March 21, 2016 Item No. ______
INTERSTATE FIRST ADDITION FINAL PLAT
PROPOSED ACTION
Staff recommends adoption of the following motion: Move to approve: a) a resolution approving the final
plat of Interstate First Addition, b) the vacation of a drainage and utility easement, and c) approval of the
stormwater management agreement.
OVERVIEW
Interstate Properties LLC is the owner of property at the southeast corner of 215th Street and Holyoke
Avenue and is proposing to develop the property for an office and truck repair and maintenance facility.
Interstate Companies is a provider of support, repair services and parts inventories for the trucking, mining
and excavation industry and has facilities located in several Midwestern and Western states. The City
Council approved the preliminary plat and conditional use permit for Interstate First Addition on
November 16, 2015 and is now requested to consider the final plat as well as the vacation of a drainage
and utility easement as recommended by the Planning Commission.
The Planning Commission held a public hearing to consider the preliminary plat, conditional use permit,
and drainage and utility easement vacation at their November 5, 2015 meeting. There was no public
comment.
At the developer’s request, the City Council held a work session on January 26, 2016 and agreed to allow
the future 215th Street (CSAH 70) cash escrow for future upgrade to be postponed until the CSAH 70
improvements are planned, at which time the cost would be assessed to the subject property.
PRIMARY ISSUES TO CONSIDER
Why did grading commence on the property prior to approval of the final plat? The developer requested
and received City approval to commence grading of the site in fall 2015 following City Council approval of the
preliminary plat and staff approval of a grading permit. The developer submitted a financial security as
required by the grading permit.
SUPPORTING INFORMATION
◊ Resolution approving the final plat
◊ Resolution approving the drainage and utility easement vacation
◊ Signed development contract
◊ Signed stormwater management agreement
◊ November 5, 2015 Planning Commission meeting minutes
◊ October 30, 2015 planning and engineering reports
Financial Impact: $ None Budgeted: Y☐ N☒ Source: ________________________________
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances_________________________________
Envision Lakeville Community Values: Diversified Economic Development_______________________________
Report Completed by: Frank Dempsey, Associate Planner____________________________________________
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
RESOLUTION NO. 16-____
RESOLUTION APPROVING THE FINAL PLAT
OF INTERSTATE FIRST ADDITION
WHEREAS, the owner of the property described as INTERSTATE FIRST
ADDITION has requested final plat approval; and
WHEREAS, the City Council approved the preliminary plat on November 16, 2015;
and
WHEREAS, the final plat is acceptable to the City.
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
1. The INTERSTATE FIRST ADDITION final plat is approved subject to the
developer’s execution of the development contract and security
requirements.
2. The Mayor and City Clerk are hereby authorized to sign the development
contract, stormwater management agreement, and the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 21st day of March, 2016
CITY OF LAKEVILLE
Matt Little, Mayor
ATTEST:
_______________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _________is a true and correct copy
of the resolution presented to and adopted by the City Council of the City of Lakeville
at a duly authorized meeting thereof held on the 21st day of March 2016 as shown by
the minutes of said meeting in my possession.
__________________________
Charlene Friedges
City Clerk
(SEAL)
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
1
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 16-___
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the Planning Commission has conducted a public hearing on November 5,
2015, preceded by two (2) weeks published notice, to consider the vacation of the following
described public drainage and utility easement; and
WHEREAS, the City Council has determined that it is in the public interest to vacate said
public drainage and utility easement.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easement is hereby vacated, subject to the
recording of the Interstate First Addition final plat:
The 10 foot wide public drainage and utility easement adjoining the northerly line of
Lot 1, Block 1 Grenada Business Park, Dakota County, Minnesota, according to the
recorded plat thereof. EXCEPT the west 15 feet thereof, and EXCEPT the easterly 20
feet that adjoins the public right-of-way of Grenada Avenue.
And also,
The public drainage and utility easement within Outlot B, Grenada Business Park,
Dakota County, Minnesota, according to the recorded plat thereof.
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 21st day of March 2016
CITY OF LAKEVILLE
BY:________________________
Matt Little, Mayor
2
ATTEST:
BY:________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. 16-______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 21st day of March, 2016 as shown by the minutes of
said meeting in my possession.
