SPIRIT PLACE AT BRANDTJEN FARM
PRELIMINARY AND FINAL PLAT AND EASEMENT VACATION
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving the
Spirit Place at Brandtjen Farm preliminary and final plat, and 2) a resolution vacating public drainage and
utility easements.
Overview
HJ Development representatives are requesting approval of the Spirit Place at Brandtjen Farm preliminary
and final plat to allow the construction of an 18,000 square foot PetSmart retail building. The vacation of
underling public drainage and utility easements is being processed in conjunction with the preliminary
and final plat. PetSmart will be located in the southwest quadrant of 160th Street (CSAH 46) and Elmhurst
Lane, north of Hy-Vee.
The Planning Commission held a public hearing on the Spirit Place at Brandtjen Farm preliminary plat
and development stage PUD at their June 16, 2016 meeting and unanimously recommended approval.
There was no public comment. The Parks, Recreation and Natural Resources Committee recommended
approval of the preliminary plat at their June 15, 2016 meeting.
Primary Issues to Consider
• What plan revisions have occurred since the Planning Commission meeting?
Supporting Information
• Staff response to primary issues to consider
• Preliminary and final plat and easement vacation resolutions
• Signed development contract
• Preliminary and final plat plans
• June 16, 2016 Planning Commission meeting minutes
• June 15, 2016 Parks, Recreation and Natural Resources Committee meeting minutes
• July 20, 2016 revised planning report and July 13, 2016 revised engineering report
• June 17, 2016 Dakota County Plat Commission letter
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: Diversified Economic Development
Report Completed by: Daryl Morey, Planning Director
August 1, 2016
Subdivision Ordinance, SBF PUD Booklet
2
Primary Issues to Consider
• What plan revisions have occurred since the Planning Commission meeting?
• The preliminary and final plat and engineering plans were revised to adjust Lot 1 to include more
parking spaces within the PetSmart site and to shift the shared access drive within Outlot A
slightly to the west.
• The landscape plan was revised to add three boulevard trees on the south side of the PetSmart site
and evergreen shrubs along the east wall of the PetSmart building.
• The building elevation and site plans were revised to bring the proposed wall and freestanding
signs into compliance with the Sign Ordinance.
• The lighting plan was revised to meet Zoning Ordinance requirements.
I have not included all of the revised plans for this agenda item in the Council packet. Please contact
Planning Department staff if you would like to see any of the revised plans that are not included herein,
which are mainly the engineering plans.
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE PRELIMINARY AND FINAL PLAT OF
SPIRIT PLACE AT BRANDTJEN FARM
WHEREAS, the owner of the plat described as Spirit Place at Brandtjen Farm
has requested preliminary and final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and recommended for
approval; and
WHEREAS, the preliminary and final plat meets Subdivision Ordinance
requirements and is consistent with the Spirit of Brandtjen Farm Master Planned Unit
Development Stage Plan Agreement dated October 17, 2005.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The preliminary and final plat of Spirit Place at Brandtjen Farm is hereby
approved subject to the development contract and security requirements.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
the development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 1st day of August, 2016.
CITY OF LAKEVILLE
BY: _____________________
Matt Little, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 1st day of August, 2016 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO._________
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the City Council has conducted a public hearing, preceded by two (2)
weeks published notice, to consider the following described public drainage and utility
easement vacation, and
WHEREAS, the City Council has determined that it is in the public interest to approve
the public drainage and utility easement vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easements are hereby vacated:
A vacation of all the drainage and utility easements, as dedicated on the recorded plat of
SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, Dakota County, Minnesota,
which lie within Outlot B, said plat.
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 1st day of August, 2016
CITY OF LAKEVILLE
________________________
Matt Little, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 1st day of August, 2016, as shown by the minutes of
said meeting in my possession.
__________________________
Charlene Friedges, City Clerk
(SEAL)
BEARINGS ARE BASED ON THE MOST SOUTHERLY
LINE OF OUTLOT B, SPIRIT OF BRANDTJEN FARM
COMMERCIAL 1ST ADDITION WHICH IS ASSUMED
TO HAVE A BEARING OF N 89°52'40" W
NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE
REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL
BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS
PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH
GALVANIZED IRON PIPES MARKED BY R.L.S. NO. 47481.
DENOTES 1/2 INCH IRON MONUMENT FOUND WITH
CAP MARKED R.L.S. NO. 12294
KNOW ALL PERSONS BY THESE PRESENTS: That Lakeville PS 2016, LLC, a Minnesota limited liability company, Cobblestone Lake, LLC, a
Minnesota limited liability company, fee owner and SBF Development Corp., a Minnesota corporation, contract purchaser of the
following described property:
Outlot B, SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, according to the recorded plat thereof , Dakota County,
Minnesota.
Has caused the same to be surveyed and platted as SPIRIT PLACE AT BRANDTJEN FARM and does hereby dedicate to the public for
public use the the drainage and utility easements as created by this plat.
In witness whereof said Lakeville PS 2016, LLC, a Minnesota limited liability company, has caused these presents to be signed by its
proper officer this day of , 20 .
