Loading...
HomeMy WebLinkAbout16-047CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 16-47 RESOLUTION APPROVING THE PRELIMINARY PLAT OF SPIRIT OF BRANDTJEN FARM 16TH ADDITION WHEREAS, SBF Development Corp. has requested approval of the preliminary plat of 49 single family lots and 36 detached townhome lots to be known as Spirit of Brandtjen Farm 161 Addition, legally described as follows: Outlot D and Outlot E, SPIRIT OF BRANDTJEN FARM COMMERCIAL IST ADDITION, according to the recorded plat thereof, Dakota County, Minnesota And That part of Equestrian Trail, as dedicated per plat of SPIRIT OF BRANDTJEN FARM COMMERCIAL 1 ST ADDITION, according to the recorded plat thereof, Dakota County, Minnesota, lying southerly of the easterly extension of the north line of Outlot G, said SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION And Outlot I and Outlot M, SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION, according to the recorded plat thereof, Dakota County, Minnesota And That part of Equestrian Trail, as dedicated per plat of SPIRIT OF BRANDTJEN FARM 14TH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota, lying northerly of the following described line: Commencing at the northeast corner of Lot 1, Block 1, said SPIRIT OF BRANDTJEN FARM 14TH ADDITION; thence on an assumed bearing of North 88 degrees 48 minutes 20 Seconds East, along the northerly right of way line of said Equestrian Trail, a distance of 52.00 feet; thence southwesterly 68.12 feet, along the easterly right of way line of said Equestrian Trail, being a non-tangential curve, concave to the northwest, having a radius of 276.00 feet, a central angle of 14 degrees 08 minutes 32 seconds and a chord bearing of South 05 degrees 52 minutes 36 seconds West to the point of beginning of the line to be described; thence southwesterly 97.85 feet, along a non-tangential curve, concave to the southeast, having a radius of 119.66 feet, a central angle of 46 degrees 51 minutes 09 seconds and a chord bearing of South 54 degrees 48 minutes 53 second West to the westerly right of way line of said Equestrian Trail and said line there terminating. WHEREAS, the Planning Commission held a public hearing at their April 7, 2016 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources Committee unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: The Spirit of Brandtjen Farm 161 Addition preliminary plat is approved subject to the following conditions: 1. SBF 161 Addition shall be developed consistent with the approved SBF Master Plan, the PUD booklet dated June 20, 2005 and the PUD Development Stage Plan/Preliminary Plat. 2. The single family lots within the SBF 161 Addition preliminary plat are subject to the requirements established for cottage lots: Min. Setbacks Lot Width Front Side Rear House Garage Door Garage Interior Corner House Garage Door Garage House Garage 60ft. 1 20ft. 25ft. 15ft. 7ft. 15ft 25ft 15ft 20ft. loft. 3. The detached townhouse units within the SBF 161 Addition preliminary plat are subject to the following setback requirements: Min. Setbacks Lot Width_ Front Side Rear House GaragDoor Garage Bldgs. Corner House Garage Garage Door House NA 15ft. 25ft. 15ft. 15ft. 20ft 25ft 15ft 15ft. 4. All street section plans are subject to review and approval of the City Engineer. 5. One side of Equestrian Trail, Street A/Elkhorn Trail, Elmhurst Lane, and Street B/Engleman Way shall be designated as "No Parking", subject to review and approval of the City Engineer. 6. The front elevation of the Winthrop series detached townhouse must be revised to include stone accents. 2 7. Outlot C shall be deeded to the City with the final plat. 8. All grading, drainage and erosion control plans shall be subject to review and approval of the City Engineer. 9. All utility plans shall be subject to review and approval of the City Engineer. 10. All drainage and utility easements shall be subject to review and approval of the City Engineer. 11. Park dedication requirements shall be satisfied at the time of final plat approval as a cash fee in lieu of land based on the formula established by the SBF Master PUD Development Agreement subject to the recommendations of the Parks, Recreation and Natural Resources Committee. 12. Homeowners Association documents for SBF 161 Addition shall be submitted with application for final plat approval, and are subject to review and approval by the City Attorney. ADOPTED by the Lakeville City Council this 181 day of April 2016 ATTEST: Charlene Friedges, City erk Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 3 CITY OF Matt