
r:
rt date:
tion and loc
wer in areas
abilitating th
osed system
ystem will be
be programm
operating co
a reduction
201
g Fund
851$
ation 851
Total 851$
UTIL
Sanitary Se
Chris Petre
Annual
cation
s around the
hese portion
m and reducin
e evaluated i
med based o
osts impacts
of expenses
16 201
1,910 250$
1,910 250
1,910 250$
LITY (U-
ewer Rehabi
ee, Public W
e City is su
ns of the s
ng the poten
in conjunctio
on that evalu
s
s for sanitary
7 201
0,000 250,$
0,000 250,
0,000 250,$
-3)
ilitation
Works Directo
ubject to bre
ewer infras
ntial for infl
on with plan
uation.
y sewer repai
8 2019
,000 250,$
,000 250,
,000 250,$
or
eaks, root in
tructure is
low and infi
nned street r
irs in future
9 2020
,000 250,0$
,000 250,0
,000 250,0$
ntrusion, an
important t
iltration. Th
reconstructio
years.
0 Tot a
000 1,85$
000 1,85
000 1,85$
nd
to
he
on
al
51,910
51,910
51,910
29
UTILITY (U-4)
Project Name: Sanitary Sewer Trunk System Improvements
Project Manager: Chris Petree, Public Works Director
Anticipated Start: As development occurs
Project Description and Location
The Comprehensive Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk
facilities to accommodate anticipated growth. Timing of future sanitary sewer trunk
facilities depends on the growth rate and location of planned community development.
2016 2017 2018 2019 2020 Total
Revenues
Sanitary Sewer Trunk Fund 139,000 148,875 257,100 259,500 81,375 885,850
Total 139,000$ 148,875$257,100 $259,500$ 81,375$ 885,850$
Expenditures
Trunk Sanitary Sewer Oversizing 139,000 148,875 257,100 259,500 81,375 885,850
Total 139,000$ 148,875$257,100 $259,500$ 81,375$ 885,850$
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
30
Proje
Proje
Antic
Proje
Inspe
and e
dust a
and e
corro
reside
throu
Revenues
Water Ope
Expenditu
Tower Cl
Dak
Fair
Airla
CMF
Mich
Oper
No an
ect name:
ect Manage
cipated star
ect Descript
ections of th
extent of any
and dirt that
exterior coa
osion and ru
ential and ot
ugh periodic
s
erating Fund -
ures
leaning/Inspect
kota Heights To
field Tower
ake Tower
F Tower
haud Park Tow
rations and
nticipated im
r:
rt date:
tion and loc
e interior an
y required ma
collects ove
tings on wa
ust and mai
ther users. T
inspection a
Fees $
tions
ower
wer
Total $
operating c
mpact on ope
UTIL
Tower and
Chris Petre
2015
cation
nd exterior o
aintenance.
er time that c
ater towers
intain the q
The service
and necessary
2016
125,000 $
25,000
25,000
25,000
25,000
25,000
125,000 $
costs impact
erations or op
LITY (U-
Reservoir M
ee, Public W
of water tow
Periodic cle
can reduce th
and reservo
quality of th
life of the to
y maintenan
2017
-$
-$
ts
perating cos
-5)
Maintenance
Works Directo
wers are used
eaning of the
he life of the
oirs protect t
he treated w
owers and re
nce.
2018
-$
-$
sts.
e
or
d to determin
e tower exter
e coating sys
the metal st
water passin
eservoirs can
2019
$
$
ne the timin
riors remove
stem. Interio
tructure from
ng through t
n be extende
2020
- $
-
- $
ng
es
or
m
to
ed
Total
- 125,000$
--
- 125,000$
31
Proje
Proje
Antic
Proje
The w
recen
system
repla
soils.
recon
elsew
Reven
Specia
Water
Water
Expen
Water
Water
Oper
This
ect name:
ect Manage
cipated star
ect Descript
water mains
nt years and
m will be re
cement is b
This rep
nstruction ar
where within
nues
al Assessments
r Trunk Funds
r Operating Fun
nditures
r main extension
r main replacem
rations and
will result in
r:
rt date:
tion and loc
in areas aro
d are candid
placed in co
ased on the
presents rep
rea annually
the project
nd
Total $
n
ment
Total $
Operating C
n a reduction
UTIL
Water Main
Chris Petre
As required
cation
ound the Cit
dates for rep
onjunction w
number of
placing 10%
y, and insta
area.
2016
3,199,500
3,199,500 $
3,199,500
3,199,500 $
Costs Impa
n of expense
LITY (U-
n Replaceme
ee, Public W
d
ty that have
placement.
with street rec
breaks in a
% of our w
alling catho
2017
2,828,773
2,828,773$
2,828,773
2,828,773$
acts
s for water m
-6)
ent
Works Directo
e been subje
Portions o
construction
particular a
water system
odic protect
2018
239,922
23,992
2,650,099
2,914,013 $
263,914
2,650,099
2,914,013 $
main repairs
or
ct to numero
of the City’s
projects. A
area and an
m infrastruc
tion and rep
2019
2,429,083
2,429,083 $
2,429,083
2,429,083 $
in future ye
ous breaks i
s water mai
All water mai
evaluation o
ture in eac
placing bolt
2020
3,298,981
3,298,981$
3,298,981
3,298,981$
ears.
in
in
in
of
ch
ts
Total
239,9
23,9
14,406,4
14,670,3$
263,9
14,406,4
14,670,3$
22
92
36
50
14
36
50
32
UTILITY (U-7)
Project Name: Watermain Trunk System Improvements
Project Manager: Chris Petree, Public Works Director
Anticipated Start: As development occurs
Project Description and Location
The Comprehensive Water Plan anticipates the extension of watermain trunk facilities to
accommodate anticipated growth. Timing of future watermain trunk facilities depends on
the growth rate and location of planned community development.
2016 2017 2018 2019 2020 Total
Revenues
Water Trunk Fund 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$
Expenditures
Trunk Watermain Oversizing 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 1,000,000$
Operations and Operating Costs Impacts
No anticipated significant operating cost increases.
33
Proje
Proje
Antic
Proje
The U
end o
years
per y
Being
mana
Natur
Revenu
Water
Expend
Water
R
In
Oper
No an
ect name:
ect Manage
cipated star
ect Descript
Utilities Div
of their servi
s. The Utilit
year based o
g able to ch
aging the wa
ral Resource
ues
r Operating Fun
ditures
r meters
Residential
Meter Install
Transmitter In
ndustrial/Comm
rations and
nticipated si
r:
rt date:
tion and loc
vision replac
ice life. The
ties Division
on the age o
hange out w
ater system a
es. Replacem
nd - Fees
l
nstall
mercial
Total
operating c
gnificant im
UTIL
Water mete
Chris Petre
Annual
cation
ces residenti
e expected s
n currently s
f the meter
water meters
and monitor
ment of mete
2016
422,640$
232,739
149,901
40,000
422,640$
costs impact
mpact on oper
LITY (U-
er replaceme
ee, Public W
ial and com
ervice life fo
schedules ap
and to stay
at the end
ing water us
ers is done b
2017
371,58$
215,67
155,91
371,58$
ts
rations or op
-8)
ent
Works Directo
mmercial wat
for a water m
pproximately
on a 20 ye
of their ser
se for report
by Utilities D
2018
88 374,3$
75 214,9
3 159,4
88 374,3$
perating cost
or
ter meters t
meter is appr
y 800 meter
ear replacem
rvice life is
ting to the D
Division staff
201
365 387$
945 220
420 167
365 387$
ts.
that reach th
roximately 2
replacement
ment schedule
important t
Department o
ff.
