HomeMy WebLinkAboutItem 06.gLakeville
rr.....r..r
=now
June 20, 2016
Item No.
AGREEMENT WITH GAMETIME C/O MINNESOTA -WISCONSIN
PLAYGROUND FOR THE PURCHASE OF PLAYGROUND EQUIPMENT AT
QUAIL MEADOWS PARK
Proposed Action
Staff recommends adoption of the following motion: Move to approve agreement with
GameTime C/O Minnesota -Wisconsin Playground for the purchase of Playground equipment at
Quail Meadows Park.
Overview
The Quail Meadows Park playground was installed as part of a Joint Powers Agreement with
Independent School District #192 (ISB #192) in 1997, which allows for the shared use of the
grounds for recreational purposes. The playground, which is on park property and is in need of
replacement, is used by the neighborhood, athletic associations and North Trail Elementary
school students.
At this time, staff is recommending the Mayor and City Council approve the purchase of the
playground which includes installation, engineered wood fiber material, and some concrete
curbing with GameTime C/O Minnesota -Wisconsin Playground through the U.S. Communities
Government Purchasing Alliance, at a cost of $112,714.10. As per Joint Powers Agreement with
ISD #192, the cost of the playground will be split equally between the City and ISD #192, with
the understanding that ISD #192 will pay 100% of the cost in excess of $100,000. Therefore, the
City will pay $50,000 and ISD #192 will pay $62,714.10 for the playground replacement project.
Primary Issues to Consider
• GameTime C/O Minnesota -Wisconsin Playground is a reputable company that provides
quality playground equipment
Supporting Information
• Agreement
• Quote dated June 9, 2016
Financial Impact: $50,000 Budgeted: Y® N❑ Source: Park Improvement Fund
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Sense of Community and Belonging
Report Completed by: John Hennen, Parks & Recreation Director
AGREEMENT WITH GAMETIME C/O MINNESOTA WISCONSIN PLAYGROUND FOR THE
PURCHASE OF PLAYGROUND EQUIPMENT FOR QUAIL MEADOWS PARK
THIS AGREEMENT made this 2o'" day of June 2026, by and between the CITY OF
LAKEVILLE, hereinafter referred to as the "City", and GAMETIME CIO MINNESOTA
WISCONSIN PLAYGROUND, hereinafter referred to as the "Contractor".
THE CITY AND THE CONTRACTOR, FOR THE CONSIDERATION HEREINAFTER STATED,
AGREE AS FOLLOWS:
I. SCOPE OF SERVICES. The scope of services include providing and installing
playground equipment, engineered wood fiber, and concrete curb at Quail Meadows
Park. The Contractor agrees to perform the services as detailed in the Contract
Documents.
2. CONTRACT DOCUMENTS. The following documents shall be referred to as the
"Contract Documents", all of which shall be taken together as a whole as the contract
between the parties as if they were set verbatim and in full herein:
A. This Agreement
B. Contractors Quotes Dated June g, 2016
If there is a conflict among the provisions of the Contract, the order in which they are
listed above shall control in resolving any such conflicts with Contract Document "A"
having the first priority and Contract Document "B" having the last priority.
3. OBLIGATIONS OF THE CONTRACTOR. The Contractor agrees that the work
contemplated by the Contract shall be fully and satisfactorily completed in accordance
with the terms of the Contract Documents.
4. PAYMENT.
A. The City agrees to pay and the Contractor agrees to receive and accept payment in
accordance with the prices quoted as set forth in the Contractor's quote. Payment
to the Contractor shall be made monthly based on submission and approval of an
invoice.
B. Payments to Subcontractor. Pursuant to Minn. Stat. S 471.25, Subd. 4a, the
Contractor must pay any subcontractor within ten (2o) days of the Contractor's
receipt of payment from the City for undisputed services provided by the
subcontractor. The Contractor must pay interest of 21/2 percent per month or
any part of a month to the subcontractor on any undisputed amount not paid on
time to the subcontractor. The minimum monthly Interest penalty payment for
an unpaid balance of s1oo.00 or more is s2o.00. For an unpaid balance of less
than s2oo.00, the Contractor shall pay the actual penalty due to the
subcontractor.
g. INDEMNIFICATION.