Lakeville PS 2016, LLC
By: the
STATE OF
COUNTY OF
This instrument was acknowledged before me on , by the
of Lakeville PS 2016, LLC, a Minnesota limited liability company, on behalf of
the company.
Notary Public,
My commission expires
n witness whereof said SBF Development Corp., a Minnesota corporation, has caused these presents to be signed by its proper officer
this day of , 20 .
SBF Development Corp.
By: the
STATE OF
COUNTY OF
This instrument was acknowledged before me on , by the
of SBF Development Corp., a Minnesota corporation, on behalf of the corporation.
Notary Public,
My commission expires
In witness whereof said Cobblestone Lake, LLC, a Minnesota limited liability company, has caused these presents to be signed by its
proper officer this day of , 20 .
Cobblestone Lake, LLC
By: the
STATE OF
COUNTY OF
This instrument was acknowledged before me on , by the
of Cobblestone Lake, LLC, a Minnesota limited liability company, on behalf of the company.
Notary Public,
My commission expires
I, Marcus F. Hampton, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed
Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data
and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one
year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this
certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat.
Dated this day of , 20
______________________________________________________________
Marcus F. Hampton, Licensed Land Surveyor, Minnesota License No. 47481
STATE OF MINNESOTA
COUNTY OF
This instrument was acknowledged before me on this , by Marcus F. Hampton.
Notary Public,
My commission expires
CITY COUNCIL OF LAKEVILLE, MINNESOTA
This plat was approved by the City Council of Lakeville, Minnesota, this day of , 20 , and hereby
certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2.
By:
Mayor Clerk
DAKOTA COUNTY SURVEYOR
I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this
day of , 20 .
By:
Dakota County Surveyor
DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER
THE DAKOTA COUNTY CONTIGUOUS PLAT ORDINANCE
DRAINAGE AND UTILITY EASEMENTS BEING
5 FEET IN WIDTH, UNLESS OTHERWISE
INDICATED, ADJOINING LOT LINES, AND
BEING 10 FEET IN WIDTH, UNLESS
OTHERWISE INDICATED, ADJOINING RIGHT
OF WAY LINES, AS SHOWN ON THE PLAT.
DAKOTA COUNTY BOARD
We do hereby certify that on the ________ day of __________________, 20___, the Board of Commissioners of Dakota County,
Minnesota, approved this plat of SPIRIT PLACE AT BRANDTJEN FARM and said plat is in compliance with the provisions of Minnesota
Statutes, Section 505.03, Subd. 2, and pursuant to the Dakota County Contiguous Plat Ordinance.
By: ___________________________________ Attest: ___________________________________
Chair, Dakota County Board Dakota County Treasurer - Auditor
DAKOTA COUNTY DEPARTMENT OF PROPERTY TAXATION AND RECORDS
Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20 on the land hereinbefore described have
been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this
day of ,20 .
By: Director
Department Of Property Taxation and Records
COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA
I hereby certify that this plat of SPIRIT PLACE AT BRANDTJEN FARM was filed in the office of the County Recorder for public record on
this day of , 20 , at o'clock . M. and was duly filed in
Book of Plats, Page , as Document Number .
County Recorder
CITY OF LAKEVILLE
PARKS, RECREATION & NATURAL RESOURCES COMMITTEE
MEETING MINUTES
June 15, 2016
Chair Swan called the meeting to order at 6:00 p.m. in the Lake Marion Conference
Room at City Hall.
Members Present: Lori Bovitz, Scott Kelly (arrived at 6:08 p.m.), Jeanne Peterson, Jim
Storms, Bob Swan
Members Absent: Tom Goodwin, Judy Hayes, and Holly Weberg
Staff Present: Parks & Recreation Director John Hennen, Environmental Resources
Manager Mac Cafferty, Environmental Resources Specialist Ann Messerschmidt,
Recording Secretary Tamara Wallace
2. Approval of June 1 minutes
Minutes were approved as written.
3. Citizen comments
There were no citizens present.
4. Staff Report
Six seasonal staff began in the recreation department this week to help with
upcoming summer programs and camps.
Staff is preparing for the annual Pan-O-Prog event held the week of July 4 – 10.
Pan-O-Prog has been extended by one day this year, introducing the new “Fun Fair
Carnival” attraction on Sunday, July 10 from 12 p.m. – 6 p.m. located in the
Lakeville Area Arts Center parking lot, and public parking lot west of Howland and
south of 209th Street.
Staff is currently working on the 2017 budget, and 2017 – 2021 Capital
Improvement Plan (CIP). After much resident feedback, included in this budget will
be the redesign of the Dodd Trail Park courts into designated pickleball courts.
Lakeville Soccer will be hosting its father’s day soccer tournament, this weekend,
June 17 – June 19.
5. Storm Water Pollution Prevention Program Public Meeting
Public Meeting Opened at 6:06 p.m.