__________________________
Charlene Friedges
City Clerk
Seal
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
City of Lakeville
Planning Department
Memorandum
To Planning Commission
From: Frank Dempsey, AICP, Associate Planner
Date: October 30, 2015
Subject: Packet Material for the November 5, 2015 Planning Commission Meeting
Agenda
Item: Preliminary and Final Plat of Interstate First Addition, Conditional Use Permit
and Easement Vacation
Application
Action Deadline: Preliminary and Final Plat (January 29, 2016) – Conditional Use Permit
(December 1, 2015)
BACKGROUND
Representatives of Lakeville Properties LLC have submitted applications and plans for a
preliminary and final plat, conditional use permit and easement vacation for Interstate First
Addition located at the southeast quadrant of 215th Street (CSAH 70) and Highview Avenue.
The property is currently platted as Outlot B, Acorn Tappe First Addition totaling 14.3 acres.
The project is proposed in conjunction with plans for an 81,708 square foot office, truck
repair, storage and limited retail use with a 9,982 square foot accessory storage building. The
conditional use permit is required to allow the limited retail sales in the building. The
easement vacation is required to clear the property title from the public drainage and utility
easements dedicated with the Acorn Tappe First Addition final plat.
Interstate Properties LLC is the property ownership of Interstate Companies, Inc. which is a
provider of repair services and parts inventories for the trucking industry. The company is
located in several Midwestern and Western states. The Twin Cities branch of the company is
currently located in Bloomington and is proposing to relocate to Lakeville. Interstate
Properties LLC will employ approximately 100 employees. Additional company information is
available at www.istate.com.
2
The Interstate First Addition plans have been reviewed by Planning Department and
Engineering Division staff, Parks and Recreation Department staff and will be reviewed by the
Parks, Recreation and Natural Resources Committee.
The following exhibits are attached for your information:
EXHIBITS
A. Zoning Map
B. Aerial Photo Location Map
C. Preliminary Plat and Easement Vacation Exhibit
D. Final Plat
E. Survey
F. Civil Site Plan
G. Architectural Site Plan
H. Grading, Drainage and Utility Plan
I. Erosion Control Plan
J. Building Floor Plan (2 Pages)
K. Building Elevation Plan and Rendering (2 Pages)
L. Accessory Storage Building Plan
M. Site Lighting Plan
Zoning and Surrounding Uses. The subject property is zoned I-2, General Industrial District.
The proposed preliminary and final plat abuts the following existing land uses:
Direction Existing Use Zoning Map Land Use Plan
North 215th Street (CSAH 70) and Industrial
buildings
I-1 and I-2 Industrial
District
Industrial
South Wausau Supply Warehouse building I-2, General Industrial
District
Industrial
East Undeveloped property owned by
Lakeville Properties LLC
I-2, General Industrial
District
Industrial
West Highview Avenue and Boise Cascade
building
I-2, General Industrial
District
Industrial
STAFF ANALYSIS
PRELIMINARY AND FINAL PLAT
The proposed preliminary and final plat totals 14.3 acres. The 5.0 acre property to the east is
also owned by the developer as possible future expansion area and was platted as Lot 1,
Block 1, Acorn Tappe First Addition. That property is not included in the preliminary and final
plat or site development plans at this time. The subject property includes a 20 foot wide
3
private rail easement along the south side of the property boundary. There are no rail service
facilities in place on the property and the property owner has indicated that none are
proposed with the development of the property.
Zoning. The property is zoned I-2, General Industrial District. The proposed servicing of
motor freight vehicles and accessory parts sales is a permitted use of the property. The
proposed retail sales of truck parts requires a conditional use permit in the I-2 District under
the condition that the retail use is allowed in the C-1, Neighborhood Commercial District and
does not constitute more than 30% of the building area or 50% of the gross floor area of the
property. The retail sale of motor vehicle parts is a permitted use in the C-1 District. Refer to
the Conditional Use Permit discussion later in this report.
Comprehensive Plan. The Comprehensive Plan guides the property for industrial land use
consistent with the proposed use of the property.
Lots/Blocks. There is one lot and one block in the Interstate First Addition preliminary and
final plat. The preliminary and final plat is subject to the following minimum I-2 District
requirements:
Lot Area – 30,000 square feet
Lot Width – 100 feet
The preliminary and final plat of Interstate First Addition meets the minimum lot area and lot
width requirements.