19 20
7,430 390$
0,012 219
7,418 170
7,430 390$
he
20
ts
e.
to
of
20 Tot
0,006 1,946$
9,014 1,102
0,992 803
42
0,006 1,946$
tal
6,029
2,385
3,644
2,017
6,029
34
Proje
Proje
Antic
Proje
The C
day, 7
Addit
Period
of the
The C
motor
subme
Revenue
Water
Expendi
Well 4 r
Well 6 r
Well 8 r
HSPS 60
Well 11
Well 19
Well 12
Well 13
Filter Ba
Well 14
Well 15
Well 16
Well 2 r
Well 9 r
Well 10
Well 18
Operat
No anti
ect name:
ect Manage
cipated star
ect Descriptio
City’s wells p
7 days a we
tionally, bein
dic inspection
e wells and wa
City has 17 w
rs. Vertical tu
ersible pumps
es
Operating Fun
itures
roof replacemen
rehabilitation
rehabilitation
00HP Pump
rehabilitation
rehabilitation
rehabilitation
rehabilitation
ackwash Pump
rehabilitation
rehabilitation
rehabilitation
rehabilitation
rehabilitation
rehabilitation
rehabilitation
tions and op
icipated sign
r:
rt date:
on and locati
provide water
eek. This pu
g constantly
n and mainten
ater system at
wells which a
urbine pump
s and motors
d - Fees $
nt
Total $
perating cos
nificant impa
UTIL
Well and P
Chris Petre
Annual
ion
for the distri
uts the motor
exposed to w
nance, with re
t maximum p
are a combina
s and motors
are scheduled
2016
145,000 $
25,000
60,000
60,000
145,000 $
sts impacts:
act of operat
LITY (U-
Pump Rehabi
ee, Public W
ibution system
rs and pump
water can cor
eplacement a
pumping capa
ation of verti
s are schedul
d for rehabilit
2017
180,000$
60,000
60,000
60,000
180,000$
:
tions or oper
-9)
ilitation
Works Directo
m which oper
p components
rrode pipes a
as needed, ens
acity.
ical turbine a
led for rehab
tation every 1
2018
225,000$
60,000
60,000
45,000
60,000
225,000$
rating costs.
or
rates on dema
s under trem
and other wel
sures the effic
and submersib
bilitation ever
10 years.
2019
120,000$
60,000
60,000
120,000$
and 24 hours
mendous stres
ll component
cient operatio
ble pumps an
ry 8 years an
2020
240,000$
60,000
60,000
60,000
60,000
240,000$
a
ss.
ts.
on
nd
nd
Total
910,000$
910,000$
35
Proje
Proje
Antic
Proje
Well
accom
Chien
adjace
2018
and w
The M
Protec
Revenu
Water T
Expend
Well Co
Well
Well
Well
Well
Well
Well Co
Oper
Main
ect name:
ect Manage
cipated star
ect Descriptio
21 is prog
mmodate exis
n, Jordan, an
ent to the Hig
and Wells 24
water needs. L
Minnesota De
ction Plan in
ues
Trunk Fund
Total
ditures
onstruction
21
22
23
24
25
ollection Pipe
Total
rations and
ntenance cost
r:
rt date:
on and Locat
rammed for
sting and anti
d/or the Tun
ghview Avenu
4 and 25 are p
Locations wil
epartment of H
order to recei
2016
875,000
l 875,000$
875,000
875,000$
operating c
ts are an add
UTIL
Well Const
Chris Petre
2016
tion
construction
icipated grow
nnel City/Wo
ue/Dodd Bou
planned for 20
ll be based on
Health requir
ive permits to
2017
-
-$ $
-$ $
costs impact
ditional $1,0
LITY (U-1
truction – W
ee, Public W
n in 2016 t
wth. The we
newoc aquife
ulevard round
020. Constru
n data provide
res the City to
o construct fut
2018
2,137,500
2,137,500$
918,750
918,750
300,000
2,137,500$
ts
00 per year p
10)
Well 21
Works Directo
to provide a
ell will draw
fers. Well 2
dabout. Wells
uction will dep
ed in the Wate
o amend its W
ture wells.
2019
-
-$ $
-$ $
per well.
or
adequate wa
water from
1 is planned
s 22 and 23 a
pend on popu
er Supply Pla
Wellhead and
2020
1,837,500
1,837,500 $
918,750
918,750
1,837,500 $
ater supply t
the Prairie D
to be locate
are planned fo
ulation deman
an.
d Source Wate
Total
4,850,000
4,850,000
-
4,850,000
to
Du
ed
or
nd
er
36
PPRO
P
PA
OGR
PRO
ARK
RAM
OJEC
KS
MM
CTS
MED
S
D
37
Total
CIP #Park / Project 2016 2017 2018 2019 2020 2016-2020
P-1 Parks Major Maintenance
General Fund
General Maintenance 40,225 45,950 45,950 46,200 46,400 224,725
Buildings/Shelters/Grounds 12,100 92,850 19,250 25,000 - 149,200
Field Improvements/Maintenance 10,000 6,500 6,500 6,500 6,500 36,000
Open space improvement and maintenance 107,175 53,900 93,700 41,750 33,000 329,525
169,500 199,200 165,400 119,450 85,900 739,450
P-3 Summerlyn Park
Park Dedication Fund 325,000 - - - - 325,000
325,000 - - - - 325,000
P-4 King Park Improvements
Park Dedication Fund - Fees 412,538 - 857,825 597,550 - 1,867,913
Miracle League/LBA Lighting Donation 150,000 - 150,000 150,000 - 450,000
562,538 - 1,007,825 747,550 - 2,317,913
P-5 Avonlea Park
King Creek Greenway - Sale 950,000 - - - - 950,000
Park Dedication Fund - Fees - 550,000 - - - 550,000
950,000 550,000 - - - 1,500,000
P-6 Quigley-Sime Parking Lot Paving
Park Dedication Fund - Fees - - 180,000 - - 180,000
- - 180,000 - - 180,000
P-7 Park Development - Adminstrative Projects
Park Dedication Fund - Fees 45,000 10,000 20,000 40,000 20,000 135,000
45,000 10,000 20,000 40,000 20,000 135,000
P-8 Park Development - Developer Credits
Park Dedication Fund - Fees 433,201 433,201 433,201 433,201 433,201 2,166,005
433,201 433,201 433,201 433,201 433,201 2,166,005
P-9 Park Improvements (Various Parks)
Park Improvement Fund 211,500 153,000 465,000 293,750 204,000 1,327,250
Fundraising 222,000 - - - - 222,000
Donations - LOA - Rotary 50,000 - - - - 50,000
Donations - Quail Meadows - ISD #192 50,000 - - - - 50,000
533,500 153,000 465,000 293,750 204,000 1,649,250
P-10 Ritter Farm Dog Park
Park Dedication Fund - Fees 145,000 - - - - 145,000
145,000 - - - - 145,000
P-11 Legacy Park
Park Dedication Fund - Fees - - - - 350,000 350,000
- - - - 350,000 350,000
P-12 Michaud Park
Park Dedication Fund - Fees - - - - 96,000 96,000
- - - - 96,000 96,000
P-13 Trail Improvements
Trail Improvement Fund 251,520 332,880 227,684 295,236 245,000 1,352,320
251,520 332,880 227,684 295,236 245,000 1,352,320
P-14 Trail - 175th: Isleton Ave to Jasmine Ave
Park Dedication Fund - Fees - - 85,700 - - 85,700
Escrow Funds - - 7,900 - - 7,900
- - 93,600 - - 93,600
TOTAL 3,415,259$ 1,678,281$ 2,592,710$ 1,929,187$ 1,434,101$ 11,049,538$
PARKS AND RECREATION
Project Summary
38
Total
CIP #Funding Source / Project 2016 2017 2018 2019 2020 2016-2020
Escrows
P-14 Trail - 175th: Isleton Ave to Jasmine Ave - - 7,900 - - 7,900
Federal Grant
P-2 North Creek Greenway Trail, Restroom, Amenities - - - - - -
General Fund
P-1 Park Major Maintenance 169,500 199,200 165,400 119,450 85,900 739,450
Other
P-4 King Park Improvements - LBA Lighting Donation 150,000 - 150,000 150,000 - 450,000
P-5 Avonlea Park 950,000 - - - - 950,000
P-9 Park Improvements - Fundraising/Donations 322,000 - - - - 322,000
Total Other 1,422,000 - 150,000 150,000 - 1,722,000
Park Improvement Fund - Taxes