Environmental Resources Specialist Ann Messerschmidt gave a presentation on
the Storm Water Pollution Prevention Plan (SWPPP), a list of best management
practices implemented to protect the health of the water system, as well as outline
the minimum control measurements required. Ms. Messerschmidt also highlighted
various projects and educational outreach events the department has been involved
Parks, Recreation & Natural Resources Committee Meeting Minutes, June 15, 2016 Page 2
with this past year ranging from the Blue Thumb and recreation nature programs,
and educational events to increase awareness on storm water pollution, water
quality, and recycling.
Steve McComas from Blue Water Science works with the environmental resources
staff to protect the water quality in Lakeville. Mr. McComas provided a report on the
status of each lake within the City, along with their current water clarity/ algae
improvement plan, and answered committee questions about the increase of fish,
specifically carp, in some of the lakes. Overall most of the City’s lakes have
consistently improved in the last five years.
Motion made by Jeanne Peterson, seconded by Bob Swan to close the Storm
Water Pollution Prevention Program Public Meeting at 6:27 p.m.
Ayes: unanimous
6. Spirit Place at Brandtjen Farm
Staff reviewed the Spirit Place at Brandtjen Farm plat which had limited
environmental impact with no tree preservation or wetland concerns on site.
Committee member Storms asked for clarification on when the developer would pay
park dedication fees vs. land dedication.
Staff indicated park dedication fees are paid when land is not dedicated for park
needs.
Motion made by Jeanne Peterson, seconded by Lori Bovitz to recommend to
City Council approval of the Spirit Place at Brandtjen Farm subject to the
recommendations as presented by City staff.
Ayes: unanimous
7. Other Business
The next Parks, Recreation, & Natural Resources Committee meeting is scheduled
for Wednesday, July 6, however there are no pending plats at this time, so the
meeting will likely be cancelled.
This will be recording secretary Tamara Wallace’s last meeting as she heads to the
administration department as the new Senior Administrative Assistant/ Deputy
Clerk.
Committee member Swan asked for clarification on the construction process of the
six dedicated pickleball courts at Dodd Trail Park. The plan is to refinish the court
surfacing, utilize the asphalt and fencing currently on site, install new pickleball nets
and posts, and ultimately install trees and benches for a small sitting area.
Committee member Swan asked how the 2017 budget process is coming, which
staff is still currently working on.
Parks, Recreation & Natural Resources Committee Meeting Minutes, June 15, 2016 Page 3
Committee member Storms asked how things were going with the recently added
Heritage Center staff members. Staff reported that the new coordinator, Renee
Brekken, is acclimating to the position really well; and the new 28 hour part time
administrative assistant, Karrie Glen, has helped significantly taking a substantial
workload off the staff.
9. Announcements
Committee member Bovitz reminded that the newly formed Lakeville Community
Band will be participating in the upcoming “Music in the Park” event held at Antlers
Park, Shelter A as part of the 2016 Pan-O-Prog festivities.
9. Adjourn
Meeting adjourned at 6:38 p.m.
Respectfully submitted,
Tamara Wallace, Recording Secretary
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 20 July 2016
RE: Lakeville – Spirit Place of Brandtjen Farm (Petsmart)
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation and HJ Development have submitted plans for Spirit Place of
Brandtjen Farm to be platted from Outlot B, SBF Commercial 1st Addition. The proposed
preliminary and final plat consists of one lot and four outlots at the southwest corner of 160th
Street (CSAH 46) and Elmhurst Lane. Lot 1, Block 1 is proposed for development of a 18,000
square foot building for Petsmart, a retail store specializing in pet related products and services.
The subject site is zoned PUD, Planned Unit Development District as approved by the City
Council for Spirit of Brandtjen Farm on 20 June 2005. The proposed development requires the
consideration of applications for preliminary plat, final plat, PUD Development Stage Plan for
Lot 1, Block 1, and vacation of existing drainage and utility easements.
Exhibits:
A. Site Location
B. SBF Land Use Plan
C. Title Sheet
D. Preliminary Plat
E. Final Plat
F. Erosion & Sediment Control Plan
G. Preliminary Grading & Drainage Plan
H. Preliminary Utility Plan
I. Preliminary Paving & Dimensional Plan
J. Landscape Plan (2 pages)
K. Lot 1 Architectural Site Plan (2 pages)
2
L. Floor Plan (2 pages)
M. Exterior Elevations
N. Lighting Plan
ANALYSIS
SBF Land Use Plan. The SBF Land Use Plan guides the subject site for mixed use development
based on the uses allowed in the O-R District and C-3 District. An amendment to the SBF PUD
Booklet was approved in 2010 to allow for development of big box retail users within this area
of SBF, which is consistent with the proposed 18,000 square foot retail building.
Uses. Retail stores are a permitted use within this area of SBF. The floor plan of the principal
building is included in the submitted plans and indicates retail space as well as pet grooming, a
training room, employee areas, and service areas. The proposed pet sales and grooming areas
are subject to the requirements of Section 11-73-7.O of the Zoning Ordinance to be made a
condition of PUD Development Stage Plan approval:
1. All areas in which animals are confined are located indoors and are properly
soundproofed from adjacent properties or tenants in the case of multiple occupancy
buildings.