A. The Contractor shall indemnify, defend and hold harmless the City and
its officials, agents, representatives, and employees from any loss, claim,
liability and expense (including reasonable attorney's fees and expenses of
litigation) with respect to. (a) Worker's Compensation benefits payable on
account of injury or death to any Contractor employee or to any employee of
Contractor's subcontractors, where the injury or death arises out of or is in any
way related to the work performed or to be performed under the Contract; (b)
claims for personal injury, death, or property damage or loss asserted by a
Contractor or subcontractor or any of their officers, agents, representatives, or
employees where the injury, death, damage, or loss arises out of or is in any way
related to the work performed or to be performed under the Contract; and (c)
claims for personal injury, death, or property damage or loss as asserted by
third -parties at the work site, where the claim is based in the whole or in any
part on, or is in any way related to, any act or omission by Contractor, or
Contractor's subcontractors, agents, employees or delegates.
B. Contractor shall agree that the indemnities stated above shall be construed and
applied in favor of indemnification. To the extent permitted by law, the stated
indemnities shall apply regardless of any strict liability or negligence
attributable to the City and regardless of the extent to which the underlying
harm is attributable to the negligence or otherwise wrongful act or omission
(including breach of contract) of Contractor, its subcontractors, agents,
employees or delegates. Contractor also agrees that if applicable law limits or
precludes any aspect of the stated indemnities, then the indemnities will be
considered limited only to the extent necessary to comply with that applicable
law. The stated indemnities continue until all applicable statutes of limitations
have run.
C. If a claim arises within the scope of the stated indemnity, the City may require
Contractor to furnish a written acceptance of tender of defense and indemnity
from Contractor's insurance company. Contractor will take the action required
by City within fifteen (s5) days of receiving notice from City.
5. RIGHTS AND REMEDIES.
A. The duties and obligations imposed by the Contract Documents and the rights
and remedies available thereunder shall be in addition to and not a limitation of
any duties, obligations, rights and remedies otherwise imposed or available by
law.
B. No action or failure to act by the City or the Contractor shall constitute a waiver
of any right or duty afforded by any of them under the Contract, nor shall any
such action or failure to act constitute an approval of or acquiescence in any
breach thereunder, except as may be specifically agreed in writing.
7. GOVERNING LAW. The Contract shall be governed by the laws of the State of
Minnesota.
8. INSURANCE. Prior to commencing work on the Contract, the Contractor shall furnish
the City a certificate of insurance. The Contractor shall furnish and maintain during the
project such public liability and property damage insurance as shall protect Contractor
and any subcontractors performing work covered by the Contract from claims for
damages by Workers Compensation Statute, and from claims for property damages or
personal injury which may arise from operations under this Contract, whether such
operations are by Contractor or by an subcontractor or anyone directly or indirectly
employed by either of them and the amounts of insurance shall be as follows:
I. Workers Compensation — as provided in the applicable law.
2. Commercial General Liability:
Personal Injury - $2,000,000.00
Property Damage - $2,000,000.00
3. Comprehensive Automobile Liability:
Personal Injury - sz,000,000.00
Property Damage - $2,000,000.00
All insurance policies (or riders) required by this Agreement shall be (i) taken out by the
Provider and maintained with responsible Insurance companies organized under the
laws of one of the states of the United States and qualified to do business in the State
of Minnesota, (ii) shall contain a provision that the insurer shall not cancel or revise
coverage thereunder without giving written notice to Provider as an insured party and
to City as an additional insured before cancellation or revision becomes effective, (iii)
shall name Provider as an insured party and City as an additional insured with respect to
General Liability and Auto Liability policies on a primary and non-contributory, basis, (iv)
shall be in accordance with specifications approved by the insurance advisory for City,
and (v) shall be evidenced by a Certificate of Insurance listing City as an additional
insured which shall be filed with the city. Certificates of Insurance that do not meet
these requirements will not be accepted. Certificates of Insurance shall include the
policy endorsement showing the City named as additional insured on a primary and
non-contributory basis.
g. TERM. The term of this Contract shall begin on the effective date and end at the
completion of all work associated with the construction of the Ouail Meadows Park play
structure unless sooner terminated as hereinafter provided.
so. SUPPLIES, EQUIPMENT, AND INCIDENTALS. The City and Contractor agree that
the Contractor shall furnish any and all supplies, equipment, and incidentals necessary
for Contractor's performance of this Contract.
is. TERMINATION WITHOUT CAUSE BY CITY. The City reserves the right at its sole
discretion to terminate this Contract at will immediately without cause at any time
within the term of this Contract. In the event of such termination, the City shall provide
Contractor written notice of termination and upon receipt of same, Contractor shall
immediately cease and desist Contractor's provision of services underthis Contract and
City shall have no further obligation under this Contract to pay any further
compensation to Contractor except for compensation due and owing for services prior
to Contractor's receipt of the written notice of termination.