P-9 Park Improvements (Various Parks)211,500 153,000 465,000 293,750 204,000 1,327,250
P-13 Trail Improvement Fund - Taxes
Trail improvement 251,520 332,880 227,684 295,236 245,000 1,352,320
Park Dedication Fund - Fees
P-3 Summerlyn Park 325,000 - - - - 325,000
P-4 King Park Improvements 412,538 - 857,825 597,550 - 1,867,913
P-5 Avonlea Park - 550,000 - - - 550,000
P-6 Quigley-Sime Parking Lot Paving - - 180,000 - - 180,000
P-7 Park Development-Administrative Projects 45,000 10,000 20,000 40,000 20,000 135,000
P-8 Park Development-Developer Credits 433,201 433,201 433,201 433,201 433,201 2,166,005
P-10 Ritter Farm Dog Park 145,000 - - - - 145,000
P-11 Legacy Park - - - - 350,000 350,000
P-12 Michaud Park - - - - 96,000 96,000
P-14 Trail - 175th: Isleton Ave to Jasmine Ave - - 85,700 - - 85,700
Total Park Dedication Fund 1,360,739 993,201 1,576,726 1,070,751 899,201 5,900,618
TOTAL 3,415,259$ 1,678,281$ 2,592,710$ 1,929,187$ 1,434,101$ 11,049,538$
PARKS AND RECREATION
Financing Summary
39
PARKS AND RECREATION (P-1)
Project name: Parks – Major Maintenance
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: Various
Totals
2016 2017 2018 2019 2020 2016-2020
General Maintenance
STS labor 16,225 16,750 16,750 17,000 17,000 83,725
Tree Trust labor 1,500 1,700 1,700 1,700 1,900 8,500
Tree Trust/Eagle Scout project materials 12,000 12,000 12,000 12,000 12,000 60,000
Tree plantings 5,000 10,000 10,000 10,000 10,000 45,000
Picnic table construction 3,000 3,000 3,000 3,000 3,000 15,000
Sign replacement 2,500 2,500 2,500 2,500 2,500 12,500
Total general maintenance 40,225 45,950 45,950 46,200 46,400 224,725
Buildings/Shelters/Grounds
Meadows-reshingle warming house 1,600 - - - - 1,600
Antlers-reshingle shelters B&C - 5,000 - - - 5,000
Cherryview-reshingle warming house 1,700 - - - - 1,700
Casperson-reshingle building (contractual)- - 7,500 - - 7,500
Casperson-reshingle shelters B&C - - 2,700 - - 2,700
Bunker Hill-reshingle shelter 1,300 - - - - 1,300
Orchard Lake-reshingle shelter - - 1,400 - - 1,400
Meadows rink end-board replacement - - 1,200 - - 1,200
Rolling Oaks-reshingle warming house - 1,700 - - - 1,700
Dakota Heights-reshingle warming house - 1,700 - - - 1,700
Dakota Heights-rubber floor replacement - 2,500 - - - 2,500
Meadows-rubber floor replacement - 2,500 - - - 2,500
Prairie Lake-replace carpet w/rubber floor - 4,000 - - - 4,000
McGuire-rubber floor replacement - 2,500 - - - 2,500
Foxborough-ID sign replacement - 4,000 - - - 4,000
Antlers-replace plumbing fixtures - 6,000 - - - 6,000
Steve Michaud Park-building window replacement - 18,000 - - - 18,000
Steve Michaud Park-door replacement (1&3)1,000 4,000 - - - 5,000
Parkview-door replacement (1)- 1,000 - - - 1,000
Dakota Heights-trail and door installation - - 1,000 - - 1,000
Meadows-trail and door installation - - 650 - - 650
Auto bldg door opener/closers-Valley & Michaud 6,500 - - - - 6,500
Drinking fountain replacements (4):- - 4,800 - - 4,800
Aronson Field #3 fence improvements (3rd baseline) - 7,200 - - - 7,200
Aronson Fields #1 & 3-outfield fence improvements - 15,500 - - - 15,500
King Field #2-backstop fence repair - 4,750 - - - 4,750
Jaycee-fence replacement - - 15,000 - 15,000
Upper 205th Street trail fence - 12,500 - - - 12,500
Ritter-ELC roof replacement (contractual)- - - 10,000 - 10,000
Total buildings/shelters/grounds 12,100 92,850 19,250 25,000 - 149,200
Fields
Field improvements/maintenance 10,000 6,500 6,500 6,500 6,500 36,000
Open Space
Fogseal parking lots 21,750 30,500 32,000 26,250 25,500 136,000
Bench refurbishment 2,500 2,500 2,500 2,500 2,500 12,500
Resurface BB/tennis courts 19,200 20,900 20,700 13,000 5,000 78,800
Oak Shores-BB/tennis court reconstruction 63,725 - - - - 63,725
Dodd Pointe-overlay BB court - - 6,500 - - 6,500
Meadows-BB court reconstruction - - 17,000 - - 17,000
Quigley-Sime trail extension - - 15,000 - - 15,000
Total open space 107,175 53,900 93,700 41,750 33,000 329,525
Total Major Maintenance 169,500 199,200 165,400 119,450 85,900 739,450
40
Proje
Proje
Antic
Proje
The P
Farm
park
only
Chok
baske
amen
Revenues
Park Dedi
Expenditu
Park Cons
Oper
Summ
inclu
etc.
Divis
appro
being
ect name:
ect manager
cipated star
ect descript
Parks, Trails
ms in the Sum
in 2014 wit
serve Summ
kecherry Dev
etball half-c
nities.
ication Fund
ures
struction
rations and
merlyn Park
de items suc
Staff recom
sion’s maint
oved in 2016
g completed
PARK
r:
rt date:
ion and loca
s and Open
mmerlyn De
th constructi
merlyn Deve
velopment.
court, bench
operating c
construction
ch as paveme
mmended ad
tenance need
6, the additi
on a timely
KS AND R
Summerlyn
John Henn
2016
ation
Space Plan
evelopment.
ion proposed
elopment but
The park w
hes, walkin
2016
325,000$
325,000$
costs impact
n will add w
ent managem
dding a full
ds. Consid
ion of this p
basis.
RECREA
n Park
en, Interim P
calls for a n
Staff comm
d for 2016.
t also the D
would includ
ng trails, op
2017
-$
-$
ts
work load to
ment, turf ma
l time staff
dering at thi
park will nec
ATION (P
Parks and Re
neighborhood
menced the p
This neigh
onnelly Farm
de items suc
pen green
2018
-$
-$
the mainten
anagement,
member in
is time no a
cessitate oth
P-3)
ecreation Di
d park north
preliminary
hborhood pa
ms Develop
ch as shelter
space and
2019
-$
-$
nance divisio
playground
n 2016 to m
additional st
her maintena
irector
h of Donnell
design of th
ark would no
pment and th
r, playground
other sma
2020 (
-$ $
-$ $
on which wi
maintenance
meet the Par
taff has bee
ance tasks no
ly
he
ot
he
d,
all
Total
(2016-2020)
325,000
325,000
ill
e,
rk
en
ot
41
Proje
Proje
Antic
Proje
Impro
field,
projec
additi
constr
donat
Reven
Park
Mirac
LBA
Expen
King
Irr
Dr
Lig
Oper
Plann
additi
increa
100%
the sta
ect name:
ect manager
cipated star
ect descriptio
ovements to K
parking lot
ct will increa
ional games to
ruction of add
te funds for th
nues
Dedication Fun
cle League /
Lighting Donat
Total
nditures
Park:
rigate four fields
rainage system
ghting (Design
Total
ations and op
ned improvem
ional staff tim
asing mowing
% Maintenanc
aff time that h
PARK
r:
rt date:
on and locatio
King Park in
and trail ligh
ase the playab
o be played a
ditional fields
he lighting pro
nd - Fees
tion
s
& Const.)
perating cost
ments to King
me required
g frequency.
e Free Plan f
has been requ
KS AND R
King Park
John Henn
2016
on
nclude installa
hting, installa
bility, safety
at the facility
s. Lakeville B
oject.