2. Animal wastes are disposed of at least once each day via an existing sanitary sewer
system or enclosed in a container of sufficient construction at least once a day to
minimize odors.
3. The floors and walls of pet grooming areas are made of nonporous materials or sealed
concrete to make them nonporous.
4. All applicable requirements of the City Code regarding the keeping and care of animals
are satisfactorily met.
5. No commercial boarding or kenneling of animals shall be allowed.
6. The breeding of cats and dogs is prohibited unless expressly allowed by the PUD
Development Stage Plan.
7. All applicable provisions of Minnesota statutes sections 346.35 through 346.58
regarding the commercial keeping and care of animals are satisfactorily met.
8. All animals to be sold are acquired from a licensed animal broker.
Inclusion of veterinary services within the uses allowed on Lot 1, Block 1 in the future will
require application for amendment of the PUD Development Stage Plan subject to the
3
performance standards of Section 11-73-7.S of the Zoning Ordinance. Future development of
Outlot B, Outlot C, and Outlot D will require separate application for PUD Development Stage
Plan approval.
Lot Requirements. The SBF PUD District does not establish minimum lot area or width
requirements. A 30 foot setback for buildings and a 15 foot setback for parking from public
rights-of-way is required at the perimeter of the PUD District. Interior setbacks are to be
evaluated based on specific site designs. The proposed principal building is setback 30 feet
from the north plat line in compliance with the perimeter setback requirement. The proposed
parking areas are setback a minimum of 15 feet from all public rights-of-way and the shared
east-west private drive along the south plat line.
Vehicle Access. Lot 1, Block 1, Outlot B, and Outlot C are to be accessed via a shared private
drive intersecting Elmhurst Lane and utilized by the HyVee grocery store and other future uses
west of Elmhurst Lane and north of 162nd Street. The driveway to Lot 1, Block 1, Outlot B, and
Outlot C is aligned with the drive aisle along the rear of the HyVee building to the south. The
driveway is designed with one in-bound lane and two out-bound lanes. The pavement
markings for the outbound lanes are to be revised to provide left and right turning arrows so as
not to encourage cross traffic behind the Hy-Vee building. The submitted plans include a sheet
showing turning movements for semi-tractor/trailer access to Lot 1, Block 1, which must be
updated to reflect the most current site plan and proposed lot lines. The preliminary and final
plat identify the shared driveway accessing Lot 1, Block 1, Outlot B, and Outlot C to be a
separate parcel platted as Outlot A.
Off-Street Parking. Section 11-19-13 of the Zoning Ordinance requires retail stores to provide a
minimum of one parking stall per 200 square feet of net building area. Based on the 18,000
square foot area of the proposed building, 81 parking stalls are required. The submitted site
plan illustrates 91 parking stalls within Lot 1, Block 1 exceeding the requirements of the Zoning
Ordinance. An ingress/egress easement and shared parking agreement is required for access
and parking stalls within Lot 1, Block 1, Outlot B, and Outlot C. Parking requirements for Outlot
B, Outlot C, and Outlot D will be reviewed with the PUD Development Stage Plan for each
parcel.
Off-street parking stalls are designed as nine feet wide and 20 feet deep accessed by 24 foot
wide drive aisles as required by Section 11-19-4.H.1 of the Zoning Ordinance. The parking area
is to be surfaced with asphalt, including a heavy-duty section to accommodate delivery
vehicles, with striped stalls and surrounded by concrete curb and gutter as required by Sections
11-19-4.H.12, 13 and 15 of the Zoning Ordinance. The specifications for construction of the off-
street parking area are subject to review and approval of the City Engineer.
Pedestrian Access. There is a planned trail along 160th Street (CSAH 46) and a sidewalk on the
west side of Elmhurst Lane. The developer is required to grade the area for the planned trail
along 160th Street (CSAH 46) and provide an escrow for the cost of construction. The submitted
plans illustrate a five-foot wide sidewalk on the north side of the shared east-west private
4
driveway. The submitted plans also provide a five-foot wide sidewalk on the south side of the
shared east-west private drive with construction deferred until Outlot D is developed. Section
10-4-3.H.1 of the Subdivision requires sidewalks within commercial plats to be eight feet wide;
however, this standard applies to sidewalks abutting public streets. The proposed five-foot
wide sidewalk is adequate for these internal private drives. Internal sidewalk connections are
also provided to the sidewalks at the perimeter of Lot 1, Block 1 and Outlot B, Outlot C, and
Outlot D.
Building Design. The proposed building is a one-story box measuring 25 feet, four inches in
height. The height of the proposed building is within the 35-foot limit of the C-3 District
applicable to this area of the SBF PUD District. Section 11-17-9.D.1 of the Zoning Ordinance
requires the buildings to use a minimum of three Grade A materials listed in Section 11-17-9.B
of the Zoning Ordinance for a minimum of 65 percent of the area of the building elevations.
Grade B or C materials defined in Section 11-17-9.B of the Zoning Ordinance may be used for up
to 35 percent of the area of the elevations, or 10 percent Grade D materials may also be used.