Outlot. No outlots are proposed with the Interstate First Addition preliminary and final plat.
Streets. The preliminary and final plat abuts 215th Street (CSAH 70) and Highview Avenue. All
required right of way was dedicated with the approval of the Acorn Tappe First Addition plat.
No additional right-of-way is required.
The Dakota County Plat Commission reviewed the Interstate First Addition preliminary and
final plat at their October 19, 2015 meeting. The Plat Commission tabled a recommendation
until their November 2, 2015 meeting to allow additional time to study the future road needs
and possible future access locations along the 215th Street (CSAH 70) corridor in this area.
Staff will inform the Planning Commission of the Plat Commission’s recommendation at the
public hearing on November 5, 2015.
Access. Street access will be provided from two driveways located off of Highview Avenue
abutting the west side of the property. As owner of the 5.0 acre property to the east, the
developer also has potential driveway access from 215th Street if that access is needed in the
future. The initial phase will not include access to 215th Street. All driveway locations and
widths meet Zoning Ordinance requirements.
4
Park and Trails. Outlot B, Acorn Tappe First Addition did not pay park dedication fees at the
time of final plat approval in 1999. According to project records for the Acorn Tappe First
Addition final plat, the parent parcel had previously paid park dedication.
The Parks, Trails and Open Space Plan identifies a future bituminous trail along the south side
of 215th Street adjacent to the plat. The trail is likely to be constructed at the time Dakota
County upgrades 215th Street sometime in the future. The upgrade of 215th Street is not in
either the City’s or County’s Five Year Capital Improvement Plans.
The Parks, Recreation and Natural Resources Committee will review the preliminary and final
plat at their November 4, 2015 meeting. Their recommendation will be forwarded to the
Planning Commission at the public hearing.
Grading, Drainage, Erosion Control, and Utilities. City sewer and water is currently
available to the site. All public utilities will be constructed by the developer to serve the
proposed preliminary and final plat. The existing City sanitary sewer and water systems that
serve the area are adequate to accommodate the proposed industrial building and related
facilities within the development. On-site storm sewer improvements will be constructed
with the preliminary and final plat to accommodate the proposed property improvements.
The stormwater design and the grading and drainage plan is currently being reviewed and
may likely have to be amended prior to City Council consideration of the preliminary and final
plat. The amendments may affect the site plan and truck parking areas. Staff recommends
that the grading and drainage plan be approved by staff prior to the issuance of a grading
permit or City Council’s consideration of the preliminary or final plat.
Grading, drainage, erosion control, and utility details are addressed in the engineering report
dated October 30, 2015. A copy of the engineering report is attached for your review. The
Engineering Department recommends approval of the Interstate First Addition preliminary
and final plat.
Tree Preservation. There are no significant trees located within the proposed Interstate First
Addition preliminary and final plat.
Wetlands. There are no wetlands within the Interstate First Addition preliminary and final
plat.
Easement Vacation
A 10 foot wide platted drainage and utility easement is located along the south side of Outlot
B. The proposed final plat of Interstate First Addition will include new boundary drainage and
utility easements. All utility companies have been sent the public hearing notice for the
proposed easement vacation. No opposition was expressed by the utility companies for the
proposed easement vacation.
5
Conditional Use Permit (Retail Sales)
Section 11-87-7(A) of the Zoning Ordinance allows accessory retail sales in the I-2 District
provided that:
1. Such use is allowed as a permitted use in a C-1 district.
Motor vehicle parts sales is a permitted use in the C-1, Neighborhood Commercial District.
2. Such use does not constitute more than thirty percent (30%) of the lot area and not
more than fifty percent (50%) of the gross floor area of the principal use.
Retail sales area totals 3.4% of the gross floor area of the principal building and .04% of the
property.
The accessory enclosed retail sales in the building shall not exceed 30% of the gross floor
area of the principal building and shall remain accessory to the motor freight vehicle
repair use of the property.
SITE PLAN ANALYSIS
Setbacks. The Interstate First Addition preliminary and final plat is subject to the following
minimum building setbacks in the I-2 District:
Front Yard: 40 feet
Rear Yard: 30 feet
Side Yards:
30 feet (north)
10 feet (south)
Parking: 15 feet (abutting street), 5 feet (interior lot lines)
The proposed buildings meet all setback requirements. No part of the principal building is
located closer than 150 feet to any property line. Proposed parking areas also meet setback
requirements.