2016
412,538
150,000
562,538$
-
-
562,538
562,538$
ts impacts
g Park will a
for turf man
The purchase
for 25 years.
uired to remov
RECREA
Improvemen
en, Interim P
ation of irriga
ation of drain
and overall
ultimately pr
Baseball Asso
2017
-
-
-$
-
-
-
-$
add workload
nagement inc
e and installat
The installat
ve standing w
ATION (P
nts
Parks and Re
ation systems
n tile system
quality of th
reventing the
ociation (LBA
2018
857,825
150,000
1,007,825$
232,500
140,000
635,325
1,007,825$
d to the main
cluding servic
tion of the lig
ation of the dr
water from fie
P-4)
ecreation Di
s on four fie
m and trail ex
he fields and
need to acqui
A) has and w
2019
597,550
150,000
747,550$
-
185,000
562,550
747,550$
ntenance divi
cing irrigatio
ghting system
rain tile syste
elds after rain
irector
lds along wit
xtension. Th
will allow fo
ire land for th
will continue t
2020
-
-
-$
-
-
-
-$
sion regardin
on system an
m will include
em will reduc
events.
th
he
or
he
to
Total
(2016-2020)
1,867,913
450,000
2,317,913$
232,500
325,000
1,760,413
2,317,913$
ng
nd
a
ce
42
Proje
Proje
Antic
Proje
The P
corrid
aside
comp
Reven
King
Park D
Expen
Avon
Oper
Until
would
$7,40
is dev
it is d
ect name:
ect manager:
cipated start
ect descriptio
Parks, Trails a
dor for comm
66.5 acres at
lex.
nues
Creek Greenwa
Dedication Fund
Total
nditures
nlea Park
Total
ations and op
the park lan
d include rou
0 for labor an
veloped into i
developed for
PARK
date:
on and locatio
and Open Sp
munity playfie
the corner of
ay - Sale
d - Fees
l
l
perating cost
d is develope
ugh cutting th
nd equipment
ts final use. T
agricultural u
KS AND R
Avonlea Par
John Henne
2017
on
ace Plan call
elds. Staff h
f future 185th
2016
950,000
-
950,000$
950,000
950,000$
ts impacts
ed, operation
he site appro
t. No additio
There is the p
use for approx
RECREA
rk
n, Interim Pa
s for the acqu
has been work
and Cedar A
2017
0 -
550,000
0 550,000$
0 550,000
0 550,000$
al cost for th
ximately fou
onal operation
potential to re
ximately $250
ATION (P
arks and Recre
uisition of lan
king with Ma
Avenue for the
2018
-
0 -
0 -$
0
0 -$
he 66.5 acres
ur times/year
nal cost is ant
ent out the lan
0 - $400/year
P-5)
eation Directo
nd along the
attamy Devel
e developmen
2019
-
-
-$
-$
s after the pu
which is est
ticipated unti
nd after purch
r.
or
Cedar Avenu
lopment to s
nt of an athlet
2020
-
-
-$
-$
urchase of lan
timated to co
l the park lan
hased and unt
ue
et
ic
Total
(2016-2020
950,0
550,0
1,500,0$
1,500,0
1,500,0$
nd
ost
nd
til
)
00
00
00
00
00
43
PARKS AND RECREATION (P-6)
Project name: Quigley-Sime Parking Lot Paving
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2018
Project description and location
Funding is being scheduled for paving Quigley-Sime parking lot. Paving and striping of
lot will maximize parking capacity, eliminate dust-control issues and reduce maintenance
of the lot.
Operations and operating costs impacts
Operating cost impacts include pavement management maintenance (i.e. fog sealing and
striping) increasing the budget two years after the lot has been constructed and every five
years after initial fog seal application. This parking lot will not be plowed.
2016 2017 2018 2019 2020
Total
(2016-2020)
Revenues
Park Dedication Fund - Fees -$ -$ 180,000 $ -$ -$ 180,000$
Expenditures
Pave Quigley-Sime parking lot - - 150,000 - - 150,000
Parking lot Eng (Design, Insp,
Adm-20%)- - 30,000 - - 30,000
Total -$ -$ 180,000 $ -$ -$ 180,000$
44
PARKS AND RECREATION (P-7)
Project name: Park Development – Administrative Projects
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: On-going
Project description and location
The Park Dedication Fund budget provides appropriations for a number of activities including
planning, design and feasibility reports for park projects such as Summerlyn Park, Antlers Park
Master Plan, Legacy Park, Chokecherry Hill Greenway and Avonlea Development Concept
Plan. It also includes appraisal and professional fees for the bi-annual review of park
dedication fee analysis for commercial and industrial properties.
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost as a result of
completing planning and design work.
2016 2017 2018 2019 2020
Total
(2016-2020)
Revenues
Park Dedication Fund - Fees 35,000$ 10,000 $ 20,000$ 50,000$ 20,000 $ 135,000$
Expenditures
Park Fees analysis - C/I values 10,000 - 10,000 - 10,000 30,000
Summerlyn - Design & Construction 25,000 - - - - 25,000
Antlers Park Master Plan 10,000 - - - - 10,000
Legacy Planning & Design - - - 40,000 - 40,000
Planning & Design - 10,000 10,000 - 10,000 30,000
Total 45,000$ 10,000 $ 20,000$ 40,000$ 20,000 $ 135,000$
45
PARKS AND RECREATION (P-8)
Project name: Park Development – Developer Credits
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: On-going
Project description and location
Developer credits: Represents credits associated with new development when the park
dedication requirement is fulfilled through a land dedication.
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost at this time.
2016 2017 2018 2019 2020
Total
(2016-2020)
Revenues
Park Dedication Fund - Fees 433,201 $ 433,201 $ 433,201 $ 433,201$ 433,201 $ 2,166,005$
Expenditures
Developer Credits 433,201$ 433,201 $ 433,201 $ 433,201$ 433,201 $ 2,166,005$
46
PARKS AND RECREATION (P-9)
Project name: Park Improvement Fund
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: Various
Project description and location
The Park Improvement Fund provides funding for replacement and upgrades to items such as
Aronson building improvements, Antlers building and playground replacements. The existing
Land of Amazement (LOA) play structure (23 years old) at Steve Michaud Park was
constructed in 1992. LOA is a destination site whereby residents and non-residents travel to
the site to play on this unique play structure. This unit is an old type wood structure that is in
need of replacement as many of the wooden poles, decking, handrails and balusters are
deteriorating, splitting or cracking along with a significant number of play apparatus pieces
that no longer can be repaired/replaced. LOA was preliminary designed in 2015 in order to
facilitate fundraising efforts for construction in 2016.
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost.
*Includes architectural design, construction plans and misc. expenses.
**City staff will work with Dakota County to obtain funding for the construction of this building as Antlers
Park will be considered a trailhead along the Lake Marion/South Creek Trail Project, which will be a part
of the Dakota County Regional Trail System. The building will also be incorporated into the Antlers Park
Master Plan.
2016 2017 2018 2019 2020
Revenues
Park Improvement Fund 211,500 153,000 465,000 293,750 204,000
Fundraising 222,000 - - - -
Donations - Rotary - LOA 50,000
Donations - ISD #192 - Quail Meadows 50,000 - - - -
Total 533,500$ 153,000$ 465,000$ 293,750$ 204,000$
Expenditures
*Aronson building upgrades - - 140,000 - -
**Replacement of Antlers building - - 325,000 - -
Playground Replacements
Steve Michaud LOA 357,000 - - - -
Oak Shores 76,500 - - - -
Quail Meadows 100,000 - - - -
Dodd Trail - 76,500 - - -
Highview Heights - 76,500 - - -
Hypointe Crossing - - - 65,500 -
Cherryview - - - 78,750 -
Independence - - - 73,000 -
Greenridge - - - 76,500 -
Dodd Pointe - - - - 77,000
Bunker Hill - - - - 77,000
Bracketts Crossing - - - - 50,000
Total 533,500$ 153,000$ 465,000$ 293,750$ 204,000$
47
Proje
Proje
Antic
Proje
The R
large
tables
Reve
Park
Expe
Dog
Oper
The c
will i
drink
site.
ect name:
ect Manage
cipated star
ect Descript
Ritter Farm D
and small d
s.
nues
Dedication Fu
Total
enditures
Park Construc
Total
rations and
construction
include item
king fountain
PARKS
r:
rt date:
tion and loc
Dog Park wo
dog area, pe
unds-Fees $
$
ction $
$
operating c
of the dog p
s such as ref
n and gravel
S AND R
Ritter Farm
John Henn
2016
cation
ould be appr
et drinking a
2016
145,000$
145,000$
145,000$
145,000$
costs impact
park will add
fuse collectio
parking lot m
RECREA
m Dog Park
en, Interim P
roximately 6
and wash of
2017
-$
-$
-$
-$
ts
d work load
on, periodic
maintenance
ATION (P
Parks and Re
6-7 acres in s
ff area, grav
2018
-$
-$
-$
-$
to the maint
flail mowin
e along with
P-10)
ecreation Di
size. Ameni
vel parking l
2019
-$
-$
-$
-$
tenance divis
ng, winteriza
the general
irector
ities include
lot and picni
2020
-$
-$
-$
-$
sion which
ation of
up-keep of
a
ic
48
Proje
Proje
Antic
Proje
The P
the L
more
neigh
Reve
Park
Expe
Park
Oper
Lega
inclu
maint
the P
been
not b
ect name:
ect Manage
cipated star
ect Descript
Parks, Trails
Legacy, Cres
non-traditi
hborhood par
nues
Dedication Fu
enditures
Construction
Total
rations and
cy Park cons
de items suc
tenance, etc
ark Division
approved in
eing comple
PARKS
r:
rt date:
tion and loc
s and Open S
scent Ridge
ional amen
rks.
unds-Fees
operating c
struction wil
ch as turf ma
. Staff recom
n’s maintena
n 2016, the a
eted on a tim
S AND R
Legacy Par
John Henn
2020
cation
Space Plan c
and Berres
nities versus
2016
-$
-$
-$
costs impact
ll add worklo
anagement, p
mmended ad
ance needs. C
ddition of th
mely basis.