The exterior materials for the proposed building identified for each elevation comply with the
minimum requirement for use of three Grade A materials and the total area of the elevations
finished with Grade A material is 72 percent, exceeding the requirements of the Zoning
Ordinance. Articulation and variation in the building appearance to meet the standards
intended for SBF is attempted with columns spaced along each elevation, parapet details, and
use of five different colors for the various building materials.
Landscaping. The submitted plans include a preliminary landscape plan for Lot 1, Block 1. The
landscape plan provides for plantings along the west lot line, east half of the north lot line,
along the west side of the shared driveway accessing Lot 1, Block 1, Outlot B and Outlot C, as
well as plantings for the parking lot islands. The landscape plan provides for three boulevard
trees planted approximately 60 feet on center along the north side of the east-west shared
driveway along the south lot line of Lot 1, Block 1. There are also plantings of tall-growing
evergreen shrubs along the east wall of the principal building to mask its horizontal mass.
Plant types and sizes are appropriate and comply with Section 11-21-9.C of the Zoning
Ordinance.
Signs. The submitted plans illustrate one freestanding sign and wall signs on two elevations of
the proposed building:
The proposed freestanding sign is allowed to be 100 square feet in area and up to 20
feet in height. The proposed sign is 70 square feet in area and 20 feet tall above a
block/brick pylon. The freestanding sign is setback 15 feet from the public right-of-way
for 160th Street (CSAH 46) as required by Section 11-23-21 of the Zoning Ordinance.
Section 11-23-19.E.1.b of the Zoning Ordinance allows uses within the C-3 District one
wall sign on two facades facing a public street or private driveway on through lots such
as Lot 1, Block 1. The maximum area of any individual wall sign is limited to 100 square
feet. Wall signs are shown to be installed on the north and south elevations of the
5
proposed building. Petsmart has a sign package that is 42 inches high including letters
with a bouncing ball logo. The total area of the sign is 102.5 square feet as defined by
the Zoning Ordinance. City staff recommends allowing flexibility under the PUD District
for the additional 2.5 square feet for both wall signs.
Exterior Lighting. The submitted plans include a photometric lighting plan for Lot 1, Block 1
illustrating the type, height, location, and illumination pattern of all proposed exterior lighting.
Lighting at the north, west, and south perimeter property lines is less than one-foot candle and
complies with Section 11-16-17.A of the Zoning Ordinance. All of the exterior light fixtures are
to have LED luminaires hooded with a 90-degree horizontal cut-off as required by Section 11-
16-17.B.1 of the Zoning Ordinance and the freestanding light sources comply with the 35 foot
limit of Section 11-16-17.C of the Zoning Ordinance.
Trash Storage. The site plan identifies an exterior trash enclosure southeast of the proposed
principal building. Details regarding construction of the trash enclosure are included on the
submitted plans indicating that the structure is to be constructed of matching brick material as
the principal building consistent with the requirements of Section 11-18-11 of the Zoning
Ordinance.
Park Dedication. Lot 1, Block 1 is subject to park dedication requirements at the time of final
plat approval. The park dedication requirements will be met as a cash fee in lieu of land at
$5,400 per acre for commercial uses in accordance with the SBF Master PUD Agreement. The
area of Lot 1, Block 1 is 1.86 acres and the area of Outlot A to be developed as a shared
driveway is 0.23 acres. The park dedication fee in lieu of land for the proposed final plat of 2.09
acres is $11,286.
Outlots. The preliminary and final plats identify four outlots as shown in the table below. The
outlots are to be retained by the developer. An ingress/egress easement will be required to be
recorded over Outlot A for access to Lot 1, Block 1, Outlot B, and Outlot C.
Outlot Purpose
A Shared access to Lot 1, Block 1/Outlot B/Outlot C
B, C, D Future commercial sites
Utility Plan. The developer has submitted plans for extension of public utilities to serve the
proposed development. The subject site is within the current MUSA and there is sanitary sewer
and water utility capacity to serve the proposed retail use. The utility plan is subject to review
and approval by the City Engineer.
Grading Plan. The developer has submitted grading plans for the proposed development. The
grading, drainage, and erosion control plan is subject to review and approval by the City
Engineer.
6
Easements. Section 10-4-4 of the Subdivision Ordinance requires a 10 foot wide drainage and
utility easement at the perimeter of all lots. The preliminary and final plat provide for a 10 foot
wide drainage and utility easement along the north lot line of Lot 1, Block 1 and a five foot wide
drainage and utility easement along the west lot line of Lot 1, Block 1 and where Lot 1, Block 1
abuts Outlot A and Outlot B. The south lot line of Lot 1, Block 1 provides a 27.67 foot wide
drainage and utility easement to overlay the north half of the shared east-west private drive,
sidewalk, and necessary utility locations. The preliminary and final plats also include a drainage
and utility easement crossing Lot 1, Block 1 and overlaying portions of Outlot A and Outlot B for
extension of sanitary sewer and water utilities. The applications also include a request to
vacate existing drainage and utility easements dedicated with SBF Commercial 1st Addition.
