Loading...
HomeMy WebLinkAboutSurvey 16652 Draft Horse*no structures in easements *maintain 6" between bottom of siding and sod The curb box, drain tile cleanout and catch basin (if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date: 04-23-2016 MJD * Planning DepartmentApprovedDate:__________________04/27/2016 dmorey 23 ft