RECREA
rk
en, Interim P
calls for a ne
Ridge Deve
s what ha
2017
-$
-$
-$
ts
oad to the m
pavement ma
dding a full t
Considering
his park will
ATION (P
Parks and Re
eighborhood
elopments.
as been ins
2018
-$
-$
-$
maintenance d
anagement, p
time staff me
g at this time
necessitate
P-11)
ecreation Di
d park in the
The park w
stalled in t
2019
- $
- $
- $
division whi
possibly pla
ember in 20
e no addition
other mainte
irector
e area servin
would includ
the previou
2020
- 350,$
- 350,$
- 350,$
ich will
ayground
16 to meet
nal staff has
enance tasks
ng
de
us
0
,000
,000
,000
s
49
PARKS AND RECREATION (P-12)
Project name: Steve Michaud Soccer #8 & #9 Drain Tile Installation
Project Manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: 2020
Project Description and location
Improvements to Steve Michaud Park include the installation of drain tile system in
soccer fields 8 and 9. The project will increase the playability, safety and overall quality
of the fields. At this time the fields are prone to becoming saturated and unplayable
during periods of continued or heavy rains. These conditions have forced the closure of
the fields during tournaments and regularly scheduled games. In addition the increase in
soil moisture has had a negative impact on the turf conditions and an increase in turf
stress. The installation of a sport field drain tile system will minimize or eliminate these
negative conditions and allow for consistent field conditions and playability.
2016 2017 2018 2019 2020
Revenues
Park Dedication Funds-Fees -$ -$ -$ -$ 96,000$
Expenditures
Drain Tile Installation 96,000$
Fields #8 and #9
Total -$ - $ - $ -$ 96,000$
Operations and operating costs impacts
No impact on operations or operating costs.
50
PARKS AND RECREATION (P-13)
Project name: Trail Improvement Fund
Project manager: John Hennen, Interim Parks and Recreation Director
Anticipated start date: Various
Project description and location
The City retained the services of WSB Engineering who evaluated the condition of all
trail segments and provided recommendations for maintenance. Staff has developed a
plan for either overlaying or reclaiming trail segments. Staff is proposing to have WSB
inspect 1/3 of trail system each year to perform pavement ratings and analysis.
2016 2017 2018 2019 2020
Revenues
Trail Improvement Fund - Taxes 251,520$ 332,880$ 227,684$ 295,236 $ 245,000 $
Expenditures
Trail crack and fog sealing 60,000 60,000 60,000 60,000 60,000
Trail inspections (1/3 of system)5,000 5,000 5,000 5,000 5,000
S side 165th - Hudson to Highview (reclamation)35,469
Dakota Heights Park Trails (reclamation)16,141
The Greenway Trail - W segment 24,087
N side 165th - Ipava to Holbrook Ave (reclamation)78,236
Casperson soccer field trail 1,800
W side Flagstaff Ave - Fontina Path to Dodd Blvd (reclam.)78,517
E side Flagstaff - Fontina Path to Dodd (overlay)51,914
N Creek Trail - E from Flagstaff to N Creek MHP (reclam.) 47,035
Dodd Trail Park Trails - Flagstaff to Dodd Blvd (reclamation)32,434
King park trail extension 16,000
Aronson Park Trails (reclamation)18,508
Cedar Highlands Park Trails (reclamation)30,295
Hypointe Park Trails (reclamation)9,869
Oak Shores Park Trails (reclamation)46,532
Parkview Park Trails (reclamation)16,281
Quail Meadows Park Trails (reclamation)14,085
N side of 175th - Ipava to Highview 78,509
*W side Cedar - 190th to 202nd (reclamation)50,148
*N side 160th - Ipava to Interlachen (reclamation)14,321
*S side 160th - Ipava to Cedar Ave (overlay)50,659
Misc. Trails - TBD 150,000$
Engineering costs for reclamation/overlay projects (20%)30,787 41,980 27,114 36,599 30,000
Total 251,520$ 332,880$ 227,684$ 295,236 $ 245,000 $
*Budget number is City's cost (45%) - Dakota County to pay 55%
Operations and operating costs impacts
No anticipated significant impact on operations or operating cost.
51
Proje
Proje
Antic
Proje
There
Jasm
segm
Reve
Park
Escro
Expe
Trav
Engi
Oper
The t
budg
ect name:
ect Manage
cipated star
ect Descript
e is an inad
ine Avenue
ment as a mea
nues
Dedication Fu
ow Funds
Total
enditures
vel Constructio
neering (20%
Total
rations and
trail segment
et two years
PARKS
r:
rt date:
tion and loc
dequate trail
. Citizens
ans of safe p
unds-Fees
on
)
operating c
t will be add
after the tra
S AND R
175th Street
John Henn
2018
cation
segment on
have conta
edestrian tra
2016
-
-
$
-
-
$
costs impact
ded to the fog
ail is constru
RECREA
t Trail – Isle
en, Interim P
n S side of
acted staff r
avel to Chris
2017
- $
- $
ts
g sealing ma
ucted and eve
ATION (P
eton Ave. to
Parks and Re
175th Street
regarding th
stina Huddle
7 20
- 8
-
- 9$
- 7
- 1
- 9$
aintenance sc
ery 3-4 years
P-14)
Jasmine Av
ecreation Di
t from Isleto
he request t
eston Elemen
018
85,700
7,900
93,600 $
78,000
15,600
93,600 $
chedule incr
s after that p
venue (S side
irector
on Avenue t
to install th
ntary School
2019
-
-
- $
-
-
- $
reasing the
point.
e)
to
is
l.