These easements will in effect be replaced by drainage and utility easements dedicated with
the proposed final plat and therefore no longer serve a public purpose. All easements are
subject to review and approval of the City Engineer.
Final Plat. The developer has submitted a final plat for the proposed development consistent
with the preliminary plat. The final plat is subject to applicable comments pertaining to the
preliminary plat design and is subject to approval of the City Council and the Dakota County Plat
Commission.
Development Contract. The developer is required to enter into a development contract with
the City for the public and private improvements, payment of applicable fees and posting of
required securities. The development agreement will be drafted by the City Attorney and the
developer is required to execute the development agreement prior to City Council approval of
the final plat.
CONCLUSION
The proposed Spirit Place of Brandtjen Farm Preliminary Plat, Final Plat, PUD Development
Stage Plan and easement vacation are consistent with the SBF Land Use Plan and the
requirements of the SBF PUD District, Zoning Ordinance, and Subdivision Ordinance. City staff
and our office recommend approval of the applications subject to the following conditions:
1. Operation of the proposed pet store use of Lot 1, Block 1 shall be subject to the
following conditions:
a. All areas in which animals are confined are located indoors and are properly
soundproofed from adjacent properties or tenants in the case of multiple
occupancy buildings.
b. Animal wastes are disposed of at least once each day via an existing sanitary
sewer system or enclosed in a container of sufficient construction at least once a
day to minimize odors.
7
c. The floors and walls of pet grooming areas are made of nonporous materials or
sealed concrete to make them nonporous.
d. All applicable requirements of the City Code regarding the keeping and care of
animals are satisfactorily met.
e. No commercial boarding or kenneling of animals shall be allowed.
f. The breeding of cats and dogs is prohibited.
g. All applicable provisions of Minnesota statutes sections 346.35 through 346.58
regarding the commercial keeping and care of animals are satisfactorily met.
h. All animals to be sold are acquired from a licensed animal broker.
2. Allowance veterinary services within the principal building on Lot 1, Block 1 shall require
application for an amended PUD Development Stage Plan and would be subject to the
applicable performance standards for such uses as allowed within the C-3 District.
3. Future development of Outlot B, Outlot C, and Outlot D shall require application(s) for
PUD Development Stage Plan approval.
4. The developer shall record an ingress/egress and shared parking easement over Lot 1,
Block 1, Outlot A, Outlot B, and Outlot C with the final plat.
5. The pavement markings within Outlot A for the outbound lanes shall be revised to
provide left and right turning arrows.
6. The submitted plan illustrating turning movements for semi-tractor/trailer access to Lot
1, Block 1 shall be revised to reflect the most current site plan and proposed lot lines.
7. The developer shall grade for the future trail along 160th Street (CSAH 46).
8. The developer shall satisfy park dedication requirements as a cash fee in lieu of land of
$11,286 for commercial uses in accordance with the SBF Master PUD Agreement.
9. All grading, drainage, erosion control, and utility plans are subject to review and
approval of the City Engineer.
10. All easements shall be subject to review and approval of the City Engineer.
11. The developer shall execute a development agreement prior to City Council
consideration of the final plat, subject to review of the City Attorney and approval of the
City Council.
8
c. Justin Miller, City Administrator
David Olson, Community and Economic Development Director
Zachary Johnson, City Engineer
John Hennen, Parks and Recreation Director
Roger Knutson, City Attorney
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Project Engineer
Christina Orlowsky, Civil Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: July 13, 2016
Subject: Spirit Place at Brandtjen Farm
• Preliminary and Final Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Site Plan Review
BBAACCKKGGRROOUUNNDD
HJ Development Inc. has submitted a preliminary and final plat named Spirit Place at
Brandtjen Farm and site plans to construct a PetSmart retail building on Lot 1, Block 1, Spirit
Place at Brandtjen Farm. The proposed development is located south of and adjacent to 160th
Street (CSAH 46), north of 162nd Street, east of Pilot Knob Road (CSAH 31), and west of and
adjacent to Elmhurst Lane. The parent parcel consists of Outlot B, Spirit of Brandtjen Farm
Commercial 1st Addition. The development is zoned PUD, Planned Unit Development.
The preliminary and final plats consist of one lot within one block and four outlots on 5.62
acres. The outlots created with the preliminary and final plat will have the following uses:
Outlot A: Cross access shared driveway; to be retained by the Developer (0.23 acres)
Outlot B: Future Development; to be retained by the Developer (1.30 acres)
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 22 OOFF 88
Outlot C: Future Development; to be retained by the Developer (0.94 acres)
Outlot D: Future Development; to be retained by the Developer (1.29 acres)
The proposed development and site plan will be completed by:
Developer: HJ Development Inc.
Engineer/Surveyor: James R. Hill, Inc. and Pope Architects
SSIITTEE CCOONNDDIITTIIOONNSS
The Spirit Place at Brandtjen Farm site consists of 5.62 acres of undeveloped land. The
property generally slopes west to east. An existing access drive bisects the plat, providing
access to the existing Hy-Vee grocery store. There are no wetlands or trees on the property.