22. INDEPENDENT CONTRACTOR. City and Contractor agree that Contractor, while
engaged In carrying out and complying with the terms and conditions of this Contract
and the provision of services thereunder, shall be considered at all times an
independent contractor and not an officer, employee, or agent of the City. City and
Contractor further agree that Contractor shall not at any time or in any manner
represent that Contractor or any of the Contractor's agents or employees are in any
manner agents- or employees of the City. City and Contractor further agree that
Contractor shall be exclusively responsible under this Contract for Contractor's own
FICA payment, workers compensation payments, unemployment compensation
payments, withholding amounts, and/or self-employment taxes or other taxes if any
such payments, amounts, ortaxes are required to be paid by law or regulations.
z3. WRITTEN NOTICE OR OTHER CORRESPONDENCE. Any written notice or other
correspondence to be provided by or between the City and the Contractor in
accordance with this Contract shall be hand delivered or mailed by registered or
certified mail to the following address:
CITY: City of Lakeville
20195 Holyoke Avenue
Lakeville MN 55044
VENDOR: GameTime C/O Minnesota Wisconsin Playground
51o1 H ighway 55, Suite 6000
Golden Valley, MN 55422
14. WAIVER OF DEFAULT. Any waiver by City of a default under the provisions of this
Contract by Contractor shall not operate or be construed as a waiver of a subsequent
default by the Contractor. No waiver shall be valid unless in writing and signed by the
Mayor and the City Administrator on behalf of the City.
15. NO ASSIGNMENT OR SUBCONTRACTING. The City and Contractor agree that the
services to be rendered by the Contractor under this Contract are unique and personal.
Accordingly, the Contractor may not assign or subcontract out any of the Contractor's
rights or any of the Contractor's duties or obligations under this Contract.
16. INVALIDITY OF PROVISIONS. If any term or provision of this Contract or any
application hereof to any person or circumstances, shall to any extent be invalid or
unenforceable, the remainder of this Contract or the application of such term or
provision to persons or circumstances other than those as to which it is held invalid or
unenforceable shall not be effected hereby and each term and provision of this
Contract shall be valid and be enforced to the fullest extent permitted by law.
27. DATA PRACTICES/RECORDS.
A. All data created, collected, received, maintained, or disseminated for any purpose
In the course of this Contract is governed by the Minnesota Government Data
Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state
rules adopted to implement the act, as well as federal regulations on data privacy.
B. All books, records, documents, and accounting procedures and practices of the
Contractor and its subcontractors, if any, relative to this Contract are subject to
examination by the City.
18. WARRANTY. The Contractor shall be held responsible for any and all defects in
workmanship which may develop in any part of the contracted service, and upon proper
notification by the City shall remedy, without cost to the City, any such faulty work and
damage done by reason of the same in accordance with the proposal specifications.
ig. CHANGE ORDERS. Without invalidating the Contract, the City may, at any time or
from time to time, order additions, deletions, or revisions in the Work; these will be
authorized by Change Orders. Upon receipt of a Change Order, the Contractor shall
proceed with the work involved. Changes in the Contract Price shall be based on the
Proposal Prices.
20. ENTIRE AGREEMENT. This instrument herein contains the entire and only agreement
between the parties and no oral statement or representation or prior written matter not
contained in this instrument shall have any force and effect. This Contract shall not be
modified in any way except by writing executed by both parties.
21. DISCRIMINATION. Contractor agrees to comply with Minnesota Statute 8x.59 that
states:
Subsection A. That, in the hiring of common or skilled laborfor the performance of any
work under any contract, or any subcontract, no contractor, material Contractor or
vendor, shall, by reason of race, creed, or color, discriminate against the person or
persons who are citizens of the United States or resident aliens who are qualified and
available to perform the work to which the employment relates;
Subsection B. That no contractor, material Contractor, or vendor, shall, in any manner,
discriminate against, or intimidate, or prevent the employment of any person or
persons identified in clause (s) of this section, or on being hired, prevent, or conspire to
prevent the person or persons from the performance of work under any contract on
account of race, creed, or color;
Subsection C. That a violation of this section is a misdemeanor; and
Subsection D. That this contract may be canceled or terminated by the state, county,
city, town, school board, or any other person authorized to grant the contracts for
employment, and all money due, or to become due under the contract, may be
forfeited for a second or any subsequent violation of the terms or conditions of this
contract.