Parking. The proposed 81,708 square foot principal building will include office, repair service,
storage and retail areas. The building will require a total of 159 parking spaces based on the
square footage of each use of the building. A total of 175 parking spaces are proposed. Parking
requirements are based on the following formula:
Required and Proposed Parking
Total Building Area (including accessory storage building) is 91,690 square feet
6
Office: 14,537 sf – 10% / 200 = 66 spaces
Repair/Service/Sales: 40,409 – 1000 / 800 + 8 = 57 spaces
Storage: 35,237 sf – 10% = /1,000 = 36 spaces
Parking Required 159 spaces
Parking Proposed 186 spaces
The proposed parking lot design, spaces and drive aisle dimensions and configurations meet
the requirements of the Zoning Ordinance. Parking calculations were determined upon
submittal of the detailed floor plan with square footage calculations (Exhibit J). The
architectural site plan must be amended to reflect the required number of parking spaces.
Parking aisles will be 24 feet in width and parking stall dimensions will be 9 feet in width and
18 feet in length.
Section 11-87-3(M) of the Zoning Ordinance lists the performance standards for the servicing
of motor freight vehicles as follows:
Servicing of motor freight vehicles and heavy construction equipment; directly related
accessory materials and parts sales for such repair and servicing (not including new or
used vehicle sales); and accessory materials and parts warehousing which is related to and
dependent upon such uses, provided that:
1. All servicing of vehicles and equipment shall occur entirely within the principal
structure;
2. To the extent required by state law and regulations, painting shall be conducted in
an approved paint booth, which thoroughly controls the emission of fumes, dust, or
other particulate matter;
3. Storage and use of all flammable materials, including liquids and rags, shall conform
with applicable provisions of the Minnesota uniform fire code;
4. Parking, driveway, and circulation standards and requirements shall be subject to
the review and approval of the city engineer and shall be based upon the specific
needs of the operation and shall accommodate large vehicle equipment and
semitrailer/tractor trucks;
5. The storage of damaged vehicles and vehicle parts and accessory equipment must
be completely inside a principal or accessory building; and
6. The sale of products other than those specifically mentioned in this subsection M
shall be subject to a separate conditional use permit and shall be in compliance with
section 11-87-7 of this chapter.
Circulation. The driveways and interior layout provides adequate width and turning radii to
accommodate truck turning movements and emergency vehicle access. The parking aisle
and stall sizes and dimensions meet Zoning Ordinance requirements.
7
Landscaping/Screening. A total of 21 trees and 13 shrubs are proposed to be planted with
the development of the proposed site plan. The landscaped areas along the 215th Street
frontage abutting 215th Street directly opposite the dock/overhead doors and semi- trailer
parking area does not provide adequate screening due to the proposed wide spacing and
species of trees proposed. Staff recommends that the landscape plan be modified to increase
screening with staggered rows of conifer trees spaced not more than 20 feet apart to
maximize screening. A $20,000 escrow shall be submitted as security to guarantee
installation of the landscaping.
Principal Building Exterior. The proposed principal building will be constructed of
prefinished metal walls on 44% of the north elevation of the building facing 215th Street with
the remaining area containing prefinished concrete decorative panels and glass windows.
The west building elevation facing Highview Avenue will be not more than 38% prefinished
metal wall panels with decorative pre-cast wall panels and glass. The east and south building
elevations will include up to 65% (east wall) and 46% (south) constructed of prefinished metal
wall panels with prefinished concrete panels. The proposed exterior materials meet Zoning
Ordinance requirements for buildings in the I-2 District. Prefinished concrete panels shall be
integral colored and shall not be painted.
Accessory Building Exterior. The 9,669 square foot detached cold storage accessory
building will be located near the southeast corner of the property. The building will be
constructed of decorated precast concrete panels on at least 50% of the north and west faces
as required by the Zoning Ordinance for buildings that face public right of way. The
remainder of the building will be constructed of prefinished metal walls with a prefinished
metal roof.