EEAASSEEMMEENNTTSS
The parent parcel contains existing public Drainage and Utility Easements dedicated with
Spirit of Brandtjen Farm Commercial 1st Addition, which will be vacated with the final plat. The
Drainage and Utility Easement will be re-dedicated with the final plat over the area containing
existing public utilities located on the parent parcel.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
Spirit Place at Brandtjen Farm is located south of and adjacent to 160th Street, a minor arterial
County roadway as identified in the City’s Transportation Plan. Dakota County controls the right-
of-way requirements and access locations along 160th Street. 160th Street adjacent to the site is
constructed as a four-lane divided urban roadway with dedicated left turn lanes and right turn
lanes at the intersection of Elmhurst Lane. The Elmhurst Lane and 160th Street intersection is
restricted to 3/4 access, consistent with Dakota County access spacing guidelines. A 10-foot wide
trail is located along the north side of 160th Street. The current Dakota County Plat Needs Map
identifies 160th Street as a six-lane roadway with 100-feet of half right-of-way. No additional right-
of-way dedication is required. The preliminary and final plats were reviewed by the Dakota
County Plat Commission at their June 13th meeting and recommended for approval. The
Developer shall coordinate with Dakota County for any additional improvements that will be
required along 160th Street.
Elmhurst Lane
Spirit Place at Brandtjen Farm is located west of and adjacent to Elmhurst Lane, a local
commercial street. The street is designed as a 44-foot wide, two lane urban roadway with 8-foot
wide concrete sidewalks within 80-foot wide right-of-way. No additional right-of-way dedication
is required with the final plat.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 33 OOFF 88
SSIITTEE PPLLAANN RREEVVIIEEWW
Spirit Place at Brandtjen Farm includes the construction of an approximately 18,000 square
foot PetSmart retail building and parking lot located north of the private access drive on Lot
1, Block 1, with concrete sidewalks to allow pedestrian access from adjoining sites.
The parking lot is adequately sized to allow truck circulation into and out of the site, and will
provide capacity to meet the requirements of the City’s Zoning Ordinance. Access to the site
will be from the proposed access located on Outlot A, southeast of Lot 1, Block 1. The private
access will connect to the existing private drive, located on the parent parcel. No accesses to
streets are proposed with the development. A private cross access easement and
maintenance agreement will be required with the final plat for the shared driveway within
Outlot A.
The Developer shall install a stop sign and bar on the proposed driveway access to the private
street on Lot 1, Block 1. A $500.00 security is required with the final plat for the stop sign and
bar.
The landscaping plan provides for several types of trees and shrubs in landscaped areas
around the building and parking lot. Landscaping areas around the main building will be
sodded.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
the private access drive in the location of the proposed driveway within Outlot A.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of Spirit Place at Brandtjen Farm includes the construction of private sidewalks.
Private sidewalks will be installed along the north side of the adjacent private street within
Lot 1, Block 1, and Outlots A and C, Spirit Place at Brandtjen Farm.
The Parks, Trails, and Open Space Plan identifies a 10-foot wide bituminous trail along the
south side of 160th Street adjacent to the development. Per the Spirit of Brandtjen Farm
Commercial 1st Addition Development Contract, the Developer shall construct the trail at the
time Outlots A, B, and F, Spirit of Brandtjen Farm Commercial 1st Addition are final platted into
lots and blocks.
The Park Dedication fee has not been collected on the parent parcel and will be satisfied
through a cash contribution with the final plat. The Park Dedication fee for commercial areas
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 44 OOFF 88
in Spirit of Brandtjen Farm is $5,400.00 per acre, consistent with the Spirit of Brandtjen Farm
Master PUD Agreement.
Total Area of Spirit Place at Brandtjen
Farm
Final Plat 5.62 acres
Less:
Outlot B – Future Development 1.30 acres
Outlot C – Future Development 0.94 acres
Outlot D – Future Development 1.29 acres
Park Dedication Area Required 2.09 acres
Spirit of Brandtjen Farm Commercial
Park Dedication Rate
$5,400.00
per acre
Park Dedication Fee Due with Final
Plat
$11,286.00
The remainder of the Park Dedication requirement will be paid at the time Outlots B, C and D
are final platted into lots and blocks, consistent with the Spirit of Brandtjen Farm Master PUD
Agreement.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Spirit Place at Brandtjen Farm is located within subdistrict NC-20060 of the North Creek
sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will
be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater
Treatment Facility. The downstream facilities have sufficient capacity to serve the proposed
commercial development.
Public sanitary sewer will be extended from the existing service stub within a Drainage and
Utility Easement located within the private access drive east of Lot 1, Block 1, to provide
sanitary sewer service to the Development. Privately owned and maintained sewer will
extend from the public main to provide future service to Outlots B and C.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be paid for Lot 1, Block 1 with the Building Permit Application. The Sanitary Sewer Availability
Charge will be calculated at the rate in effect at the time of approval of the Building Permit
Application, as determined by the City’s Building Official.