22. BACKGROUND CHECKS. The City may require criminal history background checks of
the Contractor's employee's for purposes of access to City facilities. The City reserves
the right to deny access to City facilities to those Contractors or Contractor's
employees that it deems inappropriate.
CITY OF LAKEVILLE
BY:
AND:
Matt Little, Mayor
Charlene Friedges, City Clerk
CONTRACT?:
BY:
Its
M t N N E s o TA • w t SCO N s tMinnesota / Wisconsin Playground
5101 Highway 65, Suite
Golden Valle Minnesotato 55422
Ph. 800-622-54251763-546-7787
Consultant: Dan Lanes Fax 763-546-50501 dan@mnwiplay.com
North Trail Elementary D73911L4
City of Lakeville
Attn: John Hennen
20195 Holyoke Ave.
Lakeville, MN 55044
Phone -952-985-2715
Fax: 952-985-2719
jhennen0ciJakeville.mn.us
RDU Ga*neTlme - PowerrScape play unit.
(5) 80000 — 49" Sq Punched Steel Deck
(2) 80078 » 6"Stepped Platform
(1) 80656 --Access Attachment 31& 4'
(1) 80924 -- Double Seat
(1) 80925 -- Leaning Rail
(1) 81530 -- Overhead Tree Climber Lnk
(1) 81670 -- Crunch Bar
(1) 81681-- Tuning Bar
(1) 81691-- Single Steering Wheel
(1) 90002 — Diamond Web Link
(3) 90022 » 2'4" Transfer System w/ Barrier
(1) 90032 -- 3' Transfer Platform w/guardrail
(1) 90104 -- Z-6"/3' Schooner Climber
(1) 90129 --1'-6"/3' Tree Climber Link
(1) 90130 — 5' Trunk Climber
(1) 90226 -- Decorative Panel
ThunderringAbove Dk
(3) 90267 -- 9° Uptight, Alum
(7) 90269 --11' Upright, Alum
(5) 90270 •- I2' Upright, Alum
(2) 90271 •• 13' Upright, Alum
(8) 90272 --14' Upright, Alum
(1) 90350 -- 5'-0 F5 Slide w/Hood
(1) 90369 -- River Rock Climber
(1) 90389 -- 2'-0" Overhead Climber Access
Udder
(1) 90401-- Std Funnel Bridge,2 Dk Span
Barrier
(1) 90512 -- 8' Std Zip Slide
(1) 90575 -- Scramble Up (6-6" to 8'-0")
(1) 90579 -- Double Swerve Slide
(2) 90704 -- Left Curve Section WilderSIide II
(1) 90706 -- Exit Section WilderSiide 11
Page i of 4
4
QUOTE
#16090
06/09/2016
Ship To Zip: 55044
$61,412.96
MINN E S O TA • W I S C O N SI N Minnesota / Wisconsin Playground
5101 Highway 55, Suite
1 !�1 Golden Valley, Minnesota 55422
to 5
QUOTE
#16090
Ph. 800-622-54251763-546-7787
Consultant: Dan Lanes Fax 763-546-50501 dan@mnwiplay.com
06/09/2016
North Trail Elementary D7391L4
tz
(1) 90709 — Support 1NilderSlide 1I
(1) 90743 — Over N Under
(1) 90790 — Sloped Funnel Climber Barrier
(I)b!)