Exterior Lighting. A photometric lighting plan has been submitted showing a total of 30
light fixtures throughout the site. Building wall mounted lights are proposed on all sides of
the building. Wall fixtures and pole fixtures must be down-cast type fixtures that do not send
light source glare onto street right of way or over the property line. The lighting plan shows
that the light intensity at the property line does not exceed one foot candle as required by the
Zoning Ordinance.
Snow Storage. Snow storage may not take place within required parking spaces.
RECOMMENDATION
Planning Department staff recommends approval of the Interstate First Addition preliminary
and final plat, conditional use permit and easement vacation subject to the stipulations listed
below:
1. Implementation of the recommendations listed in the October 30, 2015, engineering
report.
8
2. The grading and drainage plan be approved by staff prior to the issuance of a grading
permit or City Council consideration of the preliminary or final plat.
3. The Interstate First Addition shall be developed consistent with the plans approved by
the City Council.
4. Accessory enclosed retail sales in the building shall not exceed 30% of the gross floor
area of the principal building and shall remain accessory to the motor freight vehicle
repair use of the property.
5. The landscape plan shall be modified to increase screening with staggered rows of
eight foot tall conifer trees spaced not more than 20 feet apart.
6. A $20,000 security escrow shall be submitted to guarantee installation of the
landscaping identified on the approved landscape plan. All plant materials shall be set
back at least 3 feet from all property lines, including street right-of-way lines. All areas
not planted with trees shall be planted with sod, grass seed and mulch or other
suitable ground cover. All landscaping shall be maintained and any dead materials
removed and replaced as needed.
7. An on-site stormwater management agreement shall be entered into between the
developer and the City. The maintenance agreement shall be drafted by the City
Attorney, signed by the developer and approved by the City Council.
8. Prefinished concrete panels shall be integral colored or exposed aggregate only and
shall not be painted.
9. Snow storage cannot take place in required parking spaces.
10. Exterior lighting fixtures shall be in compliance with Zoning Ordinance requirements
and shall not glare onto public right-of-way.
cc: David Olson, Community and Economic Development Director
Jack Matasosky, APPRO Development
Travis Penrod, Interstate Systems
Interstate First Addition
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Matt Decur, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Interim Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Dave Olson, Community and Economic Development Director
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: October 30, 2015
Subject: Interstate First Addition
• Preliminary Plat Review
• Final Plat Review
• Final Grading and Erosion Control Plan Review
• Final Utility Plan Review
• Final Tree Preservation Plan Review
• Easement Vacation Review
• Site Plan Review
BBAACCKKGGRROOUUNNDD
Interstate Lakeville Property LLC has submitted a preliminary and final plat named Interstate
First Addition. The proposed subdivision is located east of and adjacent to Highview Avenue,
and south of and adjacent to 215th Street (CSAH 70). The parent parcel consists of Outlot B,
Acorn Tappe First Addition (PID No. 221037500020). Outlot B, Acorn Tappe First Addition is
zoned I-2 General Industrial District.
The final plat consists of one (1) industrial lot within one (1) block and no outlots on 14.3
acres. The proposed development will be completed by:
Developer: Appro Development
Engineer/Surveyor: Jacobson Engineering & Surveyors
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 22 OOFF 88
SSIITTEE CCOONNDDIITTIIOONNSS
The Interstate First Addition site consists of undeveloped agricultural land. The property
generally slopes west to east. There are no wetlands or trees on the property.
EEAASSEEMMEENNTTSS
The parent parcel contains the following existing private easements that will remain:
• Private Transmission Line Easement, per Doc. 1662419
• Private Rail Spur Easement, per Doc 1881670
The parent parcel contains the following existing public easements to be vacated:
• Drainage and Utility Easements, in favor of the City of Lakeville, per the plat of Acorn
Tappe 1st Addition.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
215th Street (CSAH 70)
Interstate First Addition is located south of and adjacent to 215th Street, an arterial County
highway, as identified in the City’s Transportation Plan. 215th Street adjacent to the site is a
two-lane undivided rural roadway. The current Dakota County Plat Review Needs Map
designates 215th Street as a four-lane divided urban roadway over its entire length adjacent to
the plat with a half right-of-way requirement of 75-feet. The necessary right-of-way was
dedicated with the Airlake Development 3rd Addition plat. Interstate First Addition will be
reviewed by the Dakota County Plat Commission at its November 2, 2015 meeting.