WWAATTEERRMMAAIINN
Development of Spirit Place at Brandtjen Farm includes a new connection and extension of
an existing private water service. Private watermain will be extended within the development
to provide water service to the development and future developments in Outlots B and C. The
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 55 OOFF 88
Developer shall extend the private watermain to Outlots B and C with the Development
improvements. At the time Outlots B or C (whichever is first) is final platted into lots and
blocks, the Developer shall extend the private watermain to connect to the existing
watermain within Elmhurst Lane to provide a looped system and sufficient domestic service
and fire protection for Lot 1, Block 1, and Outlots B and C. The Developer shall be responsible
for any repair and/or replacement of sidewalk or street necessary to connect the watermain
within Elmhurst Lane.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans submitted with the building permit application. A cross
access easement and maintenance agreement is required with the final plat for the private
utilities extending across multiple properties.
OOVVEERRHHEEAADD LLIINNEESS
There are no overhead utilities located adjacent to or within the parent parcel.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Spirit Place at Brandtjen Farm is located within subdistrict NC-14B and NC-14A of the North
Creek Stormwater District as identified in the City’s Water Resources Management Plan.
Stormwater runoff generated from the Spirit Place at Brandtjen Farm development will be
conveyed via a proposed private storm sewer system to the existing public storm sewer
system within the private access street along the south side of the property. The stormwater
management requirements for the parent parcel were satisfied through stormwater
management basins constructed with Spirit of Brandtjen Farm Commercial 2nd Addition.
The final grading plan must indicate any proposed borrow areas in which the building
footings will be placed on fill material. The grading specifications must indicate that all
embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be
issued until an as-built certified grading plan has been submitted and approved by the City
Engineer.
Spirit Place at Brandtjen Farm contains more than one acre of site disturbance. A National
Pollution Discharge Elimination System General Stormwater Permit for construction activity is
required from the Minnesota Pollution Control Agency for areas exceeding one acre being
disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City.
SSTTOORRMM SSEEWWEERR
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 66 OOFF 88
The development of Spirit Place at Brandtjen Farm includes the construction of a private
storm sewer system. The privately-owned and maintained storm sewer will be located within
Lot 1, Block 1, and Outlots A and B, and will collect and convey stormwater runoff generated
from within the development to the public storm sewer system located within the private
access street along the south side of the property. A private cross access and maintenance
agreement is required with the final plat for the private utilities extending across multiple
properties. A $2,000.00 security will be collected to ensure proper connection to the existing
storm sewer system.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat. The Trunk Storm Sewer Area Charge for Lot 1, Block 1 and Outlot A is
calculated as follows:
91,071.00 s.f. x $0.250/s.f. = $22,767.75
Area of Lot 1, Block 1, and Outlot A, Spirit Place at Brandtjen Farm Commercial
Area Charge
Total Trunk
Storm Sewer Area Charge
The Trunk Storm Sewer Area Charge for Outlots B, C and D will be collected at the time they
are final platted into lots and blocks, at the rate in effect at the time of final plat approval.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Spirit Place at Brandtjen Farm is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, there are no
areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
There are no existing wetlands on the site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees are located on the property.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 77 OOFF 88
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit Place at Brandtjen Farm. Construction costs are based upon
estimates submitted by the Developer’s engineer on June 15, 2015.
CONSTRUCTION COSTS
Sanitary Sewer
Storm Sewer Connection
24,158.00
2,000.00
Grading, Erosion Control, and Restoration 25,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 51,158.00
OTHER COSTS
Developer’s Design (3.0%) $ 1,534.74
Developer’s Construction Survey (2.5%) 1,278.95
City’s Legal Expense (0.5%) 255.79
City Construction Observation (5.0%) 2,557.90
Developer’s Record Drawing (0.5%) 255.79
Landscaping 33,130.00
Stop Sign and Bar 500.00
Lot Corners/Iron Monuments 500.00
SUBTOTAL - OTHER COSTS $40,013.06
TOTAL PROJECT SECURITY $ 91,171.06
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$500.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
JJUULLYY 1133,, 22001166
PPAAGGEE 88 OOFF 88
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
175.00 f.f. x $.2357/f.f/qtr. x 4 qtrs. = $164.99
Lot 1, Block 1, 160th St.
Front Footage
Streetlight Operating Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
2.09 acres x 4.20 x $7.75/unit/qtr. x 4 qtrs. = $272.12
Lot 1, Block 1, and Outlot A
Spirit Place and Brandtjen Farm Commercial/Industrial
Residential Equivalent Utility Factor
Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
5 units x $75.00/unit = $375.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $1,534.74.
CASH REQUIREMENTS
Sanitary Sewer Availability Charge to be paid with building permit
Park Dedication Fee $ 11,286.00
Trunk Storm Sewer Area Charge 22, 767.75
Streetlight Operating Fee 164.99
Environmental Resources Fee 272.12
City Base Map Updating Fee 375.00
City Engineering Administration (3.00%) 1,534.74
TOTAL - CASH REQUIREMENTS $ 36,400.60
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the Spirit Place at Brandtjen Farm preliminary and final
plat, grading and erosion control plan and utility plan subject to the requirements and
stipulations within this report.