2020
-
-
-
-
-
-
52
C
I
T
Y
O
F
L
A
K
E
V
I
L
L
E
Council Meeting 01.04.2016
2
0
1
5
-
2
0
2
5
F
A
C
I
L
I
T
Y
P
L
A
N
20
1
4
C
F
+
2016 - 2025
20
1
5
2
0
1
5
E
s
t
'
d
2
0
1
6
2
0
1
7
2
0
1
8
2
0
1
9
2
0
2
0
2
0
2
1
2
0
2
2
2
0
2
3
2
0
2
4
2
0
2
5
T
o
t
a
l
s
Us
e
o
f
F
u
n
d
s
:
Ar
t
C
e
n
t
e
r
4
8
,
5
7
5
$
7
3
,
5
6
5
$
2
1
6
,
1
5
0
$
1
0
1
,
2
9
2
$
4
7
,
3
7
5
$
1
0
,
8
0
0
$
-
$
-
$
-
$
- $ - $ 45,000 $ 420,617 $
Ce
n
t
r
a
l
M
a
i
n
t
e
n
a
n
c
e
F
a
c
i
l
i
t
y
4
0
,
6
5
0
77
,
1
1
9
10
2
,
3
0
0
92
,
7
0
0
20
3
,
0
0
0
-
-
36
,
0
0
0
80
,
0
0
0
7,
0
0
0
- - 521,000
Ci
t
y
H
a
l
l
2
9
3
,
5
0
0
36
8
,
3
9
6
33
9
,
4
5
0
27
5
,
6
5
0
77
,
0
0
0
14
5
,
0
0
0
75
,
0
0
0
17
5
,
0
0
0
-
- - - 1,087,100
Fi
r
e
S
t
a
t
i
o
n
#
1
1
7
3
,
0
0
0
15
7
,
1
1
4
42
,
5
5
0
-
-
-
15
,
0
0
0
-
-
14
,
8
0
0
- - 72,350
Fi
r
e
S
t
a
t
i
o
n
#
2
1
3
4
,
5
0
0
12
5
,
2
3
1
16
,
1
0
0
5,
3
0
0
-
-
13
,
8
0
0
-
-
- - 5,900 41,100
Fi
r
e
S
t
a
t
i
o
n
#
3
1
0
,
7
0
0
5,
4
7
5
13
,
0
0
0
4,
8
0
0
6,
8
5
0
-
3,
8
0
0
-
-
- - - 28,450
Fi
r
e
S
t
a
t
i
o
n
#
4
2
,
4
0
0
4,
8
2
5
11
,
4
0
0
7,
2
0
0
26
,
0
0
0
11
5
,
0
0
0
-
4,
8
0
0
-
- - - 164,400
He
r
it
a
g
e
C
e
n
t
e
r
9
4
,
9
5
0
18
6
,
3
5
0
80
,
8
0
0
39
,
0
0
0
30
,
0
0
0
60
,
4
0
0
54
,
0
0
0
56
,
0
0
0
-
- - - 320,200
Ga
l
a
x
i
e
L
i
q
u
o
r
S
t
o
r
e
-
-
11
,
4
7
5
2,
5
0
0
-
-
-
65
,
0
0
0
-
- - - 78,975
Ke
n
r
i
c
k
L
i
q
u
o
r
S
t
o
r
e
89
,
0
0
0
89
,
0
0
0
64
,
5
0
0
46
,
1
0
0
6,
4
0
0
-
1
1
3
,
0
0
0
-
-
- - - 230,000
Po
l
i
c
e
S
t
a
t
i
o
n
4
,
1
0
0
3,
8
1
9
19
,
0
5
0
55
,
5
0
0
36
,
0
0
0
16
0
,
0
0
0
-
60
,
0
0
0
-
- - - 330,550
Wa
t
e
r
T
r
e
a
t
m
e
n
t
F
a
c
i
l
i
t
y
67
1
,
8
0
0
67
1
,
8
0
0
38
,
5
7
5
15
,
0
0
0
-
-
-
27
,
2
0
0
32
,
0
0
0
- 11,000 - 123,775
To
t
a
l
U
s
e
o
f
F
u
n
d
s
1
,
5
6
3
,
1
7
5
$
1,
7
6
2
,
6
9
4
$
95
5
,
3
5
0
$
64
5
,
0
4
2
$
43
2
,
6
2
5
$
49
1
,
2
0
0
$
27
4
,
6
0
0
$
42
4
,
0
0
0
$
11
2
,
0
0
0
$
21
,
8
0
0
$
11,000 $ 50,900 $ 3,418,517 $
So
u
r
c
e
o
f
F
u
n
d
s
:
In
t
e
r
e
s
t
E
a
r
n
i
n
g
s
(
2
%
)
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
- $ - $ -$ -$
An
n
u
a
l
L
e
v
y
(
B
u
i
l
d
i
n
g
F
u
n
d
)
5
1
,
0
0
0
51
,
0
0
0
51
,
0
0
0
25
0
,
0
0
0
35
0
,
0
0
0
45
0
,
0
0
0
45
0
,
0
0
0
45
0
,
0
0
0
45
0
,
0
0
0
45
0
,
0
0
0
450,000 450,000 3,801,000
Co
m
m
u
n
i
c
a
t
i
o
n
s
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
15
0
,
0
0
0
-
-
-
-
-
-
- - - 150,000
Li
q
u
o
r
F
u
n
d
89
,
0
0
0
89
,
0
0
0
75
,
9
7
5
48
,
6
0
0
6,
4
0
0
-
1
1
3
,
0
0
0
65
,
0
0
0
-
- - - 308,975
Wa
t
e
r
F
u
n
d
67
1
,
8
0
0
67
1
,
8
0
0
38
,
5
7
5
15
,
0
0
0
-
-
-
27
,
2
0
0
32
,
0
0
0
- 11,000 - 123,775
D
o
n
a
t
i
o
n
s
2
7
,
0
0
0
27
,
0
0
0
-
-
-
-
-
-
-
- - - -
Ot
h
e
r
1
2
2
,
3
7
1
12
2
,
7
1
1
65
0
,
0
0
0
-
-
-
-
-
-
- - - 650,000
To
t
a
l
S
o
u
r
c
e
o
f
F
u
n
d
s
9
6
1
,
1
7
1
$
96
1
,
5
1
1
$
96
5
,
5
5
0
$
31
3
,
6
0
0
$
35
6
,
4
0
0
$
45
0
,
0
0
0
$
56
3
,
0
0
0
$
54
2
,
2
0
0
$
48
2
,
0
0
0
$
45
0
,
0
0
0
$
461,000 $ 450,000 $ 5,033,750 $
Ch
a
n
g
e
i
n
F
u
n
d
B
a
l
a
n
c
e
(6
0
2
,
0
0
4
)
$
(8
0
1
,
1
8
3
)
$
10
,
2
0
0
$
(3
3
1
,
4
4
2
)
$
(7
6
,
2
2
5
)
$
(4
1
,
2
0
0
)
$
28
8
,
4
0
0
$
11
8
,
2
0
0
$
37
0
,
0
0
0
$
42
8
,
2
0
0
$
450,000 $ 399,100 $ 1,615,233 $
Be
g
i
n
n
i
n
g
F
u
n
d
B
a
l
a
n
c
e
1,
3
7
5
,
0
1
0
$
1,
3
7
5
,
0
1
0
$
57
3
,
8
2
7
$
58
4
,
0
2
7
$
25
2
,
5
8
5
$
17
6
,
3
6
0
$
13
5
,
1
6
0
$
42
3
,
5
6
0
$
54
1
,
7
6
0
$
91
1
,
7
6
0
$
1,339,960 $ 1,789,960 $
En
d
i
n
g
F
u
n
d
B
a
l
a
n
c
e
77
3
,
0
0
6
$
57
3
,
8
2
7
$
58
4
,
0
2
7
$
25
2
,
5
8
5
$
17
6
,
3
6
0
$
13
5
,
1
6
0
$
42
3
,
5
6
0
$
54
1
,
7
6
0
$
91
1
,
7
6
0
$
1,
3
3
9
,
9
6
0
$
1,789,960 $ 2,189,060 $
53
C
I
T
Y
O
F
L
A
K
E
V
I
L
L
E
Council Meeting 01.04.2016
2
0
1
5
-
2
0
2
5
E
Q
U
I
P
M
E
N
T
P
L
A
N
20
1
4
C
F
+
2016 - 2025
20
1
5
2
0
1
5
E
s
t
'
d
2
0
1
6
2
0
1
7
2
0
1
8
2
0
1
9
2
0
2
0
2
0
2
1
2
0
2
2
2
0
2
3
2
0
2
4
2
0
2
5
T
o
t
a
l
s
Us
e
o
f
F
u
n
d
s
:
El
e
c
t
i
o
n
s
2
6
,
6
6
7
$
30
,
3
2
2
$
30
,
3
2
2
$
30
,
3
2
2
$
-
$
-
$
-
$
-
$
-
$
-
$
- $ - $ 60,644 $
Fi
r
e
5
6
1
,
5
3
4
87
7
,
2
6
0
67
8
,
7
8
4
23
2
,
2
4
7
28
5
,
0
0
0
88
,
0
0
0
66
3
,
0
0
0
1,
0
7
5
,
0
0
0
20
,
0
0
0
70
,
0
0
0
591,000 - 3,703,031
In
f
o
r
m
a
t
i
o
n
S
y
s
t
e
m
s
8
7
,
9
2
6
83
,
9
6
3
55
7
,
6
7
9
42
6
,
0
3