A Cash Escrow for Future Upgrading of an Adjacent Street shall be collected for future
improvements to 215th Street. The Cash Escrow for Future Upgrading is calculated as follows:
991.65 f.f. x $160.00/front foot = $158,664.00
Front Footage along
215th Street
Future Upgrade Fee
Total
Highview Avenue
Interstate First Addition is located east of and adjacent to Highview
Avenue, a minor collector as identified in the City’s Transportation Plan. Highview Avenue
adjacent to the site is a two-lane undivided rural roadway. Right-of-way was dedicated with
the Airlake Development 3rd Addition plat.
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 33 OOFF 88
SSIITTEE PPLLAANN
Interstate proposes to construct a 81,708 square foot building to house office, warehouse,
sales, and service operations; and a 9,982 square foot cold storage building.
Parking will be provided for 186 vehicles, including 8 handicapped accessible spaces, at the
sales and office entries to the building. Parking spaces are properly sized and 24’ drive lanes
provide access and circulation.
Parking will be provided for 78 tractor trailers on the south and east side of the property, near
the service bays and docks. These stalls include 10-foot wide concrete dolly pads.
The parking lot is adequately sized to allow truck circulation into and out of the site, parking
stalls, and service bays. Two driveway accesses to Highview Avenue will service the site.
Driveways are proposed at 46-feet and 70-feet wide to allow ingress and egress of trucks. The
driveways proposed align with driveways directly across Highview Avenue to the west. Street
lights will be constructed on Highview Avenue at each of the driveways.
The landscaping plan provides for several types of trees and bushes in landcaped areas
around the building and parking lot. Landcaping areas around the main building will be
sodded and irrigated. Areas outside the parking lot, including stormwater basins, will be
seeded. All ponding and infiltration areas will be seeded with a native seed mix and will be
maintained by the property owner.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
Highview Avenue in the location of the proposed north driveway to the site.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Parks, Trails, and Open Space Plan indicates a Transportation Corridor along 215th Street
(CSAH 70). A trail will be constructed along both sides of 215th Street with future upgrades. A
fee shall be collected for the developer’s 5/8 share of costs for construction of this trail. The
fee is calculated as follows:
$16,428.00 x 5/8 = $10,267.50
Engineer’s Estimated Cost
Future 215th Street Trail
Developer’s Share of Trail Cost
Total
The Park Dedication requirement was previously collected on the parent parcel.
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 44 OOFF 88
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Interstate First Addition is located within subdistrict SC-10235 of the South Creek sanitary
sewer district, as identified in the City’s Comprehensive Sewer Plan.
Private sanitary sewer will be extended from the existing service stub within 215th Street
(CSAH 70) to provide sewer service to the development. A $3,000.00 security will be collected
to ensure proper connection to the existing service stub.
Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the
Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to
serve the proposed subdivision.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and must
be paid with the building permit.
WWAATTEERRMMAAIINN
Development of Interstate First Addition includes new connections to existing public
watermain in Highview Avenue and a connection to an existing service stub in 215th Street.
Private watermain will be extended within the development to provide water service to the
subdivision.
New connections to the watermain will require removal and restoration of Highview Avenue.
A $10,500.00 security will be collected to ensure proper connection to the watermain and
restoration of Highview Avenue.
The Lateral Watermain Access Charge was assessed to the parent parcel.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are overhead lines adjacent to the property along 215th Street (CSAH 70). These
transmission lines are exempt from the City’s Public Ways ordinance requiring burial of
overhead lines.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Interstate First Addition is located within subdistrict SC-14 of the South Creek stormwater
district as identified in the City’s Water Resources Management Plan. The Water Resources
Management Plan does not indicate any trunk storm sewer or regional stormwater facilities
within the Interstate First Addition Plat.
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 55 OOFF 88
Development of Interstate First Addition includes construction of private stormwater
management basins to collect and treat the stormwater runoff generated from the site. The
basins will provide water quality treatment and rate control of the stormwater runoff
generated from the subdivision. The stormwater management basins will be located within
Lot 1, Block 1, Interstate First Addition. The stormwater management basin designs are being
reviewed by City staff and by Barr Engineering. Grading permits will not be issued for the site
until stormwater basin designs are consistent with City requirements. A maintenance
agreement will be required at the time of final platting for the private stormwater basins and
any storm sewer facilities draining to the basins.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Interstate First Addition contains more than one acre of site disturbance. A National Pollution
Discharge Elimination System General Stormwater Permit for construction activity is required
from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed
by grading. A copy of the Notice of Stormwater Permit Coverage has been submitted to the
City.
