HomeMy WebLinkAbout16-047CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 16-47
RESOLUTION APPROVING THE PRELIMINARY PLAT OF
SPIRIT OF BRANDTJEN FARM 16TH ADDITION
WHEREAS, SBF Development Corp. has requested approval of the preliminary plat of 49 single
family lots and 36 detached townhome lots to be known as Spirit of Brandtjen Farm 161
Addition, legally described as follows:
Outlot D and Outlot E, SPIRIT OF BRANDTJEN FARM COMMERCIAL IST ADDITION,
according to the recorded plat thereof, Dakota County, Minnesota
And
That part of Equestrian Trail, as dedicated per plat of SPIRIT OF BRANDTJEN FARM
COMMERCIAL 1 ST ADDITION, according to the recorded plat thereof, Dakota County, Minnesota,
lying southerly of the easterly extension of the north line of Outlot G, said SPIRIT OF BRANDTJEN
FARM COMMERCIAL 1ST ADDITION
And
Outlot I and Outlot M, SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION,
according to the recorded plat thereof, Dakota County, Minnesota
And
That part of Equestrian Trail, as dedicated per plat of SPIRIT OF BRANDTJEN FARM 14TH
ADDITION, according to the recorded plat thereof, Dakota County, Minnesota, lying northerly of
the following described line:
Commencing at the northeast corner of Lot 1, Block 1, said SPIRIT OF BRANDTJEN FARM 14TH
ADDITION; thence on an assumed bearing of North 88 degrees 48 minutes 20 Seconds East, along
the northerly right of way line of said Equestrian Trail, a distance of 52.00 feet; thence southwesterly
68.12 feet, along the easterly right of way line of said Equestrian Trail, being a non-tangential curve,
concave to the northwest, having a radius of 276.00 feet, a central angle of 14 degrees 08 minutes 32
seconds and a chord bearing of South 05 degrees 52 minutes 36 seconds West to the point of
beginning of the line to be described; thence southwesterly 97.85 feet, along a non-tangential curve,
concave to the southeast, having a radius of 119.66 feet, a central angle of 46 degrees 51 minutes 09
seconds and a chord bearing of South 54 degrees 48 minutes 53 second West to the westerly right of
way line of said Equestrian Trail and said line there terminating.
WHEREAS, the Planning Commission held a public hearing at their April 7, 2016 meeting,
preceded by notice as required by the Subdivision Ordinance; and
WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources
Committee unanimously recommended approval of the preliminary plat; and
WHEREAS, the preliminary plat is acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
The Spirit of Brandtjen Farm 161 Addition preliminary plat is approved subject to the following
conditions:
1. SBF 161 Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated June 20, 2005 and the PUD Development Stage Plan/Preliminary Plat.
2. The single family lots within the SBF 161 Addition preliminary plat are subject to the
requirements established for cottage lots:
Min.
Setbacks
Lot
Width
Front
Side
Rear
House
Garage
Door
Garage
Interior
Corner
House
Garage
Door
Garage
House
Garage
60ft.
1 20ft.
25ft.
15ft.
7ft.
15ft
25ft
15ft
20ft.
loft.
3. The detached townhouse units within the SBF 161 Addition preliminary plat are subject
to the following setback requirements:
Min.
Setbacks
Lot
Width_
Front
Side
Rear
House
GaragDoor
Garage
Bldgs.
Corner
House Garage Garage
Door
House
NA
15ft.
25ft.
15ft.
15ft.
20ft 25ft 15ft
15ft.
4. All street section plans are subject to review and approval of the City Engineer.
5. One side of Equestrian Trail, Street A/Elkhorn Trail, Elmhurst Lane, and Street
B/Engleman Way shall be designated as "No Parking", subject to review and approval of
the City Engineer.
6. The front elevation of the Winthrop series detached townhouse must be revised to
include stone accents.
2
7. Outlot C shall be deeded to the City with the final plat.
8. All grading, drainage and erosion control plans shall be subject to review and approval of
the City Engineer.
9. All utility plans shall be subject to review and approval of the City Engineer.
10. All drainage and utility easements shall be subject to review and approval of the City
Engineer.
11. Park dedication requirements shall be satisfied at the time of final plat approval as a cash
fee in lieu of land based on the formula established by the SBF Master PUD Development
Agreement subject to the recommendations of the Parks, Recreation and Natural
Resources Committee.
12. Homeowners Association documents for SBF 161 Addition shall be submitted with
application for final plat approval, and are subject to review and approval by the City
Attorney.
ADOPTED by the Lakeville City Council this 181 day of April 2016
ATTEST:
Charlene Friedges, City erk
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
3
CITY OF
Matt