9
37
5
,
7
8
7
34
4
,
0
7
0
83
,
9
5
3
13
5
,
0
7
9
56
0
,
5
2
3
46
4
,
2
0
3
285,816 240,681 3,473,830
In
s
p
e
c
t
i
o
n
s
-
-
-
-
-
-
-
22
,
4
6
0
22
,
4
6
0
22
,
4
6
0
22,460 - 89,840
Pa
r
k
s
3
6
4
,
9
7
2
37
1
,
3
0
8
33
5
,
0
9
2
60
2
,
5
4
5
32
8
,
9
8
5
20
5
,
5
7
0
39
0
,
3
1
5
12
8
,
9
0
0
38
4
,
5
2
5
31
2
,
7
2
5
429,575 486,800 3,605,032
Po
l
i
c
e
3
0
4
,
4
4
1
41
5
,
4
2
3
22
0
,
9
7
1
70
2
,
7
3
6
1,
2
1
4
,
1
7
4
28
1
,
0
0
0
46
1
,
0
4
6
63
4
,
5
0
0
39
0
,
0
0
0
50
0
,
4
8
6
600,758 495,740 5,501,411
St
r
e
e
t
s
8
6
5
,
3
1
2
90
1
,
3
2
1
1,
6
0
4
,
2
3
4
1,
0
9
0
,
0
6
1
98
7
,
9
0
8
1,
2
3
6
,
7
9
4
36
1
,
8
3
0
37
3
,
4
9
2
33
4
,
7
1
6
76
4
,
6
8
8
1,109,912 652,892 8,516,527
T ot
a
l
U
s
e
o
f
F
u
n
d
s
2
,
2
1
0
,
8
5
2
$
2,
6
7
9
,
5
9
7
$
3,
4
2
7
,
0
8
2
$
3,
0
8
3
,
9
5
0
$
3,
1
9
1
,
8
5
4
$
2,
1
5
5
,
4
3
4
$
1,
9
6
0
,
1
4
4
$
2,
3
6
9
,
4
3
1
$
1,
7
1
2
,
2
2
4
$
2,
1
3
4
,
5
6
2
$
3,039,521 $ 1,876,113 $ 24,950,315 $
So
u
r
c
e
o
f
F
u
n
d
s
:
In
t
e
r
e
s
t
E
a
r
n
i
n
g
s
(
2
%
)
-
$
-
$
59
,
3
4
7
$
17
,
6
1
5
$
4,
4
0
9
$
7,
4
8
0
$
12
,
6
4
1
$
10
,
8
1
1
$
5,
7
5
8
$
13
,
7
4
9
$
14,453 $ 1,071 $ 147,334 $
An
n
u
a
l
L
e
v
y
3
0
0
,
0
0
0
30
0
,
0
0
0
25
0
,
0
0
0
45
0
,
0
0
0
60
0
,
0
0
0
75
0
,
0
0
0
1,
0
0
0
,
0
0
0
1,
2
5
0
,
0
0
0
1,
2
5
0
,
0
0
0
1,
3
0
0
,
0
0
0
1,500,000 1,600,000 9,950,000
Ge
n
e
r
a
l
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
7
2
7
,
0
0
0
87
7
,
0
0
0
50
,
0
0
0
-
-
-
-
-
-
-
- - 50,000
Li
q
u
o
r
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
8
2
5
,
8
1
2
82
5
,
8
1
2
50
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
60
0
,
0
0
0
600,000 600,000 5,900,000
Co
m
m
u
n
i
c
a
t
i
o
n
s
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
4
9
5
,
0
0
0
49
5
,
0
0
0
10
0
,
0
0
0
-
-
-
-
-
-
-
- - 100,000
Pa
v
e
m
e
n
t
M
g
m
t
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
5
2
4
,
0
0
0
52
4
,
0
0
0
10
0
,
0
0
0
10
0
,
0
0
0
85
,
0
0
0
-
-
-
-
-
- - 285,000
En
v
i
r
o
n
m
e
n
t
a
l
R
e
s
F
u
n
d
C
o
n
t
r
i
b
u
t
i
o
n
-
-
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31
,
0
0
0
31,000 31,000 310,000
Au
c
t
i
o
n
/
S
a
l
e
P
r
o
c
e
e
d
s
2
2
5
,
8
0
4
20
1
,
8
7
0
25
0
,
1
7
5
22
5
,
0
0
0
22
5
,
0
0
0
22
5
,
0
0
0
22
5
,
0
0
0
22
5
,
0
0
0
22
5
,
0
0
0
22
5
,
0
0
0
225,000 225,000 2,275,175
Bo
n
d
P
r
o
c
e
e
d
s
-
-
-
1
,
0
0
0
,
0
0
0
1,
8
0
0
,
0
0
0
80
0
,
0
0
0
-
-
-
-
- - 3,600,000
To
t
a
l
S
o
u
r
c
e
o
f
F
u
n
d
s
3
,
0
9
7
,
6
1
6
$
3,
2
2
3
,
6
8
2
$
1,
3
4
0
,
5
2
2
$
2,
4
2
3
,
6
1
5
$
3,
3
4
5
,
4
0
9
$
2,
4
1
3
,
4
8
0
$
1,
8
6
8
,
6
4
1
$
2,
1
1
6
,
8
1
1
$
2,
1
1
1
,
7
5
8
$
2,
1
6
9
,
7
4
9
$
2,370,453 $ 2,457,071 $ 22,617,509 $
Ch
a
n
g
e
i
n
F
u
n
d
B
a
l
a
n
c
e
88
6
,
7
6
4
$
54
4
,
0
8
5
$
(2
,
0
8
6
,
5
6
0
)
$
(6
6
0
,
3
3
5
)
$
15
3
,
5
5
5
$
25
8
,
0
4
6
$
(9
1
,
5
0
3
)
$
(2
5
2
,
6
2
0
)
$
39
9
,
5
3
4
$
35
,
1
8
7
$
(669,068)$ 580,958 $ (2,332,806)$
Be
g
i
n
n
i
n
g
F
u
n
d
B
a
l
a
n
c
e
2,
4
2
3
,
2
4
7
$
2,
4
2
3
,
2
4
7
$
2,
9
6
7
,
3
3
2
$
88
0
,
7
7
2
$
22
0
,
4
3
7
$
37
3
,
9
9
2
$
63
2
,
0
3
8
$
54
0
,
5
3
6
$
28
7
,
9
1
5
$
68
7
,
4
5
0
$
722,637 $ 53,569 $
En
d
i
n
g
F
u
n
d
B
a
l
a
n
c
e
3,
3
1
0
,
0
1
1
$
2,
9
6
7
,
3
3
2
$
88
0
,
7
7
2
$
22
0
,
4
3
7
$
37
3
,
9
9
2
$
63
2
,
0
3
8
$
54
0
,
5
3
6
$
28
7
,
9
1
5
$
68
7
,
4
5
0
$
72
2
,
6
3
7
$
53,569 $ 634,526 $
*V
e
h
i
c
l
e
s
a
n
d
m
a
j
o
r
e
q
u
i
p
m
e
n
t
p
u
r
c
h
a
s
e
s
Do
e
s
n
o
t
i
n
c
l
u
d
e
v
e
h
i
c
l
e
s
f
o
r
:
En
g
i
n
e
e
r
i
n
g
,
O
p
e
r
a
t
i
o
n
s
&
M
a
i
n
t
,
E
n
v
i
r
o
n
m
e
n
t
a
l
R
e
s
o
u
r
c
e
s
,
U
t
i
l
i
t
y
F
u
n
d
s
54
C
I
T
Y
O
F
L
A
K
E
V
I
L
L
E
Co
u
n
c
i
l
M
e
e
t
i
n
g
0
1
.
0
4
.
2
0
1
6
S
T
R
E
E
T
R
E
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
Total
Co
l
l
e
c
t
o
r
R
o
a
d
R
e
c
o
n
s
t
r
u
c
t
i
o
n
:
Hi
g
h
v
i
e
w
A
v
e
n
u
e
:
C
R
7
0
-
S
.
C
i
t
y
L
i
m
i
t
41
6
,
6
9
9
$
-
$
-
$
-
$
-
$
416,699 $
Ke
n
r
i
c
k
A
v
e
:
N
.
C
i
t
y
L
i
m
i
t
-
1
7
3
r
d
-
2,
2
3
4
,
0
4
5
-
-
-
2,234,045
Ho
l
y
o
k
e
A
v
e
:
2
1
5
t
h
-
H
e
r
i
t
a
g
e
D
r
-
1,
1
5
2
,
4
4
1
-
-
-
1,152,441
Ho
l
y
o
k
e
A
v
e
/
2
1
0
t
h
I
n
t
e
r
s
e
c
t
i
o
n
-
81
,
0
0
0
-
-
-
81,000
Ip
a
v
a
A
v
e
;
1
8
5
t
h
-
K
e
n
w
o
o
d
T
r
-
-
1
,
4
0
5
,
3
6
6
-
-
1,405,366
17
2
n
d
S
t
.