SSTTOORRMM SSEEWWEERR
Development of Interstate First Addition includes the construction of a private storm sewer
system. Storm sewer will be installed within the development to collect and convey
stormwater runoff to the private stormwater management basins located within Lot 1, Block
1, Interstate First Addition.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel. The Trunk
Storm Sewer Area Charge for Lot 1, Block 1, Interstate First Addition is calculated as follows:
623,345.00 s.f. x $0.250/s.f. = $155,836.25
Area of Lot 1, Block 1, Interstate First Addition Industrial
Area Charge
Total Trunk
Storm Sewer Area Charge
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Interstate First Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the
Federal Emergency Management Agency (FEMA). Based on this designation, there are no
areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 66 OOFF 88
WWEETTLLAANNDDSS
There are no existing wetlands on the site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees are located on the property.
EERROOSSIIOONN CCOONNTTRROOLL
The developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
A native seed mix for the basins must be used and a maintenance schedule for the first 2
years must be included in the plans. This must include mowing 2 to 3 times, 30 days apart
during the first year with the mower deck set about 6-8 inches off the ground. The second
year, the pond areas must be mowed once before weeds set their seeds. This will reduce
weed establishment, and help stimulate the desirable vegetation. This will cut down on
maintenance in the long-term.Additional erosion control measures may be required during
construction as deemed necessary by City staff or the Dakota County Soil and Water District.
Any additional measures required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Interstate First Addition. Construction costs are based upon
estimates submitted by the Developer’s engineer on October 19, 2015.
CONSTRUCTION COSTS
Sanitary Sewer Connection $ 3,000.00
Watermain Connection and Restoration 10,500.00
Storm Sewer and Stormwater Basins 90,000.00
Driveway Construction and Restoration of Highview Ave. 6,000.00
Grading, Erosion Control, and Restoration 45,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 154,500.00
OTHER COSTS
Developer’s Design (6.0%) $ 9,270.00
Developer’s Construction Survey (2.5%) 3,862.50
City’s Legal Expense (0.5%) 772.50
City Construction Observation (7.0%) 10,815.00
Developer’s Record Drawing (0.5%) 772.50
Landscaping/Native Seeding 20,000.00
Street Lights 2,800.00
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 77 OOFF 88
Lot Corners/Iron Monuments 100.00
SUBTOTAL - OTHER COSTS $48,392.50
TOTAL PROJECT SECURITY $ 202,892.50
The street light security totals $2,800 which consists of two (2) mast-arm street lights at
$1,400 each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
614.55 f.f. x $.2277/f.f/qtr. x 4 qtrs. = $559.73
Highview Avenue
Front Footage
Streetlight Operating Fee Total
A cash fee for one-year of surface water management expenses shall be paid at the time of
final plat approval and is calculated as follows:
14.3 acres x 4.2 x $7.00/unit/qtr. x 4 qtrs. = $1,681.68
Total Area,
Interstate First Addition Commercial/Industrial
Utility Factor
Surface Water Management Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
1 unit x $75.00/unit = $75.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $4,635.00.
CASH REQUIREMENTS
Sanitary Sewer Availability Charge to be paid with building permit
Future Upgrade Fee for 215th Street $ 158,664.00
Future Trail Construction along 215th Street 10,267.50
Trunk Storm Sewer Area Charge 155,836.25
Streetlight Operating Fee 559.73
IINNTTEERRSSTTAATTEE FFIIRRSSTT AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
OOCCTTOOBBEERR 3300,, 22001155
PPAAGGEE 88 OOFF 88
Surface Water Management Fee 1,681.68
City Base Map Updating Fee 75.00
City Engineering Administration (3.00%) 4,635.00
TOTAL - CASH REQUIREMENTS $331,719.16
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the preliminary and final plat, grading and erosion
control plan, utility plan, easement vacation, and tree preservation plan for Interstate First
Addition, subject to the requirements and stipulations within this report.