(1) 91120 — 90° Play Port Bridge
(2) 91139 -- Entryway - Barrier
(2) 91144 — High Point Entryway - Guardrail
(2) 91208 — Climber Entryway - Guardrail
(4) 91209 -- Climber Entryway - Barrier
(1) 91303 -- Gill Wali Climber
(2) COM66 — 8' Upright, Galy
(5) G90267 — 9' Upright, Galv
1 3185 GawTime - Hexainid Regular
$17391.13
$17,391.13
1 RDU GameTime - Five -unit swing package.
$3.31538
$3,31538
(1) 5152 — PT Solo Add -A -Bay 31/2" x 8'
(1) 8537 — Adaptive Swing w/Cutin
(4) 8910 — Belt Seat 3 1/2110d(8910)
(1)18826 — PrimeTlme Swing 3 1/2" x 8'
(1)18827 — PrimeTime Swing Add a Bay 3
1/2" x 8'
1 178749 GameTime - Owner's Kit
$5000
$30A
3 161290 Gamdiime - Geo -Textile 2250 Sq Ft Roll
$488.72
$1,466.16
10 161292 GameTime - Heavy Duty Large Wear Mat
$17056
$1,705.60
44"X48"xl"
1 EWF -12L EWFLGE -12" compressed depth engineered
$3,758.00
$5,758.00
wood fiber.
Contract: USC
SubTotal:
$91.099.23
Freight:
$4,49987
Total Amount:
$95,59910
This quotation is subject to polices in the current Gametime Park and Playground catalog and the following terms and motions. Our quotation
Is based on shipment of all item at one time to a single destination, unless noted, and changes arc sabjed to Price adjustment. Purchases in
excess of $1 AW.00 to be supported by your written purchase order made out to Gametime, do Minnesota/Wisoomn Playground.
Pricing: fob. factory, firm for 30 days from date of quotation. Sales tax, if applicable, will be added at time of invoice unless a tax exempt
certificate is provided at time of order entry.
Payment terms: net 30 days for tax supported governmental agencies. A 15% per month finance charge will be imposed on a0 past due accounts.
Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage
not accepted.
Shipment: order shall ship within 30445 days after GameTime's receipt and acceptance of your puree order, color selections, approved
submittals, and receipt of deposit, if required.
Page 2 of 4 4K
U M I N N E SOTA • W 15 C O N S I N Minnesota / Wisconsin Playground
� 5101 Highway 55, Suite
Golden Valley, Minnesotato 55422 QUOTE
Ph. 800-622-54251763-546-7787 #16090
Consultant Dan Lanes Fax 763-546-50501 dan@tnnwiplay.com
06/09/2016
North Trail Elementary D7391L4
Shipment: ander shall ship within 3045 days after GameTime s rempt and acceptance of your purchase order, color selections, approved
submittals, and mccipt of deposit, if required.
Freight charges: Prepaid do added
Project Scope:
INC AISIO.NS -
-- One mobilization
— Public utility !orates oal)
Ma Vm and di ng of footings to accept direct embedment supports
Assembly
of==
f play egmegnpmW
ipment
Concrete o footings of play equipment
Pouring of conarKe forfinAngs
Standard insurance offerings
- EXCIAMONS -
- Clear access path to play area for installalion equipment
- Private unity locaft such as, but not limited to. irrigation, fiber gWcs, private lighting, etc.
- Accepting. unloading and storage of order(s)/shipment(s) prior to i0wation
- Siwwork of any kind such as. but not limited to'grading (play area to have max slope of 1%). site restoration. drainage, etc.
-nn .�mfada
- gunstbsI conditions. etc.
ite removal of spoils
from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play
area)
Disposal of paddag material (can be deposited in oww1ownerls reprsentative onsite dumpster or stockpiled for removal by others)
- Border to help contain safety surfacing
- Bonding of any type
- Permits of any
-site restoration
Spreading of engineered wood fiber ORNM
Fatclushons: unless specifically included, this quotation excludes all site work and landscaping, removal of existing equipment; acceponce of
equipment and off-loading; storage of goods prior to instaifation: equipment assembly and installation; safety surfacing; borders and drainage
Provisions.
Order Informatioi :
Bill To. )�,bip To:
Company.
Atta:
Address:
City. State, Tip:
Contact
Tel:
Fax:
Project Name:
Attn:
Address:
City, State, Zip:
Contact
Tel:
Fax:
Page 3 of 4
M 1 N N E S O TA • W I S C O N SN Minnesota / Wisconsin Playground
5101 Highway 55, Suite 6000 QUOTE
Golden Valley, Minnesota 55422 #16090
Ph. 800-622-54251763-546-7787
Consultant: Dan lanes Fax 763-546-50501 dan@mnwiplay.com
06/09/2016
North Trail Elementary D7391L4
Accepted By ('F P.O. No:
Signatuae: _ Date:,
Tide: _.. Phony
Facsimile: Purchase Amount $95,599.10
Page 4 of 4
MINNESOTA •WtSCONS1N Minnesota / Wisconsin Playground
`PT AYGRO� 5101 Highway 55, Suite 6000
�.a1`�, Golden Valley, Minnesota 55422
Ph. 800-622-54251763-546-7787
Consultant: Dan Lanes Fax 763-546-5050 1 dan@mnwiplay.com
North Frail Elementary D73911A - Install
City of Lakeville
Ann: John Hennen
20195 Holyoke Ave.
Lakeville, MN 55044
Phone: 952-985-2715
Fax: 952-985-2719
jhennen@ci.lakeville.mmus
QUOTE
#16091
06/09/2016
Ship To Zip: 55044
1 INS Install play equipment. $12-44.00 $12,344.00
1 EWF INS Install fabric, wood fiber, and wear mats. $2,217.00 $2,217.00
1 CONC Install concrete curb to match existing. Owner $2,554.00 $2,554.00
to excavate expanded area and remove
material and grade site.
Contract: USC SubTotal: $17,115.00
Total Amount: $17,115A0
This quotation is subject to polices in the current aametime Park and Playground catalog and the following terms and conditions. Our quotation
is based on shipment of all items at one time to a single destination, unless noted, and changes are subje to rice: djustment. Purchases in
excess of $1,t11 .00 to be supported by your written purchase order made out to Gametime. do Minnesotan Playground.
Pricing: f�o.b. factory, firm for 30 days from date of quotation. Sales tax. if applicable, will be added at time of invoice unless a tax exempt
certificate is provided at time of order entry.
Payment terms: net 30 days for tax supported governmental agencies. A 13% per month finance charge will be imposed on all past due accounts.
Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage
not accepted.
Shipment: order shall ship within 30-45 days after GameTime's receipt and acceptance of your purchase order, color selections, approved
submittals, and receipt of deposit, if required.
EWF Shipment: order shall deliver within 14 - 21 days after our receipt and acceptance of your purchase order as well as schedule and weather
allowing. Bulk material will ship via semi-truckhmiler with a live floor system in trailer which allows driver to deposit EWF directly onto a
specific area provided proper access is available. Driver has final say whether the site has proper access. Site restoration is not included and will
be the responsibility of the ownedowner's representative. Road restrictions may be in effect and cause delays depending on time of year.
Freight charges: Prepaid 8c added
FAI
Page 1 of 2
MINNESOTA •WISCONSIN Minnesota / Wisconsin Playground
5101 Highway 55, Suite 6000 QUOTE
l
0i_ Golden Valley, Minnesota 55422 #16091
Ph. 800-622-54251763-546-7787
Consultant Dan lanes Fax 763-546-50501 dan@tnnwiplay.cotn 06/09/2016
North Trail Elementary D739IL4 - Install
INCLUSIONS -
- One mobilization
Public utility locates only
-- Marking and digging of footings to accept direct embedment supports
— Unpacking of Play equipment
Assembly c equipment
Cancr�de for oodogs of play equipment
Pon " of concrete for footings
S ng of eogineened =fiber (EWF)
Standard insmance offerings
- EXCLUSIONS -
- Clear access path to play area for installation equipment
- Private wMy !ceases sada as, but not limited to, irrigation, fiber optics, private lighting, etc.
- Accepting, unloading and storage of erder(s)1shipment(s) prior to installation
- Sitework of any kind sac* as, but not limited to, rading (play area to have max slope of 1%), site restoration, drainage, etc.
-
Renardof Phy egxowerrt, bonder, Jib swfacrn8, sic.
Dig�ng in rode, hard pan, tree mats, unstabel soil conditions, etc.
- Offsite removal of spools from footing holes (can be stockpiled near play arca for owner!owner's representative removal or spread within play
area)
Disposal of Padaing nwerial (can be deposited in owner/owner's reprsentative onsite dumpster or stockpiled for removal by others)
-Border to hdp coffiain safety surfacing
- Banding of any type
- Permits of any kind
Exclusions: unless specifically included, this quotation excludes all site work and landscaping; removal of existing equipment; acceptance of
equipment and off-loading; storage of goods prior to installation; equipment assembly and installation; safety surfacing•; borders and drainage
provisions.
Accepted By (printed w
Signature.
Tide:
Facsimile:
P.O. No:
Date:
Phone:
Purchase Amount: $179115.00
Page 2 of 2
F!
�x
9
q
f `
1 �
I
� I
l I
-- J