K
e
n
y
o
n
A
v
e
-
K
o
d
i
a
k
A
v
e
-
-
-
70
1
,
7
3
1
-
701,731
Kl
a
m
a
t
h
T
r
L
S
.
C
R
5
-
N
.
C
R
5
-
-
-
1
,
5
3
4
,
1
0
3
-
1,534,103
Ko
d
i
a
k
/
1
7
5
t
h
S
t
r
e
e
t
-
-
-
79
6
,
5
2
5
-
796,525
Ju
d
i
c
i
a
l
/
1
6
8
t
h
S
t
r
e
e
t
-
-
-
74
4
,
0
4
4
-
744,044
He
r
i
t
a
g
e
D
r
/
I
b
e
r
i
a
A
v
e
-
-
-
46
2
,
9
8
3
-
462,983
Hi
g
h
v
i
e
w
A
v
e
:
C
R
4
6
-
1
7
5
t
h
-
-
-
-
1
,
1
0
9
,
8
8
8
1,109,888
St
r
e
e
t
R
e
c
o
n
s
t
r
u
c
t
i
o
n
(
T
a
x
P
o
r
t
i
o
n
)
5,
9
8
5
,
3
0
0
4,
8
8
1
,
6
2
0
4,
8
0
8
,
9
8
6
4,
4
3
9
,
0
0
9
5,
8
7
0
,
4
6
7
25,985,382
Ip
a
v
a
A
v
e
/
1
6
t
h
S
t
r
e
e
t
I
n
t
e
r
s
e
c
t
i
o
n
-
-
-
13
0
,
0
0
0
62
0
,
0
0
0
750,000
20
2
n
d
S
t
r
e
e
t
/
H
a
m
b
u
r
g
A
v
e
I
n
t
e
r
s
e
c
t
i
o
n
20
0
,
0
0
0
70
0
,
0
0
0
75
0
,
0
0
0
-
-
1,650,000
6,
6
0
1
,
9
9
9
$
9,
0
4
9
,
1
0
6
$
6,
9
6
4
,
3
5
2
$
8,
8
0
8
,
3
9
5
$
7,
6
0
0
,
3
5
5
$
39,024,207 $
55
CITY OF LAKEVILLE
PLANNING COMMISSION MEETING MINUTES
December 3, 2015
Chair Swenson called the meeting to order at 6:00 p.m. in the Council Chambers at City
Hall. The pledge of allegiance to the flag was given.
Members Present: Chair Jason Swenson, Vice Chair Linda Maguire, Brooks Lillehei,
Scott Einck, Paul Reuvers, Pat Kaluza, Karl Drotning, Ex-officio member Nic Stevens
Members Absent: None
Others Present: Daryl Morey, Planning Director, Kris Jenson, Associate Planner; Zach
Johnson, City Engineer; and Penny Brevig, Recording Secretary
3. Approval of the Meeting Minutes
The November 19, 2015 Planning Commission meeting minutes were approved as
presented.
4. Announcements
Mr. Morey stated that the December 17th Planning Commission will be cancelled due
to lack of agenda items. The next regular meeting is scheduled for January 7, 2016.
5. Simply Self Storage
Chair Swenson opened the public hearing to consider the application of O. B.
Management Services, Inc. for a Conditional Use Permit (CUP) to allow a self-
storage facility in the O-P, Office Park District.
Jared Farmer from Farmer Development, representing O. B. Management and
Simply Self Storage, presented a brief overview of their project.
Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated
O.B. Management Services, Inc. is requesting a CUP for a self-storage facility in the
former Train America building at 9913 – 214th Street. The proposed storage
business is Simply Self Storage, which is a national self-storage business with
locations in 18 states.
Ms. Jenson stated that the building has just over 100,000 square feet of floor area.
Nearly 17,000 square feet of that is occupied by three tenant spaces, one on the first
floor and two tenant spaces on the second floor. The area not currently occupied by
the existing tenants will be remodeled to include storage units in a variety of sizes.
Ms. Jenson explained that some parking spaces will be removed to accommodate
the addition to the building and still meet the impervious surface maximum allowed
Planning Commission Meeting Minutes, December 3, 2015 Page 2
by the CUP approved in 2006. She stated the parking on the site will exceed Zoning
Ordinance parking requirements for the existing and proposed uses.
Ms. Jenson explained the building modifications which are described in detail in the
November 24, 2015 planning report. Because the building was originally designed
for sports and athletic uses, there is only a second floor in a portion of the building.
The structure will be modified to add a second floor to accommodate additional
storage units.
Ms. Jenson stated that Planning Department staff recommends approval of the
CUP, subject to the three stipulations listed in the November 24, 2015 planning
report.
Chair Swenson opened the hearing to the public for comment.
There were no comments from the audience.
Motion was made by Reuvers, seconded by Drotning to close the public
hearing at 6:06 p.m.
Ayes: Lillehei, Einck, Maguire, Swenson, Reuvers, Kaluza, Drotning
Nays: 0
Chair Swenson asked for comments from the Planning Commission. The Planning
Commission felt this was a good re-use of an existing building.
Motion was made by Maguire, seconded by Lillehei to recommend to City
Council approval of the Simply Self Storage Conditional Use Permit to allow a self-
storage facility in the O-P, Office Park District subject to the following stipulations,
and adopt the Findings of Fact dated December 3, 2015:
1. The site plan and building shall be developed in accordance with the plans
approved by the City Council.
2. A building permit is required prior to commencing construction.
3. Signs shown on the colored elevation plans are illustrative and any new signs
proposed for the building or site will require a sign permit to be issued by the
Planning Department.
Ayes: Einck, Maguire, Swenson, Reuvers, Kaluza, Drotning, Lillehei
Nays: 0
6. City of Lakeville
Chair Swenson opened the public hearing to consider the request of the City of
Lakeville for the adoption of the 2016-2020 Capital Improvement Plan (CIP).
City Engineer Zach Johnson presented the 2016-2020 CIP. Mr. Johnson reviewed
the objectives of the CIP and indicated that the CIP includes future transportation,
Planning Commission Meeting Minutes, December 3, 2015 Page 3
utility, parks and recreation, facilities and equipment improvements for the years
2016-2020.
The City Council has reviewed plans for the North Creek Greenway Trail and, due to
the increased project costs and delays in acquiring the needed easements, this
project will be postponed until time of development in the area. The final CIP
document will reflect the deletion of this project.
Mr. Johnson highlighted three of the more noticeable projects for 2016 which include
the Dodd Boulevard reconstruction project scheduled for 2016, the County Road 50
reconstruction project between County Road 60 and Dodd Boulevard starting in
2017, and the 172nd Street realignment project planned for 2016.
Mr. Johnson stated that staff has reviewed the 2016-2020 CIP and finds it to be
consistent with the Comprehensive Plan and therefore recommends approval as
presented.
Chair Swenson opened the hearing to the public for comment.
There were no comments from the audience.
Motion was made by Kaluza, seconded by Maguire to close the public hearing
at 6:14 p.m.
Ayes: Maguire, Swenson, Reuvers, Kaluza, Drotning, Lillehei, Einck
Nays: 0
Chair Swenson asked for comments from the Planning Commission. Discussion
points included:
Commissioner Drotning asked for an explanation of the 172nd Street
realignment project. Mr. Johnson explained that the intersection of 172nd
Street and County Road 5 would be eliminated and realigned with Kenyon
Avenue just south of HOM Furniture. Utilities will be extended to the
northwest quadrant of the new intersection.
Commissioner Drotning commented on the pressure that the Met Council is
putting on cities to provide affordable housing. Mr. Johnson commented that
the 172nd Street realignment project is unique in that the City will be
partnering with the County, property owners, and perspective developers.
Chair Swenson commented that having been on the Planning Commission for
two years now, it is nice to see the transportation improvement projects
scheduled for completion in the next five years.
Motion was made by Drotning, seconded by Reuvers to recommend to City
Council adoption of the 2016-2020 Capital Improvement Plan as presented, which is
consistent with the Comprehensive Plan.
Ayes: Swenson, Reuvers, Kaluza, Drotning, Lillehei, Einck, Maguire
Nays: 0
Planning Commission Meeting Minutes, December 3, 2015 Page 4
There being no further business, the meeting was adjourned at 6:20 p.m.
Respectfully submitted,
Penny Brevig, Recording Secretary